15 m
20 m
Kedalaman kolam = 1.50 m
Tebal Selimut Beton = 3.00 cm
Berat Air = 1000.00 kg/m3
Berat Tanah = 2000.00 kg/m3
Mutu baja tulangan utama = fy 3900.00 Kg/cm2 390.00 Mpa
Mutu baja tulangan Sengkang = fy 2400.00 Kg/cm2 240.00 Mpa
Mutu Beton = f'c 300.00 Kg/cm2 24.90 Mpa
ANALISA DINDING KOLAM RENANG
Kedalaman kolam = 1.50 m
Tebal Selimut Beton = 3.00 cm
Berat Air = 1,000.00 kg/m3
Berat Tanah = 2,000.00 kg/m3
Mutu baja tulangan utama = fy 3,900.00 Kg/cm2 390.00 Mpa
Mutu baja tulangan Sengkang = fy 2,400.00 Kg/cm2 240.00 Mpa
Mutu Beton = f'c 300.00 Kg/cm2 24.90 Mpa
ANALISA PLAT DINDING KOLAM
Rencana Tebal Dinding beton
L 1.50
Ht = + S.2 = 0.06 = 0.154 m
16 16
= 15.375 cm ~ = 20.00 cm AMAN
d = 20.00 3.00 = 17.00 cm
TEKANAN DAN MOMEN YANG TERJADI
Kondisi kolam dalam keadaan terisi
Tekanan Air yang Terjadi
Pa = Wa . h = 1,000.00 1.50 = 1,500.00 kg
Momen Pada Dasar Dinding Kolam
Pa . h2 1,500.00 2.25
Ma = = = 562.50 kgm
6 6
Kondisi kolam dalam keadaan Kosong
Tekanan Tanah Yang Terjadi
1 - sin α 0.293
Pt = Wt . h . = 2,000.00 1.50
1 + sin α 1.707
= 514.719 kg
Momen Pada Dasar Dinding Kolam
Kesimpulan
Tinggi Dinding beton 1.50 m
Tebal Beton 20.00 cm
Tulangan Luar Arah X D 13.00 200.00 mm
Tulangan Luar Arah Y D 13.00 200.00 mm
Tulangan Dalam Arah X D 13.00 200.00 mm
Tulangan Dalam Arah Y D 13.00 200.00 mm
ANALISA PLAT LANTAI KOLAM
Kedalaman kolam = 1.50 m
Tebal Selimut Beton = 3.00 cm
Berat Air = 1,000.00 kg/m3
Berat Tanah = 2,000.00 kg/m3
Mutu baja tulangan utama = fy 3,900.00 Kg/cm2 3.90E+02 Mpa
Mutu baja tulangan Sengkang = fy 2,400.00 Kg/cm2 2.40E+02 Mpa
Mutu Beton = f'c 300.00 Kg/cm2 2.49E+01 Mpa
ANALISA PLAT LANTAI KOLAM
X = 3.75 m
Y = 4.00 m
Ly/Lx 1.07
X1 36
X2 36
Kesimpulan
Jarak Lx 3.75 m
Jarak Ly 4.00 m
Tebal Beton 20.00 cm
Tulangan Arah X
Tulangan Atas D 13 mm - 20 cm
Tulangan Bawah D 13 mm - 20 cm
Tulangan Arah Y
Tulangan Atas D 13 mm - 20 cm
Tulangan Bawah D 13 mm - 20 cm
ANALISA SLOOF
Kedalaman kolam = 1.50 m
Tebal Selimut Beton = 3.00 cm
Tebal Plat Lantai = 20.00 cm
Berat Air = 1,000.00 kg/m3
Berat Tanah = 2,000.00 kg/m3
Mutu baja tulangan utama = fy 3,900.00 Kg/cm2 3.90E+02 Mpa
Mutu baja tulangan Sengkang = fy 2,400.00 Kg/cm2 2.40E+02 Mpa
Mutu Beton = f'c 300.00 Kg/cm2 2.49E+01 Mpa
ANALISA SLOOF BETON
Panjang Sloof (Lx) = 3.75 m = 375.00 cm
Panjang Sloof (Ly) = 4.00 m = 400.00 cm
Rencana Dimensi Sloof
Selimut Beton (s) = 3.00 cm
UKURAN SLOOF
Arah X Ht = 0.30 m = 30.00 cm
b = 0.25 m = 25.00 cm
d = 27.00 cm
Arah y Ht = 0.30 m = 30.00 cm
b = 0.25 m = 25.00 cm
d = 27.00 cm
Beban Mati
Plat beton = 480.00 Kg/m2
Finishing = 100.00 Kg/m2
MEP = 50.00 Kg/m2
Lain Lain = 100.00 Kg/m2
QDL = 730.00 Kg/m2
Total QDL = QDL . Lx . Ly = 730.00 3.75 4.00
= 10,950.00 Kg
Beban Hidup
Air kolam = 1,500.00 Kg/m2
QLL = 1,500.00 Kg/m2
TOTAL QLL = QLL . Lx . Ly = 1,500.00 3.75 4.00
= 22,500.00 Kg
1.5 x P
bxh =
0.33 x fc'
52,267.50
750.00 =
99.00
750.00 = 527.95
CEK AMAN
CEK TULANGAN
10% x 1.5 x P
As =
fy
5,226.75
6.15 =
3,900.00
6.15 = 1.34
Check AMAN
L = 2 M
L
= 2 316,575.00
400.00
= 1,582.88 kg
Vc = 1.00 17.32 25.00 27.00
6
= 1,948.56 kg
1.50 400.00
Vs = - 1.95E+03
0.6
= 1,000.00 - 1,948.56
= (948.56) kg
PERLU TULANGAN MINIMUM
TULANGAN SENGKANG
Digunakan SK = 8.00 mm Atul = 100.00 mm
S1 = 1/2 x h = 15.00 cm
3 x Asmm2 x fy sengkang
S2 =
b
7.20E+04 = 288.00 mm
S2 =
2.50E+02 28.80 cm
S perlu = 15.00 cm
Di gunakan tulangan
SK O 8 mm - 15.00 cm
Kesimpulan
Panjang Sloof = 4.00 m
Ukuran Sloof = 25.00 x 30.00 cm
Cek Terhadap Penampang = AMAN
Cek Terhadap Tulangan = AMAN
Tulangan Atas = 4 D 16 mm
Tulangan Bawah = 2 D 16 mm
Sengkang = O 8.00 mm - 15.00 cm
ANALISA PONDASI KOLAM RENANG
Kedalaman kolam = 1.50 m
Tebal Selimut Beton = 3.00 cm
Berat Air = 1,000.00 kg/m3
Berat Tanah = 2,000.00 kg/m3
Mutu baja tulangan utama = fy 3,900.00 Kg/cm2 3.90E+02 Mpa
Mutu baja tulangan Sengkang = fy 2,400.00 Kg/cm2 2.40E+02 Mpa
Mutu Beton = f'c 300.00 Kg/cm2 2.49E+01 Mpa
ANALISA PONDASI
Daya dukung tanah qu = 3.00 Kg/cm2 300.00 KN/m2
Kedalaman = 1.70 m
Sf = 3.00
Selimut Beton = 3.00 cm
Mutu Beton f'c = K 300.00 Kg/cm2 24.90 Mpa 3.00E+06 KN
Mutu baja ( fy) = 3,900.00 Kg/cm2 390.00 Mpa 3.90E+07 KN
Tebal = 20.00 cm
Beban Mati
Plat beton = 480.00 Kg/m2 = 7,200.00 Kg
Finishing = 100.00 Kg/m2 = 1,500.00 Kg
MEP = 50.00 Kg/m 2
= 750.00 Kg
Lain Lain = 100.00 Kg/m 2
= 1,500.00 Kg
Beban Hidup
Air kolam = 3,000.00 Kg/m2 = 45,000.00 Kg
TOTAL QLL = = 45,000.00 Kg
P 85,140.00
A perlu = = = 85,140.00 cm2
qn 1.00
KESIMPULAN
Check kegunaan plat lantai untuk pondasi
Check luas tapak akibat beban = OK 1
Check ketebalan plat beton = OK 1
Keterangan = PLAT LANTAI KOLAM BISA DI JADIKAN PONDASI
TABEL PLAT LANTAI PLAT 4 SISI TERJEPIT Catatan : Pondasi Di tempatkan di setiap titik pertemuan sloo
Koef Mlx Mly Mty Klasifikasi daya dukung tanah = qu
1.00 36 36 36 Tanah Keras = 5 kg/cm2
1.10 42 37 37 Tanah sedang = 2.5 - 5 kg/cm2
1.20 46 38 38 Tanah lunak = 0.5 - 2,5 kg/cm2
1.30 50 38 38 Tanah sangat lunak = 0 - 0.5 kg/cm2
1.40 53 38 38
1.50 56 37 37 qn >= P/A
1.60 58 36 36 qn = daya dukung tanah di bagi safty factor
1.70 59 36 36 P = Beban Aksial dari Pondasi
1.80 60 35 35 A = luas pondasi
1.90 61 35 35 Safty factor = 3
2.00 62 35 35
2.10 62 34 34
2.20 62 34 34
2.30 63 34 34
2.40 63 34 34
2.50 63 34 34
di setiap titik pertemuan sloof
safty factor