PIRAMAL SCHOOL OF EDUCATION LEADERSHIP PROJECT

ACTIVITY CHECKLIST : BRICK WORK

Project Format No PSL/Cheklist/000

Client Piramal School of Education Leadership Date:


Report/WIR
PMC ---
No.
Contractor Drawing No.

Location

S/N DESCRIPTION Yes No. Remarks

PRECHECK:

1 Check Shelf life & Condition of materials

2 Surface under masonry work is cleaned

3 RCC Masonry interface hacked/ applied bonding agent

DURING CHECK:

1 Bricks are moistened before placing

2 Volumetric batching for conventional mortar

3 Check mixing of mortar

4 Check Proportion of conventional mortar

5 Layout is as per approved architectural drawing

Concrete runners provided as per approved architectural drawing or @


6
every 1200 mm height.

POST CHECK:

1 Joint thickness of brick work

2 Is line and level checked?

3 All door frames fixed as per approved architectural drawing

4 Staggering of vertical joints

5 Racking of joint

6 Beam/ slab bottom – Masonry joint packed with Brick packings

7 Date is imprinted after completion of masonry

8 Ensure Curing period

Comments,If any :

Client Representative Contractor Representative


Name : Name :
Sign : Sign :
Date : Date :