Project Format No
Report No/WIR
PMC ---
No
Location
PRE CHECK
Check for availability of Lab. Max. Dry density & Optimum moisture
2
content test results
Check for back filling around the liquid retaining structures, Ensure
5
backfilling is done after testing for leakage.
POST CHECK
2 Field Density Test is done as per ITP and reports are satisfactory
Comments If any :