PIRAMAL SCHOOL OF EDUCATION LEADERSHIP PROJECT

ACTIVITY CHECKLIST : EXCAVATION


Project Format No PSL/Cheklist/000

Client Piramal School of Education Leadership Date

Report No/WIR
PMC ---
No

Contractor Drawing No.

Location

Sr. No. Description Yes No. Remarks

PRE CHECK

1 Are the latest "Good for Construction" drawings available?

2 Is the soil investigation report kept on-site?

3 Have TBMs been established?

4 Has a grid line marking been done at appropriate spacing?

Are safety measures required for the neighboring construction


5
activities?

6 Are the required tools available?

If blasting is necessary, is it being carried out by a certified, licensed


7
contractor?

POST CHECK

Does the depth to be excavated include the depth of the


1
construction soling?

2 Are the layout & alignment as per drawings?

3 Has the required depth of cut been achieved?

4 If excavation is beyond 1.25m are there steps provided?

5 Has proper shoring and strutting been done in loose soils?

6 Is the excavation barricaded at a distance of 1 meter?

7 Has the point of height indicator been installed?

Are the marking pillars safely barricaded or protected to avoid any


8
disturbance of marking points?

Comments If any :

PSL Representative Contractor Representative


Name : Name :
Sign : Sign :
Date : Date :