Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

(Al Hamra Marina Residences - Phase 3 -

Proposed Residential Building (G+6))

SUBMITTAL & REVIEW FORM


AL HAMRA REAL ESTATE DEVELOPMENT
Submission of Documents, Drawings, Samples. Etc.
Project Name-Al Hamra Marina Residences - Phase 3 - Proposed Residential
Ref: GBH-G+6-CIVIL-SD-0136
Building (G+6)
Project No. 22029 Rev. 1
Client: Al Hamra Marina Residences Properties LLC Date 08/12/2023
:
To Project Central - Project Development Consultants Submitted for: Approval
Sub-Contractor: M/s Premier
From: Main Contractor: GBH International Contracting LLC
Irrigation & Landscaping LLC
Approval
Information
Action:
We are submitting herewith / under separate cover, the Civil Shop Approved
drawings listed below for approval Approved as Noted
Revise and resubmit
Rejected
Code
Item DrawingReference No. Rev Description Type Copies
Submitt Action
al
1 GBH-PR-001 1 Swimming Pool Layout SD 1 ✓
GBH-PR-002 1
2 First Floor Pipe Layout SD 1 ✓
GBH-PR-003 1
3 Second Floor Pipe Layout SD 1 ✓
GBH-PR-004 1
4 Pump Room Mechanical Layout SD 1 ✓
GBH-PR-005 1
5 Pump Room Mechanical Section Details SD 1 ✓
GBH-PR-006 1
6 Adult and Kids Pool Details Drawing -01 SD 1 ✓
GBH-PR-007 1
7 Adult and Kids Pool Details Drawing -02 SD 1 ✓
GBH-PR-008 1
8 Pool Civil Detail Drawing SD 1 ✓
GBH-PR-009 1
9 Pump Room Schematic Layout SD 1 ✓
GBH-PR-010 0 Swimming Pool Fittings Installation
10
Details
SD 1 ✓
GBH-PR-011 0
10 Swimming Pool Section Details SD 1 ✓
Type:
□ MT : Material Submittal □ MOS : Method Statement □ SD : Shop Drawing □ AB : As – built Drawing
□ CA : Calculation □ GT : Guarantees □ CT : Certificate □ MK : Mockups
□ SM : Sample □ TF : Temp. Facilities □ TT : Test Report □ OT : Others

Contractor’s Authorized Signature &


Raised By GBH International Contracting LLC
Stamp

Send To Client: Yes No


Consultant Comments AHRED Comments

DC-F-001-00 March 2018


Comments By : Date: For AHRED: Date:
Corrections or comments made relative to submittals during this review do not relieve the vendor from compliance with the requirements of
the drawing and specifications. This check is only for review of general conformance with the design concept of the project and general
compliance with the information given in the contract documents. The venodor is responsible for confirming and correlating all quantities
and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and
performing his work in a safe and satisfactory manner.

DC-F-001-00 March 2018