Dept Existing
One set of SL & RL with 70% effy plus 6 Combers with 95%
Lap Former &
effy. 8 hours shift. Auto doffing & Auto Waste evacuation
Comber
provided
Drawing One man 7 deliveries with 85% effy per shift 8 hours.
Breaker & LD2 2 DO6+One speed frame Or 2 DO6+One Super Lap Or 2 DO6
+ One LD2 per shift 8 hours
Simplex machine of 144 spls including can changes
0.85 Hank to 1.29 hank - 3 M/Cs with 80% effy
Simplex
1.30 Hank to 1.6 Hank - 4 M/Cs with 80% effy
Above 1.6 Hank - 4 M/Cs with 83% effy
For Siders per 8 Hours shift,
Count Karded Combed
10s to 16s - -
17s to 23s 3 Sides 4 Sides
24s to 41s 3.5 Sides 4.5 Sides
42s to 49s 5 Sides 6 Sides
50s to 60s 5.5 Sides 6.5 Sides
Spinning 60s and above 7 Sides 8 Sides
Spinning
General Points
1. All Permanent maistry category in all dept & Permanent Electrician will be removed
2. less than 240 days will be de promoted
3. 10 mins before should be in the dept and not to allow after 10, 15, 30 mins late except other issues like bus / auto repairs & out side traffiics
4. Leave & absenteeism should control
5. Night shift & travelling expenses will be cut off those who are working less than 240 days
6. Increment, Special allownces also cut off like bonus, tours those who are working less than 240 days
7. Management provided uniforms & shoes should wear regularly in all three shifts
8. Daily in all three shifts In & Out time face / finger punching to be done…. 4 time punch per shift including interval times
9. If any one coming duty after long leave days, proper fitness certificate from ESI should submit to the management before attending duty
10. Those who are crossing 45 years, full health check report should be submitted once in 6 months and after verified the management then o
will allow for duty
Proposal Duties & Responsibilities
Chute feeding : One Man / 26 Cards with 95% Effy / 8 Hours Shift ,
Existing same to be followed
Automatic Waste Evacuation System with Auto doffing
One Super Lap former with 70% effy plus 8 Combers with 95%
Existing same to be followed
effy. 8 hours shift. Auto doffing & Auto Waste evacuation provided
Upto 16s - 20 drums - 72% Effy - 408 kgs Existing same to be followed.. Red
20s - 29s - 40 drums - 75-78% Effy - 680-390 kgs light should be below 1.5-2.0%
30s - 49s - 50 drums - 78%-80% Effy - 590-370 kgs
50s & Above - 60 drums - 88% Effy - 478 kgs
ill be removed
0 mins late except other issues like bus / auto repairs & out side traffiics