POWER TRASNSFORMERS

SMP-E-010
ELECTRICAL STANDARD MAINTENANCE PROCEDURE

AL-KHOBAR SEAWATER RO 2 DESALINATION PLANT

I- Tools required: II- Consumables:


1. Air Blower 1. Rags (lint free)
2. Vacuum Cleaner 2. Antistatic brush
3. Multi-meter 3. Dust Mask
4. Complete toolbox (wrenches, Allen, spanners, …) 4. Electrical Grease
5. Torque Wrench 5. Warning Tape
6. Extension cable 6. Elec. Tape
7. Portable Ladder

III- Safety (To be applied as per the type of maintenance):


1. Be sure that the lighting in the working area is enough if not provide extra one.
2. Be sure that the permission to work has been provided and coordinated with process department.
3. Switch off and lock out all power supplying the concerned DC panel before starting the maintenance.
4. Provide Tag-out and Lock-out for the controlling power of the equipment or unit.
5. All associated equipment must be turned "OFF" if necessary.
6. Wear eye goggles if using portable air blower for cleaning.
7. If working on a higher level, provide a safety belt and protect your-self from accidental fall.

IV- Supplier Requirements:

 DAILY

S/N ACTIVITY DESCRIPTION RESP.

1 Check and record the oil and winding temperature Electrical


2 Record ambient temperature, load and voltage. Electrical
3 Check and record the level of oil shown by the oil level indicator Electrical
4 Check for any abnormal sound and vibration etc. Electrical
5 Check for oil leaks at any connections such as valves, meters and Electrical
particularly welding points
6 Check the level of the sealing oil in oil cup. Electrical
7 Check for cracks, damages and traces of oil spouting in the Electrical
pressure relief device.
8 Check indictors and relays. Electrical
9 Check for any loose connections such as connectors main circuits, Electrical
grounding circuits, auxiliary circuits, foundation bolts and the like.
10 Check for dust on radiator surface Electrical

 Yearly

Rev. a Page 1 of 2
POWER TRASNSFORMERS
SMP-E-010
ELECTRICAL STANDARD MAINTENANCE PROCEDURE

AL-KHOBAR SEAWATER RO 2 DESALINATION PLANT

S/N ACTIVITY DESCRIPTION RESP.

1 Check to see whether all connections are in good conditions or Electrical


not.
2 Check transformer tank and its accessories for any oil leak, rust, Electrical
coating damage
3 Operation of all switches annunciates and lamps to observe Electrical
proper functions according to schematic diagrams.
4 Measurement of dielectric Strength of Insulation Oil Electrical

 EVERY 2 YEARS

S/N ACTIVITY DESCRIPTION RESP.

1 Measurement of the Insulation resistance between windings and Electrical


between winding and ground
2 Check for operating and insulation resistance for thermometer, Electrical
level gauge, flow indicator, gas detector, pressure relay, vacuum
gauge etc.
3 Check the water-tightness Electrical
4 Check the tightness of all connections. Electrical

V- Equipment Tag Concerned

Tag Equipment
KRO2-BAT-01 Power Transformer 34.5/13.8/13.8 kV, 186/93/93 MVA
KRO2-BAT-02 Power Transformer 34.5/13.8/13.8 kV, 186/93/93 MVA
KRO2-BAT-03 Power Transformer 230/34.5/34.5 kV, 236/186/50 MVA
KRO2-BAT-04 Power Transformer 230/34.5/34.5 kV, 236/186/50 MVA
KRO2-BAT-05 Power Transformer 34.5/13.8kV 50 MVA
KRO2-BAT-06 Power Transformer 34.5/13.8kV 50 MVA