SC5 SUPER CORRIDOR 5 STATION DRAWING NUMBERS ARE APPLICABLE TO SC1,SC2,SC3,SC4,BHS & MR10 ROAD

Drawing Number
Project Originator Zone Level Description / Title SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC
Sr.No. Line Code Discipline Type Number
Code Code Code Code
1 2 3 4 5 6 7 8 9 14 15 16 17 18 19 20
SET-1 REV R0 REV R1 REV R2 REV R3 REV R4 REV R5
4-4-2022/ 22-04-2022/
02-05-2022 (DVE) / 09-05-
1 IND L003 RAS STR DRG SC5 F1 2000 LAYOUT OF PILE, PILE CAP AND PIER ALONG WITH COORDINATES FOR SUPER CORRIDOR 5 STATION 22/03/22 2022 (DVE)/ 23-05-2022 03/06/22 / 06/06/2022 30/09/22
(DVE)

2 IND L003 RAS STR DRG SC5 F1 2001 R.C DETAILS OF INITIAL VERTICAL PILE LOAD TEST FOR SUPER CORRIDOR 5 STATION 19/02/22 28/02/22
3 IND L003 RAS STR DRG SC5 F1 2002 REINFORCEMENT DETAIL OF HORIZONTAL TEST PILE FOR SUPER CORRIDOR 5 STATION 19/02/22 28/02/22
22-04-2022 / 02-05-22 /
4 IND L003 RAS STR DRG SC5 F1 2004 22/03/22 1/4/22 12/4/2022 (DVE) 9/5/2022 (DVE) 20/05/2022 (DVE) 23/05/2022 (DVE)
RC DETAILS OF WORKING PILE FOR SUPER CORRIDOR 5
05/05/2022 / 09/05/2022 16-05-22 / 17-05-2022
5 IND L003 RAS STR DRG SC5 F1 2005 - 22/04/2022 (DVE) (DVE) (DVE) / 23-05-2022 7/Jun/22 10/Jun/22
REINFORCEMENT DETAILS OF PILE CAP FOR SUPER CORRIDOR 5 STATION
6 IND L003 RAS STR DRG SC5 F1 2006 TYPICAL DETAILS OF CRASH BARRIER FOR SUPER CORRIDOR 5 STATION 22-04-22 / 24-05-2022 03-06-22 / 07-06-2022

23 -05-22 / 27-05-2022 /
7 IND L003 RAS STR DRG SC5 F1 2008 REINFORCEMENT DETAILS OF PIER FOR SUPER CORRIDOR 5 STATION - 22/04/2022 (DVE) 01-06-2022 29/09/22 4/10/22

8 IND L003 RAS STR DRG SC5 F1 2010 GENERAL ARRANGEMENT SHOWING CONSTRUCTION SEQUENCE FOR SUPER CORRIDOR 5 STATION 4/7/22
9 IND L003 RAS STR DRG SC5 F1 2011 PIER ELEVATION DETAILS FOR SUPER CORRIDOR 5 STATION 4/7/22
09-05-2022/24-06-22
10 IND L003 RAS STR DRG SC5 01 2100 5/7/22 30/08/22
STRUCTURAL ARRANGEMENT PLAN AT CONCOURSE LEVEL FOR SUPER CORRIDOR 5 STATION
09-05-2022/24-06-22/05-
11 IND L003 RAS STR DRG SC5 01 2100-LOD 07-22
LOADING DIAGRAM AT CONCOURSE AND PLATFORM LVL FOR SUPER CORRIDOR 5 STATION
02/11/22 4/Nov/22
12 IND L003 RAS STR DRG SC5 01 2100A COORDINATED LAYOUT AT CONCOURSE LEVEL SHOWING INSERT PLATE, OPENINGS/CUTOUTS & RC 22/12/22 27/12/22 10/02/23 04/04/23
MULLIONS FOR SUPER CORRIDOR 5 STATION (SHEET 1 OF 2)
02/11/22 4/Nov/22
13 IND L003 RAS STR DRG SC5 01 2100B COORDINATED LAYOUT AT CONCOURSE LEVEL SHOWING INSERT PLATE, OPENINGS/CUTOUTS & RC 22/12/22 27/12/22 10/02/23 04/04/23
MULLIONS FOR SUPER CORRIDOR 5 STATION (SHEET 2 OF 2)
5/Jul/22 27/09/22 14/10/22
14 IND L003 RAS STR DRG SC5 01 2101A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-6 AT CONCOURSE LVL FOR SUPER CORRIDOR 5 2/Jun/22
STATION
5/Jul/22 27/09/22 14/10/22 07/11/22
15 IND L003 RAS STR DRG SC5 01 2101B PRESTRESSING STRANDS DEAILS OF PRE TENSIONED PRECAST GIRDER TYPE-6 AT CONCOURSE LVL FOR 2/Jun/22
SUPER CORRIDOR 5 STATION
5/Jul/22 12/Sep/22 27/09/22 14/10/22 5/12/22
16 IND L003 RAS STR DRG SC5 01 2101C REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-6 AT CONCOURSE LVL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
17 IND L003 RAS STR DRG SC5 01 2101D DETAILS OF LOAD TEST FOR GIRDER TYPE-6 AT CONCOURSE LVL FOR SUPER CORRIDOR 5 STATION 8/May/23 17/May/23 16/Jun/23
18 IND L003 RAS STR DRG SC5 01 2101E DETAILS OF LOAD TEST FOR GIRDER TYPE-6 AT CONCOURSE LVL FOR SUPER CORRIDOR 5 STATION 12/Jul/23
5/Jul/22 20/10/22
19 IND L003 RAS STR DRG SC5 01 2102A 2/Jun/22 29/09/22 18/10/22
TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-5 AT CONCOURSE LVL FOR SUPER CORRIDOR 5
5/Jul/22 20/10/22 4/11/22
20 IND L003 RAS STR DRG SC5 01 2102B PRESTRESSING STRANDS DEAILS OF PRE TENSIONED PRECAST GIRDER TYPE-5 AT CONCOURSE LVL FOR 2/Jun/22 29/09/22 18/10/22
SUPER CORRIDOR 5 STATION
5/Jul/22 12/Sep/22 29/09/22 20/10/22
21 IND L003 RAS STR DRG SC5 01 2102C REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-5 AT CONCOURSE LVL FOR SUPER 2/Jun/22 18/10/22
CORRIDOR 5 STATION
5/Jul/22 29/09/22 20/10/22
22 IND L003 RAS STR DRG SC5 01 2103A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-1 AT CONCOURSE LVL FOR SUPER CORRIDOR 5 2/Jun/22 18/10/22
STATION
5/Jul/22 20/10/22
23 IND L003 RAS STR DRG SC5 01 2103B PRESTRESSING STRANDS DEAILS OF PRE TENSIONED PRECAST GIRDER TYPE-1 AT CONCOURSE LVL FOR 2/Jun/22 29/09/22 18/10/22 31-10-22
SUPER CORRIDOR 5 STATION
5/Jul/22 12/Sep/22 29/09/22 20/10/22
24 IND L003 RAS STR DRG SC5 01 2103C REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-1 AT CONCOURSE LVL FOR SUPER 2/Jun/22 18/10/22
CORRIDOR 5 STATION
5/Jul/22 26-08-22/13-09-22 20/10/22 07/11/22
25 IND L003 RAS STR DRG SC5 01 2104A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-2 &2A AT CONCOURSE LEVEL FOR SUPER 2/Jun/22 19/10/22
CORRIDOR 5 STATION
5/Jul/22 26/08/22 20/10/22
26 IND L003 RAS STR DRG SC5 01 2104B PRESTRESSING STRANDS DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-2 AT CONCOURSE LEVEL FOR 2/Jun/22 19/10/22
SUPER CORRIDOR 5 STATION
5/Jul/22 26/08/22 2/11/22 7/11/22
27 IND L003 RAS STR DRG SC5 01 2104C REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-2 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22 19/10/22
CORRIDOR 5 STATION
5/Jul/22 13/Sep/22 2/11/22 7/11/22
28 IND L003 RAS STR DRG SC5 01 2104D REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-2 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22 19/10/22
CORRIDOR 5 STATION
5/Jul/22 26/08/22 2/11/22
29 IND L003 RAS STR DRG SC5 01 2104E TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-2B & 2 C AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
5/Jul/22 26/08/22 21/10/22 7/11/22
30 IND L003 RAS STR DRG SC5 01 2105A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-3 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
5/Jul/22 26/08/22 21/10/22 30/12/22 25/01/23
31 IND L003 RAS STR DRG SC5 01 2105B PRESTRESSING STRANDS DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-3 AT CONCOURSE LEVEL FOR 2/Jun/22
SUPER CORRIDOR 5 STATION
5/Jul/22 26/08/22 21/10/22 7/11/22 12/12/22
32 IND L003 RAS STR DRG SC5 01 2105C REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-3 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
7/5/2022 / 13/09/22 21/10/22 12/12/22 02/01/23 25/01/23
33 IND L003 RAS STR DRG SC5 01 2105D REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-3 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
5/Jul/22 26/08/22 21/10/22
34 IND L003 RAS STR DRG SC5 01 2105E TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-3B & 3C AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
5/Jul/22 21/10/22 7/11/22 25/01/23
35 IND L003 RAS STR DRG SC5 01 2106A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-4 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
5/Jul/22 21/10/22 7/11/22 30/12/22 25/01/23
36 IND L003 RAS STR DRG SC5 01 2106B PRESTRESSING STRANDS DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-4 AT CONCOURSE LEVEL FOR 2/Jun/22
SUPER CORRIDOR 5 STATION
5/Jul/22 7/11/22 09/12/22 10/01/23 25/01/23
37 IND L003 RAS STR DRG SC5 01 2106C REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-4 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
5/Jul/22 7/11/22 09/12/22 02/01/23 03/01/23
38 IND L003 RAS STR DRG SC5 01 2106D REINFORCEMENT DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE-4 AT CONCOURSE LEVEL FOR SUPER 2/Jun/22
CORRIDOR 5 STATION
SC5 SUPER CORRIDOR 5 STATION DRAWING NUMBERS ARE APPLICABLE TO SC1,SC2,SC3,SC4,BHS & MR10 ROAD
Drawing Number
Project Originator Zone Level Description / Title SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC
Sr.No. Line Code Discipline Type Number
Code Code Code Code
1 2 3 4 5 6 7 8 9 14 15 16 17 18 19 20
24/Jun/22 13-07-22 29/Jul/22 9/9/2022 9/11/22 14/11/22
39 IND L003 RAS STR DRG SC5 01 2107 CONCRETE DIMENSION OF CANTILEVER PIER ARM AT CONCOURSE LEVEL APPLICABLE FOR GRID 2 TO 9
FOR SUPER CORRIDOR 5 STATION
SC5 SUPER CORRIDOR 5 STATION DRAWING NUMBERS ARE APPLICABLE TO SC1,SC2,SC3,SC4,BHS & MR10 ROAD
Drawing Number
Project Originator Zone Level Description / Title SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC
Sr.No. Line Code Discipline Type Number
Code Code Code Code
1 2 3 4 5 6 7 8 9 14 15 16 17 18 19 20
6/24/2022 / 13/07/22 8/Sep/22 24/Sep/22 17/10/22 9/11/22 14/11/22
40 IND L003 RAS STR DRG SC5 01 2108 CONCRETE DIMENSION OF CANTILEVER PIER ARM AT CONCOURSE LEVEL APPLICABLE FOR GRID 1 & 10
FOR SUPER CORRIDOR 5 STATION
6/24/2022 / 13/07/22
41 IND L003 RAS STR DRG SC5 01 2109 CABLE PROFILE PRESTRESSED CANTILEVER PIER ARM AT CONCOURSE LEVEL FOR SUPER CORRIDOR 5
STATION Sheet-1
42 IND L003 RAS STR DRG SC5 01 2110 9/Sep/22 12/10/2022 12/10/2022 18/10/22 10/02/23
SS BEARING DETAIL AT CONCOURSE LEVEL FOR SUPER CORRIDOR 5 STATION
24/Jun/22 13-07-22 29/Jul/22 22/09/2022
43 IND L003 RAS STR DRG SC5 01 2111 REINFORCEMENT DETAILS FOR PRESTRESSED CANTILEVER PIER ARM AT CONCOURSE LEVEL FOR SUPER
CORRIDOR 5 STATION (SHEET 1 OF 2)
24/Jun/22 13-07-22 22/Sep/22 18/10/22 21/10/22
44 IND L003 RAS STR DRG SC5 01 2112 REINFORCEMENT DETAILS FOR PRESTRESSED CANTILEVER PIER ARM AT CONCOURSE LEVEL FOR SUPER
CORRIDOR 5 STATION (SHEET 2 OF 2)
45 IND L003 RAS STR DRG SC5 01 2130 MICELLANEOUS DETAILS FOR SUPER CORRIDOR 5 STATION (SHEET 2 OF 2) 31/03/23 25/04/23
46 IND L003 RAS STR DRG SC5 01 2151 16-12-22
STACKING FOR TWO FLOOR PHI GIRDER
24/Mar/23 29/3/2023 & 11/4/2023 12/Apr/23 18/Apr/23
47 IND L003 RAS STR DRG SC5 ZZ 2121 TYPICAL DETAILS OF RCC MULLIONS AND TRANSOMS FOR MASONRY WALL STIFFENING FOR SUPER
CORRIDOR 5 STATION
48 IND L003 RAS STR DRG SC5 ZZ 2122 24/Mar/23 29/Mar/23
TYPICAL DETAILS OF LINTEL BEAMS FOR SUPER CORRIDOR 5 STATION
04-08-2023 & 11-8-2023 & 18/Aug/23
14-08-2023 & 16-08-2023
49 IND L003 RAS STR DRG SC5 ZZ 2123
TYPICAL FRAMING ARRANGEMENT FOR FACADE WITH LARGE OPENING FOR SUPER CORRIDOR 5 STATION
09-05-2022/24-06-22/05-
49 IND L003 RAS STR DRG SC5 02 2200 07-22 11/10/22 16/11/22 18/11/22 01/02/23 03/02/2023
STRCTURAL ARRANGEMENT AT PLATFORM LEVEL FOR SUPER CORRIDOR 5 STATION

50 IND L003 RAS STR DRG SC5 02 2200A COORDINATED LAYOUT AT PLATFORM LEVEL SHOWING INSERT PLATE, OPENINGS/CUTOUTS & RC 21-12-22 & 30-01-2023 10/02/23 04/04/23
MULLIONS FOR SUPER CORRIDOR 5 STATION (SHEET 1 OF 2)

51 IND L003 RAS STR DRG SC5 02 2200B COORDINATED LAYOUT AT PLATFORM LEVEL SHOWING INSERT PLATE, OPENINGS/CUTOUTS & RC 21-12-22 10/02/23 04/04/23
MULLIONS FOR SUPER CORRIDOR 5 (SHEET 2 OF 2)

52 IND L003 RAS STR DRG SC5 02 2201A TYPICAL DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 11 AT PLATFORM LEVEL FOR SUPER 15/Jun/22 29/08/22 11/10/22 10/11/22 06/12/22 27/12/22
CORRIDOR 5 STATION

53 IND L003 RAS STR DRG SC5 02 2201B PRESTRESSING STRANDS DETAILS OF PRETENSIONED PRECAT GIRDERS TYPE 11 AT PLATFORM LEVEL FOR 15/Jun/22 29/08/22 9/11/22 18/11/22 06/12/22 27/12/22
SUPER CORRIDOR 5 STATION

54 IND L003 RAS STR DRG SC5 02 2201C REINFORCEMENT DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 11 AT PLATFORM LEVEL FOR SUPER 15/Jun/22 29/08/22 9/11/22 06/12/22 27/12/22 15/05/23
CORRIDOR 5 STATION

55 IND L003 RAS STR DRG SC5 02 2202A TYPICAL DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 11 A AT PLATFORM LEVEL FOR SUPER 15/Jun/22 29/08/22 11/10/22 06/12/22 30/12/22 07/02/23
CORRIDOR 5 STATION

56 IND L003 RAS STR DRG SC5 02 2202B PRESTRESSING STRANDS DETAILS OF PRETENSIONED PRECAT GIRDERS TYPE 11A AT PLATFORM LEVEL FOR 15/Jun/22 29/08/22 10/11/22 06/12/22 26/12/22 07/02/23
SUPER CORRIDOR 5 STATION

57 IND L003 RAS STR DRG SC5 02 2202C REINFORCEMENT DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 11 A AT PLATFORM LEVEL FOR 15/Jun/22 29/08/22 10/11/22 06/12/22 26/12/22
SUPER CORRIDOR 5 STATION

58 IND L003 RAS STR DRG SC5 02 2202D REINFORCEMENT DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 11 A AT PLATFORM LEVEL FOR 15/Jun/22 29/08/22 10/11/22 06/12/22 28/12/22 15/05/23
SUPER CORRIDOR 5 STATION

59 IND L003 RAS STR DRG SC5 02 2202E 12/01/23


TEMPORARY BRACING FRAMING FOR PROVIDING LATERAL STABILITY FOR PI GIRDER HAVING CUTOUT

60 IND L003 RAS STR DRG SC5 02 2203A TYPICAL DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 12 AT PLATFORM LEVEL FOR SUPER CORRIDOR 15/Jun/22 29/08/22 11/10/22 21/10/2022 8/11/2022 14/11/22
5 STATION

61 IND L003 RAS STR DRG SC5 02 2203B PRESTRESSING STRANDS DETAILS OF PRETENSIONED PRECAST GIRDERS TYPE 12 AT PLATFORM LEVEL FOR 15/Jun/22 29/08/22 15/11/22 29/11/22 11/1/23 07/02/23
SUPER CORRIDOR 5 STATION

62 IND L003 RAS STR DRG SC5 02 2203C REINFORCEMENT DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 12 AT PLATFORM LEVEL FOR SUPER 15/Jun/22 29/08/22 15/11/22 22/11/22 11/1/23
CORRIDOR 5 STATION

63 IND L003 RAS STR DRG SC5 02 2203D REINFORCEMENT DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 12 AT PLATFORM LEVEL FOR SUPER 15/Jun/22 29/08/22 15/11/22 06/12/22 11/1/23 01/03/23
CORRIDOR 5 STATION

64 IND L003 RAS STR DRG SC5 02 2204A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE 13 AT PLATFORM LEVEL FOR SUPER 16/06/22 29/08/22 19/10/2022 21/10/2022 14/11/22 17/11/2022
CORRIDOR 5 STATION

65 IND L003 RAS STR DRG SC5 02 2204B PRESTRESSING STRAND DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 13 AT PLATFORM LEVEL FOR 16/06/22 29/08/22 16/11/22 06/12/22 07/12/22 30/12/22
SUPER CORRIDOR 5 STATION

66 IND L003 RAS STR DRG SC5 02 2204C REINFORCEMENT DETAIL OF PRETENSIONED PRECAST GIRDER TYPE 13 AT PLATFORM LEVEL FOR SUPER 16/06/22 29/08/22 16/11/22 06/12/22 07/12/22 29/12/22
CORRIDOR 5 STATION

67 IND L003 RAS STR DRG SC5 02 2204D REINFORCEMENT DETAIL OF PRETENSIONED PRECAST GIRDER TYPE 13 AT PLATFORM LEVEL FOR SUPER 16/06/22 29/08/22 16/11/22 06/12/22 07/12/22 29/12/22
CORRIDOR 5 STATION

68 IND L003 RAS STR DRG SC5 02 2205A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE 14 & 14 A AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 20/10/2022 15/11/2022 06/12/22 24/01/23
CORRIDOR 5 STATION

69 IND L003 RAS STR DRG SC5 02 2205B PRESTRESSING STRAND DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 14 AT PLATFORM LEVEL FOR 20/06/22 29/08/22 18/11/22 29/11/22 06/12/22 12/01/23
SUPER CORRIDOR 5 STATION

70 IND L003 RAS STR DRG SC5 02 2205C REINFORCEMENT DETAIL OF PRETENSIONED PRECAST GIRDER TYPE 14 AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 18/11/22 06/12/22 24/01/23
CORRIDOR 5 STATION

71 IND L003 RAS STR DRG SC5 02 2205D REINFORCEMENT DETAIL OF PRETENSIONED PRECAST GIRDER TYPE 14 AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 18/11/22 06/12/22 24/01/23 15/02/23
CORRIDOR 5 STATION

72 IND L003 RAS STR DRG SC5 02 2206A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE 15 AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 17/11/22 06/12/22 02/01/23 24/01/23
CORRIDOR 5 STATION

73 IND L003 RAS STR DRG SC5 02 2206B PRESTRESSING STRAND DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 15 AT CONCOURSE FOR SUPER 20/06/22 29/08/22 05/12/22 06/12/22 02/01/23 07/02/23
CORRIDOR 5 STATION

74 IND L003 RAS STR DRG SC5 02 2206C REINFORCEMENT DETAIL OF PRETENSIONED PRECAST GIRDER TYPE 15 AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 05/11/22 06/11/22 06/01/23 24/01/23
CORRIDOR 5 STATION
75 IND L003 RAS STR DRG SC5 02 2207A TYPICAL DETAILS OF PRE TENSIONED PRECAST GIRDER TYPE 16 AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 17/11/2022 05/12/22 06/12/22 03/01/23
CORRIDOR 5 STATION

76 IND L003 RAS STR DRG SC5 02 2207B PRESTRESSING STRAND DETAILS OF PRETENSIONED PRECAST GIRDER TYPE 16 AT CONCOURSE LEVEL FOR 20/06/22 29/08/22 05/12/22 06/12/22 05/01/23 07/02/23
SUPER CORRIDOR 5 STATION
SC5 SUPER CORRIDOR 5 STATION DRAWING NUMBERS ARE APPLICABLE TO SC1,SC2,SC3,SC4,BHS & MR10 ROAD
Drawing Number
Project Originator Zone Level Description / Title SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC
Sr.No. Line Code Discipline Type Number
Code Code Code Code
1 2 3 4 5 6 7 8 9 14 15 16 17 18 19 20

77 IND L003 RAS STR DRG SC5 02 2207C REINFORCEMENT DETAIL OF PRETENSIONED PRECAST GIRDER TYPE 16 AT PLATFORM LEVEL FOR SUPER 20/06/22 29/08/22 / 06/12/22 06/01/23 24/01/23 09/02/23
CORRIDOR 5 STATION
78 IND L003 RAS STR DRG SC5 02 2208 26/10/22
PHI GIRDER CASTING BED DETAILS
ADDITIONAL REINFORCEMENT DETAILS IN DIAPHRAGMS FOR PI GIRDER LIFTING FOR SUPER CORRIDOR 5 11/1/2023, 12/1/2023 &
79 IND L003 RAS STR DRG SC5 ZZ 2215 13/1/2023 07/02/2023
STATION

80 IND L003 RAS STR DRG SC5 ZZ 2215A 12/1/2023 & 13/1/2023
SLEEVE LOCATION IN DIAPHRAGM WALL FOR PI GIRDER LIFTING FORSUPER CORRIDOR 5 STATION
81 IND L003 RAS STR DRG SC5 03 2303 CONCRETE DIMENSION OF 17.2 M TRACK GIRDER FOR SUPER CORRIDOR 5 STATION 01/09/22 03/02/23 29/03/23

82 IND L003 RAS STR DRG SC5 03 2304 REINFOCEMENT DETAILS OF SLAB AND DIAPHRAGM OF 17.2 M TRACK GIRDER FOR SUPER CORRIDOR 5 01/09/22 22/03/23 24/03/23
STATION

83 IND L003 RAS STR DRG SC5 03 2305 01/09/22 24/03/23


CABLE PROFILE FOR PRECAST 17.2 M PRE TENSIONED TRACK GIRDER FOR SUPER CORRIDOR 5 STATION
84 IND L003 RAS STR DRG SC5 03 2306 REINFORCEMENT DETAILS FOR 17.2 M TRACK GIRDER FOR SUPER CORRIDOR 5 STATION 01/09/22 24/03/23
85 IND L003 RAS STR DRG SC5 03 2308 CONCRETE DIMENSIONS OF TYPICAL CANTILEVER PIER ARM AT PLATFORM LEVEL FOR GRID 2,3,4,7,8,9 FOR 15/07/22 10/12/2022 / 30/11/22 21/12/22 23/12/22 27/12/22 & 29/12/2022 3/1/2023
SUPER CORRIDOR 5 STATION

86 IND L003 RAS STR DRG SC5 03 2309 CONCRETE DIMENSIONS OF TYPICAL CANTILEVER PIER ARM AT PLATFORM LEVEL FOR GRID 1,5,6,10 FOR 12/Oct/22 30/11/22 21/12/22 23/12/22 & 29/12/2022 3/1/2023 06/01/23
SUPER CORRIDOR 5 STATION
CABLE PROFILE FOR PRESTRESSED CANTILEVER PIER ARM AT PLATFORM LEVEL Grid 1 TO 10 FOR SUPER 16/12/22, 6/1/2023 &
87 IND L003 RAS STR DRG SC5 03 2310 15/07/22 10/12/2022 / 04/11/22 29/11/22 13/1/2023 02/05/23 08/05/23
CORRIDOR 5 STATION
SC5 SUPER CORRIDOR 5 STATION DRAWING NUMBERS ARE APPLICABLE TO SC1,SC2,SC3,SC4,BHS & MR10 ROAD
Drawing Number
Project Originator Zone Level Description / Title SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC
Sr.No. Line Code Discipline Type Number
Code Code Code Code
1 2 3 4 5 6 7 8 9 14 15 16 17 18 19 20

88 IND L003 RAS STR DRG SC5 03 2312 REINFORCEMENT DETAILS OF PRESTRESSED CANTILEVER PIER ARM AT PLATFORM LEVEL FOR GRID 1 TO 10 15/07/22 10/12/2022 / 04/11/22 14/12/22 16/12/22 23/12/22 & 29/12/2022 2/1/2023
FOR SUPER CORRIDOR 5 STATION
89 IND L003 RAS STR DRG SC5 03 2321 CONCRETE DIMENSION OF 13 M TRACK GIRDER FOR SUPER CORRIDOR 5 STATION 1/Sep/22 03/02/23 29/03/23
90 IND L003 RAS STR DRG SC5 03 2322 CABLE PROFILE FOR PRECAST 13 M PRETENSION TRACK GIRDER FOR SUPER CORRIDOR 5 STATION 1/Sep/22 29/03/23
91 IND L003 RAS STR DRG SC5 03 2323 REINFORCEMENT DETAIL OF 13 M TRACK GIRDER FOR SUPER CORRIDOR 5 STATION 1/Sep/22 07/10/23 24/03/23

92 IND L003 RAS STR DRG SC5 03 2324 REINFORCEMENT DETAILS OF SLAB AND DIAPHRAGM FOR 13 M TRACK GIRDER FOR SUPER CORRIDOR 5 1/Sep/22 21/03/23 24/03/23
STATION
93 IND L003 RAS STR DRG SC5 03 2325 14/05/2022 13/07/2022
DETAILS OF POT CUM PTFE BEARINGS OF 17.2M SPAN TRACK GIRDER
94 IND L003 RAS STR DRG SC5 03 2326 DETAILS OF POT CUM PTFE BEARINGS OF 13M SPAN TRACK GIRDER 26/05/2022 20/06/2022 06/02/23 22/2/23 24/02/23
95 IND L003 RAS STR DRG SC5 03 2331 TRACK GIRDER LOCKING DETAILS FOR ERECTION 26/05/2022 23/02/2023
96 IND L003 RAS STR DRG SC5 03 2335 TYPICAL DRAINAGE DETAILS FOR STATION TRACK LEVEL SUPER STRUCTURE 31/03/23 11/04/23

97 IND L003 RAS STR DRG SC5 04 2400 GENERAL ARRANGEMENT OF ROOF STRUCTURE PEDESTAL LAYOUT & ANCHOR BOLT DETAIL FOR SUPER 18/11/22 03/02/23 3/3/2023 / 13/03/23 19/05/23 09/06/23
CORRIDOR 5 STATION
98 IND L003 RAS STR DRG SC5 04 2400A GENERAL ARRANGEMENT OF ROOF STRUCTURE GENERAL NOTES FOR SUPER CORRIDOR 5 STATION 03/02/23 / 13/03/23 19/05/23 & 09/06/2023

99 IND L003 RAS STR DRG SC5 04 2401A GENERAL ARRANGEMENT OF BRACING AND DRAIN SUPPORTING FRAMING FOR SUPER CORRIDOR 5 18/11/22 03/02/23 3/3/2023 / 13/03/23 19/05/23 09/06/23
STATION
100 IND L003 RAS STR DRG SC5 ZZ 2401 CROSS SECTION ELEVATION OF PORTALS (SHEET 1 OF 3) FOR SUPER CORRIDOR 5 STATION 19/05/23 09/06/23
101 IND L003 RAS STR DRG SC5 ZZ 2402 CROSS SECTION ELEVATION OF PORTALS (SHEET 2 OF 3) FOR SUPER CORRIDOR 5 STATION 19/05/23 09/06/23
102 IND L003 RAS STR DRG SC5 ZZ 2402A CROSS SECTION ELEVATION OF PORTALS (SHEET 3 OF 3) FOR SUPER CORRIDOR 5 STATION 19/05/23 09/06/23
103 IND L003 RAS STR DRG SC5 ZZ 2403 DETAILS OF PORTAL FOR SUPER CORRIDOR 5 STATION 18/11/22 3/3/2023 / 13/03/23 19/05/23 09/06/23
104 IND L003 RAS STR DRG SC5 04 2404 GENERAL ARRANGEMENT OF ROOF PURLIN LAYOUT FOR SUPER CORRIDOR 5 STATION 03/02/23 3/3/2023 / 13/03/23 19/05/23 09/06/23

105 IND L003 RAS STR DRG SC5 ZZ 2405 GENERAL ARRANGEMENT OF ROOF STRUCTURE LONG SECTION/ELEVATION FOR SUPER CORRIDOR 5 03/02/23 3/3/2023 / 13/03/23 19/05/23 09/06/23
STATION
106 IND L003 RAS STR DRG SC5 04 2410 LAYOUT AT SERVICE PLATFORM LEVEL FOR SUPER CORRIDOR 5 STATION 30-03-23 & 25-05-2023 09/06/23

107 IND L003 RAS STR DRG SC5 04 2410A 30-03-23 & 25-05-2023 09/06/23
CROSS SECTION DETAIL SHOWING SERVICE PLATFORM ARRANGEMENT FOR SUPER CORRIDOR 5 STATION

108 IND L003 RAS STR DRG SC5 04 2412 09/06/23


PEB CONNECTION DETAIL FOR SUPER CORRIDOR 5 STATION

109 IND L003 RAS STR DRG SC5 ZZ 2501 29/09/22 3/10/22 11/4/23 11/8/2023
PLANS & SECTION SHOWING TYPICAL STAIRCASE -05 FOR SUPER CORRIDOR 5 STATION 23/11/22

110 IND L003 RAS STR DRG SC5 ZZ 2502 29/09/22 3/10/22 23/11/22 11/4/23
REINFORCEMENT DETAILS FOR ST-05 FOR SUPER CORRIDOR 5 STATION

111 IND L003 RAS STR DRG SC5 ZZ 2503 6/10/22 23/11/22 11/4/23
PLANS & SECTION SHOWING TYPICAL STAIRCASE -06 FOR SUPER CORRIDOR 5 STATION

112 IND L003 RAS STR DRG SC5 ZZ 2504 6/10/22 23/11/22 11/4/23
REINFORCEMENT DETAILS FOR ST-06 FOR SUPER CORRIDOR 5 STATION

113 IND L003 RAS STR DRG SC5 ZZ 2505 13-10-22 23/11/22 11/4/23
PLANS & SECTION SHOWING TYPICAL STAIRCASE -07 FOR SUPER CORRIDOR 5 STATION

114 IND L003 RAS STR DRG SC5 ZZ 2506 13-10-22 23/11/22 11/4/23
REINFORCEMENT DETAILS FOR ST-07 FOR SUPER CORRIDOR 5 STATION

115 IND L003 RAS STR DRG SC5 ZZ 2507 13-10-22 23/11/22 11/4/23
PLANS & SECTION SHOWING TYPICAL STAIRCASE -08 FOR SUPER CORRIDOR 5 STATION

116 IND L003 RAS STR DRG SC5 ZZ 2508 13-10-22 23/11/22 11/4/23
REINFORCEMENT DETAILS FOR ST-08 FOR SUPER CORRIDOR 5 STATION

117 IND L003 RAS STR DRG SC5 ZZ 2509 03-02-23 30/03/23 13/04/23 31/05/23 21/06/23
DIMENSIONAL DETAILS OF EMERGENCY STAIRCASE AT END PIER ARM FOR SUPER CORRIDOR 5 STATION

118 IND L003 RAS STR DRG SC5 ZZ 2511 20-12-22 5/1/2023 & 6/1/2023 11/Apr/23
DETAILS OF LIFT ENCLOSURE RC SHAFT FOR SUPER CORRIDOR 5 STATION

119 IND L003 RAS STR DRG SC5 ZZ 2512 20-12-22 5/1/2023 & 6/1/2023 02/2/2023 07/2/2023 11/Apr/23
DETAILS OF LIFT ENCLOSURE RC SHAFT FOR SUPER CORRIDOR 5 STATION
120 IND L003 RAS STR DRG SC5 03 22104A GAD FOR POT FIXED BEARING 17.2M SPAN 06/07/2022 11/07/2022 20/07/2022
121 IND L003 RAS STR DRG SC5 03 22104B GAD FOR FREE FLOAT BEARING 17.2M SPAN 06/07/2022 11/07/2022 20/07/2022
122 IND L003 RAS STR DRG SC5 03 22104C GAD FOR LONGITUDINAL GUIDED BEARING 17.2M SPAN 06/07/2022 11/07/2022 20/07/2022
123 IND L003 RAS STR DRG SC5 03 22104D GAD FOR TRANSVERSE GUIDED BEARING 17.2M SPAN 06/07/2022 11/07/2022 20/07/2022
124 IND L003 RAS STR DRG SC5 03 22110A GAD FOR POT FIXED BEARING 13M SPAN 11/07/2022 20/07/2022
125 IND L003 RAS STR DRG SC5 03 22110B GAD FOR FREE FLOAT BEARING 13M SPAN 11/07/2022 20/07/2022
126 IND L003 RAS STR DRG SC5 03 22110C GAD FOR LONGITUDINAL GUIDED BEARING 13M SPAN 11/07/2022 20/07/2022
127 IND L003 RAS STR DRG SC5 03 22110D GAD FOR TRANSVERSE GUIDED BEARING 13M SPAN 11/07/2022 20/07/2022
128 IND L003 RAS STR DRG SC5 ZZ 3313-FW-002-01 FORMWORK SCHEME FOR CANTILEVER PIER ARM 16/12/2022
129 IND L003 RAS STR DRG SC5 ZZ 3313-FW-002-02 FORMWORK SCHEME FOR CANTILEVER PIER ARM 16/12/2022
130 IND L003 RAS STR DRG SC5 ZZ 3313-FW-003-01 FORMWORK SCHEME FOR PLATFORM LEVEL PIER ARM 16/12/2022
131 IND L003 RAS STR DRG SC5 ZZ 3313-FW-003-02 FORMWORK SCHEME FOR PLATFORM LEVEL PIER ARM 16/12/2022
132 IND L003 RAS STR DRG SC5 ZZ 3313-FW-003-03 FORMWORK SCHEME FOR PLATFORM LEVEL PIER ARM 16/12/2022
133 IND L003 RAS STR DRG SC5 ZZ 3671-(SH1/4) SC3,SC4 & SC5 FOUNDATION PLAN 12/05/2023
134 IND L003 RAS STR DRG SC5 ZZ 3671-(SH2/4) SC3,SC4 & SC5 FOUNDATION BOLT & TEMPLETE DETAIL (BP1) 12/05/2023
135 IND L003 RAS STR DRG SC5 ZZ 3671-(SH3/4) SC3,SC4 & SC5 FOUNDATION BOLT & TEMPLETE DETAIL (BP2) 12/05/2023
136 IND L003 RAS STR DRG SC5 ZZ 3671-(SH4/4) SC3,SC4 & SC5 FOUNDATION BOLT & TEMPLETE DETAIL (BP2) 12/05/2023
137 IND L003 RAS STR DRG SC5 ZZ 10501 LIFTING FRAME DETAILS FOR PI GIRDER 8/12/22

138 IND L003 RAS STR DRG SC5 ZZ 10502 LIFTING FRAME DETAILS FOR PI GIRDER 8/12/22
SET-2
SC5 SUPER CORRIDOR 5 STATION DRAWING NUMBERS ARE APPLICABLE TO SC1,SC2,SC3,SC4,BHS & MR10 ROAD
Drawing Number
Project Originator Zone Level Description / Title SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC SUBMITTED BY DDC
Sr.No. Line Code Discipline Type Number
Code Code Code Code
1 2 3 4 5 6 7 8 9 14 15 16 17 18 19 20

1 IND L003 RAS STR DRG SC5 ZZ 1000 26-04-2023 15-06-2023 / 14/08/2023
GENERAL NOTES FOR ENTRY EXIT AND FOB FOR SUPER CORRIDOR 5 STATION

2 IND L003 RAS STR DRG SC5 ZZ 1001 TYPICAL DETAILS OF BEAMS, COLUMNS & SLABS FOR ENTRY EXIT AND FOB FOR SUPER CORRIDOR 5 26-04-2023 15-06-2023 / 14/08/2023
STATION

3 IND L003 RAS STR DRG SC5 ZZ 3000 19-04-2023 4/5/2023 15-06-2023 / 14/08/2023
FOUNDATION DETAILS OF ENTRY EXIT-01 FOR SUPER CORRIDOR 5 STATION

4 IND L003 RAS STR DRG SC5 ZZ 3001 19-04-2023 4/5/2023 15-06-2023 / 14/08/2023
COLUMN DETAILS OF ENTRY EXIT-01 FOR SUPER CORRIDOR 5 STATION
5 IND L003 RAS STR DRG SC5 ZZ 3002 REINFORCEMENT DETAILS OF STAIRCASE FOR ENTRY EXIT-01 OF SUPER CORRIDOR 5 STATION 19-05-2023 03/07/23 / 14/08/23

6 IND L003 RAS STR DRG SC5 ZZ 3003 14-10-22 & 03-11-2022 2/06/23 15-06-2023 / 14/08/2023
DETAILS OF STAIRCASE, LIFT AND ESCALATOR PIT OF ENTRY EXIT-01 FOR SUPER CORRIDOR 5 STATION

7 IND L003 RAS STR DRG SC5 ZZ 3004 14-10-22 & 03-11-2022 22-05-2023 02/06/23 15-06-2023 / 14/08/2023
FRAMING PLANS OF ENTRY EXIT -01 FOR SUPER CORRIDOR 5 STATION (sh 1 of 2)
8 IND L003 RAS STR DRG SC5 ZZ 3004A FRAMING PLANS OF ENTRY EXIT -01 FOR SUPER CORRIDOR 5 STATION (sh 2 of 2) 22-05-2023 02/06/23 / 14/08/23

9 IND L003 RAS STR DRG SC5 ZZ 3005 14-10-22 & 03-11-2022 04/05/23 15-06-2023 / 14/08/2023
SECTION & DETAILS OF ENTRY EXIT - 01 FOR SUPER CORRIDOR 5 STATION
10 IND L003 RAS STR DRG SC5 ZZ 3006 BEAM SCHEDULE FOR ENTRY EXIT - 01 FOR SUPER CORRIDOR 5 STATION 22-05-2023 02/06/23 / 14/08/23

11 IND L003 RAS STR DRG SC5 F1 3020 21-03-23 29/03/23 19/05/2023
DETAILS OF FOUNDATIONS, COLUMNS AND LIFT FOR ENTRY EXIT-03 FOR SUPER CORRIDOR 5 STATION
12 IND L003 RAS STR DRG SC5 ZZ 3021 REINFORCEMENT DETAILS OF BEAM & SLAB FOR ENTRY EXIT-03 FOR SUPER CORRIDOR 5 STATION 21-03-23 19/05/2023
13 IND L003 RAS STR DRG SC5 ZZ 3022 REINFORCEMENT DETAILS OF STAIRCASE FOR ENTRY EXIT-03 FOR SUPER CORRIDOR 5 STATION 18-04-23 03/07/23
14-10-22 , 03-11-2022 &
14 IND L003 RAS STR DRG SC5 ZZ 3023 20-03-23 25/04/23 19/05/2023
DETAILS OF STAIRCASE, LIFT AND ESCALATOR PIT OF ENTRY EXIT-03 FOR SUPER CORRIDOR 5 STATION
14-10-22 , 03-11-2022 &
15 IND L003 RAS STR DRG SC5 ZZ 3024 20-03-23 25-04-2023 15-05-2023 19/05/2023
FRAMING PLANS OF ENTRY EXIT -03 FOR SUPER CORRIDOR 5 STATION (sheet1/2)
16 IND L003 RAS STR DRG SC5 ZZ 3024A FRAMING PLANS OF ENTRY EXIT -03 FOR SUPER CORRIDOR 5 STATION (SHEET2/2) 25-04-2023 15-05-2023 19/05/2023
14-10-22 , 03-11-2022 &
17 IND L003 RAS STR DRG SC5 ZZ 3025 20-03-23 25-04-2023
SECTION & DETAILS OF ENTRY EXIT - 03 FOR SUPER CORRIDOR 5 STATION
18 IND L003 RAS STR DRG SC5 ZZ 3026 BEAM SCHEDULE OF ENTRY EXIT - 03 FOR SUPER CORRIDOR 5 STATION 15-05-2023 19/05/2023
4/10/22 / 18/10/22/
19 IND L003 RAS STR DRG SC5 ZZ 4000 21/04/22 23/08/23
LAYOUT & DETAILS OF FOB -01 (SHEET 2 OF 2) FOR SUPER CORRIDOR 5 STATION
4/10/22 / 18/10/22/
20 IND L003 RAS STR DRG SC5 ZZ 4001 21/04/22 23/08/23
LAYOUT & DETAILS OF FOB -01 (SHEET 2 OF 2) FOR SUPER CORRIDOR 5 STATION
21 IND L003 RAS STR DRG SC5 ZZ 4002 4/10/22 / 18/10/22 23/08/23
LAYOUT & DETAILS OF FOB -03 FOR SUPER CORRIDOR 5 STATION
22 IND L003 RAS STR DRG SC5 ZZ 4004 23/08/23
LAYOUT & DETAILS OF FOB -03 FOR SUPER CORRIDOR 5 STATION
23 IND L003 RAS STR DRG SC5 ZZ 4004A 23/08/23
LAYOUT & DETAILS OF FOB -03 FOR SUPER CORRIDOR 5 STATION
22 IND L003 RAS STR DRG SC5 ZZ 4005 FOUNDATION DETAILS OF FOB-01 FOR SUPER CORRIDOR 5 STATION 12/4/23
23 IND L003 RAS STR DRG SC5 ZZ 4006 COLUMN DETAILS OF FOB-03 FOR SUPER CORRIDOR 5 STATION 20/04/23 26/04/23
24 IND L003 RAS STR DRG SC5 ZZ 4007 BEAM & SLAB SCHEDULE FOR FOB FOR SUPER CORRIDOR 5 STATION 21/4/2023 23/08/23

25 IND L003 RAS STR DRG SC5 ZZ 5000 LAYOUT & DETAILS OF DG ROOM AND UGWT/PUMP ROOM FOR SUPER CORRIDOR 5 STATION 19-10-22 10/02/2023 31/03/2023 18/04/2023 21/04/2023 02/05/2023
SUBMITTED BY DDC SUBMITTED BY DDC

21 22
REV R6 REV R7

03/06-22 / 06-06-2022 30/09/22

22/Jun/22 30/09/22

20/06/23

4/11/22 05/12/22

5/12/22

08/12/22

08/12/22 21/08/23

25/01/23

15/02/23

10/01/23 19/01/23
SUBMITTED BY DDC SUBMITTED BY DDC

21 22
SUBMITTED BY DDC SUBMITTED BY DDC

21 22

09/02/23

07/02/23

07/02/23

17/11/2022 06/12/22

06/12/22 07/12/22

01/11/23 07/02/23

01/11/23 01/03/23

07/02/23

07/02/23

7/2/2023

09/02/23

24/01/23 07/02/23
SUBMITTED BY DDC SUBMITTED BY DDC

21 22

06/01/23 & 13/1/2023 17-01-2023

13/1/2023 17-01-2023
SUBMITTED BY DDC SUBMITTED BY DDC

21 22
6/1/2023 & 13/1/2023
SUBMITTED BY DDC SUBMITTED BY DDC

21 22