Baseline Thickness Measurement Procedure
Baseline Thickness Measurement Procedure
-
/-::( U PA/)~
"f: ~
~~
::r; 1i.SN1
~
...
r-. ~ \_E'JEL \\~ E.1) I ~
• 11A1R1,U ,
\I'' ' )n )
I \-."" ~/~
?:;':l..z--n.i ~
- .
OA 17-06-15 Issued for Review BBU CM MIJ
.. .. ""'"~'
Kuwait National Petroleum Company (K.S.C.)
Clean Fuels Project
Kuwait
'·,,,..,.......
-~-..,-~
.. J.......,..,. •
. ·--l...-.. KNPC
~,... . ...... ~ .. ..r, ••..,
.
~
--
CONTRACT NO. CONTRACTOR JOB NO. DOCUMENT NO. REV
Jl/2025/06-01 Jl-2025 - OA
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 2of18
PSCJ Job No. Jl-2025
Revisions after Rev. OA are denoted by a vertical line in the left hand margin against the
revised text, with the revision number displayed next to the revision line as shown on the
left.
Record of Revisions
List of Holds
Page/Section Description
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 3of18
PSCJ Job No. Jl-2025
TABLE OF CONTENTS
1.0 PURPOSE 4
2.0 SCOPE 4
3.0 REFERENCES 4
4.0 ABBREVIATIONS 4
5.0 PROCEDURE 5
5.3 COUPLANT 6
5.4 CALIBRATION 6
A INTIU!X
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 4of18
PSCJ Job No. Jl-2025
1.0 PURPOSE
2.0 SCOPE
This procedure describes the minimum requirements for the thickness survey of
materials which shall be performed on painted surface after the pressure test by
manual ultrasonic pulse echo contact method. This scope includes the methods
of calibration, evaluation and reporting. This document has specific reference to
the Project - Clean Fuels Project (CFP), MAB Package 1
3.0 REFERENCES
ASME Sec V - Non-Destructive Examination
ASNT-SNT-TC1A - Recommended Practice for Non- Destructive
Testing Personnel
ASTM E 1316 - Terminology for Nondestructive Examination
ASTM E 797 - Standard Practice for Measuring Thickness by
Manual Ultrasonic Pulso Echo Contact Metod.
Shell DEP 31.38.01 .31 Gen. - Shop & Field Fabrication Of Piping .
31 .38.01.31-P6000CFP-OOO-PV - Proj. Variation to SHELL
DEP31.38.01.31,Shop and Field
Fabrication of Piping
UOP 8-11-15 Piping Standard Specification
4.0 ABBREVIATIONS
5.0 PROCEDURE
5. 1 PERSONNEL QUALIFICATIONS
5.1 .1 Personnel involved in this testing shall be qualified to the requirements of
ASNT-SNT-TC 1A.
5.1.2 NDT UT Level II personnel shall perform the test.
5.1.3 Qualification records of certified personnel shall be submitted to the client
for approval prior to start the Thickness Survey.
5. 2 EQUIPMENT
A Normal probe 2.5 - 7.5 MHz & 5-10 mm diameter or curved probes to
suit the curvature of the pipe surface (for small bore pipes)
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 6of18
PSCJ Job No. Jl-2025
5.3 COUPLANT
5.3.1 A liquid or paste is used to couple the probe and the test surface since the
ultrasonic sound waves travel poorly in air and not at all in vacuum.
5.3.2 Couplants are selected based on their properties of wetability, viscosity, low
cost, removability, non-corrosive and non-toxic properties.
5.3.3 Surface finish, surface orientation and temperature are some of the factors
influencing selection of couplant.
5.3.4 Couplants used on nickel base alloys shall not contain more than 250ppm of
sulfur.
5.3.5 Couplants used on austenitic stainless steel or titanium shall not contain
more than 250 ppm of halides (chlorides plus fluorides)
5.4 CALIBRATION
The basic unit shall be calibrated yearly or after any major repair/service
done to the equipment and records shall be provided to the company
5. 5 SURFACE CONDITION
5.5.1 All surface shall be clean and free of scale,dirt,grease or other foreign
material that could interfere with interpretation of examination results .If
painting or coating is present on the thickness survey location then
thickness survey shall be done using an instrument which is capable of
measuring & displaying the metal thickness excluding the thickness of
internal and extenal coating.
5. 6 EXAMINATION REQUIREMENTS
5.6.1 Place the search unit on a standardization block of known thickness from the
same material group as the material to be measured with suitable couplant
and adjust the instrument controls (material standardization, velocity) until the
display presents the appropriate thickness reading.
5.6.2 Place the search unit on the part where thickness to be measured and take
the reading (mm) from the basic unit display.
5.6.3 If flaw detectors are used the scanning speed shall not be more than 100
mm/sec.
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 7of 18
PSCJ Job No. Jl-2025
a) FOR PIPING
All the pipes, fittings shall be subject to thickness verification . Number of
locations and area of examination shall be as below
All the piping with diameter 2" and above requires thickness survey.
However for highly corrosive services thickness survey shall be considered
up to 1 1/2 "diameter.
5.7.1 In case of 45° elbows , thickness survey requirements are similar to that of
90° elbows.
For underground piping , each length of pipe/ fitting one spot thickness
check is required .
5. 7 .2.1 One Monitoring point ( at 10 meters approx. interval for Inside battery
limit and 50 meters interval for outside battery limit at top, bottom, left and
right ( 3,6,9,12 O'clock) positions).
Thickness measurements shall preferably be made at upstream and
downstream of the instrument connections such as control valves,
instrument, orifice etc ... as per the details given for straight pipe/ fittings as
applicable.
--·0 -+---
2 3
FLOW
FLOW
--........__
~
2
'
I
\ I
(z~:/3~ 4"111-12"111
s
(@)
ECCENTRIC A.NO CONCEl'fTRJC REIXJCffiS
s
f]~ -3-
6
3
ALL TCST POINTS - N,S,C,W,T,B
1 s
e
4
3
~ 1:) 2
3
ALL S IZ ES
9
ALL SIZ ES
Figure la
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 10of18
PSCJ Job No. Jl-2025
Figure 1b
5.7.7 Towers (Drum) initial thickness reading shall be taken as per the below
figure.2
Figure 2
lJ. .
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 11 of 18
PSCJ Job No. Jl-2025
5.7.8 Reactors : initial thickness reading shall be taken as per given figure .3
·•·.
'
·•·.
..~[· ~--ijft~v~
...;•. . . .-.
.·· ·:.
:··*' . . . ' . . ..
, ·-; .,
Figure 3
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 12of18
PSCJ Job No. Jl-2025
5.7.9 Heat Exchangers (Fin Fan Coolers & Shell & Tube Type) : initial thickness
reading shall be taken as per given figure 4a & 4b
IlJ8£ $H££T
I Figure 4 a
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 13of18
PSCJ Job No. Jl-2025
FtqATING ljfAD
Figure 4b
INTREC
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 14of18
PSCJ Job No. Jl-2025
5.7.10 Heater & Boiler Tubes initial thickness reading shall be taken as per
given figure 5
Note!
THICKNESS RfAOlNGS SHAU. BETAKEN~ El(H 1\JBE AND BEND AS Pet DETAILS~ ABOVE.
- -----=----------ii Figure 5
A
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 15of18
PSCJ Job No. Jl-2025
5. 7.11 Portable Gas Container initial thickness reading shall be taken as per
given figure 6
.c·
· '3,.~ . . .f., · . .,,...~ .: 3 . .
----
ri
I
_
!."
·.. __,. ___
_.._...._~
""'"'""'....,,........,_.
l
·1
,., . -~: ....
. - - . . ; :,,i__• .•
J
·1
l•·
{
~ ,.
Figure 6
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 16of18
PSCJ Job No. Jl-2025
c) Storage Tanks
5.7.12 Shell:
• Shell Course 1 (bottom Strake) : 9 readings per plate min .
• Shell Course 2 and above : 3 reading per plate min.
• Shell course 3 & above :
d) Other Equipment
5. 7 .17 For equipment other than listed above, thickness survey locations shall be
determined by Contractor and approved by Company.
Kuwait National Petroleum Company
(K.S.C) llC/UT/03C/CFP/CCC
BASELINE THICKNESS
Clean Fuels Project REV. OA, 17-JUNE-15
MEASUREMENT PROCEDURE
KNPC Contract No. CFP/EPC/0054-MAB1 Page 17of18
PSCJ Job No. Jl-2025
5.10 DOCUMENTATION
5.11 .1 The spots where thickness readings were taken shall be marked up on
applicable isometrics with unique number for each of the locations
A,B,C,Ds may be used to represent 0°, 90°,180°,270° and a permanent
marker preferably at 0° location shall be placed on the pipe/fittings for
reference which will be followed by the flow direction and continuous
unique numbers as per line & Isometric number.
5.11 .2 The examination details (Required thickness , isometric drawing reference,
line reference, line size, thickness reading, average thickness reading,
location of measurement, size frequency and type of search unit and
identification of the operator who carried out of each examination etc. )
shall be reported in the format as shown on the attached report formats for
piping (Attachment A) and equipment (Attachment B)
5.11.3 The location of the spots shall be marked up in the hard copy and soft
copy of the isometric drawings. Soft and hard copies of documents shall
be submitted to the company. Autocad software will be used for producing
isometrics.
5.11.4 The thickness data shall be in the form of a spread sheet given against
the unique number assigned for the spots. This shall be in the form of an
excel sheet and both soft and hard copies shall be submitted to the
company.
6.0 SAFETY
INTltl!X
INTERNATIONAL Head Office: East Ahmadi, Block No.6,
INSPECTION Plot No.142, P.O.Box No.296,
Sabahiya, S4573 Kuwait.
CENTRE W .L.L Tel : 23986748, 23988915, 23984391,
Paid Capital 23984389, Fax: 23986749
Email: enqulry@intrexkw.com
KD.250,000/- INTREX Websit e: www.intrexkw .com
Project: Date :
Location : Instrument: :
Pipe Diameter
Pipe Schedule
Nominal thickness
Drawing No :
10
11
12
13
14
RESULTS:
Name
Sign
Date
NAME
SIGN
DATE