Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Damaged Wagons from Intensive Yard

(Incoming wagons thoroughly intensive Fit wagons ready for dispatch


examination & cause written in DDR).

SICK LINE/ROH SHED


Lifting

Lifting & Dismantling of Bogie Assembled Bogie & wheels


& wheels, Body repair& Air Brake is fitted to wagons for final fit.
Testing.

WHEEL LATHE SHED BOGIE REPAIR SHED


(Wheel coming from ROH shed for (Bogie coming from ROH shed for
turning, UST and CTRB checking, repair. After repair, Bogie is
Mounting & dismounting of CTRB as assembled with turned wheels and
is sent to Sick line/ROH shed.
per requirement) & turned wheel is sent
to Bogie Repair shed.

PROCESS FOR FLOW CHART

You might also like