BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES
Main Contract: Part B: Pricing schedule
Employer's requirements
Site accommodation

Site accommodation for the employer and the


employer's representatives where
separate from main contractor's site
accommodation, including: - site offices. -
sanitary accommodation. - welfare facilities. -
foundations to site accommodation
- temporary drainage to accommodation. -
temporary services. - intruder alarms.

Bringing to site and installing, including all


temporary drainage, services and intruder
a alarms. item
b Adaptations/alterations during works. item
Dismantling and removing from site, including
c rectifying any damage. item
d Maintaining. weeks
e Cleaning. weeks
f Charges. weeks
g Off-site rented temporary accommodation. weeks
Rectifying damage to off-site rented temporary
h accommodation. item

Furniture and equipment for the employer and


the employer's representatives where separate
from main contractor's site accommodation.
i Bringing to site and installing. item
j Cleaning. week
k Charges. week
l Dismantling and removing from site. item

Telecommunication and IT systems for the


employer and the employer's
representatives where separate from main
contractor's site accommodation,
including telephones, fax machines,
photocopier, computers, printers and
consumables.
m Purchase charges. nr

Nigerian Institute of Quantity Surveyors To Collection N

Page 1
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Employer's requirements continued ...
Site accommodation continued ...

Telecommunication and IT systems for the


employer and the employer's
representatives where separate continued ...
a Hire charges. week
b Consumables. week
Site records
Site records
c Operation and maintenance manuals. item
d Compilation of health and safety file. item
Web-based information management system
Provision of system.
Uploading of data.
Training of building user's staff in the operation
of the web-based management system.
Completion and post-completion requirements
Handover requirements

Training of building user's staff in the operation


and maintenance of the building engineering
e services systems. item
Provision of spare parts for maintenance of
f building engineering services. item

Provision of tools and portable indicating


instruments for the operation and
maintenance of building engineering services
g systems. item
Operation and maintenance services

Operation and maintenance of building


engineering services installations, mechanical
plant and equipment and the like during the
h defects lia week

Nigerian Institute of Quantity Surveyors To Collection N

Page 2
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Employer's requirements continued ...
Completion and post-completion continued ...
Landscape management services
Maintenance of internal and external planting.
Main Contractor's cost items
Management and staff
Project-specific management and staff
a Project manager/director. week
b Construction manager. week

Supervisors, including works/trade package


managers, building services engineering
managers/co-ordinators and off-site production
c managers. week
d Health and safety manager/officers. week
Commissioning manager (building engineering
e services). week
f Planning/programming manager and staff. week
g Senior/managing quantity surveyor. week
h Project/package quantity surveyors. week
i Procurement manager. week
j Design manager. week
k Project engineers. week
l Environmental manager. week
m Temporary works design engineers. week
n Materials management staff (e.g. storeman). week

Administrative staff, including secretary,


document controllers, finance clerks and the
o like. week
p Other management and staff. week
Visiting management and staff

Managing director, regional director,


operations director, commercial director and
q the like. week
r Quality manager. week
s Contracts/commercial manager. week

Nigerian Institute of Quantity Surveyors To Collection N

Page 3
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Management and staff continued ...
Visiting management and staff continued ...
a Health and safety manager. week
b Environmental manager/consultant. week
c Other visiting management and staff. week
Extraordinary support costs
d Legal advice costs (i.e. solicitors). item
e Recruitment costs. item
f Team building costs. item
g Other extraordinary support costs. item
h Day transport. week
Personnel transport (i.e. transportation of work
i operatives to site). week
Temporary living accommodation (e.g.
j long/medium term accommodation costs). week
k Subsistence payments. week
Out of normal hours working, including
l non-productive overtime allowances. week
Staff travel
m Visits to employer's and consultants' offices. nr
n Visits to subcontractors' offices/works. nr
o Overseas visits. nr
Accommodation charges and overnight
p expenses. nr
Site establishment

Site accommodation (Type and extent of


accommodation to be provided to be stated,
with each type separately quantified)
q Purchase charges. item
r Hire charges. week

Employer's accommodation, where an integral


part of the main contractor's site
s accommodation. week

Nigerian Institute of Quantity Surveyors To Collection N

Page 4
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Site establishment continued ...

Site accommodation (Type and extent of


accommodation to be provided to be stated,
with each type separately continued ...
Delivery of temporary site accommodation to
a site, erection, construction and removal. item
Temporary accommodation made available by
b the employer. week
c Intruder alarms. item
Land/property rental where site
d accommodation located off-site. week

Alterations and adaptations to site


accommodation, including partitioning, doors,
e painting and decorating, and the like. item
Relocation and alterations of temporary
f accommodation during construction stage. item
Reinstating temporary site accommodation to
g original condition prior to removal from site. item

Removal of site accommodation and


temporary works in connection with site
h accommodation. item
Temporary works in connection with site
establishment

Temporary bases and foundations for site


accommodation, including maintenance and
reinstatement of existing surfaces on
i completion of the works. m2

Connections to temporary service, including


maintenance and removal on completion of
j the works. nr

Connections to temporary drainage, in


including maintenance and removal on
k completion of the works. nr

Temporary site roads, paths and pavings


(including on-site car parking), including
reinstatement of existing surfaces on
l completion of the works. m

Nigerian Institute of Quantity Surveyors To Collection N

Page 5
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Site establishment continued ...
Temporary works in connection with site
establishment continued ...

Temporary surface water drainage to


temporary site roads, paths and pavements,
including maintenance and removal on
a completion of the works. m
Furniture and equipment
b Workstations for staff, including maintenance. nr
General office furniture, including
c maintenance. item
Conference/meeting room furniture, including
d maintenance. item
Photocopiers, including purchase/rental,
e maintenance and other running costs. item
f Canteen furniture, including maintenance. item

Canteen equipment, including


purchase/rental, maintenance and other
g running costs. item
h Floor coverings, including maintenance. item
Water dispensers, including purchase/rental,
i maintenance and other running costs. item
j Heaters, including maintenance of heaters. item
Other office equipment, including
k maintenance. item
l Removal of furniture and equipment. item
m Maintenance furniture and floor covering. item
IT systems

Computer hardware, including


purchase/rental, installation, initial set up,
maintenance and running costs, such as: -
desktop computers and laptop
computers. - CAD stations. - server and
network equipment. - printers and plotters. -
n other computer system hardware. item
o Software and software licences. item

Nigerian Institute of Quantity Surveyors To Collection N

Page 6
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Site establishment continued ...
IT systems continued ...
Modem lines, modems and connections (i.e.
a email and internet capability). item
b WAN lines and connections (if on WAN). item
c Line rental charges. week
d Internet/website addresses. nr
e Internet service provider (ISP) charges. nr
f Line calls charges. week
g IT support and maintenance. week
Consumables and services
h Stationery. week
Computer and printer consumables (e.g. ink
i cartridges). week
j Postage. week
k Courier charges. week
l Tea, coffee, water bottles and the like. week
m First aid consumables. week
Photocopier consumables (e.g. paper and
n toners). week
o Fax consumables (e.g. paper and toners). week
Drawing printer consumables (e.g. ink
p cartridges). week
Brought-in services Services
q Catering. week
r Equipment maintenance. week

Document management, including


management information systems and
electronic data management systems
s (EDMS). week
Printing (purchasing), including reports and
t drawings. week
u Staff transport. week
v Off-site parking charges. week

Nigerian Institute of Quantity Surveyors To Collection N

Page 7
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Site establishment continued ...
Brought-in services Services continued ...
a Meeting room facilities. week
b Photographic services. week
c Other. week
Sundries
Main contractor's signboards. item Fixed
d charge. item
e Safety and information notice boards. item
f Fire points. item
g Shelters. item
h Tool stores. item
i Crane signage. item
j Employer's composite signboards. item
Temporary services
Temporary water supply
k Temporary connections. nr
Distribution equipment, installation and
l adaptations. item
m Meter charges. week
Temporary gas supply
n Gas connection. nr
Distribution equipment, installation and
o adaptations. item
p Charges. week
q Bottled gas. week
Temporary electricity supply
r Temporary connections. nr
s Temporary electrical supply for tower cranes. item
Charges - power consumption for site
t establishment. item
u Charges - power consumption for the works. item

Nigerian Institute of Quantity Surveyors To Collection N

Page 8
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Temporary services continued ...
Temporary electricity supply continued ...
Distribution equipment, installation and
a adaptations. item
b Attendance. nr
c Uninterrupted power supply (UPS). item
d Temporary substation modifications. item
Temporary telecommunication systems

Landlines (including connection and rental


charges), including: telephone and fax lines
e ISDN lines. item

Mobile (cellular) phones, including:- mobile


phones, including purchase or rental
and connection charges. spare batteries.
f mobile phone charges. item

Telephone charges, including: telephone call


charges. fax charges. fax and telephone
g consumables. item

5 Radios (including purchase or rental


charges), including: base set. handsets and
chargers. repairs and maintenance.
licences.sp
Temporary drainage
h Temporary mains. item
i Septic tanks. nr
j On-site treatment plant. item
k Holding tanks. nr
l Sewage pumping. nr
m Distribution pipework, etc item
n Drainage installation and adaptations. item
o Disposal charges (i.e. rates). week
p Disposal costs (i.e. tanker charges). week
Security
Security staff
q Security guards (day and night). nr

Nigerian Institute of Quantity Surveyors To Collection N

Page 9
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Security continued ...
Security staff continued ...
a Watchmen (day and night). nr
Security equipment
Site pass issue equipment, including
b maintenance and removal. item
c Site pass consumables. item
CCTV surveillance installation, including
d maintenance and removal. item
Temporary vehicle control barriers, including
e maintenance and removal. nr
Hoardings, fences and gates

Perimeter hoardings and fencing and the like


to site boundaries and to form site
compounds.
Access gates, including frames and
f ironmongery. nr
Painting of hoardings, fencing, gates, and the
g like. m
h Temporary doors. nr
Modification to line of hoarding and fencing
i during construction. nr
Dismantling and removal of hoarding, fencing,
j gates, and the like. m
Safety and environmental protection
Safety programme

Works required to satisfy requirements of


CDM Regulations: Health and safety
k manager/officers. nr
Safety audits, including safety audits carried
l out by external consultant. nr
m Staff safety training. item
n Site safety incentive scheme. item
o Notices and information to neighbours. item

Nigerian Institute of Quantity Surveyors To Collection N 0.00

Page 10
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Safety and environmental protection continued ...
Safety programme continued ...
Personal protective equipment (PPE),
a including for employer and consultants. nr
b PPE for multi-service gangs. nr
c Fire points. nr
d Temporary fire alarms. nr
e Fire extinguishers. nr
f Statutory safety signage. item
g Nurse. nr
h Traffic marshals. nr
Barriers and safety scaffolding
Guard rails and edge protection (e.g. to edges
i of suspended slabs and roofs). item
Temporary staircase balustrades (i.e. to new
j staircases during construction). item
k Lift shaft protection. item
Protection to holes and openings in ground
l floor slabs, suspended slabs and the like. item
m Debris netting/plastic sheeting. item
n Fan protection. item
o Scaffold inspections. nr
p Protective walkways. item
q Other safety measures. item
Environmental protection measures
r Control of pollution. item
s Residual control of noise. item
t Environmental monitoring. item
u Environmental manager/consultant. nr
Environmental audits, including safety audits
v carried out by external consultant. nr

Nigerian Institute of Quantity Surveyors To Collection N

Page 11
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Control and protection
Survey, inspections and monitoring
a Surveys. item
b Topographical survey. item
c Non-employer dilapidation survey. item
Structural/dilapidations survey adjoining
d buildings. item
e Environmental surveys. item
f Maintenance and inspection costs. item
Setting out
g Setting out primary grids. item
h Grid transfers and level checks. item
i Maintenance of grids. item
Take over control and independent checks
j (i.e. on change of subcontractors). item
k Instruments for setting out. item
Protection of works
Protection of finished works to project
l handover. item
Protection of stairs, balustrades and the like
m works to project handover. item
Protection of fittings and furnishings works to
n project handover. item
Protection of entrance doors and frames
o works to project handover. item
Protection of lift cars and doors works to
p project handover. item
Protection of specifically vulnerable products
q to project handover. item
r Protection of all sundry items. item
Samples
s Provision of samples. item
t Provision of sample room. item
u Mock-ups and sample panels. item

Nigerian Institute of Quantity Surveyors To Collection N

Page 12
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Control and protection continued ...
Samples continued ...
Testing of samples/mock-ups, including
a testing fees. item
b On-site laboratory equipment. item

Mock-ups of prefabricated units (e.g.


residential units, student accommodation
c units, hotel accommodation and the like). item
Environmental control of building
d Dry out building. item
e Temporary heating/cooling. item
f Temporary waterproofing, including over roofs. item
g Temporary enclosures. item
Mechanical plant
Generally
Common user mechanical plant and
equipment used in construction operations.
Tower cranes
Type of craneage to be provided shall be
stated; with each type separately quantified.
h Hire charges. week
i Crane operator. week
j Overtime for crane and operator. week
Piles for tower crane bases, including
k maintenance removal. nr

Temporary bases for tower cranes, including


anchors, maintenance; removal and
reinstatement on completion (size, in m2, to
l be stated). nr
m Ties. week
n Connections to temporary electrical supply. nr
o Bring to site, erection, test and commission. nr
p Periodic safety checks/inspections. week
q Dismantling and removing from site. nr

Nigerian Institute of Quantity Surveyors To Collection N

Page 13
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Mechanical plant continued ...
Tower cranes continued ...
Type of craneage to be provided shall be
stated; with each type continued ...

Other costs specific to tower crane such as: -


chain pack and sundries - relief operator -
a banksman - man cage. item

Temporary voids in building structure for


craneage, hoists and the like including filling
b voids after removal. item
Mobile cranes
Type of craneage to be provided shall be
stated; with each type separately quantified.
Mobile crane hire charges, including
c driver/operator charges. week
d Attendance. nr
e Other costs specific to mobile crane hire. item
Hoists
Type of hoist to be provided shall be stated;
with each type separately quantified.
Goods and passenger hoists, including
f protection cages and embedment frames. week
g Hoist bases. nr
Bringing to site, erecting, testing and
h commissioning. nr
i Dismantling and removing from site. week
j Protection systems. item
k Hoist operator, including overtime. week
l Beam hoists. item
m Periodic safety checks/inspections. month
Other costs specific to temporary hoist
n installations. item
Access plant
o Folk lifts. week
p Scissor lifts. week

Nigerian Institute of Quantity Surveyors To Collection N

Page 14
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Mechanical plant continued ...
Access plant continued ...
a Loading platforms. week
Maintenance of mechanical access
b equipment. week
Other costs specific to mechanical access
c equipment. item
Concrete plant
d Concrete plant. week
e Plant operator. week
f Overtime for plant and operator. week
g Bases for concrete plant. nr

Power connections, including cabling and


statutory undertaker's charges for temporary
h connection to their supply. nr
i Bring to site, erection, test and commission. nr
j Maintenance of concrete plant. week
k Dismantling and removing from site. nr
Other plant
l Small plant and tools. week
Temporary works

Access scaffolding: Common user access


scaffolding (type of access scaffolding
to be specified): - access scaffolding to
elevations, lift shafts and the like, including:
fans and mesh screens. - structural scaffolding
(e.g. to party walls). - birdcage scaffolding. -
cantilever access scaffolding. - staircase
platforms. - primary loading platforms. -
travelling access platforms.
Bringing to site, erecting and initial safety
m checks. nr
n Hire charges. week
o Altering and adapting during construction. nr
p Dismantling and removing from site. nr

Nigerian Institute of Quantity Surveyors To Collection N

Page 15
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Temporary works continued ...
Temporary works

Common user temporary works: support


scaffolding and propping. crash decks.
temporary protection to existing trees and/or
vegetation. floodlights.
Bringing to site, erecting and initial safety
a checks. nr
b Hire charges. week
c Altering and adapting during construction. nr
d Dismantling and removing from site. nr
Site records

Site records: Unless otherwise indicated, costs


associated with the following shall be deemed
to be included in management and staff costs:
Photography: camera purchase,
e consumables, printing and presentation. item

Works records: Unless otherwise indicated,


costs associated with the following
shall be deemed to be included in management
and staff costs:

Progress reporting. site setting out drawings.


condition surveys and reports.
operation and maintenance manuals.
f as-built/ins item
Completion and post-completion requirements
Testing and commissioning plan

Costs associated with the following shall be


deemed to be included in section 1.2.1:
Management and staff costs:
g Preparation of Commissioning Plan. item

Nigerian Institute of Quantity Surveyors To Collection N

Page 16
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Completion and post-completion continued ...
Handover

Unless otherwise indicated, costs associated


with the following shall be deemed to be
included in section 1.2.1: Management and
staff costs:
a Preparation of Handover Plan. item

Training of building user's staff in the operation


and maintenance of the building engineering
b services systems. item
Provision of spare parts for maintenance of
c building engineering services. item

Provision of tools and portable indicating


instruments for the operation and
maintenance of building engineering services
d systems. item
e Pre-completion inspections. item
f Final inspections. item
Post-completion services
g Supervisory staff (employer/tenant care). week
h Handyman. week
i Minor materials and sundry items. item
j Insurances. item
k Other post-construction staff. week
Cleaning
Site tidy

Cleaning site accommodation - internal,


including cleaning telephone handsets, other
office furniture and equipment and window
l cleaning. week
Periodic maintenance of site accommodation,
m including redecoration (internal and external). week

Waste management, including rubbish


disposal (including compactor visits; skips
and waste bins; roll-off, roll-on waste bins) and
n other disposal. week

Nigerian Institute of Quantity Surveyors To Collection N

Page 17
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Cleaning continued ...
Site tidy continued ...
a Pest control. week
Maintenance of roads, paths and pavings
Maintenance of temporary site roads, paths,
b and pavements. week
Maintenance of public and private roads,
c including wheel spinners and road sweepers. week
Building clean
d Final builder's clean. item
Fees and Charges
Fees
Building control fees, where not paid by the
e employer. item
Oversailing fees, where not paid by the
f employer. item

Considerate Constructors' Scheme fees (or


alternative scheme operated by local
g authority). item
Scheme registration fees or similar fees,
h where not paid by the employer. item
Charges
i Rates on temporary accommodation. week
Licences in connection with hoardings,
j scaffolding, gantries and the like. item

Licences in connection with crossovers,


parking permits, parking bay suspensions and
k the like. item
Site services
Temporary works
Temporary works that are not specific to an
l element. item
Multi-service gang
m Ganger. week
n Labour. week

Nigerian Institute of Quantity Surveyors To Collection N

Page 18
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Site services continued ...
Multi-service gang continued ...
a Fork lift driver. week
b Service gang plant and transport. week
Insurance, bonds, guarantees and warranties
Works insurance
c Contractor's "all risks" (CAR) insurance. item
d Contractor's plant and equipment insurance. item
e Temporary buildings insurance. item
f Terrorism insurance. item
Other insurances in connection with the
g works. item
h Insurance premium tax (IPT). item
Allowance for recovery of all or part of
i insurance premium excess. item
Public liability insurance
j Non-negligence insurance. item
k Professional indemnity insurance. item
l Insurance premium tax (IPT). item
Allowance for recovery of all or part of
m insurance premium excess. item
Employer's (main contractor's) liability
insurance
Management and staff, including
n administrative staff. item
o Works operatives. item
p Insurance premium tax (IPT). item
Allowance for recovery of all or part of
q insurance premium excess. item
Other insurances
r Employer's loss of liquidated damages. item
s Latent defects cover. item
t Motor vehicles. item
u Other insurances. item

Nigerian Institute of Quantity Surveyors To Collection N

Page 19
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

PRELIMINARIES continued ...


Main Contract: Part B: Pricing continued ...
Main Contractor's cost items continued ...
Insurance, bonds, guarantees and continued ...
Other insurances continued ...
Allowance for recovery of all or part of
a insurance premium excess. item
Bonds
b Tender Bonds (if applicable) item
c Performance bonds. item
Guarantees
d Parent company guarantees. item
Product guarantees, insurance backed
e guarantees. item
Warranties
f Collateral warranties. item
g Funder's warranties. item
h Purchaser's and tenant's warranties. item
i Other warranties item

Nigerian Institute of Quantity Surveyors To Collection N

Page 20
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

Collection

Total from Page 1 N

Total from Page 2 N

Total from Page 3 N

Total from Page 4 N

Total from Page 5 N

Total from Page 6 N

Total from Page 7 N

Total from Page 8 N

Total from Page 9 N

Total from Page 10 N

Total from Page 11 N

Total from Page 12 N

Total from Page 13 N

Total from Page 14 N

Total from Page 15 N

Total from Page 16 N

Total from Page 17 N

Total from Page 18 N

Nigerian Institute of Quantity Surveyors Carried Forward N

Page 21
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

Collection continued ...

Total from Page 19 N

Total from Page 20 N

Nigerian Institute of Quantity Surveyors To Summary N 0.00

Page 22
BESMM4 PREMIMINARIES BILL PART B PRICING SCHEDULE

Qty Unit Fixed Charge Time Related Total Charges

Summary

PART B PRICING SCHEDULE N

Nigerian Institute of Quantity Surveyors Total for Bill N