SAFETY INSPECTION REPORT

LPS-01 PROJECT

Area
LPS-01 Date 11.02.2024 Time 08.00 PM
Location
Completed by Mark Signature

Items to be checked

1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear

2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height 20 Site Storage x

Access Walkways and


3 Signs and Notices 9 15 Internal Routes 21 House Keeping x
Stairs
First Aid and Medical Plant and
4 10 Ladder Access x 16 22 Portable Hand/Power Tools
Facility Machinery
Scaffolding/Working Guarding and
5 Health Hazards 11 17 23 Hygiene and Welfare
Platforms Fencing
Edge Protection/ Floor Electrics/
6 Chemicals x 12 18 x 24 Personal Protection Equipment
opening illumination
Photo
Observation Corrective Actions to be Taken Action Date Action By Followed By
No.
PVC materials scattered on Advised the concerned team

Immediate
the staircase. to clear this immediately

2 Days

4 Days
1 from B1 zone B staircase.


Found damaged socket Removed from usage and

x Immediate

2 Days

4 Days
2 without earthing connection at site.
level 6 zone C.

Observations Closeouts

PVC materials scattered on the staircase. Advised the concerned team to clear this
immediately from B1 zone B staircase.

HBK-CRCC JV-HS-FRM-00044 Rev 1 Page 1 of 2


SAFETY INSPECTION REPORT
LPS-01 PROJECT

Found damaged socket without earthing Removed from usage and site.
connection at level 6 zone C.