Items to be checked
1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear
2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height 20 Site Storage x
Immediate
the staircase. to clear this immediately
2 Days
4 Days
1 from B1 zone B staircase.
√
Found damaged socket Removed from usage and
x Immediate
2 Days
4 Days
2 without earthing connection at site.
level 6 zone C.
Observations Closeouts
PVC materials scattered on the staircase. Advised the concerned team to clear this
immediately from B1 zone B staircase.
Found damaged socket without earthing Removed from usage and site.