Seci-Dvc-Ktps6mw-Gwg-Civ-37 - MCR - Roof General Arrangement and Reinforcement Details - R01

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1 2 3 4 5 6 7 8 9 10 11 12

1 1 1 1 KEY PLAN
A B C D E 3-T12 3-T12

450 450 450 450 450 STP 2L-T8 STP 2L-T8


29° 3079 2372 2769 2356
3-T12 3-T12
3-T12
A B C C' D E RB-01 RB-02
H 3529 2672 3220 2806 SECTION 1-1 SECTION 1-1 H
MCR
2172 1357 2672 1330 1890 2806 LOCATION
3-T12 3-T12 3-T12
150

150

150

150
RB-01-(300x450) RB-02-(300x450) RB-03-(300x450) RB-04-(300x450) T8@ STP 2L-T8 STP 2L-T8
T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@70 C/C
190 C/C
5 T8@
3-T12 3-T12
C1 900 900 C2 900 900 C3 900 900 C4 900 190C/C 900 C5
150

150

150

150
150 150
150 150 150 150
150 150 150 150 1 1 1 1 RB-03 RB-04
RB-01 - (300X450) RB-02 - (300X450) RB-03 - (300X450) RB-04 - (300X450) SECTION 1-1 SECTION 1-1
RB-22-(300x450)

RB-26-(300x450)

RB-29-(300x450)

PB-35-(300x450)
RB-32-(300x450)
1 1 1 1 3-T16 3-T16 3-T16 3-T16
3331
3331

A B C D E
450 450 450 450 450 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3079 2372 2769 2356
4-T12 4-T12 4-T12 4-T12
G 3-T16 G
RB-05 RB-06 RB-07 RB-08
150

150

150

150
RB-05-(300x450) RB-06-(300x450) RB-07-(300x450) RB-08-(300x450) SECTION 1-1 SECTION 1-1 SECTION 1-1 SECTION 1-1
4
4-T12
150

150

150

150
(300x450)
RB-21-

150 150 150 150 150 150


1481

150 150 T8@ T8@


T8@70 C/C T8@135 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@70 C/C
1781

150 150 190 C/C 190 C/C

PB-34-(300x450)
RB-09- C6 900 900 C7 900 900 C8 900 900 C9 900 900 C10

RB-28-(300x450)

RB-31-(300x450)
RB-23-(300x400)

RB-25-(300x450)

150 150 (300x400)


300

1 1 1 1
RB-05 - (300X450) RB-06 - (300X450) RB-07 - (300X450) RB-08 - (300X450)
75

3
225
(300x450)

1
RB-20-

B 3-T12
1800
1800

F 300 300 STP 2L-T8 F


1057
150 150 3-T12
150

150

150

150
RB-10-(300x450) RB-11-(300x450) RB-12-(300x450) RB-13-(300x450)
3-T12 RB-09
2
SECTION 1-1
150

150
150

150

PB-33-(300x450)
RB-24-(300x450)

RB-27-(300x450)

3-T12
RB-19-(300x450)

RB-30-(300x450)
T8@200 C/C
B23 B25
3594
3594

RB-09 - (300X400)
150 150
E 150 150 150 150 150 150 150 150 A 1 B 1 C 1 D 1 E 4-T12 4-T12 4-T12 4-T12
E
RB-16- RB-17- 450 450 450 450 450 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3079 2372 2769 2356
150
150

150

150

RB-14-(300x450) RB-15-(300x450) (300x450) (300x450) RB-18-(300x450)


3-T12 3-T12 3-T12 3-T12
1
150

4-T12
RB-10 RB-11 RB-12 RB-13
150

150

150
150
150

SECTION 1-1 SECTION 1-1 SECTION 1-1 SECTION 1-1

ROOF BEAM LAYOUT @4.50M 3-T12

T8@ T8@
T8@70 C/C T8@150 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@70 C/C
190 C/C 190 C/C

C12 900 900 C13 900 900 C14 900 900 C15 900 900 C16

D 1 1 1 1 D
RB-10 - (300X450) RB-11 - (300X450) RB-12 - (300X450) RB-13 - (300X450)

A 1 B 1 C 1 C' 1 D 1 E 3-T12 3-T12 3-T12 3-T12 3-T12

450 450 450 450 450 450 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3079 2372 805 1515 2356 HANGER
3-T12 3-T12 3-T12 3-T12 3-T12 BARS SECONDARY
MAIN BEAM TOP BEAM
3-T12 300
REINFT.
RB-14 RB-15 RB-16 RB-17 RB-18 (TYP)
LD
SECTION 1-1 SECTION 1-1 SECTION 1-1 SECTION 1-1 SECTION 1-1 (IN TENSION)

VARIES AS PER
BEAM DEPTH
300
3-T12
(TYP) 2-Ø12

Ld+10Ø
(TYP)
T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C
T8@
T8@70 C/C T8@70 C/C T8@70 C/C T8@70 C/C
T8@
T8@70 C/C BEAM

60
C 190 C/C 190 C/C
C

°
900 900 900 900 900 900 Ld+10Ø
C17 C18 C19 C20 C21 C22 VARIES AS PER
1 1 1 1 1 BEAM BREADTH
RB-14-(300X450) RB-15-(300X450) RB-16-(300X450) RB-17-(300X450) RB-18 - (300X450) MAIN BEAM BOT. BEAM SECONDARY BEAM
REINFT. BOT. REINFT.

1 1 1 1 TYP. DET. OF HANGER BARS IN MAIN BEAM AT


1 2 3 4 5 3-T12 3-T12 3-T12 3-T12
TYP. DETAILS FOR Ld SECONDARY BEAM JUNCTION
500
3094
500
1500
500
1081
500
3031
500 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8

3-T12 3-T12 3-T12 3-T12


REFERENCE DRAWINGS
3-T12
RB-19 RB-20 RB-21 RB-22
SECTION 1-1 SECTION 1-1 SECTION 1-1 SECTION 1-1 SR. DOCUMENT TITLE DOCUMENT NO. 01 SECOND SUBMISSION KK 01.03.24 LT 01.03.24 LT 01.03.24

B 3-T12 01
MCR - ARCHITECTURAL DETAILS, ELEVATIONS, SECTIONS AND
FINISHING (INCLUDING EQUIPMENT LAYOUT)
SECI-DVC-KTPS6MW-DWG-CIV-32 00 FIRST SUBMISSION KK 01.01.24 LT 01.01.24 LT 01.01.24 B
02
MCR - PLINTH BEAM GENERAL ARRANGEMENT AND REINFORCEMENT
SECI-DVC-KTPS6MW-DWG-CIV-35 NAME DATE NAME DATE NAME DATE
T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C DETAILS REV. DESCRIPTION
900 900 900 900 03
MCR - LINTEL BEAM GENERAL ARRANGEMENT AND REINFORCEMENT
SECI-DVC-KTPS6MW-DWG-CIV-36
DRAWN CHECKED APPROVED
C17 C12 C11 C6 C1 DETAILS
AS-BUILT APPROVAL INFORMATION PROPOSAL
1 1 1 1 04 MCR - ROOF GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-37 DRAWING ISSUED FOR
RB-19-(300X450) RB-20-(300X450) RB-21-(300X450) RB-22-(300X450) 05
MCR - CABLE TRENCH GENERAL ARRANGEMENT AND REINFORCEMENT
SECI-DVC-KTPS6MW-DWG-CIV-40
DETAILS PROJECT : 6 MWac FLOATING SOLAR PV (FSPV) PLANTS ON RAW WATER RESERVOIRS OF
NOTES: KODERMA THERMAL POWER PLANT
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED. 6. DEVELOPMENT LENGTH/LAP LENGTH FOR REINFORCEMENT BARS SHALL BE 50xDIA OF THE LEGEND:- CLIENT:- NAME SIGN. DATE
2. ANTI TERMITE TREATMENT SHALL BE PROVIDED BELOW FOUNDATION AND AT FLOOR LEVEL. LARGEST BAR AND NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ANY ONE SECTION. T.O.C.:- TOP OF CONCRETE DAMODAR VALLEY CORPORATION (DVC)
DRN. JS 01.03.2024
3. THIS DRAWING IS NOT TO BE SCALED ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 7. CLEAR COVER FOR MAIN REINFORCEMENT BARS SHALL BE AS FOLLOWS: F.G.L.:- FINISH GROUND LEVEL
SCALE
4. EL(+) 0.00M CORRESPONDS TO FINISHED GROUND LEVEL (F.G.L.). (a) ROOF BEAM = 40MM. T.O.F.:- TOP OF FOOTING CONSULTANT:- DGN. JS 01.03.2024
SOLAR ENERGY CORPORATION OF INDIA LTD N.T.S
8. LAP SPLICES SHALL BE PROVIDED ONLY IN THE CENTRAL HALF OF CLEAR COLUMN HEIGHT, B.O.F.:- BOTTOM OF FOOTING
A CONCRETE MIX GRADE MAX.AGGREGATE SIZE
AND NOT WITHIN A JOINT OR WITHIN A DISTANCE 2D FROM FACE OF THE BEAM. T.P.L.:- TOP OF PLINTH LEVEL
CKD. KA 01.03.2024 A
PCC M10 20mm 9. STIRRUPS SPACING SHALL BE 100 MM FOR ENTIRE LAP LENGTH. EPC CONTRACTOR:- SC 01.03.2024
FOOTING, BEAM, M30 20mm } (CONFIRMING TO
IS 456:2000) 10. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE MORE THAN 50% OF
B.S.L.:-
T.P.P.L.:-
BOTTOM OF SLAB
TOP OF PARAPET LEVEL
GENSOL ENGINEERING LTD.
APPD.
DRAWING NO. REV.
COLUMN, SLAB BARS SHALL BE LAPPED AT ANY SECTION. F.F.L.:- FINISH FLOOR LEVEL DRAWING TITLE: SECI-DVC-KTPS6MW-DWG-CIV-37 R1
5. ALL REINFORCEMENT STEEL SHALL BE HYSD (Fe 500D) CONFIRMING TO IS 1786. 11. ALL HOOKS, BENDS,LAPS,SPLICES SHALL BE AS PER RELEVANT IS CODES. L.L. :- LINTEL LEVEL MCR - ROOF GENERAL ARRANGEMENT AND
12. 75 MM THICK PCC 1:3:6 SHALL BE PROVIDED BELOW THE PLINTH BEAM. REINFORCEMENT DETAILS SHT. No. 01 No. OF SHT. 01 OF 05
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN
2 1 4 3-T12

STP 2L-T8
300 300
3281
4-T12

3-T12
RB-23
H SECTION 1-1 H
MCR
LOCATION

4-T12

T8@200 C/C T8@140 C/C


B10 B5
1096
1

RB-23-(300X400)

1 1 2 1 4 1 5 4-T12 4-T12 4-T12

500 500 500 500 STP 2L-T8 STP 2L-T8 STP 2L-T8
3094 3081 3031
G 3-T12 3-T12 3-T12 G
4-T12 RB-24 RB-25 RB-26
SECTION 1-1 SECTION 1-1 SECTION 1-1

3-T12

T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C

C18 900 900 C13 900 900 C7 900 900 C2


1 1 1
RB-24-(300X450) RB-25-(300X450) RB-26-(300X450)

F 1 1 2 1 4 1 5 3-T12 3-T12 3-T12 F


500 500 500 500 STP 2L-T8 STP 2L-T8 STP 2L-T8
3094 3081 3031
3-T12 3-T12 3-T12

3-T12
RB-27 RB-28 RB-29
SECTION 1-1 SECTION 1-1 SECTION 1-1

3-T12

T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C

C19 900 900 C14 900 900 C8 900 900 C3


1 1 1
E RB-27-(300X450) RB-28-(300X450) RB-29-(300X450) E

1 1 2 1 4 1 5 3-T12 3-T12 3-T12

500 500 500 500 STP 2L-T8 STP 2L-T8 STP 2L-T8
3094 3081 3031
3-T12 3-T12 3-T12

3-T12 RB-30 RB-31 RB-32


SECTION 1-1 SECTION 1-1 SECTION 1-1

3-T12

D T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C
D
900 900 900 900 900 900

C21 1 C15 1 C9 1 C4
RB-30-(300X450) RB-31-(300X450) RB-32-(300X450)

1 1 1 3-T12 3-T12 3-T12


1 2 4 5
500 500 500 500 STP 2L-T8 STP 2L-T8 STP 2L-T8
3094 3081 3031
3-T12 3-T12 3-T12

3-T12 RB-33 RB-34 RB-35


SECTION 1-1 SECTION 1-1 SECTION 1-1
C C
3-T12

T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C T8@70 C/C T8@190 C/C T8@70 C/C

C22 900 900 C16 900 900 C10 900 900 C5


1 1 1
RB-33-(300X450) RB-34-(300X450) RB-35-(300X450)

NOTES: LEGEND:-
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED. T.O.C.:- TOP OF CONCRETE
2. ANTI TERMITE TREATMENT SHALL BE PROVIDED BELOW FOUNDATION AND AT FLOOR LEVEL. F.G.L.:- FINISH GROUND LEVEL
3. THIS DRAWING IS NOT TO BE SCALED ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. T.O.F.:- TOP OF FOOTING 01 SECOND SUBMISSION KK 01.03.24 LT 01.03.24 LT 01.03.24

B 4. EL(+) 0.00M CORRESPONDS TO FINISHED GROUND LEVEL (F.G.L.). B.O.F.:- BOTTOM OF FOOTING 00 FIRST SUBMISSION KK 01.01.24 LT 01.01.24 LT 01.01.24 B
T.P.L.:- TOP OF PLINTH LEVEL
CONCRETE MIX GRADE MAX.AGGREGATE SIZE NAME DATE NAME DATE NAME DATE
B.S.L.:- BOTTOM OF SLAB REV. DESCRIPTION
PCC M10 20mm
FOOTING, BEAM, M30 20mm } (CONFIRMING TO
IS 456:2000)
T.P.P.L.:-
F.F.L.:-
TOP OF PARAPET LEVEL
FINISH FLOOR LEVEL
DRAWN
AS-BUILT
CHECKED
APPROVAL
APPROVED
INFORMATION PROPOSAL
COLUMN, SLAB L.L. :- LINTEL LEVEL DRAWING ISSUED FOR
5. ALL REINFORCEMENT STEEL SHALL BE HYSD (Fe 500D) CONFIRMING TO IS 1786.
PROJECT : 6 MWac FLOATING SOLAR PV (FSPV) PLANTS ON RAW WATER RESERVOIRS OF
6. DEVELOPMENT LENGTH/LAP LENGTH FOR REINFORCEMENT BARS SHALL BE 50xDIA OF THE KODERMA THERMAL POWER PLANT
REFERENCE DRAWINGS
LARGEST BAR AND NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ANY ONE SECTION.
CLIENT:- NAME SIGN. DATE
7. CLEAR COVER FOR MAIN REINFORCEMENT BARS SHALL BE AS FOLLOWS: DAMODAR VALLEY CORPORATION (DVC)
SR. DOCUMENT TITLE DOCUMENT NO.
(a) ROOF BEAM = 40MM. DRN. JS 01.03.2024
8. LAP SPLICES SHALL BE PROVIDED ONLY IN THE CENTRAL HALF OF CLEAR COLUMN HEIGHT, SCALE
01
MCR - ARCHITECTURAL DETAILS, ELEVATIONS, SECTIONS AND FINISHING (INCLUDING
SECI-DVC-KTPS6MW-DWG-CIV-32
CONSULTANT:- DGN. JS 01.03.2024
AND NOT WITHIN A JOINT OR WITHIN A DISTANCE 2D FROM FACE OF THE BEAM. EQUIPMENT LAYOUT)
SOLAR ENERGY CORPORATION OF INDIA LTD N.T.S
A 9. STIRRUPS SPACING SHALL BE 100 MM FOR ENTIRE LAP LENGTH. 02 MCR - PLINTH BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-35
CKD. KA 01.03.2024 A
10. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE MORE THAN 50% OF EPC CONTRACTOR:- SC 01.03.2024
APPD.
BARS SHALL BE LAPPED AT ANY SECTION. 03 MCR - LINTEL BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-36 GENSOL ENGINEERING LTD.
DRAWING NO. REV.
11. ALL HOOKS, BENDS,LAPS,SPLICES SHALL BE AS PER RELEVANT IS CODES.
04 MCR - ROOF GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-37 DRAWING TITLE: SECI-DVC-KTPS6MW-DWG-CIV-37
12. 75 MM THICK PCC 1:3:6 SHALL BE PROVIDED BELOW THE PLINTH BEAM. R1
MCR - ROOF GENERAL ARRANGEMENT AND
05 MCR - CABLE TRENCH GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-40 REINFORCEMENT DETAILS SHT. No. 01 No. OF SHT. 02 OF 05
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN
D E 3-T12

STP 2L-T8
29° 450 450
1515
3-T12

3-T12 RB-01
H SECTION 1-1 MCR
H
LOCATION

3-T12

21-2L-T8
A B C C' D E @70 C/C

3529 2672 3220 2806 C20 C21


2206 1323 1638 1034 1330 1890 2806 RB-01 - (300X450)

G G
2595
3331

D E 3-T12

STP 2L-T8
450 450
1515
3-T12

3-T12
RB-02
736

SECTION 1-1
4

3-T12
1481
1781

F 21-2L-T8
@70 C/C F
300

C23 C24
RB-02 - (300X450)
3
592
1800

1208

2
3-T12
1 2
STP 2L-T8
E E
2136

500 500
1433 3-T12

RB-03
3594

3-T12
SECTION 1-1
1458

3-T12
RB-01-
22-2L-T8
(300x450) @70 C/C

1 C23 C20
RB-03 - (300X450)
75 225 150 150
(300x450)

(300x450)

D D
RB-03-

RB-04-
2033

RB-02-
(300x450)
150

0
150

1 2 3-T12

ROOF BEAM LAYOUT @2.55M STP 2L-T8


500 500
1433
3-T12

3-T12
RB-04
SECTION 1-1
C C
3-T12

22-2L-T8
@70 C/C

C24 C21
RB-04 - (300X450)
NOTES: LEGEND:-
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED. T.O.C.:- TOP OF CONCRETE
2. ANTI TERMITE TREATMENT SHALL BE PROVIDED BELOW FOUNDATION AND AT FLOOR LEVEL. F.G.L.:- FINISH GROUND LEVEL
3. THIS DRAWING IS NOT TO BE SCALED ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. T.O.F.:- TOP OF FOOTING 01 SECOND SUBMISSION KK 01.03.24 LT 01.03.24 LT 01.03.24

B 4. EL(+) 0.00M CORRESPONDS TO FINISHED GROUND LEVEL (F.G.L.). B.O.F.:- BOTTOM OF FOOTING 00 FIRST SUBMISSION KK 01.01.24 LT 01.01.24 LT 01.01.24 B
T.P.L.:- TOP OF PLINTH LEVEL
CONCRETE MIX GRADE MAX.AGGREGATE SIZE NAME DATE NAME DATE NAME DATE
B.S.L.:- BOTTOM OF SLAB REV. DESCRIPTION
PCC M10 20mm
FOOTING, BEAM, M30 20mm } (CONFIRMING TO
IS 456:2000)
T.P.P.L.:-
F.F.L.:-
TOP OF PARAPET LEVEL
FINISH FLOOR LEVEL
DRAWN
AS-BUILT
CHECKED
APPROVAL
APPROVED
INFORMATION PROPOSAL
COLUMN, SLAB L.L. :- LINTEL LEVEL DRAWING ISSUED FOR
5. ALL REINFORCEMENT STEEL SHALL BE HYSD (Fe 500D) CONFIRMING TO IS 1786.
PROJECT : 6 MWac FLOATING SOLAR PV (FSPV) PLANTS ON RAW WATER RESERVOIRS OF
6. DEVELOPMENT LENGTH/LAP LENGTH FOR REINFORCEMENT BARS SHALL BE 50xDIA OF THE KODERMA THERMAL POWER PLANT
REFERENCE DRAWINGS
LARGEST BAR AND NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ANY ONE SECTION.
CLIENT:- NAME SIGN. DATE
7. CLEAR COVER FOR MAIN REINFORCEMENT BARS SHALL BE AS FOLLOWS: DAMODAR VALLEY CORPORATION (DVC)
SR. DOCUMENT TITLE DOCUMENT NO.
(a) ROOF BEAM = 40MM. DRN. JS 01.03.2024
8. LAP SPLICES SHALL BE PROVIDED ONLY IN THE CENTRAL HALF OF CLEAR COLUMN HEIGHT, SCALE
01
MCR - ARCHITECTURAL DETAILS, ELEVATIONS, SECTIONS AND FINISHING (INCLUDING
SECI-DVC-KTPS6MW-DWG-CIV-32
CONSULTANT:- DGN. JS 01.03.2024
AND NOT WITHIN A JOINT OR WITHIN A DISTANCE 2D FROM FACE OF THE BEAM. EQUIPMENT LAYOUT)
SOLAR ENERGY CORPORATION OF INDIA LTD N.T.S
A 9. STIRRUPS SPACING SHALL BE 100 MM FOR ENTIRE LAP LENGTH. 02 MCR - PLINTH BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-35
CKD. KA 01.03.2024 A
10. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE MORE THAN 50% OF EPC CONTRACTOR:- SC 01.03.2024
APPD.
BARS SHALL BE LAPPED AT ANY SECTION. 03 MCR - LINTEL BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-36 GENSOL ENGINEERING LTD.
DRAWING NO. REV.
11. ALL HOOKS, BENDS,LAPS,SPLICES SHALL BE AS PER RELEVANT IS CODES.
04 MCR - ROOF GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-37 DRAWING TITLE: SECI-DVC-KTPS6MW-DWG-CIV-37
12. 75 MM THICK PCC 1:3:6 SHALL BE PROVIDED BELOW THE PLINTH BEAM. R1
MCR - ROOF GENERAL ARRANGEMENT AND
05 MCR - CABLE TRENCH GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-40 REINFORCEMENT DETAILS SHT. No. 01 No. OF SHT. 03 OF 05
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

A B C C' D E
29°
3529 2672 3220 2806
B
H MCR
H
LOCATION

5
EXT. TOP S3 S4

510

510

510

510
EXT. TOP EXT. TOP 8T @200C/C
450 8T @200C/C 8T @200C/C

1000

1000

1000

1000
(150THK) (150THK)
800 970
EXT. TOP NOTES:
1050 800 730 630
1050 8T @200C/C 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
EXT. TOP
EXT. TOP 8T @200C/C 730 2. ANTI TERMITE TREATMENT SHALL BE PROVIDED BELOW FOUNDATION AND AT FLOOR
EXT. TOP
8T @200C/C 8T @200C/C LEVEL.

3331
810 595 595
540 8T@200 C/C 8T@200 C/C 8T@200 C/C 3. THIS DRAWING IS NOT TO BE SCALED ONLY WRITTEN DIMENSIONS ARE TO BE
ALT. BENT UP ALT. BENT UP ALT. BENT UP
8T@200 C/C 420 FOLLOWED.
G ALT. BENT UP 730 630 850 4. EL(+) 0.00M CORRESPONDS TO FINISHED GROUND LEVEL (F.G.L.).
G
595 730
970 850 CONCRETE MIX GRADE MAX.AGGREGATE SIZE
S1 595 EXT. TOP
810 8T @200C/C
EXT. TOP PCC M10 20mm
S2
} (CONFIRMING TO

1000

1000

1000

1000
EXT. TOP 8T @200C/C
EXT. TOP FOOTING, BEAM, M30 20mm IS 456:2000)

760

760

760

760

760

760

760

760

760
8T @200C/C (150THK) 8T @200C/C
COLUMN, SLAB
(150THK)
5. ALL REINFORCEMENT STEEL SHALL BE HYSD (Fe 500D) CONFIRMING TO IS 1786.
6. DEVELOPMENT LENGTH/LAP LENGTH FOR REINFORCEMENT BARS SHALL BE 50xDIA
4
OF THE LARGEST BAR AND NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ANY

315
480 260 EXT. TOP ONE SECTION.
260 8T @200C/C 800 970

825

825

825

825

825

825

825

825
1080 7. CLEAR COVER FOR MAIN REINFORCEMENT BARS SHALL BE AS FOLLOWS:

1080

1080

1080
S5 595 EXT. TOP S8 (a) SLAB = 20MM.
8T@200 C/C
F ALT. BENT UP 800
8T @200C/C 8. LAP SPLICES SHALL BE PROVIDED ONLY IN THE CENTRAL HALF OF CLEAR COLUMN F
(150THK) HEIGHT, AND NOT WITHIN A JOINT OR WITHIN A DISTANCE 2D FROM FACE OF THE
1050 730 630
EXT. TOP (150THK)

210
1050 BEAM.
8T @200C/C
8T@200 C/C 9. STIRRUPS SPACING SHALL BE 100 MM FOR ENTIRE LAP LENGTH.
EXT. TOP 730 8T@200 C/C
3581

595 ALT. BENT UP ALT. BENT UP 10. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE MORE THAN
8T @200C/C
3 595 8T@200 C/C 50% OF BARS SHALL BE LAPPED AT ANY SECTION.
ALT. BENT UP 420
320 8T@200 C/C OPENING 11. ALL HOOKS, BENDS,LAPS,SPLICES SHALL BE AS PER RELEVANT IS CODES.
ALT. BENT UP 730 850 12. 75 MM THICK PCC 1:3:6 SHALL BE PROVIDED BELOW THE PLINTH BEAM.
730
320 595 EXT. TOP
970 850 8T @200C/C
S6 S7 LEGEND:-
EXT. TOP EXT. TOP EXT. TOP
1080

1080

1080

1080
EXT. TOP S9
8T @200C/C 8T @200C/C 8T @200C/C T.O.C.:- TOP OF CONCRETE
825

825

825

825

825

825

825

825
8T @200C/C
(150THK) F.G.L.:- FINISH GROUND LEVEL
E (150THK)
(150THK) T.O.F.:- TOP OF FOOTING
E
B.O.F.:- BOTTOM OF FOOTING
2 T.P.L.:- TOP OF PLINTH LEVEL
S12 S13
S10 B.S.L.:- BOTTOM OF SLAB
S11
T.P.P.L.:- TOP OF PARAPET LEVEL
825

825

825

825

825

825

825

825
1080

1080

1080

1080
(150THK) (150THK) F.F.L.:- FINISH FLOOR LEVEL
(150THK)
(150THK)
L.L. :- LINTEL LEVEL
EXT. TOP
8T @200C/C 730 630
1050
595 730 8T@200 C/C
EXT. TOP 1050 800
ALT. BENT UP
3594

8T @200C/C 8T@200 C/C


540 810 595 8T@200 C/C
8T@200 C/C ALT. BENT UP
D A ALT. BENT UP ALT. BENT UP 420
A D
730 630 850
730

595 970 850


810
800 970
1080

1080

1080

1080
EXT. TOP EXT. TOP
EXT. TOP 8T @200C/C 8T @200C/C
EXT. TOP EXT. TOP
550

550

550

550
8T @200C/C EXT. TOP
8T @200C/C 8T @200C/C
8T @200C/C

1 REFERENCE DRAWINGS

SR. DOCUMENT TITLE DOCUMENT NO.

C 01
MCR - ARCHITECTURAL DETAILS, ELEVATIONS, SECTIONS AND FINISHING (INCLUDING
EQUIPMENT LAYOUT)
SECI-DVC-KTPS6MW-DWG-CIV-32 C
ROOF SLAB LAYOUT @4.65M B 02 MCR - PLINTH BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-35

03 MCR - LINTEL BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-36


115 8T @200C/C T.P.P.L(+5.10M)
8T @200C/C 04 MCR - ROOF GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-37
8T @200C/C 8T @200C/C 8T @200C/C 8T @200C/C 8T @200C/C 8T @200C/C
450

05 MCR - CABLE TRENCH GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-40


8T @200C/C 8T@200 C/C 8T @200C/C 8T@200 C/C 8T@200 C/C 8T@200 C/C
A B C D E
1050 1050 800 800 970 970 850 850 T.O.S(+4.65M)
150

450 01 SECOND SUBMISSION KK 01.03.24 LT 01.03.24 LT 01.03.24


450 540 810 595 595 730 730 630 420
B T8@200 C/C T8@200 C/C T8@200 C/C T8@200 C/C 00 FIRST SUBMISSION KK 01.01.24 LT 01.01.24 LT 01.01.24 B
ALT. BENT UP ALT. BENT UP ALT. BENT UP ALT. BENT UP
T8@200 C/C T8@200 C/C T8@200 C/C T8@200 C/C NAME DATE NAME DATE NAME DATE
REV. DESCRIPTION
ALT. BENT UP ALT. BENT UP ALT. BENT UP ALT. BENT UP DRAWN CHECKED APPROVED
SECTION-AA AS-BUILT APPROVAL INFORMATION PROPOSAL
DRAWING ISSUED FOR
115 T.P.P.L(+5.10M)
8T @200C/C 8T @200C/C PROJECT : 6 MWac FLOATING SOLAR PV (FSPV) PLANTS ON RAW WATER RESERVOIRS OF
KODERMA THERMAL POWER PLANT
450

8T @200C/C 8T@200 C/C 8T @200C/C 8T @200C/C 8T@200 C/C 8T @200C/C 8T @200C/C 8T@200 C/C 8T @200C/C CLIENT:- NAME SIGN. DATE
1 2 3 4 DAMODAR VALLEY CORPORATION (DVC)
1080 1080 1080 1080 1000 1000 T.O.S(+4.65M) DRN. JS 01.03.2024
SCALE
150

CONSULTANT:- DGN. JS 01.03.2024


SOLAR ENERGY CORPORATION OF INDIA LTD N.T.S
A 450 550 825 825 825 760 510 450 CKD. KA 01.03.2024 A
T8@200 C/C T8@200 C/C T8@200 C/C EPC CONTRACTOR:-
APPD. SC 01.03.2024
ALT. BENT UP ALT. BENT UP ALT. BENT UP GENSOL ENGINEERING LTD.
T8@200 C/C T8@200 C/C T8@200 C/C DRAWING NO. REV.
ALT. BENT UP ALT. BENT UP ALT. BENT UP DRAWING TITLE: SECI-DVC-KTPS6MW-DWG-CIV-37 R1
MCR - ROOF GENERAL ARRANGEMENT AND
SECTION-BB REINFORCEMENT DETAILS SHT. No. 01 No. OF SHT. 04 OF 05
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
KEY PLAN

29°

H MCR
H
LOCATION

A B C C' D E
3529 2672 3220 2806

1330 1890 NOTES:


1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. ANTI TERMITE TREATMENT SHALL BE PROVIDED BELOW FOUNDATION AND AT FLOOR
LEVEL.
5 3. THIS DRAWING IS NOT TO BE SCALED ONLY WRITTEN DIMENSIONS ARE TO BE
FOLLOWED.
G 4. EL(+) 0.00M CORRESPONDS TO FINISHED GROUND LEVEL (F.G.L.).
G
CONCRETE MIX GRADE MAX.AGGREGATE SIZE

PCC M10 20mm


FOOTING, BEAM, M30 20mm } (CONFIRMING TO
IS 456:2000)
COLUMN, SLAB
3331

5. ALL REINFORCEMENT STEEL SHALL BE HYSD (Fe 500D) CONFIRMING TO IS 1786.


6. DEVELOPMENT LENGTH/LAP LENGTH FOR REINFORCEMENT BARS SHALL BE 50xDIA
OF THE LARGEST BAR AND NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ANY
ONE SECTION.
7. CLEAR COVER FOR MAIN REINFORCEMENT BARS SHALL BE AS FOLLOWS:
(a) SLAB = 20MM.
F 8. LAP SPLICES SHALL BE PROVIDED ONLY IN THE CENTRAL HALF OF CLEAR COLUMN F
HEIGHT, AND NOT WITHIN A JOINT OR WITHIN A DISTANCE 2D FROM FACE OF THE
BEAM.
9. STIRRUPS SPACING SHALL BE 100 MM FOR ENTIRE LAP LENGTH.
4 10. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE MORE THAN
50% OF BARS SHALL BE LAPPED AT ANY SECTION.
11. ALL HOOKS, BENDS,LAPS,SPLICES SHALL BE AS PER RELEVANT IS CODES.
12. 75 MM THICK PCC 1:3:6 SHALL BE PROVIDED BELOW THE PLINTH BEAM.
1781

LEGEND:-
T.O.C.:- TOP OF CONCRETE
F.G.L.:- FINISH GROUND LEVEL
E 3 T.O.F.:- TOP OF FOOTING
E
B.O.F.:- BOTTOM OF FOOTING
T.P.L.:- TOP OF PLINTH LEVEL
B.S.L.:- BOTTOM OF SLAB
1800

T.P.P.L.:- TOP OF PARAPET LEVEL


F.F.L.:- FINISH FLOOR LEVEL
L.L. :- LINTEL LEVEL

D D
3594

REFERENCE DRAWINGS

SR. DOCUMENT TITLE DOCUMENT NO.

C 01
MCR - ARCHITECTURAL DETAILS, ELEVATIONS, SECTIONS AND FINISHING (INCLUDING
EQUIPMENT LAYOUT)
SECI-DVC-KTPS6MW-DWG-CIV-32 C
EXT. TOP 02 MCR - PLINTH BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-35

8T @200C/C
03 MCR - LINTEL BEAM GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-36

1
04 MCR - ROOF GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-37
S1
275

610

05 MCR - CABLE TRENCH GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS SECI-DVC-KTPS6MW-DWG-CIV-40

(150THK)
255 8T@200 C/C
2033

EXT. TOP ALT. BENT UP EXT. TOP


8T @200C/C
8T @200C/C
550 01 SECOND SUBMISSION KK 01.03.24 LT 01.03.24 LT 01.03.24
255
B B
610

550 00 FIRST SUBMISSION KK 01.01.24 LT 01.01.24 LT 01.01.24


275

NAME DATE NAME DATE NAME DATE


REV. DESCRIPTION
0 DRAWN CHECKED APPROVED
AS-BUILT APPROVAL INFORMATION PROPOSAL
EXT. TOP DRAWING ISSUED FOR
8T @200C/C
PROJECT : 6 MWac FLOATING SOLAR PV (FSPV) PLANTS ON RAW WATER RESERVOIRS OF
KODERMA THERMAL POWER PLANT

ROOF SLAB LAYOUT @2.65M CLIENT:-


DAMODAR VALLEY CORPORATION (DVC)
NAME SIGN. DATE

DRN. JS 01.03.2024

CONSULTANT:- SCALE
DGN. JS 01.03.2024
SOLAR ENERGY CORPORATION OF INDIA LTD N.T.S
A CKD. KA 01.03.2024 A
EPC CONTRACTOR:- SC 01.03.2024
APPD.
GENSOL ENGINEERING LTD.
DRAWING NO. REV.
DRAWING TITLE: SECI-DVC-KTPS6MW-DWG-CIV-37 R1
MCR - ROOF GENERAL ARRANGEMENT AND
REINFORCEMENT DETAILS SHT. No. 01 No. OF SHT. 05 OF 05