Azbil India Private Limited

CP-AHU CONTROL PANEL Operation & Maintenance Manual

Revision 0 17 October 2022

AHU CONTROL PANEL OUTLINE:

1|Page
Azbil India Private Limited

RL0, YL0, BL0: Red/Yellow/Blue Lamps(3 ph 415V Incoming Indicator)


WL1: White Lamp(AC240V Control Power Indicator)
RL1: RED Lamp (Heater 1 ALARM)
RL2: RED Lamp (Heater 1 ALARM)
RL3: RED Lamp (FIRE ALARM)
GL1: GREEN Lamp (OA FAN MC STATUS)
RL4: RED Lamp (OA FAN OverCurrent TRIP)
GL2: GREEN Lamp(AHU-1 STATUS)
RL5: RED Lamp (AHU-1 ALARM)
GL3: GREEN Lamp(AHU-2 STATUS)
RL6: RED Lamp (AHU-2 ALARM)
SS1: Selector Switch(HEATER 1 OFF or AUTO)
SS2: Selector Switch(HEATER 2 OFF or AUTO)
SS3: Selector Switch(OA FAN INTERLOCK MANUAL or AUTO)
SS4: Selector Switch(OA FAN MANUAL OFF or ON)
SS5: Selector Switch(AHU-1 MANUAL OFF or ON)
SS6: Selector Switch(AHU-2 MANUAL OFF or ON)
EMG: ORANGE Push Button & Latch (Emergency Stop OFF or ON)
PB1: Yellow Push Button (Buzzer Stop & Shutdown MANUAL RESET)
Buzzer: Buzzer (Sound in case of New ALARM Coming)
TIC-1-1: AHU-1 Return Air Temperature Controller (SET POINT Settable)
HIC-1: AHU-1 Return Air Humidity Controller (SET POINT Settable)
TIC-1-2: AHU-1 Supply Air Temperature Controller (Un-settable)
DIC-1: AHU-1 Supply Air Dew Point Temperature Controller (Un-settable)
TIC-2-1: AHU-2 Return Air Temperature Controller (SET POINT Settable)
HIC-2: AHU-2 Return Air Humidity Controller (SET POINT Settable)
TIC-2-2: AHU-2 Supply Air Temperature Controller (Un-settable)
DIC-2: AHU-2 Supply Air Dew Point Temperature Controller (Un-settable)

2|Page
Azbil India Private Limited

AHU Control Schematics

The designed condition:

AHU-1/2 Retun Air Temperature: 24 degree C +/- 1 C

AHU-1/2 Retun Air Relative Humidity: 50%RH (14 C dew point) or lower

AHU-1/2 Supply Air Temperature Control Range: 15 to 25 C

AHU-1/2 Supply Air Dew Point Temp Control Range: 10 to 14 C DP

3|Page
Azbil India Private Limited

Standard Startup Operation Procedure:

1. Check if the 3 phases Incoming power RL0/YL0/BL0 indicators are ON;

2. Inside the Panel, confirm if all the MCCBs & MCBs are ON;

MCCB1&2, MCB3-11 and MPCB1

3. Mnaual ON on Incoming MCCB0;

4. Set and confirm AHU-1/2 Return Air Temperature & Humidity Set Point;

Return Air Temperature Satndard SP=25 C (15-35C settable)

Return Air Humidity Satndard SP=50%RH(0-100%RH settable)

5. Confirm if any ALARM indicators no happaen;

RL1-RL6

6. Start AHU-1/2 ON by Selector Switch SS5/6;

7. Start OA FAN ON by Selector Switch SS4;

If SS3 is AUTO, OA FAN will be interlocked with AHU-1/2

8. Confirm if SS1/2 is AUTO;

If Electrical Heater shall be stopped, trun OFF SS1/2

Then,

Return Air Constant Temperature & Constant Humidity Control must work;

4|Page
Azbil India Private Limited

Standard Shutdown Operation Procedure:

1. Start AHU-1/2 OFF by Selector Switch SS5/6;

Immidiately Heating, Cooling & Dehumifying Control will stop

But OFF Delay remains for 10 minutes in order to prevent Heater from Fire

2. Confirm if AHU-1/2 are completely stopped;

3. Switch off all the MCCBs and MCBs if needed;

In case of Fire Alarm Signal coming

All AHU-1/2 and OA FAN will Immidiately stop;

The shutwon condition will be kept;

In case of pushing Emergency Stop

All AHU-1/2 and OA FAN will Immidiately stop;

The shutwon condition will be kept;

In case of New alarms coming

Buzzer will sound and continue sounding till pushing the PB1 for a second

5|Page
Azbil India Private Limited

Procedure of Recovery from Forced shutdown due to Fire & EMG stop

Even if Fire signal is gone and Emergy Stop Button Latch is released, AHU-1/2

and OA Fan cannot be resumed;

Confirm if all the AHU-1/2 SS5/6 are OFF;

Push PB1 button for more than 10 seconds, and all the forced sutdown

condition will be reset;

Then,

Go to Standrad Startup Operation Procedure;

6|Page
Azbil India Private Limited
TIC-1/2-1: AHU-1/2 Return Air Temperature Controller PXF9AEY2-1VM00
PV input: Duct Insertion Temperature& Humidity sensor (HTY7805T1P00)
PV Range: 0 to 150 °C (Pt100)
SP(SV) : 24°C or settable
Proportional Band: 2 K(1.3%); Integral Time: 300 sec
MV output: Reverse Action
Modbus Device ID: 1 and 5
HI-1/2: AHU-1/2 Return Air Humidity Controller PXF9AEY2-1VM00
PV input: Duct Insertion Temperature & Humidity sensor (HTY7805T1P00)
PV Range: 0 to 100 %RH (1 to 5 VDC)
SP(SV) : 50%RH or settable
Proportional Band: 5%RH(5%); Integral Time: 300 sec
MV output: Reverse Action
Modbus Device ID: 2 and 6
TIC-1/2-2: Supply Air Temperature Controller PXF9AEY2-1VM00
PV input: Duct Insertion Temperature& Dew Point Temp sensor (HTY7905T1P00)
PV Range: 0 to 150 °C (Pt100)
Set Point(SV): 15 to 25 degrees Celsius changeable due to TIC-1/2-1 MV value
Proportional Band: 5 degree Kelvin (3.3% of Range)
Integral Time: 120 seconds
MV output: Reverse Action (when temperature is higher than SP, MV is 0%)
MV:0-50% is Cooling; MV:50-100% is ReHeating
RUN/STANDBY Interlock is done by DDC Controller Judgement
RUN AND Conditions: AHU-1/2 ON; AHU-1/2 STS; AHU-1/2 No Alarm;
AHU-1/2 Velocity Pressure ON; AHU-1/2 Heater No Overheat; No Forced Shutdown
Modbus Device ID: 3 and 7
DIC-1/2: Supply Air Dew Point Temperature Controller PXF9AEY2-1VM00
PV input: Duct Insertion Dew Point Temperature & Temp sensor (HTY7905T1P00)
PV Range: -40 to 60 °CDP (1 to 5 VDC)
Set Point(SV): 10 to 14 degrees Celsius DP changeable due to HIC-1/2 MV value
Proportional Band: 5 degree Kelvin DP (5% of Range)
Integral Time: 120 seconds
MV output: Reverse Action (when Dew Point temperature is higher than SP, MV is 0%)
MV:0-50% is Dehumidifying
RUN/STANDBY Interlock is done by DDC Controller Judgement
RUN AND Conditions: AHU-1/2 ON; AHU-1/2 STS; AHU-1/2 No Alarm;
AHU-1/2 Velocity Pressure ON; No Forced Shutdown

7|Page
Azbil India Private Limited
Modbus Device ID: 4 and 8

O&M for Instruments and Devices:

Temperature & Humidity PID Controller FUJI PXF9AE2-1VM00

8|Page
Azbil India Private Limited

9|Page
Azbil India Private Limited

Thyristor Power Controller PU23A2040AF31

10 | P a g e
Azbil India Private Limited

SETTINGS

11 | P a g e
Azbil India Private Limited

12 | P a g e
Azbil India Private Limited

DDC CONTROLLER WJ-1103W0000


WJ-1103W0000 RJ-1101W1600 RJ-1102W1600
TYPE SI POINT DESCRIPTION TYPE SI POINT DESCRIPTION TYPE SI POINT DESCRIPTION
1 AHU-1 TIC-1-1 MV 1 FIRE SIGANAL INPUT ON 1 AHU-1 HEATER ALARM LAMP
2 AHU-1 TIC-1-2 MV 2 EMERGENCY STOP ON 2 AHU-2 HEATER ALARM LAMP
3 AHU-1 HIC-1 MV 3 AHU-1 FLILTER ALARM 3 OA FAN RUN STATUS LAMP
4 AHU-1 DIC-1 MV 4 AHU-2 FLILTER ALARM 4 OA FAN TRIP LAPM
UI DO
5 AHU-2 TIC-2-1 MV 5 AHU-1 SCR ALM1+ALM2 ON 5 AHU-1 RUN STATUS LAMP
6 AHU-2 TIC-2-2 MV 6 AHU-1 SCR ALM3 ON is NORMAL STS 6 AHU-1 ALARM LAMP
7 AHU-2 HIC-2 MV 7 AHU-2 SCR ALM1+ALM2 ON 7 AHU-2 RUN STATUS LAMP
8 AHU-2 DIC-2 MV 8 AHU-2 SCR ALM3 ON is NORMAL STS 8 AHU-2 ALARM LAMP
DI
1 AHU-1 HEATER SCR SIGNAL 4-20mADC 9 AHU-1 DUCT OVERHEAT ON 1 OA FAN MANUAL/INTERLOCK SELECT
2 AHU-1 DX COIL SIGNAL 0-10VDC 10 AHU-2 DUCT OVERHEAT ON 2 OA FAN MANUAL ON
3 AHU-2 HEATER SCR SIGNAL 4-20mADC 11 AHU-1 DUCT AIR VELOCITY ON 3 AHU-1 MANUAL ON
AO
4 AHU-2 DX COIL SIGNAL 0-10VDC 12 AHU-2 DUCT AIR VELOCITY ON 4 AHU-2 MANUAL ON
DI
5 SPARE 13 OA FAN STATUS from MC 5 BUZZER STOP ON
6 SPARE 14 OA FAN TRIP from OVERLOAD RELAY 6 SPARE
1 OA FAN ON COMMAND 15 AHU-1 HEATER AUTO/OFF SELECT 7 SPARE
2 BUZZER OUTPUT 16 AHU-2 HEATER AUTO/OFF SELECT 8 SPARE
3 AHU-1 SCR ENABLE
DO
4 AHU-2 SCR ENABLE
5 AHU-1 ON COMMAND to DAIKIN
6 AHU-2 ON COMMAND to DAIKIN
1 AHU-1 STATUS from DAIKIN
2 AHU-1 ALARM from DAIKIN
DI
3 AHU-2 STATUS from DAIKIN
4 AHU-2 ALARM from DAIKIN

13 | P a g e
Azbil India Private Limited

14 | P a g e
Azbil India Private Limited

KEY CONTACTS

Name Department Designation Email


S Dhurgeshwaran Chennai BSC Engineer s.dhurgeshwaran.r6@in.azbil.com
P Ezhilselvan Chennai BSC Regional Manager p.ezhilselvan.u3@in.azbil.com
Eiji Noda Gurgaon, Japanese General Manger e.noda.9a@in.azbil.com
PJ

(END)

15 | P a g e