QUALITY ASSURANCE PLAN – STRUCTURAL WORKS

Sl. No Item Test Test Method Minimum Frequency Specified Value


Initial & Final Setting time IS-4031:1988 MORTH, CL. 1006 &
Part 5 Qty received at site on any Confirm to
1. Cement day, subjected to a max of IS-8112:2013
Compressive Strength IS-4031:1988
500 MT. IS-12269:2013
Part 6
IS-1489:1991
Moisture Content IS-2386:1963 Daily before start concrete IS-383:1970,
Part 2 production and as required IRC SP-47:1998
Specific gravity& water IS-2386:1963 At the beginning of Mix IS-383:1970,
absorption Part-3 design & for every change IRC SP-47:1998
of source
Sieve Analysis IS-2386:1963 At the beginning of Mix IS-383:1970,
Part-1 design & for every change IRC SP-47:1998
of source/ stack & for every
major structural element
Aggregate IS-2386:1963 At the beginning of Mix IS-383:1970,
Aggregate (CA &
2. crushing/Impact/Abrasion Part-4 design & for every change IRC SP-47:1998
FA)
Value for CA of source
IS-2386:1963 At the beginning of Mix IS-383:1970,
Flakiness Index for CA Part-1 design & for every change IRC SP-47:1998
of source/ stack & for every
major structural element
IS-2386:1963 At the beginning of Mix IS-383:1970,
Deleterious content Part-2 design & for every change IRC SP-47:1998
of source/ stack & for every
major structural element

FSEL-1034-QAM Rev. R 1 Page


Sl. No Item Test Test Method Minimum Frequency Specified Value
Trial Mix design IS 10262, IRC For every Grade and MORTH CL.
112 revised if source of any 1704.2.2
constituent is changed
Compressive Strength of IS-516:1959 MORTH Table 1700-9 IS-456:2000
3. Concreting
Cubes MORTH Section-
1700
Workability- Slump IS-1199:1959 As per site requirement IS-456:2000,
MORTH CL. 1704.1
Test should be conducted for Min 27MPa at 7 days
Compressive strength each job periodically or 30MPa at 28 days.
4. Grouting (100mm X 100mm X 100 IS:516-1959 As per MORTH
mm) Appendix-1800/III
Cl. 4

FSEL-1034-QAM Rev. R 1 Page