This document appears to be an engineering assignment asking a student to submit a drawing of a concrete masonry unit (CMU) wall and hollow core pre-cast concrete slab foundation system by a deadline of February 4th, 2020. The drawing must include a 2-inch concrete topping slab on a 4-inch hollow core pre-cast concrete slab, which is bearing on a high density plate over a spread footing foundation. Steel dowels connect the pre-cast slab to grouted shear keys that extend into the CMU wall.
This document appears to be an engineering assignment asking a student to submit a drawing of a concrete masonry unit (CMU) wall and hollow core pre-cast concrete slab foundation system by a deadline of February 4th, 2020. The drawing must include a 2-inch concrete topping slab on a 4-inch hollow core pre-cast concrete slab, which is bearing on a high density plate over a spread footing foundation. Steel dowels connect the pre-cast slab to grouted shear keys that extend into the CMU wall.
This document appears to be an engineering assignment asking a student to submit a drawing of a concrete masonry unit (CMU) wall and hollow core pre-cast concrete slab foundation system by a deadline of February 4th, 2020. The drawing must include a 2-inch concrete topping slab on a 4-inch hollow core pre-cast concrete slab, which is bearing on a high density plate over a spread footing foundation. Steel dowels connect the pre-cast slab to grouted shear keys that extend into the CMU wall.
This document appears to be an engineering assignment asking a student to submit a drawing of a concrete masonry unit (CMU) wall and hollow core pre-cast concrete slab foundation system by a deadline of February 4th, 2020. The drawing must include a 2-inch concrete topping slab on a 4-inch hollow core pre-cast concrete slab, which is bearing on a high density plate over a spread footing foundation. Steel dowels connect the pre-cast slab to grouted shear keys that extend into the CMU wall.