20 Venda Nova Iii Repowering Project
20 Venda Nova Iii Repowering Project
R EP O W ER IN G P R O JECT
M anuelAlbertoO liveira
P rojectM anager
Client
EDP -EnergiasdeP ortugal
Engineering
EDP -EnergiasdeP ortugal
Construction w orks
M S F/M ota-Engil/S om ague/S pieBatignolles
Equipm entsupplier
VoithHydro/S iem ens
S upervision
FAS E/Gibb andT abique
9 Km tunnellinglength
1 m illionm 3 excavated volum e
6 yearsconstruction
U pstream surge
tank
400 m
W aterintake
O utletstructure
P ow erhousecavern
1,
5km 3 km
U pstream surge
tank
O utlet 400 m
P ow erhousecavern
1,
5km 3 km
12 m
12 m
U pstream surge
tank
400 m
Headrace
tunnel W aterintake
theexcavationface 12 m
U pstream
S urgeT ank
400 m
S andtrap W aterintake
O utletstructure
P ow erhousecavern
1,
5km 3 km
78 m
P rotection of the turbines against w ater M ainS haft
ham m er
U nusuallayout ConnectionS hafts
M ainfeatures
• O penairexpansioncham ber
• Concretelined m ainshaft(13 x 80 m )
• T w inunlined connectionshafts(raiseboring
5, 40 m x 360 m )
360 m
13 m 13 m
ExpansionCham ber(view from thetop) M ainS haft(view from thebottom ) L ow erCham ber
• 22,
5 m excavation diam eter
• 20 m diam eterafterconcretelining
T ransition to pow erhouse through an inclined
steellined branchat45º
22,
5m
22,
5m
100 m
U pstream surge
tank
400 m
W aterintake
O utletstructure
P ow erhouse
1,
5km Cavern 3 km
U nits’Cham ber
27m
60 m
T hankyou foryourlistening!
m anuelalberto.oliveira@ edp.pt | w w w .edp.pt