Client: CONVERGE ICT

Project : WATERPROOFING WORKS AT CONVERGE WAREHOUSE 1&2


Location : 1638 Mabato rd, Taguig, Metro manila
Subject : Proposed Structural Epoxy Injection on Wall Cracks, repair and realignment Of windows and application of elastomeric waterproofing paints

Date : Oct 8, 2023


Cost Total Cost
Item Description Qty Unit Grand Total
Material& Labor Material& Labor
I. GENERAL REQUIREMENTS
1.0 Mobilization & Demobilization 1 lot 50,000.00 50,000.00
2.0 Work Permits
a. LGU - Renovation Permits 1 lot N/A N/A
3.0 Insurance & Bonds
a.Contractor All Risk Insurance 1 lot 25,000.00 25,000.00
4.0 Temporary Facilities
a.Site office-CM, PIC and Safety Officer 1 lot 35,000.00 35,000.00

SUB TOTAL 110,000.00 110,000.00


WAREHOUSE 1 & 2
A. Application of Structural Epoxy Injection on Wall Cracks

1.0 Surface Preparation : Cleaning and removal of peeling off paints 400 lm 125.00 50,000.00
2.0 Grinding and V Cut of Cracks preparation for Expo Injection - Seal bond 218 Structural Epoxy 400 lm 300.00 120,000.00
3.0 Application of Epoxy Injecting on Wall Cracks 400 lm 1,750.00 700,000.00
Scaffolding, Supports, Full Body Harness, Lifelines ,Safety Nets / Signages Safety and Conformances (
4.0 Working on Heights Certification 1 lot 25,000.00 25,000.00
5.0 Hauling and Cleaning of affected area 1 lot 15,000.00 15,000.00
-
SUB TOTAL 910,000.00 910,000.00
WAREHOUSE 1 & 2
A. Application of ELASTOMERIC WATERPROOFING PANTS - Exterior Walls only
1.0 Surface Preparation : Cleaning and removal of peeling off paints 2613.6 sqm 125.00 326,700.00
2.0 Application of 1st Coat Primer 2613.6 sqm 250.00 653,400.00
3.0 Application of 2 Coat Top Coat using BONDFLEX EWB 2613.6 sqm 650.00 1,698,840.00
Scaffolding, Supports, Full Body Harness, Lifelines ,Safety Nets / Signages Safety and Conformances (
4.0 Working on Heights Certification 1 lot 25,000.00 25,000.00
5.0 Hauling and Cleaning of affected area 1 lot 15,000.00 15,000.00

SUB TOTAL 41,025.00 2,718,940.00 2,759,965.00


A. REPAIR OF WINDOWS AND RESEALANT WORKS
1.0 Repair and Alignment of windows to prevent rainwater coming thru 1 lot FREE FREE
2.0 Application of water proof sealant for windows 1 lot FREE FREE
Scaffolding, Supports, Full Body Harness, Lifelines ,Safety Nets / Signages Safety and Conformances (
3.0 Working on Heights Certification 1 lot FREE FREE
4.0 Hauling and Cleaning of affected area 1 lot FREE FREE

SUB TOTAL - -

TOTAL COST OF LABOR AND MATERIALS Vat Exclusive: 3,779,965.00


VAT 12% 453,595.80
TOTAL COST OF LABOR AND MATERIALS Vat Inclusive: 4,233,560.80

TERMS AND CONDITIONS:

1.) 50% down payment due to increase of material's price , 40% progress billing, 10% retention
2.) Supply of tools and equipment for indicated works included.
3.) Electrical power and water to be provided by client.
4.) Any changes/revision shall be considered as change order.
5.) Quotation based on initial instruction ONLY.
6.) This quotation will serve as contract if conformed.
7.) Mobilization and entire project construction schedule should respect and follow gov't Covid-19 related safety protocols and restrictions.
8.) We shall not be held liable for any delay in the completion of the installation caused by force majeure, acts of third persons, and /or failure on your part to perform your undertaking under this quotation.
Lead Time: 4 to 6 weeks
Warranty: 5 years in Waterproofing and Workmanship
24/7 Customer Support service and Technical in Site Response Team With 3 to 4 Hours
Prepared By:

Engr. Jay Esguerra


EVO1 CONSTRUCTION SERVICES