Method of Statement For Horizontal Drain
Method of Statement For Horizontal Drain
METHOD OF STATEMENT
FOR
SOIL NAILING
CLIENT
IJM PROPERTIES SDN. BHD.
CONSULTANT
PERUNDING L&W SDN. BHD.
MAIN CONTRACTOR
CRESCENDO INFRA SDN. BHD.
SUBMISSION RECORD
2. DRILLING OF BOREHOLE
a) Portable drill rig with temporary staging and drag bit shall be used.
b) Temporary staging is erected as working platform for portable drilling rig, which can
be moved manually.
c) The grid position of horizontal drain shall be marked on the existing slope once the
working platform has been prepared.
d) Position drilling machine on the setting out point marked on site with specified
inclination upward into the slope and drill 100mm diameter borehole to the depth
required.
e) The entry point of drilling shall be at the lowest level from the berm drain after
considering the machine height and inclination positioning.
f) Once encountered rock / solid rock or reaching the required length, the drilling process
shall be terminated by the confirmation and instruction from the consultant.