Professional Documents
Culture Documents
Item 3 Auto Cleaning Condensor
Item 3 Auto Cleaning Condensor
(Approval PAS)
Preparation
PR Implementation
(TDEM Discussion & Vendor Selection Genba Approval
Process & Evaluation
Commitment)
PRESENTATION CONTENT:
1. Background
AWARENESS Purchased :
100%
Face to Face
Continuos Communication
Improvement Education Green Award by Env. Award by
ASEAN Best Energy
Award in Laos 2015 KRW Regent 2016 Ministry of Env.
Participating COP 23
2016 Bonn – Germany, Nov’17
Karakuri
System
Automation
Water Spray
3 Wet CO2 Target
ENERGY Painting Rain Water
Process Recycle
EFFICIENCY Facility
Economizer &
Membrane Bio Achievement
Inverter
Reactor (MBR) FY15-current :
approx. 11%
Substitute
to Natural RO
Gas
ENERGY
CONSERVATION Auto-pump
Purchased : 5%
Adjustment
Solar PV
Co-Generation Eco-Brush
2017 2020 2025 2050
9 July 2020
TDEM TMMIN
B. Reduction Scenario EVP Director
7th Toyota Environmental Action Plan (CY2020 ~ 25)
TMMIN
KRW1&2 CO2 reduction scenario Mr. Surapong T. Mr. Nandi J
3.Target setting
1.Asia CO2 Emission 2. CO2 Emission (kton/year) CO2 factor: 0.7392 CO2 -ton /MWh (Indonesia)
*Target setting method: CO2 KPI Reduce from FY13 base
Nenkei
(kton) CO2 Emission (kton/year) 2013 2019
80 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25
TMV(2%) BAU Countermeasures result Prospect
TAP(3%) TKAP(1%)
TMP(3%) Production Plan / Resut (k unit) 165 191 89 213 246 <- <- <-
IMC(4%)
ASSB(4%) TMT 60 PE
(A) BAU (k Ton) 58.4 48,6 25,3 58,6 67,2 <- <- <-
(28%) Technology
58.4 kton
KZ
(11%) 582 kton Annual (k Ton) - - 2,93 4,52 5,57 4,33 3,48 2,22
Counter
30 Scenario(Target) Daily
FY 2018 -measures
TKM 44,15 kton : Kaizen (B) Accumulated (k Ton) - - 2,93 7,45 13,02 17,35 20,83 23,05
(13%) 25,3 kton
STM 24% (2013 base) Renewable
Scenario (k Ton) (A)-(B) - - 22,37 51,15 54,18 49,85 46,37 44,15
(15%) Energy (RE)
TMMIN
(18%) 2001 2013 2020 50年
Target Renewable energy ratio - - - 4% 8% 12% - -
2025
(Base year)
Energy actual / target (GJ/unit) 2.72 3.59 3.52 3.45 3.38 3.31 3.23 3.16
4.CO2 reduction items & schedule
(2018 – 2019) (2019 – 2020) (2020 – 2021) (2021 – 2022) (2022 – 2023) (2023 – 2024) (2024 – 2025) Total (‘20 - ‘25)
Target setting Activity Activity Activity Activity Activity Activity Activity
Invest.
Guideline CO2
(Mil
ROI
CO2 Invest. ROI CO2 Invest. ROI CO2 Invest. ROI CO2 Invest. ROI CO2 Invest. ROI CO2 Invest. ROI CO2 Invest. ROI (kton) (Year)
USD)
(kton) (Mil USD) (Year) (kton) (Mil USD) (Year) (kton) (Mil USD) (Year) (kton) (Mil USD) (Year) (kton) (Mil USD) (Year) (kton) (Mil USD) (Year) (kton) (Mil USD) (Year)
Super high trasfer efficiency Recycle ASH exterior robot Recycle ASH exterior robot
Complete Co-generator Booth control range expansion Dry Booth #1 Water borne 3wet
air-less paint & Dry booth zone #2 & VOC control oven zone #1
PE Tech.
paint/casting
low CO2 technology
17 5,72 5,7 - - - 3,51 3,3 1,57 2,58 3,62 4,55 1,34 1,75 3,75 0,49 2,70 2,60 1,43 12,1 8,12 9,35 23,47 3,58
installation by 2030
2% / year
Energy Saving 2.73 0,18 1.35 1.68 0,19 0.6 1,01 1,88 1,50 0,79 - - 0,79 - - 0,79 - - 0,79 - - 6,90 2,06 1,64
On-site Solar Installation w/ On-site Solar Installation On-site Solar Installation <-
Self- investment : 0,22 MW 2,2 MW 2,2 MW 2,2 MW
Complete to install
RE
- - - - - - - - -
Solar on site by 2025
0,20 0,14 12 2,2 2,06 12 2,2 2,06 12 2,2 2.06 12 6,80 6,32 12
Total 18,68 5,91 6,1 2,93 0,32 1,12 4,52 5,18 1,50 5,57 5,68 6,11 4,33 3,81 7.88 3,48 4,76 7,3 2,22 12,1 8,12 23,05 31,85 5,74
C. Energy Consumption AP
TMMIN Position
1.4 1.34
1.22
1.2 1.15
1
0.79
0.8 0.73
0.67
0.6 0.5 0.53 0.53
0.42 0.42 0.43
0.4 0.36
0.2
0
KZ-KN
TMT-S
TMMIN-K1
TMV
TMMIN-K2
TKM-1
ASSB-BR
ASSB-SA
TKM-2
KZ-CL
TMT-G1
TMT-G2
TMT-BP
• TMMIN KRW-1 at Position No.2 & KRW-2 at Position No.4 at AP Electric Gentani FY19/20
• Need more effort to reduce energy to beat TMT-S
• Strategy
1. Eliminate Energy Loss (Muda Energy)
2. ESCO Daily Kaizen - Improve Equipment Rank (A-B-C) Activity (Efficiency Up)
3. Renewable Energy [Solar Panel, Microhidro , etc]
4. Benchmark [Yokoten Activity]
- TDEM Best model BMC & yokoten essence for ABC & start-stop M/C
3. CO2 Reduction Target & Achievement (TMMIN-TDEM Commitment)
FY19:
• Target : 1,420 Ton CO2
• Achievement : 1,680 Ton CO2
P/O Complete
LED Lighting Replacement at Assy Proposal, Specification Construction
4 Assy Shop 113 14,453 204,417,339 28,966 409,686,828 0 0 2.0 Haris Z Nov/19
Shop (175 Unit) /Quatation / Approvall
P/O
Complete
Reduce Flowrate Pompa Degrease Bayu H.P Proposal, Specification Construction
5 ED Frame 19 2,398 33,916,591 2,000 28,287,900 0 0 0.8 Nov/19
(P20) 11 KW Yudha /Quatation / Approvall
P/O Complete
Reduce Flowrate Pompa Phospate Bayu H.P Proposal, Specification Construction
6 ED Frame 26 3,270 46,249,897 3,000 42,431,850 0 0 0.9 Nov/19
(P20) 15 KW Yudha /Quatation / Approvall
P/O Complete
Bayu H.P Proposal, Specification Construction
7 ED Frame Reduce Flowrate Pompa UF1 7.5 KW 13 1,635 23,124,949 2,000 28,287,900 0 0 1.2 Nov/19
Yudha /Quatation / Approvall
P/O Complete
Bayu H.P Proposal, Specification Construction
8 ED Frame Reduce Flowrate Pompa UF2 7.5 KW 13 1,635 23,124,949 2,000 28,287,900 0 0 1.2 Nov/19
Yudha /Quatation / Approvall
P/O Complete
Reduce Flowrate Pompa DI Spray Bayu H.P Proposal, Specification Construction
9 ED Frame 6 799 11,305,530 2,000 28,287,900 0 0 2.5 Nov/19
7.5 KW Yudha /Quatation / Approvall
P/O Complete
Reduce Flowrate Pompa ED No.2 15 Bayu H.P Proposal, Specification Construction
10 ED Frame 26 3,270 46,249,897 3,000 42,431,850 0 0 0.9 Aug/19
KW Yudha /Quatation / Approvall
P/O Complete
Reduce Flowrate Pompa ED No.5 15 Bayu H.P Proposal, Specification Construction
11 ED Frame 26 3,270 46,249,897 3,000 42,431,850 0 0 0.9 Sept/19
KW Yudha /Quatation / Approvall
P/O Complete
Optimize Condensor Approch by Construction
Chiller
12 Automatic Cleaning Condensor 159 20,328 287,511,661 26,244 371,190,288 0 0 1.3 Bayu H.P Feb/20 Proposal, Specification
Factory
(Chiller P#1) - No.2 /Quatation/ Approval
P/O
Toso Booth Booth Temperature Range Agung W Proposal, Specification Construction
Complete
13 100 12,754 180,390,482 10,000 141,439,500 0 0 0.8 Sept/19
P#1 Expansion (Daihatsu) Bayu HP /Quatation / Approvall
CR : IDR 1,767,124,140
COOLING TOWER
PUMP
Condensor
TOSO
CHILLER
STORAGE TANK
CAP : 3400 M3
PUMP
5.2 Chiller Cleaning System (Current Condition)
Losses
Item System Period Activity Cleaning Remark
Estimation
3.5°C
2.8
2.0
(After 1-Month 1-Month 3-Month
Cleaning)
Manual Cleaning Tube Condensor Chiller Time
6. Proposed : Auto Cleaning Condensor Chiller System
A. Principles of Operation
• The automatic valve reverses the water flow in the H/E every few hours for 30 sec.
• Nylon brushes (housed in baskets connected to the tube ends) are then propelled
through the pipes, cleaning any scaling or fouling
• After the reversion the brushes position
in their baskets, no pressure loss
509,690
500,000 462,358 467,148 457,764
420,238 2-SHIFT
400,000
325,741
297,635 296,163
282,905
300,000 271,424 1-SHIFT
236,302
190,454
200,000
Energy Consumption : 5,604,000 KWH/Year
100,000
(IDR 7,565,400,000) 2-Shift Operation
Potential Energy Saving: 416,097,000 (5.5%) 1-Unit
0 If 1X/Month Cleaning : 2/3 (416,097,000)
Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 : IDR 277,398,000
Dec-19 Jan-20 Feb-20 Mar-20
B.2 Price Comparison with TMT (Eco-Brush & Ball Cleaning)
Chiller Capacity TMMIN TMT Remark
EQB KV200-ST – PN 10
1 MATERIAL Q235 – USD 21,750 PLANT#1
SPECIAL DESIGN (500TR)
1.42 Year
IDR 514
EQB KV250-ST – PN 10
2 USD 28,750 Mio/Year
MATERIAL Q235 (700 TR)
PLANT#2
1 Type of Auto Cleaning System ECO-BRUSH System ECO-BRUSH System ECO-BRUSH System ECO-BRUSH System ECO-BRUSH System ECO-BRUSH System
ECO-BRUSH
2 13,300 192,850,000 899,500 422,765,000 17,850 258,825,000 901,500 423,705,000 23,100 334,950,000 1,155,400 543,038,000
System
3 QUOTATION Shipping Cost 600 8,700,000 8,700,000 600 8,700,000 8,700,000 600 8,700,000 178,700 8,700,000
4 Installation 7,850 113,825,000 518,900 243,883,000 10,300 149,350,000 518,900 243,883,000 12,050 174,725,000 602,300 283,081,000
• Condensor
Approach :
- Certrifugal Chiller
1000 TR : 0.4 °C
THANK YOU