Project : Proposed Two-Storey Residential (60 SQM.

)
Bare Type

I. Earthworks
1. Excavation of Column Footing and Wall Footing
2. Backfill and Compaction

II. Concrete Works


1. Cement 154 bags
2. Sand 8.5 𝑚3
3. Gravel 17 𝑚3
₱ 82, 170.00

III. Rebars
1. Deformed Round Bar 16mm x 6m 84 pcs.
2. Deformed Round Bar 12mm x 6m 70 pcs.
3. Deformed Round Bar 10mm x 6m 252 pcs.
4. Deformed Round Bar 9mm x 6m 34 pcs.
5. G.I. Wire #16 56 kls.
₱ 101, 420.00

IV. Form Works


1. 2” x 3” x 8’ Coco Lumber 70 pcs.
2. 2” x 3” x 10’ Coco Lumber 80 pcs.
3. 2” x 2” x 8’ Coco Lumber 40 pcs.
4. ½” x 4’ 8’ Penolic Board 25 pcs.
5. C.W. Nail #4” 5 kls.
6. C.W. Nail #3” 5 kls.
7. C.W. Nail #2” 5 kls.
8. C.W. Nail # 1½” 3 kls.
9. Concrete Nail #3” 3 kls.
₱ 43, 050.00

V. Masonry
1. Cement 36 bags
2. Sand 4 𝑚3
3. C.H.B. # 5” 550 pcs.
4. C.H.B. # 4” 520 pcs.
₱ 38, 430.00
VI. Roofing
1. 2 x 3 x 20’ G.I. C-Purlins 1.2 THK 14 pcs.
2. 2 x 4 x 20 G.I. Tubular 1.5 THK 4 pcs.
3. 3/16 x 2” x 20’ Angular Bar 3 pcs.
4. 3/16 x 1½” x 20’ Angular Bar 2 pcs.
5. Pre-painted Long Span .4 x 30’ 5 pcs.
6. P.E. Foam (Insulation) 10mm Double 32 mtrs.
7. Tekscrew 2” for metal 280 pcs.
₱ 42, 000.00

VII. Plumbing (Roughing In) ₱ 22, 000.00


VIII. Electrical ₱ 18, 000.00
IX. Doors & Windows ₱ 36, 000.00

Materials - 383, 070.00


Labor - 153, 228.00

Grand Total - ₱ 536, 298.00

30 𝑚2 Ground Floor
30 𝑚2 Second Floor
60 𝑚2 Total Area

Note: Without Finishing Work