Letter No. 23566

You might also like

Download as pdf
Download as pdf
You are on page 1of 11
SES SA INFRASTRUCTURE 7 Ref: SAICPL/Bharatmala/DPR/Lot-4/PKG-2/2024/ 2.356 6 Date 06-03-2024 To, The Project Director National Highways Authority of India, Project Implementation Unit, E-26, Sector-14, Near Bright Star Hospital, "New Moradabad (Delhi Road) pin-244002 UP Email: mor@nhai.org Sub: Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana Package-2/LOT-4- Reply for the project “Construction of Four lane “Western Side Spur of Rampur- Rudrapur Section connecting NH-24 (New NH-09) to NH-87 Bypassing Rampur Town” (Design km. 0+000 to Design km. 13+700) on EPC Mode” for letter dated 28.2.2024 for Rampur Bypass-Reg. Ref: Your letter no. 11015/2/DPR/RMP Bypass & RMP RDP/PIU-MBD/27575 dated 28-02- 2024. Dear The proposal given by concessionaire includes 2 at grade junctions at very close proximity which can be a serious safety concem especially as it caters mainly to the city traffic. The traffic moving on NH-87 at a high speed of 80 to 100kmph will have to slow down suddenly to avoid conflicting with the right turning traffic from Koyli village and this can result in accidents. Similarly, traffic taking right tur from Rampur city at the junction at km 84450 towards Bareilly will conflict with straight moving traffic from Rudrapur to Bareilly. The design of the proposed interchange by SAICPL provides smooth movement of traffic without any conflicts As per present scenario, providing a median opening on NH87 at km 8+320 and km 8+450 will create a chaos. The junction at km 8+367is on gradient because of bridge location at km 8+023 due to which it will become difficult for the traffic moving at 100kmph speed to slow down suddenty at the junetion.This was intimated to the Moradabad PIU vide letter no. SAICPL/Bharatmala/DPR/LOT- 4/PAK-2/2021/14481 dated 29.6.2021 along with the attachment of Junction plan for their review and suggestions and also discussed with the concerned Team Leader (LASA, AE) Mr. R.P.Singh through VC, but no objection was received from their end. Further, a site visit was also conductedfrom 1.9.2021 to 3.9.2021 with Peer Review at this junetion and no objection also raised from their end either. The access road from Koyli village has not been considered as it is very close (85m) to the down ramp of the loop and can result in accidents. Moreover, there are other access points from Koylivillage that Reuse) are being presently used by the vehicles and these are shown in the maps attached for ready reference and further discussed below: * For the traffic movement to/from Koyli village towards Rudrapur, internal road is presently being used for movement and a U-turn facility has been provided on NH-87. ‘© For traffic movement to/from Koyli Village towards Rampur and Bareilly, a route via Bagi already exists and the same is as shown in the map attached, But the final decision may take by the AE for the betterment of the Project by considering wr.t the safety of the road users. If any further clarification required, kindly convey us. Thanking you and assuring you of our best services at alltime. Yours sincerely, For: SA Infrastructure Consultants Pvt. Ltd. Wd le Vijay Gupta Project Coordinator Encl: Annexure I to Annexure VIL Copy to: The Regional Officer-West (UP) National Highway Authority of India, 3/248, Vishal Khand, Gomti Nagar, Lucknow ~ 226010-(UP) (aes aes ate cornf wares, ured aeere) National Highways Authority of India (Moisty of Road Transpo & Highways. Government of India} ig eens, G25 HL a Fe AGE RR MMPI AM AT ae Ms}, UTA 01 (eo) PIU - Moradabad, E26. Seclor-14. Nua Bright Star Hosa, Now Moradabad (De Ro “Tol 0581-2483070 E-mail morgnha\ oe. ponhaimoradabaca@ey 11015/2/2021/DPR/RMP Bypass & RMP RDP/PIU-MBD/ 2757S Date: 28.02.2024 To, Moracabad- 244 O01 (U4 Sh. Vijay Gupta, M/s SA Infrastructure Consultants Pvt. Ltd., 1101A, XIth Floor, Tower A-11 Corporate Park, Plot No. 7A/1, Sector-142 Noida, 201301 Uttar Pradesh) ‘Sub: Consultancy services for Preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Package-2) - For the Project “Construction of Four-Lane “Western Side Spur of Rampur - Rudrapur Section connecting NH-24 (New NH -09) to NH-87 bypassing Rampur town” (Design Km 0+000 to Design Km 13+700) on EPC Mode” - Review of Design of interchange at Km 12+300 - 13+700 - reg. sir, This is with reference to the subject cited above. In this regard, it is bring to your notice that in the interchange proposed for the subject project at Km 12+300 -13+700, merging with NH- 87 (Rampur- Rudurpur Section), following has been observed & need clarification (i) Two connecting roads (one toward Rampur city & other towards Koyli Village) to NH 87 (Rampur- Rudurpur Section) exist at the interchange location, for which proper crossing facility has been taken care by NHAI PIU-Rudurpur (Junction plan with CAD file is enclosed for better appreciation). (ii) It appears that road toward Vill-Koyli has not been taken into account while designing of interchange proposed in the subject project as no provision mentioned in CA nor depicted in drawing of interchange. 2. __Inview of the above, it is requested to explain the reason why such major road was missed. Further, it is requested to review the interchange at Km 12+300-13+700 and furnish your prudent view/ comment (make site visit if required) with way forward for taken care of smooth traffic movement in all direction at this interchange proposed to be developed under subject project. Please accord Top Priority to the subject matter & furnish comment within 03 days time positively. Yours Faithfully, (Anuj Kumak Jain/ ara ae Stat) GM(T) cum PD/ aerwdtras (rer) as SRtatoraT Freres Copy to:- 1, The Regional Officer, West UP, NHAl, Vishal Khand, Gomti Nagar, Lucknow 2. Sh. Sanjay Shukla, Executive Director, M/s SA Infrastructure Consultants Pvt. Ltd., Noida, 201301- For kind information & necessary action please Head Office 6-5 & 6, Secior-10, Dwarika, New Delhi Web Site = hitpslmeww.nhai.org Anneaure 1 SZ SA INFRASTRUCTURE f: SAICPL/Bharatmala/DPR/Lot-4/PKG-2/2021/ |44 8 \ Date 29.06.2021 To, ‘The Project Director Project Implementation Unit, ‘A-S4, Ashiyana Phase-I, (near Dhap Mandir), Kanth Road Moradabad-244001 UP Email: mor@nhai.org Sub: - Consultancy Service for Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridor and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Package-2), 2 lane existing bypass of Rampur to be developed to 4 lane in the state of Uttar Pradesh — ‘Junction Development at Km 0--000 of NH-87 (190+000 Km of NH-24) and at Km 8+700 of NH-87 - Reg. Ref: NHAL/PIU-RUPC/NH-87(Pkg-1)/2021/672 dated 05.03.2021 Dear Sir, This is in regards to the Junction Development at Km 0+000 of NH-87 (1901000 Km of NH-24) and at Km 8+700 of NE-S7, AAs per the COS NHAL letter no. NHAU/2021/UP (West) /DPRCOS(Comp n0,65880)1349 dated 22.03.2021. The following projects under the Jurisdiction of PIU Moradabad have been taken up: 1. 2lane of existing bypass of Rampur to be developed to 4 lane. 2. Western side Spur of Rampur section connecting NH-24 of NH-87 bypassing Rampur town in the State of Uttar Pradesh. {In order to avoid traffic congestion, traffic conflict and to streamline the traffic movement and separation/ regulation of cross traffic movement and to ensure road safety at proposed location for the Junction Development at Km 0000 of NH-87 (190+-000 Km of NH-24) and at Km 8+700 of NH- 87 the finalized Junction Plans are attached herewith. The Junetion plans have also been forwarded to Mr R P Singh (concemed authority of consultant, LASA) so as to clarify confusions (if any). Kindly let us know if any further modifications are required so that the traffic movement requirements, ccan be catered accordingly in the Junctions Planned. This is for your kind information and necessary action. ‘Thanking you and assuring you of our best services at all time. Yours Sincerely, For, SA Infrastructure Consultants Pvt, Ltd Project Coordinator Enclosure : Junction Plans, Cra einen Rnnerare IL DESIGN CONSULTANT: oS DS © + foe} c 2 oO Cc 5 5 = 2g © = NY J \ \\ Ww Ww i ave TLE Annex Anneruve SITET TET TY i é une nm UP S 6en sueg sip jibes yeyD eAeueS 218 inky yer eAeules f s 2 eundyay shee andiefy ri esi 2fayes Be ‘br

You might also like