EF889WOD9000044

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 85

WORK ORDER

ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Order Essentials Vendor Details


Job : LE161030 - MLIP CLUSTER IX Name : S0152223 - R GURUNATH
Payment Centre : SZ000010 - Shared Services Centre - Accounting Center Khata No 43/47, Po No-370, AT-Bada Aryaapalli,PS-
Address : Mareine, via-Kanama, Ganjam odisha, ,
Type : Regular Labour With Materials Ganjam

Service Group : Revenue State : Odisha


WO Period : 06-Jun-2019 to 31-Mar-2022 Country : India
Currency : Indian rupee Mobile : 7681869226
RFQ Ref. No. : EF889WOR9000045 Phone : 7681869225
LD Clause : Applicable Email : Gurunathrati@gmail.com
Price Variation : Not Applicable BQ Ref. No. : 1
GTC : Accepted WO Accepted By : ---
Last Bill Number : 22
WO Accepted On : ---
Bill Type : Running Bill

Statutory Details
Job GST : 21AAACL0140P4ZS Vendor GST : 21CZRPG7175A1ZH
Job PAN : AAACL0140P Vendor PAN : CZRPG7175A

Billing To Execution At
Sundergarh Sundergarh

-770072 -770072

CIN-L99999MH1946PLC004768 CIN-L99999MH1946PLC004768

Nature of Scope
Laying of DI and HDPE Pipe, Specials fixing and Construction of thrust block with M15 grade concrete

Reason for Amendment


Sir kindly approve

Refer Annexure Details


Item Abstract - Cost Package Details, Delivery Schedule, Itemwise Tax Details, Material Link, Additional Terms & Conditions

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Construction of concrete structure; - 6O12S00D5
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains 207.000 Sets 430.00 10,681.20 99,691.20
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:06 PM Page 1 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Construction of concrete structure; - 6O12S00D5
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains 300.000 Sets 470.00 16,920.00 157,920.00
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Construction of concrete structure; - 6O12S00D5
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains 90.000 Sets 490.00 5,292.00 49,392.00
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Erection of precast concrete elements; Work Categorization
:- Charges for Specialized work with Tools / P&M; - 6C2CS006S
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
158.000 Numbers 470.00 8,911.20 83,171.20
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 1000 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B7N
( SAC: 12% - General construction services of waterways, dams,
1,626.000 Meter 545.00 106,340.40 992,510.40
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 1100 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B7O
( SAC: 12% - General construction services of waterways, dams,
3,000.000 Meter 565.00 203,400.00 1,898,400.00
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 1200 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B7P
( SAC: 12% - General construction services of waterways, dams,
871.000 Meter 584.00 61,039.68 569,703.68
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 300 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS007C
( SAC: 12% - General construction services of waterways, dams,
3,433.000 Meter 177.00 72,916.92 680,557.92
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:06 PM Page 2 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 300 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS007C
( SAC: 12% - General construction services of waterways, dams,
351.000 Meter 177.00 7,455.24 69,582.24
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 350 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS007D
( SAC: 12% - General construction services of waterways, dams,
2,643.000 Meter 193.00 61,211.88 571,310.88
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 400 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS006Z
( SAC: 12% - General construction services of waterways, dams,
213.000 Meter 216.00 5,520.96 51,528.96
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 400 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS006Z
( SAC: 12% - General construction services of waterways, dams,
279.000 Meter 216.00 7,231.68 67,495.68
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 450 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0070
( SAC: 12% - General construction services of waterways, dams,
266.000 Meter 247.00 7,884.24 73,586.24
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 450 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0070
( SAC: 12% - General construction services of waterways, dams,
913.000 Meter 247.00 27,061.32 252,572.32
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:06 PM Page 3 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 500 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B49
( SAC: 12% - General construction services of waterways, dams,
393.000 Meter 272.00 12,827.52 119,723.52
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 500 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B49
( SAC: 12% - General construction services of waterways, dams,
233.000 Meter 272.00 7,605.12 70,981.12
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 600 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B4A
( SAC: 12% - General construction services of waterways, dams,
2,537.000 Meter 315.00 95,898.60 895,053.60
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 600 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B4A
( SAC: 12% - General construction services of waterways, dams,
335.000 Meter 315.00 12,663.00 118,188.00
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 700 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0071
( SAC: 12% - General construction services of waterways, dams,
1,888.000 Meter 356.00 80,655.36 752,783.36
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 700 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0071
( SAC: 12% - General construction services of waterways, dams,
761.000 Meter 356.00 32,509.92 303,425.92
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 4 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 750 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B7L
( SAC: 12% - General construction services of waterways, dams,
851.000 Meter 385.00 39,316.20 366,951.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 750 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B7L
( SAC: 12% - General construction services of waterways, dams,
1,035.000 Meter 385.00 47,817.00 446,292.00
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 800 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B7M
( SAC: 12% - General construction services of waterways, dams,
61.000 Meter 410.00 3,001.20 28,011.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 900 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B4B
( SAC: 12% - General construction services of waterways, dams,
475.000 Meter 496.00 28,272.00 263,872.00
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :- 900 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C1LS0B4B
( SAC: 12% - General construction services of waterways, dams,
2,647.000 Meter 496.00 157,549.44 1,470,461.44
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 110 mm; - 6C1LS0AH3
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
684.000 Meter 6.00 492.48 4,596.48
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 5 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 110 mm; METHOD :- Lowering
& Assembling manually; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B4P
( SAC: 12% - General construction services of waterways, dams,
4,155.000 Meter 73.00 36,397.80 339,712.80
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 110 mm; METHOD :- Lowering
& Assembling manually; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B4P
( SAC: 12% - General construction services of waterways, dams,
684.000 Meter 73.00 5,991.84 55,923.84
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 125 mm; - 6C1LS0AS0
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
4,072.000 Meter 7.00 3,420.48 31,924.48
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 125 mm; - 6C1LS0AS0
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
597.000 Meter 7.00 501.48 4,680.48
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 140 mm; - 6C1LS0AS2
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
1,611.000 Meter 8.00 1,546.56 14,434.56
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 160 mm; - 6C1LS0AQK
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
1,696.000 Meter 9.00 1,831.68 17,095.68
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 160 mm; METHOD :- Lowering
& assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B81
( SAC: 12% - General construction services of waterways, dams,
1,696.000 Meter 93.00 18,927.36 176,655.36
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 6 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 180 mm; - 6C1LS0AS3
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
1,002.000 Meter 9.00 1,082.16 10,100.16
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 200 mm; METHOD :- Lowering
& assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B80
( SAC: 12% - General construction services of waterways, dams,
1,701.000 Meter 120.00 24,494.40 228,614.40
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 225 mm; METHOD :- Lowering
& assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B7Z
( SAC: 12% - General construction services of waterways, dams,
1,046.000 Meter 127.00 15,941.04 148,783.04
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 250 mm; METHOD :- Lowering
& Assembling manually; Work Categorization :- Charges for
Specialized Labour work; - 6C1LS0B3F
( SAC: 12% - General construction services of waterways, dams,
24.000 Meter 11.00 31.68 295.68
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 280 mm; METHOD :- Lowering
& Assembling manually; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B4S
( SAC: 12% - General construction services of waterways, dams,
3,580.000 Meter 11.00 4,725.60 44,105.60
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 280 mm; METHOD :- Lowering
& assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B7Y
( SAC: 12% - General construction services of waterways, dams,
3,580.000 Meter 137.00 58,855.20 549,315.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 7 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER :- 90 mm; - 6C1LS0AR8
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
2,447.000 Meter 6.00 1,761.84 16,443.84
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 1150 mm -
1200 mm; DISTANCE :- 60 Km - 70 Km; Work Categorization :-
Charges for Specialized work with Tools / P&M; - 6C1LS0DEC
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 1,007.000 Running Meter 126.00 15,225.84 142,107.84
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 1150 mm -
1200 mm; Work Categorization :- Charges for Specialized Labour
work; - 6C1LS0DEI
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 4,491.000 Running Meter 75.00 40,419.00 377,244.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 400 mm -
450 mm; DISTANCE :- 60 Km - 70 Km; Work Categorization :- Charges
for Specialized work with Tools / P&M; - 6C1LS0DEG
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 342.000 Running Meter 50.00 2,052.00 19,152.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 400 mm -
450 mm; Work Categorization :- Charges for Specialized Labour
work; - 6C1LS0CEB
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 799.000 Running Meter 35.00 3,355.80 31,320.80
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 550 mm -
600 mm; DISTANCE :- 60 Km - 70 Km; Work Categorization :- Charges
for Specialized work with Tools / P&M; - 6C1LS0DEF
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 46.000 Running Meter 85.00 469.20 4,379.20
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 550 mm -
600 mm; Work Categorization :- Charges for Specialized Labour
work; - 6C1LS0CEA
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 420.000 Running Meter 45.00 2,268.00 21,168.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 8 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 700 mm -
750 mm; DISTANCE :- 60 Km - 70 Km; Work Categorization :- Charges
for Specialized work with Tools / P&M; - 6C1LS0DEE
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 472.000 Running Meter 91.00 5,154.24 48,106.24
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 700 mm -
750 mm; Work Categorization :- Charges for Specialized Labour
work; - 6C1LS0CE8
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 708.000 Running Meter 50.00 4,248.00 39,648.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 850 mm -
900 mm; DISTANCE :- 60 Km - 70 Km; Work Categorization :- Charges
for Specialized work with Tools / P&M; - 6C1LS0DED
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 419.000 Running Meter 120.00 6,033.60 56,313.60
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI; DIAMETER :- 850 mm -
900 mm; Work Categorization :- Charges for Specialized Labour
work; - 6C1LS0DEJ
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 1,677.000 Running Meter 70.00 14,086.80 131,476.80
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Placing of concrete by any method; TYPE OF CONCRETE :-
Reinforced cement concrete; POUR LOCATION :- Below GL; Work
Categorization :- Charges for Specialized work with Tools / P&M; -
6C12S003K
( SAC: 12% - General construction services of waterways, dams,
179.496 Cubic metre 3,800.00 81,850.18 763,934.98
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE :- Transportation of precast concrete elements; SCOPE
INCLUDES :- Loading and Unloading; Work Categorization :- Charges
for Specialized work with Tools / P&M; - 6C2CS00P6
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 158.000 Numbers 430.00 8,152.80 76,092.80
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 9 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-125 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BEU
( SAC: 12% - General construction services of waterways, dams,
4,072.000 Meter 81.00 39,579.84 369,411.84
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-125 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BEU
( SAC: 12% - General construction services of waterways, dams,
597.000 Meter 81.00 5,802.84 54,159.84
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-140 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BET
( SAC: 12% - General construction services of waterways, dams,
1,611.000 Meter 85.00 16,432.20 153,367.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-180 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BES
( SAC: 12% - General construction services of waterways, dams,
1,002.000 Meter 115.00 13,827.60 129,057.60
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-250 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BER
( SAC: 12% - General construction services of waterways, dams,
2,730.000 Meter 132.00 43,243.20 403,603.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-250 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BER
( SAC: 12% - General construction services of waterways, dams,
24.000 Meter 132.00 380.16 3,548.16
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 10 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-90 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BEV
( SAC: 12% - General construction services of waterways, dams,
14,167.000 Meter 68.00 115,602.72 1,078,958.72
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE
TYPE:-HDPE pipes;DIAMETER:-90 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-Charges for Specialized
work with Tools / P&M - 6C1LS0BEV
( SAC: 12% - General construction services of waterways, dams,
2,447.000 Meter 68.00 19,967.52 186,363.52
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-300 mm - 350
mm;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C1LS0BHS
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 1,720.000 Running Meter 35.00 7,224.00 67,424.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-400 mm - 450
mm;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C1LS0BHR
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 52.000 Running Meter 50.00 312.00 2,912.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-550 mm - 600
mm;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C1LS0BHP
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 194.000 Running Meter 85.00 1,978.80 18,468.80
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-700 mm - 750
mm;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C1LS0BHN
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 562.000 Running Meter 91.00 6,137.04 57,279.04
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 11 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-850 mm - 900
mm;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C1LS0BHL
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General 1,933.000 Running Meter 120.00 27,835.20 259,795.20
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S0070
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
32.000 Numbers 2,115.00 8,121.60 75,801.60
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S0070
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
23.000 Numbers 3,525.00 9,729.00 90,804.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S0070
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
10.000 Numbers 1,337.00 1,604.40 14,974.40
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S0070
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
140.000 Numbers 1,782.00 29,937.60 279,417.60
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S0070
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
78.000 Numbers 1,782.00 16,679.52 155,675.52
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007B
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
1,542.000 Running Meter 410.00 75,866.40 708,086.40
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 12 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007B
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
97.000 Running Meter 545.00 6,343.80 59,208.80
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
2,177.000 Meter 50.00 13,062.00 121,912.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
97.000 Meter 75.00 873.00 8,148.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
14,167.000 Meter 6.00 10,200.24 95,202.24
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
4,155.000 Meter 6.00 2,991.60 27,921.60
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
1,701.000 Meter 10.00 2,041.20 19,051.20
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
1,046.000 Meter 10.00 1,255.20 11,715.20
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 13 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
2,730.000 Meter 11.00 3,603.60 33,633.60
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
4,233.000 Meter 25.00 12,699.00 118,524.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
310.000 Meter 35.00 1,302.00 12,152.00
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
2,646.000 Meter 45.00 14,288.40 133,358.40
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving multiple activities; Pipeline
works involving multiple activities; - 6O12S007O
( SAC: 12% - General construction services of waterways, dams,
water mains and lines, irrigation and other waterworks - General
77.000 Meter 70.00 646.80 6,036.80
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Hard rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With approved working space &
slope;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C11S012E
( SAC: 12% - General construction services of waterways, dams, 1,501.000 Cubic metre 335.00 60,340.20 563,175.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Hard rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With approved working space &
slope;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C11S012E
( SAC: 12% - General construction services of waterways, dams, 1,846.000 Cubic metre 335.00 74,209.20 692,619.20
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 14 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Items Abstract
Description - Code Quantity UOM Rate Tax Total Value
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Soft rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With approved working space &
slope;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C11S010F
( SAC: 12% - General construction services of waterways, dams, 1,597.000 Cubic metre 70.00 13,414.80 125,204.80
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Soft rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With approved working space &
slope;Work Categorization:-Charges for Specialized work with Tools /
P&M - 6C11S010F
( SAC: 12% - General construction services of waterways, dams, 1,902.000 Cubic metre 70.00 15,976.80 149,116.80
water mains and lines, irrigation and other waterworks - General
construction services of harbours, waterways, dams, water mains
and lines, irrigation and other waterworks - 12% - General
construction services of waterways, dams, water mains and lines,
irrigation and other waterworks - 995422 )

Two Crore, Ninety-Two Thousand, Eight Hundred Eighty Indian rupee and Forty-Two
In Words : Grand Total 20,092,880.42
Paise

Payment Terms
1 100.00% of Bill Value Payment Against Execution after receiving (0.00%). Payment will be made through Cheque on or after 0 days from Bill
Date after receiving Invoice

Liquidity Damages
LD applicable Date LD Value applied on LD Value Duration Maximum % of WO Value

WO To Date WO Value 0.05 1 Days 5

Essentials Details
Tag Description

Price Variation Tag Not Applicable

Order Expiry Date 31-Mar-2022

Privileged Vendor Not Applicable

Report Generated at 10-Feb-2022 5:10:07 PM Page 15 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Item Abstract - Cost Package Details


Description - Code Cost Package Quantity UOM Rate Tax Total Value

WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Soft
rock;EXCAVATION ZONE:-0 m - 3 m;MODE OF
MEASUREMENT:-With approved working space
& slope;Work Categorization:-Charges for
Specialized work with Tools / P&M - 6C11S010F
( SAC: 12% - General construction services of
- 1,597.000 Cubic metre 70.00 13,414.80 125,204.80
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Soft
rock;EXCAVATION ZONE:-0 m - 3 m;MODE OF
MEASUREMENT:-With approved working space
& slope;Work Categorization:-Charges for
Specialized work with Tools / P&M - 6C11S010F
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 1,902.000 Cubic metre 70.00 15,976.80 149,116.80
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Hard
rock;EXCAVATION ZONE:-0 m - 3 m;MODE OF
MEASUREMENT:-With approved working space
& slope;Work Categorization:-Charges for
Specialized work with Tools / P&M - 6C11S012E
( SAC: 12% - General construction services of
- 1,501.000 Cubic metre 335.00 60,340.20 563,175.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-Mechanised
excavation;EXCAVATION IN:-Hard
rock;EXCAVATION ZONE:-0 m - 3 m;MODE OF
MEASUREMENT:-With approved working space
& slope;Work Categorization:-Charges for
Specialized work with Tools / P&M - 6C11S012E
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 1,846.000 Cubic metre 335.00 74,209.20 692,619.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:07 PM Page 16 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Placing of concrete by any method;


TYPE OF CONCRETE :- Reinforced cement
concrete; POUR LOCATION :- Below GL; Work
Categorization :- Charges for Specialized work
with Tools / P&M; - 6C12S003K
( SAC: 12% - General construction services of
waterways, dams, water mains and lines, - 179.496 Cubic metre 3,800.00 81,850.18 763,934.98
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 400 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS006Z
( SAC: 12% - General construction services of
- 213.000 Meter 216.00 5,520.96 51,528.96
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 400 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS006Z
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 279.000 Meter 216.00 7,231.68 67,495.68
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 450 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0070
( SAC: 12% - General construction services of
- 266.000 Meter 247.00 7,884.24 73,586.24
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 17 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 450 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0070
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 913.000 Meter 247.00 27,061.32 252,572.32
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 700 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0071
( SAC: 12% - General construction services of
- 1,888.000 Meter 356.00 80,655.36 752,783.36
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 700 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0071
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 761.000 Meter 356.00 32,509.92 303,425.92
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 300 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS007C
( SAC: 12% - General construction services of
- 3,433.000 Meter 177.00 72,916.92 680,557.92
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 18 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 300 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS007C
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 351.000 Meter 177.00 7,455.24 69,582.24
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 350 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS007D
( SAC: 12% - General construction services of
- 2,643.000 Meter 193.00 61,211.88 571,310.88
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 110 mm; - 6C1LS0AH3
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General LAYING OF HDPE PIPES - CP100016 684.000 Meter 6.00 492.48 4,596.48
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 160 mm; - 6C1LS0AQK
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 1,696.000 Meter 9.00 1,831.68 17,095.68
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 90 mm; - 6C1LS0AR8
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General LAYING OF HDPE PIPES - CP100016 2,447.000 Meter 6.00 1,761.84 16,443.84
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 19 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 125 mm; - 6C1LS0AS0
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 4,072.000 Meter 7.00 3,420.48 31,924.48
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 125 mm; - 6C1LS0AS0
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General LAYING OF HDPE PIPES - CP100016 597.000 Meter 7.00 501.48 4,680.48
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 140 mm; - 6C1LS0AS2
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 1,611.000 Meter 8.00 1,546.56 14,434.56
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 180 mm; - 6C1LS0AS3
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 1,002.000 Meter 9.00 1,082.16 10,100.16
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 250 mm; METHOD :- Lowering &
Assembling manually; Work Categorization :-
Charges for Specialized Labour work; -
6C1LS0B3F
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 24.000 Meter 11.00 31.68 295.68
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 20 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 500 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B49
( SAC: 12% - General construction services of
- 393.000 Meter 272.00 12,827.52 119,723.52
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 500 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B49
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 233.000 Meter 272.00 7,605.12 70,981.12
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 600 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4A
( SAC: 12% - General construction services of
- 2,537.000 Meter 315.00 95,898.60 895,053.60
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 600 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4A
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 335.000 Meter 315.00 12,663.00 118,188.00
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 21 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 900 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4B
( SAC: 12% - General construction services of
- 475.000 Meter 496.00 28,272.00 263,872.00
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 900 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4B
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 2,647.000 Meter 496.00 157,549.44 1,470,461.44
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 110 mm; METHOD :- Lowering &
Assembling manually; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4P
( SAC: 12% - General construction services of
- 4,155.000 Meter 73.00 36,397.80 339,712.80
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 110 mm; METHOD :- Lowering &
Assembling manually; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4P
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 684.000 Meter 73.00 5,991.84 55,923.84
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 22 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 280 mm; METHOD :- Lowering &
Assembling manually; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B4S
( SAC: 12% - General construction services of
- 3,580.000 Meter 11.00 4,725.60 44,105.60
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 750 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7L
( SAC: 12% - General construction services of
- 851.000 Meter 385.00 39,316.20 366,951.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 750 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7L
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 1,035.000 Meter 385.00 47,817.00 446,292.00
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 800 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7M
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 61.000 Meter 410.00 3,001.20 28,011.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 23 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 1000 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7N
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 1,626.000 Meter 545.00 106,340.40 992,510.40
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 1100 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7O
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 3,000.000 Meter 565.00 203,400.00 1,898,400.00
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- DI pipes;
DIAMETER :- 1200 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7P
( SAC: 12% - General construction services of
LAYING OF DI PIPES - CP100015 871.000 Meter 584.00 61,039.68 569,703.68
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 280 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7Y
( SAC: 12% - General construction services of
- 3,580.000 Meter 137.00 58,855.20 549,315.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 24 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Lowering into trench, laying, aligning &


jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 225 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B7Z
( SAC: 12% - General construction services of
- 1,046.000 Meter 127.00 15,941.04 148,783.04
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 200 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B80
( SAC: 12% - General construction services of
- 1,701.000 Meter 120.00 24,494.40 228,614.40
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Lowering into trench, laying, aligning &
jointing of pipes; PIPE TYPE :- HDPE pipes;
DIAMETER :- 160 mm; METHOD :- Lowering &
assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; -
6C1LS0B81
( SAC: 12% - General construction services of
- 1,696.000 Meter 93.00 18,927.36 176,655.36
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning &
jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-250 mm;METHOD:-Lowering
& assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BER
( SAC: 12% - General construction services of
- 2,730.000 Meter 132.00 43,243.20 403,603.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 25 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE:-Lowering into trench, laying, aligning &


jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-250 mm;METHOD:-Lowering
& assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BER
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 24.000 Meter 132.00 380.16 3,548.16
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning &
jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-180 mm;METHOD:-Lowering
& assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BES
( SAC: 12% - General construction services of
- 1,002.000 Meter 115.00 13,827.60 129,057.60
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning &
jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-140 mm;METHOD:-Lowering
& assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BET
( SAC: 12% - General construction services of
- 1,611.000 Meter 85.00 16,432.20 153,367.20
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning &
jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-125 mm;METHOD:-Lowering
& assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BEU
( SAC: 12% - General construction services of
- 4,072.000 Meter 81.00 39,579.84 369,411.84
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 26 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE:-Lowering into trench, laying, aligning &


jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-125 mm;METHOD:-Lowering
& assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BEU
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 597.000 Meter 81.00 5,802.84 54,159.84
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning &
jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-90 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BEV
( SAC: 12% - General construction services of
- 14,167.000 Meter 68.00 115,602.72 1,078,958.72
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Lowering into trench, laying, aligning &
jointing of pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-90 mm;METHOD:-Lowering &
assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M -
6C1LS0BEV
( SAC: 12% - General construction services of
LAYING OF HDPE PIPES - CP100016 2,447.000 Meter 68.00 19,967.52 186,363.52
waterways, dams, water mains and lines,
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-
DI;DIAMETER:-850 mm - 900 mm;Work
Categorization:-Charges for Specialized work
with Tools / P&M - 6C1LS0BHL
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
- 1,933.000 Running Meter 120.00 27,835.20 259,795.20
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-
DI;DIAMETER:-700 mm - 750 mm;Work
Categorization:-Charges for Specialized work
with Tools / P&M - 6C1LS0BHN
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
- 562.000 Running Meter 91.00 6,137.04 57,279.04
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 27 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE:-Material shifting;PIPE TYPE:-


DI;DIAMETER:-550 mm - 600 mm;Work
Categorization:-Charges for Specialized work
with Tools / P&M - 6C1LS0BHP
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
- 194.000 Running Meter 85.00 1,978.80 18,468.80
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-
DI;DIAMETER:-400 mm - 450 mm;Work
Categorization:-Charges for Specialized work
with Tools / P&M - 6C1LS0BHR
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
- 52.000 Running Meter 50.00 312.00 2,912.00
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE TYPE:-
DI;DIAMETER:-300 mm - 350 mm;Work
Categorization:-Charges for Specialized work
with Tools / P&M - 6C1LS0BHS
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
- 1,720.000 Running Meter 35.00 7,224.00 67,424.00
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 700 mm - 750 mm; Work
Categorization :- Charges for Specialized Labour
work; - 6C1LS0CE8
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 708.000 Running Meter 50.00 4,248.00 39,648.00
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 550 mm - 600 mm; Work
Categorization :- Charges for Specialized Labour
work; - 6C1LS0CEA
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 420.000 Running Meter 45.00 2,268.00 21,168.00
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 28 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Material shifting; PIPE TYPE :- DI;


DIAMETER :- 400 mm - 450 mm; Work
Categorization :- Charges for Specialized Labour
work; - 6C1LS0CEB
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 799.000 Running Meter 35.00 3,355.80 31,320.80
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 1150 mm - 1200 mm; DISTANCE :-
60 Km - 70 Km; Work Categorization :- Charges
for Specialized work with Tools / P&M; -
6C1LS0DEC
( SAC: 12% - General construction services of
waterways, dams, water mains and lines, LAYING OF DI PIPES - CP100015 1,007.000 Running Meter 126.00 15,225.84 142,107.84
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 850 mm - 900 mm; DISTANCE :- 60
Km - 70 Km; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0DED
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 419.000 Running Meter 120.00 6,033.60 56,313.60
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 700 mm - 750 mm; DISTANCE :- 60
Km - 70 Km; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0DEE
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 472.000 Running Meter 91.00 5,154.24 48,106.24
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 550 mm - 600 mm; DISTANCE :- 60
Km - 70 Km; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0DEF
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 46.000 Running Meter 85.00 469.20 4,379.20
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 29 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Material shifting; PIPE TYPE :- DI;


DIAMETER :- 400 mm - 450 mm; DISTANCE :- 60
Km - 70 Km; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0DEG
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 342.000 Running Meter 50.00 2,052.00 19,152.00
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 1150 mm - 1200 mm; Work
Categorization :- Charges for Specialized Labour
work; - 6C1LS0DEI
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 4,491.000 Running Meter 75.00 40,419.00 377,244.00
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE TYPE :- DI;
DIAMETER :- 850 mm - 900 mm; Work
Categorization :- Charges for Specialized Labour
work; - 6C1LS0DEJ
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
LAYING OF DI PIPES - CP100015 1,677.000 Running Meter 70.00 14,086.80 131,476.80
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Erection of precast concrete elements;
Work Categorization :- Charges for Specialized
work with Tools / P&M; - 6C2CS006S
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General OTHER CIVIL WORKS - CP100024 158.000 Numbers 470.00 8,911.20 83,171.20
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Transportation of precast concrete
elements; SCOPE INCLUDES :- Loading and
Unloading; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C2CS00P6
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
OTHER CIVIL WORKS - CP100024 158.000 Numbers 430.00 8,152.80 76,092.80
irrigation and other waterworks - General
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 30 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

WORK GROUP :- Pipeline works involving


multiple activities; Pipeline works involving
multiple activities; - 6O12S0070
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 32.000 Numbers 2,115.00 8,121.60 75,801.60
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S0070
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 23.000 Numbers 3,525.00 9,729.00 90,804.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S0070
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 10.000 Numbers 1,337.00 1,604.40 14,974.40
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S0070
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 140.000 Numbers 1,782.00 29,937.60 279,417.60
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S0070
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 78.000 Numbers 1,782.00 16,679.52 155,675.52
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007B
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 1,542.000 Running Meter 410.00 75,866.40 708,086.40
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 31 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

WORK GROUP :- Pipeline works involving


multiple activities; Pipeline works involving
multiple activities; - 6O12S007B
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 97.000 Running Meter 545.00 6,343.80 59,208.80
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 2,177.000 Meter 50.00 13,062.00 121,912.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 97.000 Meter 75.00 873.00 8,148.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 14,167.000 Meter 6.00 10,200.24 95,202.24
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 4,155.000 Meter 6.00 2,991.60 27,921.60
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 1,701.000 Meter 10.00 2,041.20 19,051.20
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:08 PM Page 32 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

WORK GROUP :- Pipeline works involving


multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 1,046.000 Meter 10.00 1,255.20 11,715.20
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 2,730.000 Meter 11.00 3,603.60 33,633.60
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 4,233.000 Meter 25.00 12,699.00 118,524.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 310.000 Meter 35.00 1,302.00 12,152.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 2,646.000 Meter 45.00 14,288.40 133,358.40
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
WORK GROUP :- Pipeline works involving
multiple activities; Pipeline works involving
multiple activities; - 6O12S007O
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General - 77.000 Meter 70.00 646.80 6,036.80
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 33 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SCOPE :- Construction of concrete structure; -


6O12S00D5
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General
- 207.000 Sets 430.00 10,681.20 99,691.20
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Construction of concrete structure; -
6O12S00D5
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General
- 300.000 Sets 470.00 16,920.00 157,920.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )
SCOPE :- Construction of concrete structure; -
6O12S00D5
( SAC: 12% - General construction services of
waterways, dams, water mains and lines,
irrigation and other waterworks - General
- 90.000 Sets 490.00 5,292.00 49,392.00
construction services of harbours, waterways,
dams, water mains and lines, irrigation and
other waterworks - 12% - General construction
services of waterways, dams, water mains and
lines, irrigation and other waterworks - 995422 )

Total Value 20,092,880.42

Report Generated at 10-Feb-2022 5:10:09 PM Page 34 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Delivery Schedule


Description - Code Quantity UOM
SCOPE :- Lowering into trench, laying, aligning & jointing of pipes; PIPE TYPE :- DI pipes; DIAMETER 1,888.000 Meter
:- 700 mm; METHOD :- Lowering & assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0071
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,888.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Lowering into trench, laying, aligning & jointing of pipes; PIPE TYPE :- DI pipes; DIAMETER 475.000 Meter
:- 900 mm; METHOD :- Lowering & assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B4B
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 475.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Lowering into trench, laying, aligning & jointing of pipes; PIPE TYPE :- DI pipes; DIAMETER 851.000 Meter
:- 750 mm; METHOD :- Lowering & assembly using crane; Work Categorization :- Charges for
Specialized work with Tools / P&M; - 6C1LS0B7L
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 851.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Lowering into trench, laying, aligning & jointing of pipes; PIPE TYPE :- HDPE pipes; 3,580.000 Meter
DIAMETER :- 280 mm; METHOD :- Lowering & assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; - 6C1LS0B7Y
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 3,580.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Lowering into trench, laying, aligning & jointing of pipes; PIPE TYPE :- HDPE pipes; 1,046.000 Meter
DIAMETER :- 225 mm; METHOD :- Lowering & assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; - 6C1LS0B7Z
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,046.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Lowering into trench, laying, aligning & jointing of pipes; PIPE TYPE :- HDPE pipes; 1,701.000 Meter
DIAMETER :- 200 mm; METHOD :- Lowering & assembly using crane; Work Categorization :-
Charges for Specialized work with Tools / P&M; - 6C1LS0B80
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,701.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE TYPE:-HDPE 2,730.000 Meter
pipes;DIAMETER:-250 mm;METHOD:-Lowering & assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M - 6C1LS0BER
SRNumber Delivery Schedule Quantity Deliver between Remarks

Report Generated at 10-Feb-2022 5:10:09 PM Page 35 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SR/EF889WOR9000045 1 2,730.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE TYPE:-HDPE 1,002.000 Meter
pipes;DIAMETER:-180 mm;METHOD:-Lowering & assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M - 6C1LS0BES
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,002.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE TYPE:-HDPE 1,611.000 Meter
pipes;DIAMETER:-140 mm;METHOD:-Lowering & assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M - 6C1LS0BET
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,611.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Lowering into trench, laying, aligning & jointing of pipes;PIPE TYPE:-HDPE 14,167.000 Meter
pipes;DIAMETER:-90 mm;METHOD:-Lowering & assembly using crane;Work Categorization:-
Charges for Specialized work with Tools / P&M - 6C1LS0BEV
SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 14,167.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-850 mm - 900 mm;Work Categorization:- 1,933.000 Running Meter
Charges for Specialized work with Tools / P&M - 6C1LS0BHL

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,933.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-700 mm - 750 mm;Work Categorization:- 562.000 Running Meter
Charges for Specialized work with Tools / P&M - 6C1LS0BHN

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 562.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-550 mm - 600 mm;Work Categorization:- 194.000 Running Meter
Charges for Specialized work with Tools / P&M - 6C1LS0BHP

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 194.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-400 mm - 450 mm;Work Categorization:- 52.000 Running Meter
Charges for Specialized work with Tools / P&M - 6C1LS0BHR

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 52.000 06-Jun-2019 to 31-Mar-2022

Report Generated at 10-Feb-2022 5:10:09 PM Page 36 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Description - Code Quantity UOM


SCOPE:-Material shifting;PIPE TYPE:-DI;DIAMETER:-300 mm - 350 mm;Work Categorization:- 1,720.000 Running Meter
Charges for Specialized work with Tools / P&M - 6C1LS0BHS

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,720.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 32.000 Numbers
activities; - 6O12S0070

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 32.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 23.000 Numbers
activities; - 6O12S0070

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 23.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 10.000 Numbers
activities; - 6O12S0070

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 10.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 140.000 Numbers
activities; - 6O12S0070

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 140.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 78.000 Numbers
activities; - 6O12S0070

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 78.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 1,542.000 Running Meter
activities; - 6O12S007B

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,542.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM

Report Generated at 10-Feb-2022 5:10:09 PM Page 37 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 97.000 Running Meter
activities; - 6O12S007B

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 97.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 2,177.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 2,177.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 97.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 97.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 14,167.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 14,167.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 4,155.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 4,155.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 1,701.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,701.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 1,046.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 1,046.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 2,730.000 Meter
activities; - 6O12S007O

Report Generated at 10-Feb-2022 5:10:09 PM Page 38 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 2,730.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 4,233.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 4,233.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 310.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 310.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 2,646.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 2,646.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


WORK GROUP :- Pipeline works involving multiple activities; Pipeline works involving multiple 77.000 Meter
activities; - 6O12S007O

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 77.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Construction of concrete structure; - 6O12S00D5 207.000 Sets

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 207.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Construction of concrete structure; - 6O12S00D5 300.000 Sets

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 300.000 06-Jun-2019 to 31-Mar-2022

Description - Code Quantity UOM


SCOPE :- Construction of concrete structure; - 6O12S00D5 90.000 Sets

SRNumber Delivery Schedule Quantity Deliver between Remarks

SR/EF889WOR9000045 1 90.000 06-Jun-2019 to 31-Mar-2022

Report Generated at 10-Feb-2022 5:10:09 PM Page 39 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Report Generated at 10-Feb-2022 5:10:09 PM Page 40 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Soft
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
1 slope;Work Categorization:-Charges MLIP CLUSTER 111,790.00 13,414.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S010F
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Soft
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
1 slope;Work Categorization:-Charges MLIP CLUSTER 111,790.00 13,414.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S010F
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Soft
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
2 slope;Work Categorization:-Charges MLIP CLUSTER 133,140.00 15,976.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S010F
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Soft
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
2 slope;Work Categorization:-Charges MLIP CLUSTER 133,140.00 15,976.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S010F
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 41 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Hard
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
3 slope;Work Categorization:-Charges MLIP CLUSTER 502,835.00 60,340.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S012E
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Hard
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
3 slope;Work Categorization:-Charges MLIP CLUSTER 502,835.00 60,340.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S012E
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Hard
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
4 slope;Work Categorization:-Charges MLIP CLUSTER 618,410.00 74,209.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S012E
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP:-Excavation;SCOPE:-
Mechanised
excavation;EXCAVATION IN:-Hard
rock;EXCAVATION ZONE:-0 m - 3
m;MODE OF MEASUREMENT:-With
approved working space & LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
4 slope;Work Categorization:-Charges MLIP CLUSTER 618,410.00 74,209.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
for Specialized work with Tools / IX
P&M - 6C11S012E
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 42 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Placing of concrete by any


method; TYPE OF CONCRETE :-
Reinforced cement concrete; POUR
LOCATION :- Below GL; Work
Categorization :- Charges for LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
5 Specialized work with Tools / P&M; MLIP CLUSTER 682,084.80 81,850.18
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
- 6C12S003K IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Placing of concrete by any
method; TYPE OF CONCRETE :-
Reinforced cement concrete; POUR
LOCATION :- Below GL; Work
Categorization :- Charges for LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
5 Specialized work with Tools / P&M; MLIP CLUSTER 682,084.80 81,850.18
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
- 6C12S003K IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
400 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
6 MLIP CLUSTER 46,008.00 5,520.96
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS006Z
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
400 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
6 MLIP CLUSTER 46,008.00 5,520.96
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS006Z
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
400 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
7 MLIP CLUSTER 60,264.00 7,231.68
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS006Z
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 43 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
400 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
7 MLIP CLUSTER 60,264.00 7,231.68
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS006Z
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
450 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
8 MLIP CLUSTER 65,702.00 7,884.24
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0070
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
450 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
8 MLIP CLUSTER 65,702.00 7,884.24
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0070
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
450 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
9 MLIP CLUSTER 225,511.00 27,061.32
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0070
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
450 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
9 MLIP CLUSTER 225,511.00 27,061.32
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0070
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 44 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
700 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
10 MLIP CLUSTER 672,128.00 80,655.36
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0071
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
700 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
10 MLIP CLUSTER 672,128.00 80,655.36
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0071
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
700 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
11 MLIP CLUSTER 270,916.00 32,509.92
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0071
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
700 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
11 MLIP CLUSTER 270,916.00 32,509.92
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0071
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
300 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
12 MLIP CLUSTER 607,641.00 72,916.92
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS007C
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 45 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
300 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
12 MLIP CLUSTER 607,641.00 72,916.92
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS007C
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
300 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
13 MLIP CLUSTER 62,127.00 7,455.24
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS007C
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
300 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
13 MLIP CLUSTER 62,127.00 7,455.24
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS007C
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
350 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
14 MLIP CLUSTER 510,099.00 61,211.88
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS007D
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
350 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
14 MLIP CLUSTER 510,099.00 61,211.88
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS007D
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 46 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 110 mm; - 6C1LS0AH3 Individual / Sole Odisha Odisha CGST-6.00% ,
69 MLIP CLUSTER 4,104.00 492.48
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 110 mm; - 6C1LS0AH3 Individual / Sole Odisha Odisha CGST-6.00% ,
69 MLIP CLUSTER 4,104.00 492.48
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 160 mm; - 6C1LS0AQK Individual / Sole Odisha Odisha CGST-6.00% ,
15 MLIP CLUSTER 15,264.00 1,831.68
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 160 mm; - 6C1LS0AQK Individual / Sole Odisha Odisha CGST-6.00% ,
15 MLIP CLUSTER 15,264.00 1,831.68
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 90 mm; - 6C1LS0AR8 Individual / Sole Odisha Odisha CGST-6.00% ,
70 MLIP CLUSTER 14,682.00 1,761.84
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 90 mm; - 6C1LS0AR8 Individual / Sole Odisha Odisha CGST-6.00% ,
70 MLIP CLUSTER 14,682.00 1,761.84
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 125 mm; - 6C1LS0AS0 Individual / Sole Odisha Odisha CGST-6.00% ,
16 MLIP CLUSTER 28,504.00 3,420.48
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 47 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 125 mm; - 6C1LS0AS0 Individual / Sole Odisha Odisha CGST-6.00% ,
16 MLIP CLUSTER 28,504.00 3,420.48
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 125 mm; - 6C1LS0AS0 Individual / Sole Odisha Odisha CGST-6.00% ,
17 MLIP CLUSTER 4,179.00 501.48
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 125 mm; - 6C1LS0AS0 Individual / Sole Odisha Odisha CGST-6.00% ,
17 MLIP CLUSTER 4,179.00 501.48
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 140 mm; - 6C1LS0AS2 Individual / Sole Odisha Odisha CGST-6.00% ,
18 MLIP CLUSTER 12,888.00 1,546.56
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 140 mm; - 6C1LS0AS2 Individual / Sole Odisha Odisha CGST-6.00% ,
18 MLIP CLUSTER 12,888.00 1,546.56
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 180 mm; - 6C1LS0AS3 Individual / Sole Odisha Odisha CGST-6.00% ,
19 MLIP CLUSTER 9,018.00 1,082.16
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
LE161030 -
:- 180 mm; - 6C1LS0AS3 Individual / Sole Odisha Odisha CGST-6.00% ,
19 MLIP CLUSTER 9,018.00 1,082.16
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:09 PM Page 48 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 250 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
71 MLIP CLUSTER 264.00 31.68
Specialized Labour work; - Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
6C1LS0B3F
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 250 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
71 MLIP CLUSTER 264.00 31.68
Specialized Labour work; - Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
6C1LS0B3F
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
500 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
20 MLIP CLUSTER 106,896.00 12,827.52
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B49
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
500 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
20 MLIP CLUSTER 106,896.00 12,827.52
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B49
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
500 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
21 MLIP CLUSTER 63,376.00 7,605.12
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B49
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 49 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
500 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
21 MLIP CLUSTER 63,376.00 7,605.12
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B49
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
600 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
22 MLIP CLUSTER 799,155.00 95,898.60
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4A
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
600 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
22 MLIP CLUSTER 799,155.00 95,898.60
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4A
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
600 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
23 MLIP CLUSTER 105,525.00 12,663.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4A
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
600 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
23 MLIP CLUSTER 105,525.00 12,663.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4A
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 50 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
900 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
24 MLIP CLUSTER 235,600.00 28,272.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4B
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
900 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
24 MLIP CLUSTER 235,600.00 28,272.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4B
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
900 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
25 MLIP CLUSTER 1,312,912.00 157,549.44
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4B
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
900 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
25 MLIP CLUSTER 1,312,912.00 157,549.44
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4B
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 110 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
26 MLIP CLUSTER 303,315.00 36,397.80
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4P
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 51 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 110 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
26 MLIP CLUSTER 303,315.00 36,397.80
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4P
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 110 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
27 MLIP CLUSTER 49,932.00 5,991.84
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4P
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 110 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
27 MLIP CLUSTER 49,932.00 5,991.84
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4P
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 280 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
28 MLIP CLUSTER 39,380.00 4,725.60
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4S
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 280 mm; METHOD :- Lowering &
Assembling manually; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
28 MLIP CLUSTER 39,380.00 4,725.60
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B4S
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 52 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
750 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
29 MLIP CLUSTER 327,635.00 39,316.20
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7L
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
750 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
29 MLIP CLUSTER 327,635.00 39,316.20
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7L
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
750 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
30 MLIP CLUSTER 398,475.00 47,817.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7L
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
750 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
30 MLIP CLUSTER 398,475.00 47,817.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7L
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
800 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
72 MLIP CLUSTER 25,010.00 3,001.20
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7M
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 53 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
800 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
72 MLIP CLUSTER 25,010.00 3,001.20
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7M
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
1000 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
73 MLIP CLUSTER 886,170.00 106,340.40
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7N
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
1000 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
73 MLIP CLUSTER 886,170.00 106,340.40
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7N
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
1100 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
74 MLIP CLUSTER 1,695,000.00 203,400.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7O
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
1100 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
74 MLIP CLUSTER 1,695,000.00 203,400.00
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7O
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 54 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
1200 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
75 MLIP CLUSTER 508,664.00 61,039.68
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7P
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- DI pipes; DIAMETER :-
1200 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
75 MLIP CLUSTER 508,664.00 61,039.68
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7P
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 280 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
31 MLIP CLUSTER 490,460.00 58,855.20
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7Y
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 280 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
31 MLIP CLUSTER 490,460.00 58,855.20
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7Y
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 225 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
32 MLIP CLUSTER 132,842.00 15,941.04
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7Z
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 55 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Lowering into trench,


laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 225 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
32 MLIP CLUSTER 132,842.00 15,941.04
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B7Z
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 200 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
33 MLIP CLUSTER 204,120.00 24,494.40
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B80
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 200 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
33 MLIP CLUSTER 204,120.00 24,494.40
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B80
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 160 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
34 MLIP CLUSTER 157,728.00 18,927.36
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B81
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Lowering into trench,
laying, aligning & jointing of pipes;
PIPE TYPE :- HDPE pipes; DIAMETER
:- 160 mm; METHOD :- Lowering &
assembly using crane; Work
LE161030 -
Categorization :- Charges for Individual / Sole Odisha Odisha CGST-6.00% ,
34 MLIP CLUSTER 157,728.00 18,927.36
Specialized work with Tools / P&M; Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
- 6C1LS0B81
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 56 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE:-Lowering into trench,


laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-250
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
35 Categorization:-Charges for MLIP CLUSTER 360,360.00 43,243.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BER
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-250
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
35 Categorization:-Charges for MLIP CLUSTER 360,360.00 43,243.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BER
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-250
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
36 Categorization:-Charges for MLIP CLUSTER 3,168.00 380.16
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BER
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-250
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
36 Categorization:-Charges for MLIP CLUSTER 3,168.00 380.16
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BER
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 57 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE:-Lowering into trench,


laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-180
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
37 Categorization:-Charges for MLIP CLUSTER 115,230.00 13,827.60
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BES
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-180
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
37 Categorization:-Charges for MLIP CLUSTER 115,230.00 13,827.60
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BES
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-140
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
38 Categorization:-Charges for MLIP CLUSTER 136,935.00 16,432.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BET
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-140
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
38 Categorization:-Charges for MLIP CLUSTER 136,935.00 16,432.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BET
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 58 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE:-Lowering into trench,


laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-125
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
39 Categorization:-Charges for MLIP CLUSTER 329,832.00 39,579.84
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEU
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-125
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
39 Categorization:-Charges for MLIP CLUSTER 329,832.00 39,579.84
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEU
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-125
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
40 Categorization:-Charges for MLIP CLUSTER 48,357.00 5,802.84
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEU
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-125
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
40 Categorization:-Charges for MLIP CLUSTER 48,357.00 5,802.84
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEU
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 59 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE:-Lowering into trench,


laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-90
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
41 Categorization:-Charges for MLIP CLUSTER 963,356.00 115,602.72
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEV
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-90
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
41 Categorization:-Charges for MLIP CLUSTER 963,356.00 115,602.72
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEV
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-90
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
42 Categorization:-Charges for MLIP CLUSTER 166,396.00 19,967.52
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEV
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Lowering into trench,
laying, aligning & jointing of
pipes;PIPE TYPE:-HDPE
pipes;DIAMETER:-90
mm;METHOD:-Lowering &
assembly using crane;Work LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
42 Categorization:-Charges for MLIP CLUSTER 166,396.00 19,967.52
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
Specialized work with Tools / P&M - IX
6C1LS0BEV
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 60 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-850 mm - 900
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
43 P&M - 6C1LS0BHL MLIP CLUSTER 231,960.00 27,835.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-850 mm - 900
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
43 P&M - 6C1LS0BHL MLIP CLUSTER 231,960.00 27,835.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-700 mm - 750
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
44 P&M - 6C1LS0BHN MLIP CLUSTER 51,142.00 6,137.04
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-700 mm - 750
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
44 P&M - 6C1LS0BHN MLIP CLUSTER 51,142.00 6,137.04
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-550 mm - 600
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
45 P&M - 6C1LS0BHP MLIP CLUSTER 16,490.00 1,978.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-550 mm - 600
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
45 P&M - 6C1LS0BHP MLIP CLUSTER 16,490.00 1,978.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 61 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-400 mm - 450
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
46 P&M - 6C1LS0BHR MLIP CLUSTER 2,600.00 312.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-400 mm - 450
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
46 P&M - 6C1LS0BHR MLIP CLUSTER 2,600.00 312.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-300 mm - 350
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
47 P&M - 6C1LS0BHS MLIP CLUSTER 60,200.00 7,224.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE:-Material shifting;PIPE
TYPE:-DI;DIAMETER:-300 mm - 350
mm;Work Categorization:-Charges
for Specialized work with Tools / LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
47 P&M - 6C1LS0BHS MLIP CLUSTER 60,200.00 7,224.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 700 mm -
750 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
76 work; - 6C1LS0CE8 MLIP CLUSTER 35,400.00 4,248.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 700 mm -
750 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
76 work; - 6C1LS0CE8 MLIP CLUSTER 35,400.00 4,248.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:10 PM Page 62 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Material shifting; PIPE


TYPE :- DI; DIAMETER :- 550 mm -
600 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
77 work; - 6C1LS0CEA MLIP CLUSTER 18,900.00 2,268.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 550 mm -
600 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
77 work; - 6C1LS0CEA MLIP CLUSTER 18,900.00 2,268.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 400 mm -
450 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
78 work; - 6C1LS0CEB MLIP CLUSTER 27,965.00 3,355.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 400 mm -
450 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
78 work; - 6C1LS0CEB MLIP CLUSTER 27,965.00 3,355.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 1150 mm -
1200 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
79 MLIP CLUSTER 126,882.00 15,225.84
P&M; - 6C1LS0DEC Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 1150 mm -
1200 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
79 MLIP CLUSTER 126,882.00 15,225.84
P&M; - 6C1LS0DEC Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 63 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Material shifting; PIPE


TYPE :- DI; DIAMETER :- 850 mm -
900 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
80 MLIP CLUSTER 50,280.00 6,033.60
P&M; - 6C1LS0DED Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 850 mm -
900 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
80 MLIP CLUSTER 50,280.00 6,033.60
P&M; - 6C1LS0DED Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 700 mm -
750 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
81 MLIP CLUSTER 42,952.00 5,154.24
P&M; - 6C1LS0DEE Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 700 mm -
750 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
81 MLIP CLUSTER 42,952.00 5,154.24
P&M; - 6C1LS0DEE Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 550 mm -
600 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
82 MLIP CLUSTER 3,910.00 469.20
P&M; - 6C1LS0DEF Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 550 mm -
600 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
82 MLIP CLUSTER 3,910.00 469.20
P&M; - 6C1LS0DEF Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 64 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Material shifting; PIPE


TYPE :- DI; DIAMETER :- 400 mm -
450 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
83 MLIP CLUSTER 17,100.00 2,052.00
P&M; - 6C1LS0DEG Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 400 mm -
450 mm; DISTANCE :- 60 Km - 70
Km; Work Categorization :- Charges
LE161030 -
for Specialized work with Tools / Individual / Sole Odisha Odisha CGST-6.00% ,
83 MLIP CLUSTER 17,100.00 2,052.00
P&M; - 6C1LS0DEG Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 1150 mm -
1200 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
84 work; - 6C1LS0DEI MLIP CLUSTER 336,825.00 40,419.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 1150 mm -
1200 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
84 work; - 6C1LS0DEI MLIP CLUSTER 336,825.00 40,419.00
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 850 mm -
900 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
85 work; - 6C1LS0DEJ MLIP CLUSTER 117,390.00 14,086.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Material shifting; PIPE
TYPE :- DI; DIAMETER :- 850 mm -
900 mm; Work Categorization :-
Charges for Specialized Labour LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
85 work; - 6C1LS0DEJ MLIP CLUSTER 117,390.00 14,086.80
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 65 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Erection of precast


concrete elements; Work
Categorization :- Charges for
Specialized work with Tools / P&M; LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
86 - 6C2CS006S MLIP CLUSTER 74,260.00 8,911.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Erection of precast
concrete elements; Work
Categorization :- Charges for
Specialized work with Tools / P&M; LE161030 -
Individual / Sole Odisha Odisha CGST-6.00% ,
86 - 6C2CS006S MLIP CLUSTER 74,260.00 8,911.20
Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
( SAC: General construction services IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Transportation of precast
concrete elements; SCOPE
INCLUDES :- Loading and Unloading;
Work Categorization :- Charges for
LE161030 -
Specialized work with Tools / P&M; Individual / Sole Odisha Odisha CGST-6.00% ,
87 MLIP CLUSTER 67,940.00 8,152.80
- 6C2CS00P6 Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Transportation of precast
concrete elements; SCOPE
INCLUDES :- Loading and Unloading;
Work Categorization :- Charges for
LE161030 -
Specialized work with Tools / P&M; Individual / Sole Odisha Odisha CGST-6.00% ,
87 MLIP CLUSTER 67,940.00 8,152.80
- 6C2CS00P6 Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
( SAC: General construction services
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
48 MLIP CLUSTER 67,680.00 8,121.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
48 MLIP CLUSTER 67,680.00 8,121.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 66 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP :- Pipeline works


involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
49 MLIP CLUSTER 81,075.00 9,729.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
49 MLIP CLUSTER 81,075.00 9,729.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
50 MLIP CLUSTER 13,370.00 1,604.40
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
50 MLIP CLUSTER 13,370.00 1,604.40
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
51 MLIP CLUSTER 249,480.00 29,937.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
51 MLIP CLUSTER 249,480.00 29,937.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
52 MLIP CLUSTER 138,996.00 16,679.52
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 67 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP :- Pipeline works


involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S0070 Individual / Sole Odisha Odisha CGST-6.00% ,
52 MLIP CLUSTER 138,996.00 16,679.52
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007B Individual / Sole Odisha Odisha CGST-6.00% ,
53 MLIP CLUSTER 632,220.00 75,866.40
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007B Individual / Sole Odisha Odisha CGST-6.00% ,
53 MLIP CLUSTER 632,220.00 75,866.40
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007B Individual / Sole Odisha Odisha CGST-6.00% ,
54 MLIP CLUSTER 52,865.00 6,343.80
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007B Individual / Sole Odisha Odisha CGST-6.00% ,
54 MLIP CLUSTER 52,865.00 6,343.80
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
55 MLIP CLUSTER 108,850.00 13,062.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
55 MLIP CLUSTER 108,850.00 13,062.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 68 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP :- Pipeline works


involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
56 MLIP CLUSTER 7,275.00 873.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
56 MLIP CLUSTER 7,275.00 873.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
57 MLIP CLUSTER 85,002.00 10,200.24
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
57 MLIP CLUSTER 85,002.00 10,200.24
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
58 MLIP CLUSTER 24,930.00 2,991.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
58 MLIP CLUSTER 24,930.00 2,991.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
59 MLIP CLUSTER 17,010.00 2,041.20
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 69 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP :- Pipeline works


involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
59 MLIP CLUSTER 17,010.00 2,041.20
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
60 MLIP CLUSTER 10,460.00 1,255.20
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
60 MLIP CLUSTER 10,460.00 1,255.20
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
61 MLIP CLUSTER 30,030.00 3,603.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
61 MLIP CLUSTER 30,030.00 3,603.60
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
62 MLIP CLUSTER 105,825.00 12,699.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
62 MLIP CLUSTER 105,825.00 12,699.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 70 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

WORK GROUP :- Pipeline works


involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
63 MLIP CLUSTER 10,850.00 1,302.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
63 MLIP CLUSTER 10,850.00 1,302.00
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
64 MLIP CLUSTER 119,070.00 14,288.40
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
64 MLIP CLUSTER 119,070.00 14,288.40
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
65 MLIP CLUSTER 5,390.00 646.80
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
WORK GROUP :- Pipeline works
involving multiple activities;
Pipeline works involving multiple
LE161030 -
activities; - 6O12S007O Individual / Sole Odisha Odisha CGST-6.00% ,
65 MLIP CLUSTER 5,390.00 646.80
( SAC: General construction services Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
of harbours, waterways, dams,
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Construction of concrete
structure; - 6O12S00D5
LE161030 -
( SAC: General construction services Individual / Sole Odisha Odisha CGST-6.00% ,
66 MLIP CLUSTER 89,010.00 10,681.20
of harbours, waterways, dams, Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
water mains and lines, irrigation
and other waterworks - 995422 )

Report Generated at 10-Feb-2022 5:10:11 PM Page 71 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Itemwise Tax Details

Special Tax
S.No. Description - Code Reference Source Destination WO Item Value Tax Value
Condition Component

SCOPE :- Construction of concrete


structure; - 6O12S00D5
LE161030 -
( SAC: General construction services Individual / Sole Odisha Odisha CGST-6.00% ,
66 MLIP CLUSTER 89,010.00 10,681.20
of harbours, waterways, dams, Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Construction of concrete
structure; - 6O12S00D5
LE161030 -
( SAC: General construction services Individual / Sole Odisha Odisha CGST-6.00% ,
67 MLIP CLUSTER 141,000.00 16,920.00
of harbours, waterways, dams, Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Construction of concrete
structure; - 6O12S00D5
LE161030 -
( SAC: General construction services Individual / Sole Odisha Odisha CGST-6.00% ,
67 MLIP CLUSTER 141,000.00 16,920.00
of harbours, waterways, dams, Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Construction of concrete
structure; - 6O12S00D5
LE161030 -
( SAC: General construction services Individual / Sole Odisha Odisha CGST-6.00% ,
68 MLIP CLUSTER 44,100.00 5,292.00
of harbours, waterways, dams, Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
water mains and lines, irrigation
and other waterworks - 995422 )
SCOPE :- Construction of concrete
structure; - 6O12S00D5
LE161030 -
( SAC: General construction services Individual / Sole Odisha Odisha CGST-6.00% ,
68 MLIP CLUSTER 44,100.00 5,292.00
of harbours, waterways, dams, Proprietorship 21CZRPG7175A1ZH 21AAACL0140P4ZS SGST-6.00%
IX
water mains and lines, irrigation
and other waterworks - 995422 )

Total Reference Value 17,940,071.80


Total Tax Value 2,152,808.62

Standard Deduction Details


S.No. Deduction Type Description Percentage

1 INCOME TAX IT Cess 0.00

2 INCOME TAX IT Surcharge 0.00

3 INCOME TAX TDS 1.00

4 RETENTION RETENTION 5.00

Report Generated at 10-Feb-2022 5:10:11 PM Page 72 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Material Link


Desription - Code Issue Type Req. Quantity UOM Recovery Rate Recovery Value
Aluminum Ladder 3m - 228510031 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
ALLUMINIUM LADDER 6MTR LONG - 228510160 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
SLINGS - WIRE ROPE 16 MM * 8 MTR - 251011608 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
SLINGS - WIRE ROPE 20 MM * 8 MTR - 251012008 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
SLINGS - NYLON FLAT 8 TON CAP * 8 MTR LONG - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
251130808 BASIS
SLINGS - NYLON FLAT 10 TON CAP * 12 MTR LONG - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
251131012 BASIS
Nylon Belt Sling 5MT Capacity x 6 mtr long - 251192509 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
PIPE LIFTING CLAMP ( CROSBY LIFTING CLAMPS) - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
290098741 BASIS
1100V CU FLXCABLE PVC SH M/STR 3C*1.5SQMM(48/0.2) ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Meter 0.0000 0.0000
IS:694-1990 - 323113010 BASIS
METAL CLAD PLUG DPN 250 V 20 A IS - 325122200 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
MS FOUNDATION BOLT 32MM DIA AS PER DRAWING - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
340000132 BASIS
MS FOUNDATION BOLT 16 MM DIA * 500 MM LONG - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
340001650 BASIS
MS FOUNDATION BOLT 20 MM DIA * 500 MM LONG - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
340002050 BASIS
MS FOUNDATION BOLT 20 MM DIA * 600 MM LONG - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
340002060 BASIS
MS U BOLT 16MM DIA WITH NUT AND WASHER GRADE 4.6 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
AS PER DRAWING - 340363239 BASIS
WIRE NAILS 1 1/2 Inch X 14 BWG - 344000801 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Kilogram 0.0000 0.0000
BASIS
WIRE NAILS 2 Inch X 12 BWG - 344001001 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Kilogram 0.0000 0.0000
BASIS
WIRE NAILS 3 Inch X 10 BWG - 344001501 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Kilogram 0.0000 0.0000
BASIS
ESAB-36H (PH) E7018 450*3.15 MM IS: - 352407039 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Thousands 0.0000 0.0000
BASIS
FACE SHIELD WITH HELMET (GAS CUTTING/GRINDING) - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
359927200 BASIS
GOGGLES BLACK SPECTACLE TYPE - 359930610 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
SAFETY GOGGLES, FOR WORKERS CLEAR - 359992996 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
Nose Mask - 370312275 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
PIPE CUTTING WHEEL 14inch BOSCH MAKE MODEL ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
NO.BCO-2000 - 379090454 BASIS
POLYPROPYLENE ROPE 25 MM YELLOW COLOR - 381000251 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Kilogram 0.0000 0.0000
BASIS
SAFETY HELMET HDPE NAPE TYPE-WITH CHIN STRAP, ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
YELLOW, IS:2925-1984 - 388003020 BASIS

Report Generated at 10-Feb-2022 5:10:11 PM Page 73 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SAFETY HELMET HDPE NAPE TYPE-WITH CHIN STRAP RED ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
IS:2925-1984 - 388003030 BASIS
SAFETY HELMET HDPE NAPE TYPE-WITH CHIN STRAP ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
GREEN IS:2925-1984 - 388003040 BASIS
SAFETY HELMET HDPE NAPE TYPE-WITH CHIN STRAP BLUE ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
IS:2925-1984 - 388003050 BASIS
SAFETY LOAD CARRYING HELMET HDPE CHIN STRAP TYPE-Y ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
ELLOW IS:2925-1984 - 388004030 BASIS
SAFETY NET PP 10M L * 5M W 25MM MESH 12MM ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BORDER ROPE - 388007074 BASIS
GUM BOOT WITH STEEL TOE SIZE:6 - 388015062 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
GUM BOOT WITH STEEL TOE SIZE:7 - 388015072 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
GUM BOOT WITH STEEL TOE SIZE:8 - 388015082 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
GUM BOOT WITH STEEL TOE SIZE:9 - 388015092 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
LEATHER SAFETY SHOE WITH DIRECT INJECTED SINGLE ISSUE TO SUBCONTRACTORS - FREE
DENSITY POLYURETHANE SOLE,STEEL/FIBRE TOE SIZE 7 - BASIS 1200.0000 Pairs 0.0000 0.0000
388020007
LEATHER SAFETY SHOE WITH DIRECT INJECTED SINGLE ISSUE TO SUBCONTRACTORS - FREE
DENSITY POLYURETHANE SOLE,STEEL/FIBRE TOE SIZE 8 - BASIS 1200.0000 Pairs 0.0000 0.0000
388020008
LEATHER SAFETY SHOE WITH DIRECT INJECTED SINGLE ISSUE TO SUBCONTRACTORS - FREE
DENSITY POLYURETHANE SOLE,STEEL/FIBRE TOE SIZE 9 - BASIS 1200.0000 Pairs 0.0000 0.0000
388020009
LEATHER SAFETY SHOE WITH DIRECT INJECTED SINGLE ISSUE TO SUBCONTRACTORS - FREE
DENSITY POLYURETHANE SOLE,STEEL/FIBRE TOE SIZE 10 - BASIS 1200.0000 Pairs 0.0000 0.0000
388020010
UMBRELLA IS - 388025000 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
UMBRELLA LONG HANDLE TYPE - 388025300 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
GLOVES RUBBER IS - 388030400 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
COTTON HAND GLOVES SKIN FIT WITH RUBBER DOTTED ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
PALM - 388030690 BASIS
FULL BODY HARNESS, NYLON WEBBING, FRONTAL ISSUE TO SUBCONTRACTORS - FREE
ATTACHMENT, DOUBLE LANYARD, SCAFFOLD HOOK, BASIS 1200.0000 Numbers 0.0000 0.0000
SHOULDER ADJUST - 388037040
ROPE GRAB FALL ARRESTER WITH ANCHORAGE LIFELINE 15 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
MTR. - 388037043 BASIS
FALL ARRESTER-MOBILE GRAB TYPE EN353-2-1993 - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
388038000 BASIS
WELDING LEATHER HAND GLOVES. - 388038317 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
SAFETY BARR.TAPE LDPE D/S IMP.75MM*50MIC*300M ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
ROLL - 388046001 BASIS
BARRICATING NET (WITH EYEHOLE) 50MTR.LENGTH - ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Meter 0.0000 0.0000
388046028 BASIS
REFLECTIVE JACKET, REFL.TAPE 3M SCOTCHLITE BRAND L&T ISSUE TO SUBCONTRACTORS - FREE
LOGO FRONT & BACK COLOUR: FLUORESCENT GREEN - BASIS 1200.0000 Numbers 0.0000 0.0000
388047130

Report Generated at 10-Feb-2022 5:10:11 PM Page 74 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

REFLECTIVE JACKET FOR WORKMEN- BACKGROUND ISSUE TO SUBCONTRACTORS - FREE


FABRIC – 100% POLYSTER LOW MESH (80 GSM), COLOUR: BASIS
FLUORESCENT ORANGE, REFLECTIVE TAPE: MICRO
1200.0000 Sets 0.0000 0.0000
PRISMATIC REFLECTIVE TAPES 5 CM. WIDE TOTAL LENGTH-
260 CM. REFLECTIVE L&T LOGO WITH “L&T LIFE” & -
388047365
FIRE EXTINGUISHER FOAM 9 LTR CAP. - 388090110 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
FIRE EXTINGUISHER CO2 4.5 KG CAP. - 388090136 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
FIRE EXTINGUISHER ABC TYPE 6 KG CAP - 388090280 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
FIRE BUCKET - - 388090450 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
Safety shoe for workmen (PU) Leather Safety Footwear ISSUE TO SUBCONTRACTORS - FREE
with Direct Injection Moulded Poly urethane (PU) Sole BASIS 1200.0000 Pairs 0.0000 0.0000
Single Density with steel toe Size 6 - 388092706
Safety shoe for workmen (PU) Leather Safety Footwear ISSUE TO SUBCONTRACTORS - FREE
with Direct Injection Moulded Poly urethane (PU) Sole BASIS 1200.0000 Pairs 0.0000 0.0000
Single Density with steel toe Size 7 - 388092707
Safety shoe for workmen (PU) Leather Safety Footwear ISSUE TO SUBCONTRACTORS - FREE
with Direct Injection Moulded Poly urethane (PU) Sole BASIS 1200.0000 Pairs 0.0000 0.0000
Single Density with steel toe Size 8 - 388092708
Safety shoe for workmen (PU) Leather Safety Footwear ISSUE TO SUBCONTRACTORS - FREE
with Direct Injection Moulded Poly urethane (PU) Sole BASIS 1200.0000 Pairs 0.0000 0.0000
Single Density with steel toe Size 9 - 388092709
Safety shoe for workmen (PU) Leather Safety Footwear ISSUE TO SUBCONTRACTORS - FREE
with Direct Injection Moulded Poly urethane (PU) Sole BASIS 1200.0000 Pairs 0.0000 0.0000
Single Density with steel toe Size 10 - 388092710
Vibrator Needle - Diesel - 40MM - 390060040 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
Vibrator Needle - Diesel - 60MM - 390060060 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
SAFETY HELMET; MATERIAL :- HDPE; TYPE :- Ratchet; ISSUE TO SUBCONTRACTORS - FREE
COLOUR :- White; With chin strap; with embossed L&T BASIS 1200.0000 Numbers 0.0000 0.0000
Logo - 3O11M000J000001
SAFETY HELMET; MATERIAL :- HDPE; TYPE :- Nape; COLOUR ISSUE TO SUBCONTRACTORS - FREE
:- Blue; With chin strap; with embossed L&T Logo - BASIS 1200.0000 Numbers 0.0000 0.0000
3O11M001L000001
SAFETY HELMET; MATERIAL :- HDPE; TYPE :- Nape; COLOUR ISSUE TO SUBCONTRACTORS - FREE
:- Yellow; With chin strap; with embossed L&T Logo - BASIS 1200.0000 Numbers 0.0000 0.0000
3O11M001R000001
REFLECTIVE JACKET; MATERIAL :- Polyester (80 GSM); ISSUE TO SUBCONTRACTORS - FREE
COLOUR :- Orange; Reflective tape: micro prismatic BASIS
reflective tapes 5 cm. wide total length-260 cm. reflective 1200.0000 Sets 0.0000 0.0000
L&T logo at front and back, opening type: front -
3O11M003S000001
RAINCOAT; APPLICATION :- For workmen; TYPE :- Shirt & ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
pants type; LENGTH :- Medium; - 3O11M0055000000 BASIS
SAFETY NET; MATERIAL :- Polypropylene; TYPE :- Double ISSUE TO SUBCONTRACTORS - FREE
layer; MESH SIZE :- 25 mm x 25 mm; MESH ROPE :- 2.5 mm BASIS
dia.; BORDER ROPE :- 12 mm dia.; tie cord of 12 mm PP at 1200.0000 Square meter 0.0000 0.0000
every 1.5 m interval and binding of both the nets across at
every 3 m - 3O14M000H000001
Rain Coat - Duck Buck - 3O14M0017000002 ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
BASIS
ADMIXTURE SIKAMENT 2004 NS - 610692490 ISSUE TO SUBCONTRACTORS - FREE
16000.0000 Kilogram 0.0000 0.0000
BASIS

Report Generated at 10-Feb-2022 5:10:12 PM Page 75 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ORDINARY PORTLAND CEMENT; GRADE :- 43; FORM :- 50 ISSUE TO SUBCONTRACTORS - FREE


4000.0000 Metric Tonne 0.0000 0.0000
kg bags; - 6C11M0009000000 BASIS
REINFORCEMENT STEEL BAR; TYPE :- Thermo mechanically ISSUE TO SUBCONTRACTORS - FREE
treated (TMT); GRADE :- Fe 500; DIAMETER :- 8 mm; FORM BASIS 1200.0000 Metric Tonne 0.0000 0.0000
:- Straight bars (standard length); - 6CA1M0002000000
REINFORCEMENT STEEL BAR; TYPE :- Thermo mechanically ISSUE TO SUBCONTRACTORS - FREE
treated (TMT); GRADE :- Fe 500; DIAMETER :- 10 mm; BASIS
1200.0000 Metric Tonne 0.0000 0.0000
FORM :- Straight bars (standard length); -
6CA1M0003000000
REINFORCEMENT STEEL BAR; TYPE :- Thermo mechanically ISSUE TO SUBCONTRACTORS - FREE
treated (TMT); GRADE :- Fe 500; DIAMETER :- 12 mm; BASIS
1200.0000 Metric Tonne 0.0000 0.0000
FORM :- Straight bars (standard length); -
6CA1M0008000000
REINFORCEMENT STEEL BAR; TYPE :- Thermo mechanically ISSUE TO SUBCONTRACTORS - FREE
treated (TMT); GRADE :- Fe 500; DIAMETER :- 16 mm; BASIS
1200.0000 Metric Tonne 0.0000 0.0000
FORM :- Straight bars (standard length); -
6CA1M0009000000
REINFORCEMENT STEEL BAR; TYPE :- Thermo mechanically ISSUE TO SUBCONTRACTORS - FREE
treated (TMT); GRADE :- Fe 500; DIAMETER :- 20 mm; BASIS
1200.0000 Metric Tonne 0.0000 0.0000
FORM :- Straight bars (standard length); -
6CA1M000A000000
REINFORCEMENT STEEL BAR; TYPE :- Thermo mechanically ISSUE TO SUBCONTRACTORS - FREE
treated (TMT); GRADE :- Fe 500; DIAMETER :- 25 mm; BASIS
1200.0000 Metric Tonne 0.0000 0.0000
FORM :- Straight bars (standard length); -
6CA1M000B000000
SHUTTERING PLYWOOD; TYPE :- Film faced (densified); SIZE ISSUE TO SUBCONTRACTORS - FREE
:- 2440 mm x 1220 mm; THICKNESS :- 12 mm; - BASIS 1200.0000 Numbers 0.0000 0.0000
6CD2M0002000000
MS FULLY THREADED BOLT; BOLT SIZE :- M16; BOLT LENGTH ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
:- 100 mm; - 6M21M00LA000000 BASIS
MS FULLY THREADED BOLT; BOLT SIZE :- M20; BOLT LENGTH ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
:- 120 mm; - 6M21M00LB000000 BASIS
MS FULLY THREADED BOLT; BOLT SIZE :- M12; BOLT LENGTH ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Numbers 0.0000 0.0000
:- 100 mm; - 6M21M00LC000000 BASIS
ROUND BOTTOM FIRE BUCKETS FILLED WITH STAND (4 ISSUE TO SUBCONTRACTORS - FREE
BUCKETS) PROVIDE WITH SUITABLE STAND IS;2546 - BASIS 1200.0000 Sets 0.0000 0.0000
772701AYG
First Aid box Containging ointments and medicine for ISSUE TO SUBCONTRACTORS - FREE
immediate treatment of injuries(as prescribed by Indian BASIS 1200.0000 Numbers 0.0000 0.0000
Red Cross society) as per IS:13115 - 772781ATQ
Rubber gloves suitable for 1.1 kv - 772807BUD ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
Rubber gloves suitable for 6.6 kv - 772807BUE ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS
Rubber gloves suitable for 33 kv - 772807BUF ISSUE TO SUBCONTRACTORS - FREE
1200.0000 Pairs 0.0000 0.0000
BASIS

Report Generated at 10-Feb-2022 5:10:12 PM Page 76 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

ANNEXURE : Additional Terms & Conditions


Attribute Description
PRICE VARIATION Prices shall remain firm for the entire duration of the Sub- Contract and no price
escalation on rates of materials, diesel, labour wages,consumables etc. shall be
payable under any
circumstances.
TAXES & DUTIES VARIATIONS As per GST law, any reduction in rate of tax on any supply of goods or
service or the benefit of input tax credit shall be passed on to the recipient by way
of commensurate reduction in
prices Accordingly you shall confirm us that all the benefits on account of
introduction of GST are passed on to
us by way of reduction in rate of the goods or found that the benefit was not passed
on to us either in full or
part, the same shall be recovered by us from the payment due to you from us.
QUANTITATIVE PAYMENT TERMS Payment shall be released based on the quantity jointly agreed by
Engineer incharge and Contractor
LIQUIDATED DAMAGE CALCULATIONS If for any reason, the rate of progress of works, or any section of
works is at any time, in the opinion of Engineer in Charge too slow to ensure
completion by the prescribed time
or extended time for completion, Engineer ,incharge shall so notify the contractor in
writing and the contractor
shall there upon take such steps as are necessary to expedite progress so as to
complete the works. The
contractor shall not be entitled to any additional payment for taking such steps.If
the Contractor fails to
complete the work substantially under contract by the stipulated date, he/she shall
pay liquidated damages at
the rate of 0.05% of the work order value per day maximum 5 % of work order value
from the date of delaying
the said work up to the date of completion.LD may be waived of and necessary time
extension may be provided
for reasons notattributable to contractor on sole discretion of Project Manager /
Director.
ROYALTY COVERAGE For royalties applicable to any construction material, Agency shall obtain royalty
paid
challans from concerned department for Construction of Thrust Block. Agency shall
submit royalty challans for
quantities billed, duly certified. In case the agency fails to produce these challans
along with Agency bill, royalty
amount will be deducted from Agency as per the standard deductions applicable in
Odisha for this project
PF / ESI SCOPE Provident Fund:- The P.F. Remittance challan is to be submitted to our office as per
labour
laws same shall be produced on demand. Also necessary bonus & notice pay shall
be paid to the labour as and
when required and record for the same to be maintained and submitted to this
office whenever required. If the
agency fails to deposit/submit PF challan for labors, same shall be recovered from
RA bill . Employee State
Insurance The contractor will be required to obtain Employee State Insurance (ESI)
registration to cover all his
workmen engaged by him for this works. If he fails to do so, the Company will cover
his workmen under the ESI
and applicable value should be deducted from the bill.
LABOUR LAWS All the wages to workmen shall be paid through bank transfer only and documents
in support
of such payment of wages through bank transfer shall be submitted to project site
every month. Any failure on
part of the sub-contractor to furnish necessary documentary proof shall result in all
future payments to be made
to the subcontractor on this account being with held , till the compliance thereof is
achieved to the satisfaction of
L&T.

Report Generated at 10-Feb-2022 5:10:12 PM Page 77 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

SUBMISSION OF INVOICE The work completed in each month shall be measured and agreed jointly between
agency and the representative of L&T Engineer-incharge
CO - ORDINATION WITH OTHER AGENCIES No part of sub-contract nor any share or interest thereof shall
in any manner of degree be transferred, assigned or sublet by Sub- Contractor
directly or indirectly to any firm
or corporation whatsoever without the prior consent in writing of L&T.
Notwithstanding any subletting with such
approvals as aforesaid, Sub-Contractor shall solely be responsible for the quality and
proper and expeditious
execution of the works and performance of all the conditions of the sub-contract, in
all respects as if such
subletting had not taken place and as if such work had been directly done by Sub -
Contractor.
MATERIALS & DISPATCH All transport and handling charges, storage charges, charges for watch & ward for
your own materials and the materials handed over to you from L&T, are included in
your price and L&T will not
entertain any claim on account of above at a later date. You shall maintain a daily
stock register and any
shortfall either on account of poor watch & ward or improper storage of material
shall be recovered at prevailing
market rate plus 20% towards our overheads and costs. The store should be of
adequate capacity taking all
safety measures against theft, deterioration of materials, etc. loading at stores,
transportation to site and
unloading stocking at destination shall have to be done by the contractors at the
cost & risk
SPECIAL CONDITONS Retention:-Retention @ 5% shall be recovered from each RA Bill value. This shall be
released after 6 months from the date of total completion of works. SITE
CONDITIONS You shall be deemed to
have complete awareness about the site conditions and examined the conditions
under which the work will
precede, the means of access, limit of working area, availability of labours, materials
and other matters affecting
the cost of work. No claim for additional cost will be entertained on the ground of
lack of knowledge in this
respect You will be expected to employ on the workyour regular skilled employees
with experience of this
particular work. To the extent possible, unskilled workers shall be taken from the
local areas. If the
subcontractors or his workmen or employees shall break of damage any part of
available components etc; the
contractors shall make the same in good at his own expenses or in default the L&T
may cause the same in good
conditions and deduct the expenses (of which L&T decisions is final) from any
money due to the contractors.
Rate is inclusive of all the benefits to workmen applicable as well as central labour
law etc. L&T is not responsible
for any loss or damage to the contractorsequipment. Depending upon the nature of
work and availability of
facility locally, Sub Contractors may have to arrange for a temporaryarrangement for
facilitating uninterrupted
progress of work. No extra claim is applicable for the same. TIMELY WAGE: Agency
will be responsible for the
timely payment of wages/benefits to its employees/workers as per the provisions of
the act as applicable. FINAL
BILLS: The final bill will be certified and payment released only after the entire
works covered under Agency's
scope of works and on receipt of completion certificate for entire scope of work
from L&T Project Manager /
Project Director. Confidentiality of documents:- You shall treat all documents,
specifications, drawings andcontents therein as private and confidential. Working
Hour:- For the timely completion of works, you may
have to work round the clock (24hours in shifts) as necessary without any extra cost.
You will provide all
necessary staff for smooth execution of the work. Supplementary Condition:- We
reserve the right to issue
additional condition, specifications, amendments etc. if necessary to you. Taking

Report Generated at 10-Feb-2022 5:10:12 PM Page 78 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:
Over:- After completion of the
work you shall have to dispose of all excess material to suitable location far away
from the site shown by
engineer-in charge. After completion of total work including dispose of excess
material you have to inform our
Engineer incharge in writing. OTHERS: In addition to above we shall be authorized to
deduct any amount of
money i.e balance or to be recovered from the agency so liable from other site
/existing jobs or any job being
executed by the agency elsewhere earlier can be recovered from his/her currently
monthly progress bill.
Necessary pour cards, BBS and work permits etc shall have to be prepared and get
permitted from time to time
as per requirement. Construction of Thrust Block: a. PCC: All charges for excavation,
providing, mixing, placing
and curing of concrete of M15 grades (PCC) using own mixer machine for
construction of thrust block with
supply of required material (cement, sand, 40mm aggregates, water etc. complete),
machineries and manpower
as per approved design mix. Scope involves mobilisation-demobilisation of all
machineries, manpower &
material, consumables, tools & tackles etc complete as per specification. b. RCC: All
charges for providing,
mixing, placing and curing of concrete of M20 grades (RCC) using own mixer
machine for construction of thrust
block with supply of required material ( cement, sand, 20mm aggregates, water etc.
complete), machineries and
manpower as per approved design mix. Scope involves mobilisation-demobilisation
of all machineries, manpower
&material, stacking of cement bags etc. complete. Charges are inclusive of
providing, fixing and removal of
shuttering works as per drawing including shifting, labour, material, tools and
tackles etc. complete required for
executing the works as per specification. c. Reinforcement: All Charges for providing,
loading/unloading, shifting
of all materials to work place using own P&M and manpower cutting, bending and
placing for (HYSD) Fe 415/500
reinforcement as per approved drawing and technical specification including all
consumables, tools & tackles,
binding wire, labour etc. complete.Scope includes Obtaining No Objection
Certificate from Farmers after
completion of works at site.Scope includes construction of stock yard, P&M work
shop, your own Office & stores
for the work as per requirements if needed. No separate payment will be made for
these structures as the rates
are inclusive of the same.No extra claims shall be entertained on account of all and
any local Issues,
Miscellaneous expenses, idling of resources on what so ever reasons.The work
should be carried out with due
diligence and all work should be executed in a workmanlike manner subject to the
approval of the WRD, Odisha
and L&T authorities, whose decision as to the rate of progress and the quality of
work / material shall be final
and binding.The Contractor has to abide by the specifications of WRD, Odisha
/L&TConstruction and by
anysupplementary specifications that may be issued in time to time by them.
Arrange for power, lighting & water
at his own cost for all the works. Agency shall submit reconciliation statements for
free issue materials i.e.Pipes,
fittings, etc. if any, (with inpermissible wastage norms) as and when required . Bulk
Material like Cement and
steel reconciliation statement to be submitted once in everymonth along with
running bills , failing which 10% of
bill amount will be withheld from subsequent running account bill. The difference
between quantity issued and
quantity arrived at as stated above, (usingthe applicable norms), being the excess
consumption, shall be
recovered from contractor at with procured rate plus 20% towards our overheads
and costs. PF / ESI SCOPE

Report Generated at 10-Feb-2022 5:10:12 PM Page 79 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:
???? PF/ESI in Contractor??s scope SCREENING You will abide by the Company??s
Worker Screening Policy and
the workers shall be engaged for job work only after completion of screening
process which includes
DOCUMENTATION, MEDICAL EXAMINATION, VOCATIONAL TRIAL TEST and SAFETY
INDUCTION. Any worker
found unfit in any of the above stated process shall not be permitted for job work.
You should engage new
labourers after completion of the screening form by our time office person and
Safety Department. You should
submit the copy of Age proof certificate/ Photo ID/ Address proof for your all
labourers (Voter ID / Driving
License / School certificate / birth certificate / Aadhar card etc.) TRANSPORTATION
You must hire proper covered
personnel carriers and shall not use any load/goods carrying vehicle for transporting
workforce. Use of load /
goods transporting vehicles for workers / personnel is STRICTLY PROHIBITED. CHILD
LABOUR Child labor is
STRICTLY PROHIBITED. Any individual below the age of 18 shall not be permitted at
job site you must abide by
this policy of not engaging child labor at sites. MINIMUM WAGES You will pay
Minimum wages to all the workers
applicable in the area / state where the project work is carried out. During the
tenure of the project, whenever
Minimum wages is revised the revised minimum wages to be paid to all the workers
and the same shall be borne
by you. All Wages to the workmen shall be paid though bank transfer only and
documents in support of such
payments of wages through bank transfer shall be submitted to the project site
every month. Any failure on the
part of sub contractor to furnish necessary documentary proof shall result in all
future payments to be made to
the sub-contractor on this account being with-held till the compliance thereof is
achieved to the satisfaction of
the contractor ( L&T).
COMPLETION OF WORKS Agency shall not be entitled to any compensation for any consequent losses or any
loss suffered by the agency on account of delay in commencing of executing the
work or due to idling of
manpower and machinery, overheads etc
FORCE MAJURE CLAUSE If either the parties is prevented from his performance in whole or in part for the
reasons of force majeure Viz., the acts of God, Government, War, civil commotion
sabotage, fire, floods,
explosions and epidemics, then provided the notice of such happenings is given by
the affected to the party,
within a week from the date of occurrence, the period of force majeure shall be
excluded from the completion
time. If the period of force majeure extends beyond one month, further course of
action shall be decided on
mutual discussion.
SETTLMENT OF DISPUTES All disputes or difference of opinions, on account of interpretation of clauses,
technical specifications etc., shall be resolved through direct and mutual discussion
at site level. Failing amicable
settlement shall be referred to the Arbitration. The arbitration proceedings shall be
governed in accordance with
the Indian Arbitration Act 1966 or any statutory modifications thereof for the time
being in force and such
arbitration shall take place in Chennai
SAFETY The contractor should ensure that his workmen and supervisors strictly follow the
safety procedures of
the company as per EHS Code of Practice for Subcontractors enclosed. Personal
Protective Equipment (PPE) for
Agency workers shall be supplied by L&T at free of cost on returnable basis at one
time only. Necessary
reconciliation to be given as and when required by site management , failing which
necessary recovery shall be
done from Agency running account bill adding 20% extra as overhead charge

Report Generated at 10-Feb-2022 5:10:12 PM Page 80 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

YOUR OBLIGATION 1. The sub-contractor shall have to register himself under GST Law and furnish the
correct SAC Code and GSTIN of L&T as well as of his on the invoices in respect of
work allocated to him. 2.
Subcontractor shall have to file the GST Return in the prescribed format within the
stipulated time limit as per
GST Law. 3. Sub-contractor shall ensure to declare the detail of invoices in their
return GSTR-1 and GSTR-3 and
the same should be reflected in the GSTR-2A of L&T. Further Sub-contractor shall
have to provide the proof of
payment of GST (Payment Challan) along with copy of GST Return to L&T. In case the
same is not furnished, the
amount of GST paid to sub-contractor shall be recovered from the dues of the
subsequent invoices. 4. In case of
any denial of Input Tax Credit to L&T due to default on the part of sub-contractor or
non-furnishing of
documentary evidence in their returns, the amount against that input tax credit will
be recovered from the dues
of the subsequent invoices or Bank Guarantee furnished by the sub-contractors to
L&T.
ARBITRATION All disputes or difference of opinions, on account of interpretation of clauses,
technical
specifications etc., shall be resolved through direct and mutual discussion at site
level. Failing amicable
settlement shall be referred to the Arbitration. The arbitration proceedings shall be
governed in accordance with
the Indian Arbitration Act 1966 or any statutory modifications thereof for the time
being in force and such
arbitration shall take place in Chennai
TERMINATION OF CONTRACT If progress of works consistently found to be below the accepted program,
and if, the quality of work being executed by the agency falls below the expected
standards laid down by us, in
such cases, in the interest of timely completion of the project and to maintain the
quality of work, we reserve
the right to delete any part of the scope of work, or, the entire balance work to be
taken away from the agency.
In such case, no compensation or damages or any other extra payment shall be paid
to the agency.
RETENTION Retention 5 percentage shall be recovered from each RA bill value. This shall be
released after 6
months from the date of total completion of works
DIGITAL WAGE DISBURSEMENT All the wages to workmen shall be paid through bank transfer only and
documents in support of such payment of wages through bank transfer shall be
submitted to project site every
month. Any failure on part of the sub-contractor to furnish necessary documentary
proof shall result in all future
payments to be made to the subcontractor on this account being with held , till the
compliance thereof is
achieved to the satisfaction of L&T.
QUANTITY VARIATION The quantities given in work order are tentative only and may vary. L&T reserves the
right to interpolate or extrapolate the item of work and rates for any new items and
will be added / deleted in
work orders.Further Agency work may be continued or stopped based on Agency
work performance or any issue
with work front availability as per decision of L&T management. Quantities may vary
to any extent as per
drawing but rates are firm and are not subjected to any increase or
escalation.Quantities are approximate in
nature and payment shall be paid as per item rate on prorate basis no claim towards
variations (upward or
downward) will be entertained.

Report Generated at 10-Feb-2022 5:10:12 PM Page 81 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

QUALITY OF WORK Works shall be carried out as per the approved Drawings and the applicable
specifications
and directions of QA/QC Engineer-in charge with due compliance to QA/QC Test
procedures and testing
frequencies applicable as per our agreement with DoWR. There shall be Third Party/
DoWR/ L&T's inspection
prior to dispatch of materials and after obtaining Dispatch clearance only, materials
shall be dispatched to our
site by the vendor. The vendor has to offer for L&T/DoWR/ Third Party inspection
well in advance. The QA/QC
tests pertaining to work shall be conducted in Field QC Lab to the possible extent.
MANUALS / TESTING Use of Hydro-Testing

PRICE & VALIDITY Prices and Rates agreed shall include costs of all material, consumables, labour, all
plant
and machineries, tools & tackles,including taxes & duties (excluding GST),temporary
or enabling works, setting
out,supervision, all labors for inter carting from store to site to exact location for
execution or for all purpose,
safety of contractors material and labour, safety and security against theft and
decoity etc are full responsibility
of contractor only. Transit Insurance for mobilization and demobilization of sub-
contractor equipments and
everything necessary for due performance of work is covered under this sub-
contract. The agency should
arrange necessary construction equipment in sufficient number time to time to
achieve the required progress of
work
INSPECTION & TESTING After laying, the pipeline shall be tested for leak testing of the pipe joints, fittings,
bends .The pipe line may be tested in sub - sections. After filling the pipeline with
water the section under
testing shall be taken care for release of air through vents at high points. The
pipeline shall be adequately
pressurized for a period of time till required pressure (as instructed by EIC) is
achieved and is maintained for
minimum time period not less than of 10 minutes to reveal of any defects in the
pipeline. The test pressure for
the entire pipeline shall be measured in such a way that it should not exceed the
maximum test pressure in any
sub section.
ADVANCE TERMS NO ADVANCE

CODES & STANDARD In the absence of specifications relevant Indian Standard Code of practice together
with
their latest revisions/amendments as applicable on the date of work order shall be
followed. In the absence of
the relevant IS code of practice also the instructions of the Engineer-in-charge or
standard engineering practice
shall be adopted. Wherever blasting for excavation is required, the procedure shall
conform to IS 4081, the
agency has to do only control blasting by using experienced & licensed agency for
blasting work. The agency is
responsible for reconciliation of explosives. L&T will arrange necessary permission
from concerned
DRAWING & DOCUMENTATION As Per L-Section

SCOPE SCHEDULE 1. SCOPE OF WORK FOR LAYING DUCTILE IRON (DI) PIPES: The scope of the work for
laying Ductile Iron (DI) Pipes of various diameter covers shifting of pipes from
storage yard, lowering of pipe in
trench with canvas or other belts of suitable capacity by suitable means without
damaging the pipe external
surface. The scope of the contractor is excavation in all type of soils, F&F Rock, Hard
Rock etc. Lowering, Laying,
Jointing, Hydro testing and Back filling after completion of work of as per
specification drawings and as directed
by Engineer-in-charges. Excavation of pipe trench of suitable width as per the
drawing provided or as per the

Report Generated at 10-Feb-2022 5:10:12 PM Page 82 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:
direction of the Engineer - In charge. The excavated earth may be kept along the
trench at a minimum distance
of 1.5 m or at a suitable distance to avoid any hindrance to the execution of the
work. The excavation may be
carried out by suitable means depending upon the type of the soil. In case of hard
rock controlled blasting may
be carried out. You must hold valid license for blasting or ensure that blasting is
carried out by the agency which
is holding valid license. Sand bedding of minimum 150 mm thickness & level shall be
provided below the pipe
prior to laying the pipe in trenches where F&F or hard rock is found. It shall be
compacted with a light hand
rammer. Any reduction in thickness due to compaction shall be compensated with
stuffiest quantity of sand.
Barricading of the pipe trenches where back filling is not done or partially done or
wherever required. Necessary
display boards / caution boards as necessitated or as directed by the Engineer in
charges shall be provided. The
agency has to arrange the pumps for dewatering of water from pipe line trench
wherever required. Loading of
pipes from yard, Shifting of pipes, unloading, lowering, placing in position of Pipe in
Excavated Trench with
Proper excavation for pipe joint pits beneath the Pipe Line as per requirement .The
socket and spigot end of the
pipes shall be brushed and cleaned. The socket and the chamfered end of the pipe is
to be covered with the
suitable lubricant. Oils, petroleum bound products, grease which may damage the
rubber ring shall not be used.
Rubber ring must be inserted in the cleaned groove of the socket; it should be
checked for correct positioning.
The two pipes shall be properly aligned and spigot end shall be inserted in the
socket either pushing manually or
mechanically as recommended by Engineer In charge (EIC) upto the insertion mark.
After insertion the correct
position of the socket has to be tested with feeler blade. Deflection of the pipe if
any has to be made after the
pipes have been properly assembled. The deflection shall not exceed more than
75% of value as recommended
by the manufacturer. Special provision shall be made for accommodating the socket
of the pipe so that barrel is
uniformly rested of the surface. At the end of the each day??s work the spigot end
shall be closed by end cap or
other means so that no dirt, soil or any other foreign matter. The cutting of the pipe
if required for inserting the
valves shall be done in a good manner in order to avoid any damage to the cement
mortar lining and external
surface at an angle of 90 deg to the axis of the pipe. Cutting of the pipe shall be
reduced to the minimum. All
tools and tackles eg Chain pulley block, rope, crow bars, grinding machine, and
consumables such as lubricants,
grinding wheel etc all complete for pipe laying and jointing Backfilling after
completion of work. The selected soil
brought from outside shall be only used for filling trenches from bottom of pipe to
50 cm above top of pipe
including on both sides of the trench. Only soft earth of good quality free from
stones and free from boulders,
roots, vegetation etc shall be utilized after the lumps are broken for refilling in
trench. Filling shall be done in
layers not exceeding 150mm an compacted to 85 percent of maximum dry density.
The remaining portion shall
be filled with a mixture of hard and soft material free from boulders and clods of
earth larger than 150mm in size
if sufficient quantity of good earth and morrum are not available. Filling shall be
done in layers not exceeding
225 mm in thickness. The trench shall be refilled to build the original ground level.
Cover of minimum 1.2 m
should be maintained from the top surface of the pipe with backfilled earth.
Disposal of extra earth from the site
should be done immediately after backfilling is completed. In case you fail to

Report Generated at 10-Feb-2022 5:10:12 PM Page 83 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:
dispose of the extra earth even
after out written request with in a period of 5 days same shall be done us by
deputing some another agency and
cost of the same shall be recovered from bills. After laying, the pipeline shall be
tested for leak testing of the
pipe joints, fittings, bends .The pipe line may be tested in sub - sections. After filling
the pipeline with water the
section under testing shall be taken care for release of air through vents at high
points. The pipeline shall be
adequately pressurized for a period of time till required pressure (as instructed by
EIC) is achieved and is
maintained for minimum time period not less than of 10 minutes to reveal of any
defects in the pipeline. The test
pressure for the entire pipeline shall be measured in such a way that it should not
exceed the maximum test
pressure in any sub section. Thrust Blocks are to be constructed at the location of
bend and other ancillary works with all labour, machineries, materials and tools &
tackles as sited by the Engineer-incharge etc. Cement, steel
and shuttering materials will be provided by L&T on free issue basis. Miscellaneous
activities such as jungle
clearance, temporary formation, dewatering, barrication for safety, temporary
diversion arrangements etc. are to
be done for smooth flow of work as per the instructions of Engineer-in-charge. The
agency shall supply and fix
indicators at points of change of direction at all valves and at every one kilometer
interval along the buried
pipeline. Indicators shall consist of 10cm x 10 cm pre cast concrete posts 1.25 m
long. In case of the Pipeline
laid above the ground details such as chainage, invert levels of pipe, appurtenance
number, pedestal/saddle
number, culvert number, anchor/thrust block number etc. in distinct color. The Work
has to be done as per
enclosed work methodology and ITP provided by L&T. 1. SCOPE OF WORK FOR
LAYING OF HDPE PIPES:- The
scope of the work for laying HDPE Pipes of various diameter covers shifting of pipes
from storage yard to laying
locations, lowering of pipe in trench with canvas or other belts of suitable capacity
by suitable means without
damaging the pipe external surface. Lowering, Laying, Jointing, Hydro testing and
Back filling after completion of
work of as per specification drawings and as directed by Engineer-in-charges. Before
start of the work, the
workers should be properly trained on HDPE pipe laying, Jointing & testing
procedures, Safety and Quality
norms. Clearing & Marching of Pipeline trench: Clearing & Marching of Pipeline
trench as per requirement of
Engineer in-charge. Earth work: Earth Work excavation in all types of soil and rock
for all depths. Suitable trench
slope should be provided as specification and instruction of Engineer in-charge.
Scope also includes side dressing
and bottom dressing of trench as per instruction of Engineer in-charge. The
minimum cover on pipe is to be
maintained 1 meter Bedding: While laying in rocky area, bedding to be provided for
150 mm with available
excavated loose or moorum earth without any rock materials with proper
compaction. Transportation of Pipes,
fittings & valves: Loading, unloading and Transportation of pipes, fittings, specials,
etc. & valves from L&T Stock
yard to Pipe laying location without any damage to the pipe & valves is in the scope
of contractor. Proper care
should be taken while transportation. If any damage identified in the pipe,
DETAILS OF WORK Laying of HDPE and DI Pipe,Specials fixing and Construction of thrust block with
M15
grade concrete

Report Generated at 10-Feb-2022 5:10:12 PM Page 84 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!
WORK ORDER
ORDER NO.
Larsen & Toubro Limited, : EF889WOD9000044
Construction WO DATE : 15-Oct-2019 █▀▀▀▀▀█ █▄▄▀ █▀▀▀▀▀█
█ ███ █ ▀█ ▄█ █ ███ █
█ ▀▀▀ █ ▀█ █ ▀▀▀ █
▀▀▀▀▀▀▀ █▄▀▄▀ ▀▀▀▀▀▀▀
▀▀█▄██▀▀▀▀█▄ █▀▄ ▄▀
PB No 979, Mount-Poonamallee Road, LATEST AMENDMENT : 8 ▄█▄▄▀▀▄█▄▀▄▀▄▀ ▀ ▄█▀
▀ ▀▀ ▀▀▄▄▀ █▄▀▀▀▄ ▄▄
█▀▀▀▀▀█ █▄▀█▀▄▀ ▀▄▄
Manapakkam, Chennai - 600089, █ ███ █ ▀▀█▄ █▀▄▄ ▄▄
█ ▀▀▀ █ █▄▀ ▄ ▀▄█▀▀▄█

Tamilnadu, India AMENDMENT DATE : 21-Jan-2022 ▀▀▀▀▀▀▀ ▀▀▀ ▀ ▀

CIN - L99999MH1946PLC004768
Tel No. 044-22526000
VALUE : 20,092,880.42 INR
Fax No. 044-22526059
Website: https://eip4.lntecc.com STATUS : Authorized
Email:

Note : The Work Order Shall be governed by the “ General Conditions of Contract for Services “ until unless specified.
it is important that seller confirms acceptance of this Work Order within 7 days of receipt. Failure to return the
acceptance does not diminish the responsibilities as set forth herein, but may result in a delay to any payments that may be
due and may be a cause of termination of this Work Order.

In case of any clarification required, please contact the Work Order Issuing Authority.

Report Generated at 10-Feb-2022 5:10:12 PM Page 85 of 85 EIP © 2022 L&T Construction. All rights reserved
*Save Paper ! Save Trees !! - View WorkOrder digitally..!!!

You might also like