PROJECT PROPOSAL

MANUFACTURING TYER CHENGERE

1. Tibebu Yohannes …………… automotive department

GESUBA CONSTRUCTION AND

INDUSTRIAL COLLEGE

January, 2014 E.c

gesuba (Ethiopia)
Tyer changer
Project Proposal: MANUFACTURING OF TYER CHENGER

Occupational Title: vehicle servicing

Units of Competencies Covered

1. Use Hand Tools and Equipment.


2. Perform bench work.
3. Interpret Work Drawing and Sketches.
4. Apply quality standard.

Rationale:

This proposed tool is intended for TYER CHENGER of all garage and work shop material
purpose. More particularly, this machine related to formation of machines and vehicles. At the
same time the document has been prepared for Project based training for TVET teachers.
Therefore with this technology, the TVET teachers will be capacitated on 100% technology
copying. In the other hand, this machine can be transferred to solve their technology gap. Lastly,
the machine can be produced by TVET capacity.

Project Description:

Many of manufacturing maintenance activities in small and medium workshop or maintenance


departments and garages of various garages are needed TYER CHENGERS and so on. In the
absence of such machines, technicians are forced to do it the harsh and wrong way of old
changing systems like man power and hammers.
Tyer changer
Introduction
As we know in our country developmental of technical and vocational strategies, there are
professions to train the trainees in competently the problem of machining and tools, according to
this problem we mind to fabricate the development of manual tier changing machine. What we
mind to fabricate tool is for anyone how carried wrench to open and close work easily able to
perform this task.

Many of manufacturing maintenance activities in small and medium workshop or maintenance


departments and garages of various garages are needed tier changer and so on. In the absence of
such machines, technicians are forced to do it the harsh and wrong way of manufacturing
systems like open and close. This obviously, affects the precision and quality of tools parts
involved and subsequently affects overall performance of tools. Tyer changer that are usually
imported are heavy duty and expensive besides demanding foreign currency. Therefore, there is
a great need for a manual Tyer changer that can manufacture at reasonable cost.

In addition to this by our assumption to get a great roll to build a capacity of small enterprise and
to fulfill the shortage of such simple tools in TVET institution. Based on this problem we are
interested on manufacturing of Tier changer because, this tools can operated easily regardless of
skill and it can be distributed for small enterprise with low cost and finally we interested to
minimize shortage of this tools in training program and also to solve a place where time and
power is not available.

Generally we interested manufacturing tools is can make which are row materials available in
our country, for any trainer and trainees’ easily develop their skill, it have cost according to their
usage when we compeer to other Tyer changer.
Tyer changer
1.2 Statement of the problem

 As it is already known wheels and tyres are removed and replaced by human power and
wests a lot of power to remove the tire from wheel. And it is also new technology
machine also needs a lot of many to bay the machine.
1.3 Objectives
1.3.1 General objective
Our general goal are to eliminate or replace the wrong way manufacturing operations like wheel
and tire by reliable manual hand tools. Because, it increases the accuracy and quality of the part
to be simple that have better performance in terms of simplicity of use, saving time and
productivity rate.
 To provide the tire changer with low cost for most place of our country and sharing our skill
for others.

1.3.2 Specific objectives:

Suitable to transport
Cheap
Easy to maintain
Easy to assemble and operation.

To reduce production time


To get high rate product
To produce high quality of product
To reduce energy
To evaluate the manufacture of the technology in terms of performance including the
practicality, production rate and speed.
Tyer changer

1.4 Research methodology


As I have mentioned on the objective section formerly, I have tried to identify the project what it
has.

I have done by the following steps;-

1. Start the project by observing the garage hand tools and their cost.
Tyer changer
2. Product manufacturing specification that fully defined the project (manufacturing and
operation requirements).
3. Gathering information from internet web site about the general idea of the tire changer.
4. After this the problem are redesigning and modified some parts.

1.5 Significance of the project


The design and modification of this tyre changer helps our country in the following
conditions. These are:
 It provides the opportunity to produce more and quality products. In addition, the high
quality of the final product keeping a proper work values.
 It provides maximum yield and minimum production waste.
 It creates job opportunity for Small and Medium Enterprises after evaluating the product
and providing training.
 Environment friendly since it is easy in cleaning.
 It helps as stepping for other related projects.
 It is easy to assemble and disassemble
 It is easy to operate in manually
 It is portable or movable by using human power
 It saves human energy (labor)
 High efficiency
 High production
 Long service life
In the light of the stated objective which this project is getting to active the manufacturing
machine, the following are significance of the project.

 This project helps to solve problems of shop crowdedness since we can mount it out of
the work shop.
 To minimize shortage of changers in every manufacturing organization or service center
or garage.
 It avoids the cost and power is not appropriate technology.
 The most of the tire changer is in the average, which is every people buy.
Tyer changer
 It provides the peoples an efficient service life with full maintenance equipment or
requirement.

1.6 Limitation

 Shortage of raw materials to select the appropriate uses during manufacturing of the
project.
 Shortage of machine and accessories.
 Lack of information about similar project.
 Short period of time used to be manufactured.

1.7 Characteristics of the Tyre changer

When compared to tyre changer old and new technology changer machine combination and filers
system is very suitable for the people live in which has no electrical power supply.

 The selection of the location for installation of the tyre changer usually is not a problem
that means it is not apply electrical energy and other source of power. The handle only
needs the man power so, it is install on any concrete floor which is used to fix by hand.
 The best characteristic of this project is the environmental situation is no considered,
because it is used for every where under the maintenance availability during and after
operation.
1.8 Overview of all design consideration

Most engineering designs involve a multitude of considerations and it is a challenge to the


engineer to recognize all of the proper portion.

The following points are considerations for;-

 Body of component include


Tyer changer
 Strength
 Weight
 Size and shape
 The surface of the components are
 Wear
 Lubrication
 Corrosion
 Frictional force
 Traditional considerations ;
 Materials
 Geometry
 Operating consideration
 Cost
 Availability
 Productivity
 Component life

 Modern considerations
 Safety
 Ecology
 Quality life
 Miscellaneous considerations
 Reliability
 Ergonomics
 Aesthetics
1.8.1 SELECTION OF MATERIAL

In the selection of suitable material to satisfy a particular design and product requirements, it is
necessary to look at many aspects to insure that the component or assembly can be manufactured
within the resources available that the completed product will function satisfactorily throughout
its design life and that all these can be achieved at an acceptable cost.
Tyer changer
Parameter to be considered in the selection of materials are;-

1. Material properties
2. Manufacturing characteristics
3. Cost and availability.
1.9 The selection process

There are some instance where the choice of the material is to severely restricted by service
requirements that there is either no choice or only an extremely limited choice of possible
material. As the selection process is one of the optimization, it is of extreme importance for the
engineer to be able to determine the most important property to satisfy a particular product.

The following is a possible and systematic approach to the problem of material selection. These
are;-

 Analyze fully the product specification and determine the minimum acceptable value
for all the relevant material properties.
 Make first selection eliminating all materials which do not possess all the minimum
criteria.
 Assess the degree of importance of the various required properties from essential
through to desirable and for each property place the potential material in making
order.
 Process cost for each material.
 Select the best overall combination of properties for the least cost.
Tyer changer
Tyer changer
2 Cost per unit property method

The cost per unit property method can be used as a criterion for selecting the optimum materials,
considering the cost of the bar of a given length (L) to support a tensile force (F). the cross
section area (A) of the bar is given A=F/S

C’=C+P+A+L=CXPXFXL

Where;

S=working stress of the material which is related to its yield strength by an

Appropriate factor of safety.

C= cost of the material per unit mass

P= density of the material

2.1 Material selection for bar and handle

The bare part of the bender or handle is highly resistant lead and the parts should be sufficiently
resistant of the applied force and other factors.

Material requirements for base plate;-

 High tensile strength.


 High yield strength
 Low density
 Good weld ability

2.2 Manufacturing process and part dimensioning


In the process of manufacturing all parts of the tire changer are performed in medium size
work shop. The equipment requires are lath machine, hand grinder, drill press machine, welding
machine, power hacksaw, and appropriately in some cases may be milling machine are used.
Most of processes are performed by skilled person so, some parts like dies and die block are
seriously manufacture according to the given parameter.
Tyer changer
2.3 Theoretical aspects of manufacturing process
Theory process are used to help to increase the understanding to produce parts and shape, these
is usually more than one method of manufacturing a part from a given material.

 The processing method are;-


 Casting and shaping
 Machining (turning, drilling, milling, boring, shaping, etc.)
 Cutting (power hacksaw)
 Joining (welding, brazing, soldering, etc.) are some methods of manufacturing
processes.
Selection of a particular manufacturing processes are depends on not only on the shape to be
produced but also a large number of other factors. The type of material and its properties are
basic considerations. Brittle and hard materials are not be formed easily, where as they can be
cost or machined by several methods.
2.4 Selection of manufacturing process
The importance of proper selection of manufacturing process and machinery are relates to the
characteristics of materials, the dimensional tolerance and surface finish and manufacturing cost.
Manufacturing process is selected by various considerations, some of these are;-

 The characteristics and properties of the work piece material.


 The shape, size and thickness of the part.
 The dimensional tolerance.
 Surface finish requirement.
 The production quantity.
 The cost involved in individual and combined aspects of the manufacturing operation.
2.5 MANUFACTURING SYSTEM FOR OPERATION PLAN

A manufacturing system can be described at the factory organized to produce parts products.

The following machine tools and component operators should be available during the operation
plan, these are;-

 Lathe equipped for turning, facing and grooving.


 Drilling machine.
Tyer changer
 Power hacksaw.
 Milling machine.
 Arc welding.
Portable grinding machine

2.6 Production methods of tyre changer

The main use of the folding beam is


 To fold the bolt and nut according to the required dimension and angle
 It can be pushed the tire by means of the applied force from the operator

Operation Operation Feed Cutting Depth of Machine Tools Coolant


no mm/rev speed cut mm tool
m/min

01 Measuring - - - - -Tape rule, v- -


and laying caliper,
out to size scriber

02 Blank sawing - - - shearing -


/cutting machine

03 Drilling 30 Drilling Drill bit


- -
machine

04 Welding welding Electrode


- - -
machine
Tyer changer
2.7 Cost Analysis
Before making the product determining cost analyses is very essential and important since to
make high production rate. So that selection of material is always depend on its cost which is
available in our area. The main elements of cost analysis include;
. A. Raw material and standard items
B. Operational process cost
C. Power consumption and consumable material cost
D. Labor cost
E. Machine depreciation cost
A. Raw material and standard items
The material cost refer to those raw materials which are consumed to produce
components of a tire changer. This analysis of cost estimation of consumed material is
carried out on the basis of the data obtained form
A. Local market
B. Purchaser
C. Our experience

Table 11 estimated blank material cost before machining

Unit price Total price

S.No Name of Specification Unit Qty Birr Cent Birr Cent


material

4 Bolt and nut M12 Pcs 12 400.00 400.00

Ø 2.5
12 Electrode Pcs 100 100.00 100.00

M
13 Plat m 01 1000.00 1000.00

14 Antirust 0.5kg litter 01 100 100.00

15 grinder disk 180 Pcs 01 150.00 150.00


Tyer changer
20 Sand paper for 0.1 Rol 01 50.00 50.00
metal

Total cost
1800.00

Table 13 labor cost per person in hours

S.No Price

Birr Cent

01 For one person per hours 20 00

For our project we use 1 working labor hour for finishing these working hours are:
1. Lay out…………………………………10min
2. Machine work…………………………..10min
3. Bench work assemblies…………………10min
4. Assemblies……………………………...30min
Total labor………………………………1hur
Tyer changer