SUMMARY OF TIMESHEETS

Location : Vloid 12 JCP


Period : 01/11/2021 - 30/11/2021
Contract : Wet Hire - Dewatering Project
Unit : HPU 3287
MOOH
Hours Meter Standby (S) Flow Rate Flow Rate Consump Flow Meter Volume / Shift Total Volume
Tanggal Shift EWH BD SG RPM Fuel Rate Remarks of Standby Remarks of Breakdown
(m3/hr) (m3/hr) Fuel (m3) (m3)
Start Stop Total JMI DH (W+S+B) Awal Akhir
DS 14016 14027 11 22 0 1 23 830 830 1070 50 1100 10833.41 19963.41 9,130 P2H
1-Nov-21 18,260
NS 14027 14038 11 0 1 1 830 1070 50 0 19963.41 29093.41 9,130 Refueling 1000L
DS 14038 14049 11 22 0 1 23 832 833 1070 50 1100 29093.41 38245.41 9,152 P2H
2-Nov-21 18,326
NS 14049 14060 11 0 1 1 834 1070 50 0 38245.41 47419.41 9,174 Refueling 1000L
DS 14060 14070 10 22 0 2 24 832 832 1070 50 1100 47419.41 55739.41 8,320 P2H, Refueling 1500L
3-Nov-21 18,304
NS 14070 14082 12 0 0 832 1070 50 0 55739.41 65723.41 9,984
DS 14082 14093 11 23 0 1 24 832 832.52173913 1070 50 1150 65723.41 74875.41 9,152 P2H, Refueling 1500L
4-Nov-21 19,148
NS 14093 14105 12 0 0 833 1070 50 0 74875.41 84871.41 9,996
DS 14105 14115 10 10 0 2 12 832 832 1070 50 500 84871.41 93191.41 8,320 Sump Lumpur
5-Nov-21 8,320
NS 14115 14115 0 0 12 12 0 93191.41 93191.41 - Sump Lumpur
DS 14115 14115 0 0 0 12 12 0 93191.41 93191.41 - Sump Lumpur
6-Nov-21 -
NS 14115 14115 0 0 12 12 0 93191.41 93191.41 - Sump Lumpur
DS 14115 14115 0 0 0 12 12 0 - Sump Lumpur
7-Nov-21 -
NS 14115 14115 0 0 12 12 0 - Sump Lumpur
DS 14115 14115 0 0 0 12 12 0 - Sump Lumpur
8-Nov-21 -
NS 14115 14115 0 0 12 12 0 - Sump Lumpur
DS 14115 14115 0 0 0 12 12 0 - Sump Lumpur
9-Nov-21 -
NS 14115 14115 0 0 12 12 0 - Sump Lumpur
DS 14115 14115 0 12 0 12 24 830 1070 50 600 - Sump Lumpur, Refueling 1787L
10-Nov-21 9,960
NS 14115 14127 12 0 0 830 0 93191 103151 9,960
DS 14127 14138 11 23 0 1 24 830.00009 830.00004348 1070 50 1150 103151 112281 9,130 Refueling 1100L
11-Nov-21 19,090
NS 14138 14150 12 0 0 830 1070 50 0 112281 122241 9,960
DS 14150 14161 11 23 0 1 24 808 808 1070 50 1150 122241 131129 8,888 Refueling 1500L
12-Nov-21 18,584
NS 14161 14173 12 0 0 808 1070 50 0 131129 140825 9,696
DS 14173 14183 10 22 0 2 24 815 818.81818182 1070 50 1100 140825 148975 8,150 p2h, refueling 1433L
13-Nov-21 18,014
NS 14183 14195 12 0 0 822 1070 50 0 148975 158839 9,864
DS 14195 14206 11 23 0 1 24 822 822 1070 50 1150 158839 167881 9,042 P2H, Refueling 1200L
14-Nov-21 18,906
NS 14206 14218 12 0 0 822 1070 50 0 167881 177745 9,864
DS 14218 14224 6 6 0 6 12 822 822 1070 50 300 177745 182677 4,932 Refueling 1500L, Waiting Instruction
15-Nov-21 4,932
NS 14224 14224 0 0 12 12 0 182677 182677 - Waiting Instruction
DS 14224 14224 0 0 0 12 12 0 182677 182677 - Waiting Instruction
16-Nov-21 -
NS 14224 14224 0 0 12 12 0 182677 182677 - Waiting Instruction
DS 14224 14224 0 0 0 12 12 0 182677 182677 - Waiting Instruction
17-Nov-21 -
NS 14224 14224 0 0 12 12 0 182677 182677 - Waiting Instruction
DS 14224 14224 0 0 0 12 12 0 182677 182677 - Waiting Instruction
18-Nov-21 -
NS 14224 14224 0 0 12 12 0 182677 182677 - Waiting Instruction
DS 14224 14224 0 0 0 12 12 0 182677 182677 - Waiting Instruction
19-Nov-21 -
NS 14224 14224 0 0 12 12 0 182677 182677 - Waiting Instruction
DS 14224 14224 0 0 0 12 12 0 182677 182677 - Waiting Instruction
20-Nov-21 -
NS 14224 14224 0 0 12 12 0 182677 182677 - Waiting Instruction
DS 14224 14224 0 6 0 12 18 820 1070 50 300 182677 182677 - Waiting Instruction
21-Nov-21 4,920
NS 14224 14230 6 0 6 6 820 0 182677 187597 4,920 Waiting Instruction
DS 14230 14231 1 1 2 9 12 1642 1642 1070 50 50 187597 189239 1,642
Waiting Instruction
22-Nov-21 1,642
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
23-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
24-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
25-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
26-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
27-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
28-Nov-21 -
NS 14231 14231 0 0 12 12 0 -
Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
29-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 14231 14231 0 0 0 12 12 0 - Waiting Instruction
30-Nov-21 -
NS 14231 14231 0 0 12 12 0 - Waiting Instruction
DS 0 0 -
-
NS 0 0 -
TOTAL 215 215 2 503 0 720 888.6 10,750 178,406 178,406

PA = (W+S)/MOOH 1
MA = W/(W+BD) 1
Downtime = >3.5 hr/day 0 Days
Total Standby Hours By Client = 503 Hours
* Total Standby Hours disebabkan Blasting/ Parting/ Install HDPE/ Unit Evacuation /Human Evacuation dll porsi Client maka akan ditagihkan setara dengan Volume produksi pada Average Flowrate.

Kintap, Mei 2021


PT. JARUM MAHAKARYA INDONESIA CLIENT - PT. DARMA HENWA

Prepared By, Checked By, ` Approved By, Checked By, Approved By,

Ferry Haryanto Wahyu Riwayanto Jatmiko Awali Arman Sahrani Indyra Prameswari Fabyo Herianto Tambunan
Site Adm Site Spv. Engineer Spv. Opr. Superintendent Mine Analyst Head of Mine Engineering Dept.