Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Engineering System Design

- Dewatering Project

Document No. : ESD-EN-DH-004


For PT. DARMA HENWA - KCP Ex-JB Revision : R00
Date : 12-Jul-21
Data Information :
Technical Data
* Volume Total : 2.135.768 m3
* Water : -
* Mud : -

* Water Elv. : RL -49 (Update 12-7-21)


* Target Water Elv. : RL -86
* Mud Elv. : -
* Target Mud Elv. : -
* Static Head : 59 - 96 m
* Outlet Elv. : RL 10
* SG : 1.05 (Water)
* PH : 6-8

System Design
System Design Information
Primary Booster 1 Booster 2

RL 10
28
* Total Unit : 1 - -
* Pump Unit : DnD 200 - -
HDPE
HDPE315
355mm
mmPn Pn12,5
16 Inlet : RL -49 - -
Length
Length::1070
250 m
m
78 m

Inlet (Target) : RL -86 - -


93 m
Static Head 59
Static Head 96

Primary Pump
* Outlet : RL 10 - -
DnD 200 * Pipe Length : 1070 m - -
HDPE 355 PN
RL -49
-50 * Pipe Type :
16
- -
RL -86
-65 1.342.518 m3
2.135.768

RL ?
? m3 Note :

Duty Point - DnD 200


Duty Point - Initial
Primary Booster 1 Booster 2
3
* Flow (m /h) : 810 - -
* TDH (m) : 86 - -
* RPM : 1.250 - -
* Fuel Burn (L/Hr) : 87 - -
Duty Point - Target
* Flow (m3/h) : 810
* TDH (m) : 123
* RPM : 1.450
* Fuel Burn (L/Hr) : 120
Note :

Created By Reviewed By Approved By


Name : Untung. Priyono Name : Jatmiko. A Name : Jatmiko. A

Bagian dari ENG.SOP.001.R00 Nomor Form ENG.FRM.003.R00