PIRAMAL SCHOOL OF EDUCATION LEADERSHIP PROJECT

ACTIVITY CHECKLIST: FABRICATION PAINTING

Project Format No PSL/Cheklist/000

Client Piramal School of Education Leadership Date:


Report/WIR
PMC --- No.

Contractor Drawing No.

Location:

S.No. Description of Activity YES NO N/A Remarks

Checks ( Before start of Painting).

The Quality,Brand and shade of the paint & Primer


1
to be used is approved?
Whether the surface preparation and application of
2
putty,lamdi etc done and satisfactory

Checks ( During Painting )

1 Scaffolding work checked.

Surface is throughly cleaned and dusted off before


2
applying primier coat
Application of primer coat as per requirement and
3
allowing it to dry before applying paint.

4 Thinning of the paint is done properly.

Primer coat is sufficiently dried before applying next


5
coat.
First Coat of paint is applied till the surface present a
6
uniform appearance.
Second coat of paint is applied after overlay period of
7 1 st coat till the surface present a uniform
appearance.
Comments,If any :

PSL Representative Contractor Representative


Name : Name :
Sign : Sign :
Date : Date :