abdul

Client
TPIA
Contractor
DPR Date

Project Name

SL. No. Well head. No. Discipline

1 BK#76,BK#95 CIVIL
2

5
Asish
Client
TPIA
Contractor
DPR Date

Project Name

SL. No. Well head. No. Discipline

1 Hajari yard Mechanical

2 Bk#76 Mechanical
3 Bk#95 mechanical

4 Bk#93 mechanical

Sanjay
Client
TPIA
Contractor
DPR Date

Project Name
Well head.
SL. NO. No. Discipline

Well head No.


1 BK#76 Mechanical

2 Bk#95 Mechanical
3

5
Abdul Quadir

ient : Oil and natural Gas Corporation Ltd.


PIA : International Certification Services Pvt.L
tractor : M/S Oval projects Engineering Pvt Ltd.
R Date 05.03.2024

Hiring of Third Party Inspection services f


ct Name for laying pipeline at ONGC CBM assets B

Job Description Unit

No Any Civil Work Done Today Only 1


Visit Different Well Head Site
Rajeev Kumar Rai
ient : Oil and natural Gas Corporation Ltd.
PIA : International Certification Services Pvt.L
tractor : M/S Oval projects Engineering Pvt Ltd.
R Date 05.03.2024

ct Name Hiring of Third Party Inspection services f


for laying pipeline at ONGC CBM assets B

Job Description Unit

60" dia fit up and 16" dia welding is


done

15" dia fit up done


28" dia fit up and welding done

16" dia welding done

Sanjay Kumar Son


ient : Oil and natural Gas Corporation Ltd.
PIA : International Certification Services Pvt.L
tractor : M/S Oval projects Engineering Pvt Ltd.
R Date 05.03.2024
Hiring of Third Party Inspection servic
ct Name years " and "ARC for laying pipeline a
Job Description Unit

ss pipe cutting & welding work in


progress. N/A

Cs Pipe grinding welding work in


progress N/A
Abdul Quadir

d natural Gas Corporation Ltd.


tional Certification Services Pvt.Ltd.
val projects Engineering Pvt Ltd.
24

Third Party Inspection services for the contract " Rate contract for well head facilit
g pipeline at ONGC CBM assets Bokaro for period of two years"

TPI Observation Non- Confirmity of Observation

N/A N/A
ajeev Kumar Rai
d natural Gas Corporation Ltd.
tional Certification Services Pvt.Ltd.
val projects Engineering Pvt Ltd.
24

Third Party Inspection services for the contract " Rate contract for well head facilit
g pipeline at ONGC CBM assets Bokaro for period of two years"

TPI Observation Non- Confirmity of Observation

ok
ok

contractor is not using electrodes as


per PQR standard

anjay Kumar Soni


d natural Gas Corporation Ltd.
tional Certification Services Pvt.Ltd.
val projects Engineering Pvt Ltd.
24 During the welding and Grinding
work was going on I found some
f Third Party Inspection
points: services for the contract " Rate contract for well he
and "ARC for laying pipeline at ONGC CBM assets Bokaro for period of two
1.Body earthing was not provide of
welding machine. Non- Confirmity of
TPI Observation Observation
2.welding machine cable lugs was
During Idamaged
visit the job site grinding &
condition.
welding work was going on i found
some points:-
3.Fire extinguisher was not available I Informed the supervisor and asked
at the job site.
1.Argon cylinder was not tied to any him to rectify all these points as soon
rope and chain. as possible.
4.Power supply for extention board
without elcb and industrial plug.
2.Welding machine lugs and cable
5.two was damaged
workman condition.
without helmet was
working at the site.
3.Fitter without safety shoes working
at thegoing
6.Grinding work site. on without I stopped the work and i told him
fire blanket booth. Always work with the cylinder tied
4.welding machine was without and inform to the supervisor for all
7.Cable rubber mat.without
wire joint points rectify.
installated tape.
5.fire extinguisher was not available
at site.
6.fire booth was not available during
welding & grinding work.

7.Welding machine body earthing


not provide.

8.Poor cable management was


r well head facility at ONGC CBM assets Bokaro for period of two years " and "ARC

Status of Observation/Remarks

Drawing No=CBMB-WH-003C,CBMB-
WH-001B
r well head facility at ONGC CBM assets Bokaro for period of two years " and "ARC

Status of Observation/Remarks
tract for well head facility at ONGC CBM assets Bokaro for period of two
r period of two years"
Status of
Observation/Remarks

Closed

Open
assets Bokaro for period of two years " and "ARC

Photographs
assets Bokaro for period of two years " and "ARC

Photographs
ONGC CBM assets Bokaro for period of two

Photographs
Sanjay

Shahid

Client
TPIA
Contractor
DPR Date

Project Name

Well head.
SL. NO. No. Discipline
1 BK 92 Mechanical

2 EPS 02 Mechanical

4
5
Shahid Hussain

ient : Oil and natural Gas Corporation Ltd.


PIA : International Certification Services Pvt.L
tractor : M/S Santosh Engineers
R Date 05.03.2024

Hiring of Third Party Inspection servic


ct Name two years " and "ARC for laying pipel

Job Description Unit


4" CS line welding work done at hook 02 Nos
up point

Waterfilling worl done for 8" CS line


for post hydrotest , Thermal NA
stablization is in progress
Shahid Hussain

natural Gas Corporation Ltd.


onal Certification Services Pvt.Ltd.
tosh Engineers
4

Third Party Inspection services for the contract " Rate contract for well hea
s " and "ARC for laying pipeline at ONGC CBM assets Bokaro for period of t

Non- Confirmity of
TPI Observation Observation
NA NA

NA NA
ract for well head facility at ONGC CBM assets Bokaro for period of
o for period of two years"

Status of
Observation/Remarks
N/A

N/A
NGC CBM assets Bokaro for period of

Photographs

You might also like