Thanks a lot for your time yesterday and reference to our last phone call we need to clarify
the following points to be able to complete our offer.

1. Item "18 " Dowelling:


 is required for Some rotating machine or for all.
 The procedure of work is as standard or provided by vendor.
2. Item "19" the meaning of leveling is level measurement (base plate level).
3. Item "26" -"for solo run test and vibration measurement and correcting the
vibrations" are included scope of work or not.
4. Item "28" "belts tightening” are included for scope of work or not.
5. Item "33" " magnetism of turbine and compressor rotor” are included for scope of
work or not.

Also, the following issues need to clarified:

 Rotating machine-like turbine:


o Scope of work is shaft alignment not for bore alignment.
 The technicians, for alignment correction like tightening (foundation bolts – jacking
bolts…), are provided by vendor.
 Shims for alignment corrections provided by vendor or not.

Thanks, and best regards.

Ahmed El Sayed.