Professional Documents
Culture Documents
VTC Install
VTC Install
VTC Install
Materials
Name Specification
Motorcraft ® SAE 5W-20 Premium Synthetic Blend Motor Oil XO-5W20- WSS-
QSP M2C945-A
1.
Apply clean engine oil to the secondary timing chain tensioner O-ring seals and
mega cap bore.
Material: Motorcraft ® SAE 5W-20 Premium Synthetic Blend Motor Oil / XO-5W20-
QSP (WSS-M2C945-A)
2.
Install the RH secondary timing chain tensioner by pushing it down all the way until
a snap is heard and the tensioner is seated all the way down the mega cap bore.
3.
4.
Remove and discard the RH secondary timing chain tensioner shipping clip.
5.
Align the colored links with the timing marks and assemble the RH VCT units.
6.
Position the RH VCT units and secondary timing chain onto the camshafts by
aligning the holes in the VCT units with the dowel pins in the camshafts.
7.
Torque:
Stage 4: 180 °
8.
9.
Install the RH exhaust VCT oil control solenoid and the bolt.
Torque:
Stage 2: 20 °
10.
Install Special Service Tool: 303-1530 Tool, Chain Tensioner Hold Down.
11.
Align the colored links with the timing marks and assemble the RH VCT units.
12.
Position the RH VCT units and secondary timing chain onto the camshafts by
aligning the holes in the VCT units with the dowel pins in the camshafts.
13.
Torque:
Stage 4: 180 °
14.
Remove Special Service Tool: 303-1530 Tool, Chain Tensioner Hold Down.
15.
Apply clean engine oil to the secondary timing chain tensioner O-ring seals and
mega cap bore.
Material: Motorcraft ® SAE 5W-20 Premium Synthetic Blend Motor Oil / XO-5W20-
QSP (WSS-M2C945-A)
16.
Install the LH secondary timing chain tensioner by pushing it down all the way until a
snap is heard and the tensioner is seated all the way down the mega cap bore.
17.
18.
Remove and discard the LH secondary timing chain tensioner shipping clip.
19.
Align the colored links with the timing marks and assemble the LH VCT units.
20.
Position the LH VCT units and secondary timing chain onto the camshafts by
aligning the holes in the VCT units with the dowel pins in the camshafts.
21.
Torque:
Stage 4: 180 °
22.
23.
Install the LH exhaust VCT oil control solenoid and the bolt.
24.
Install Special Service Tool: 303-1530 Tool, Chain Tensioner Hold Down.
25.
Align the colored links with the timing marks on the LH VCT units.
26.
Position the LH VCT units and secondary timing chain onto the camshafts by
aligning the holes in the VCT units with the dowel pins in the camshafts.
27.
Torque:
Stage 4: 180 °
28.
Remove Special Service Tool: 303-1530 Tool, Chain Tensioner Hold Down.
29.