BEKELE BURUSA GENERAL CONTRACTOR

Invitation for
Look of Notice&
COMPANY PROFILE
OF
BEKELE BURUSA
GENERAL CONTRACTOR
FOR
Project Name Is: -Obicha River Bridge Project.
Shenen Dhuggo /Masala /District.
The Public body is: - WEST HARARGHE ZONE ROADS
AND LOGISTIC AUTHORITY
CHIRO
ETHIOPIA

JOUNERY ,14, 2022G.C.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

1- APPLICATI
ON FORM

BEKELE
B.B.G.C BURUSA GC.
G.C
Date: 5/04/2014E.C.
Ref:No.BBgc/0067/14

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
AttentionTo:-WEST HARARGHE ZONE ROADS
AND LOGISTICKS AUTHORITY
CHIRO

Subject:-Letter of BID
Dear Sirs፡
As per your call as Invitation for bid on the Ethiopian Herald 10 (DECENBER), 2014 E.C, ,news

paper for the procurement of construction services for Framework Obicha river bridge Project Construction

basis. We Bekele Burusa General Contractor, take the great pleasure and honor to express our interest in the

appreciated regard.

We hereby pleased to present our prequalification documents, company profile, our eligibility documents

and the financial offer for the consideration of your good office.

We believe that our proposal is prepared in compliance with the requirements as stated in your

document , and it is our sincere hope to develop long term mutual benefit with your office , envisaged this

We provide worth services within set standards and the set time line,

We pursue aggressive goals and strive for constant improvement and persevere despite obstacles.

We hope that our offer will meet your requirements. Should you have any enquiry, please don’t hesitate to

contact.

Best regards,
BekeleBurusa
G. Manager

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

2- LEGAL

DOCUMENT
Attachments 1:-
1. Main certificate of registration (1page)
2. Trade license (1page)
3. VAT registration certificate (1page)
4. Tin registration certificate (1page)
5. Tax clearance certificate (1page)
6. Oromia water & mineral Development Registration Certificate(1page)
7. PPA Certificate

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

3- POWER

OF

ATTORNEY

Ref.No:-_________
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Date:-____________

POWER OF ATTORNEY
TO ALL WHOM THESE PRESENT SHALL COME, WE BekeleBurusa General Contractor, a
company having its registered office in Adama,Dhandecha Arera , Ethiopia sends greetings:
WHEREAS the company is desirous of appointing Mr Bekele Burusa, a General Manager of the
company ,to be its Attorney and conferring upon him as its Attorney, the powers authorities and discretion
herein after appearing.

NOW THESE PRESENT WITNESSETH that the company hereby appointed Mr.Bekele
Burusa as its true and lawful Attorney in the name and on behalf of the following things:
To enter into, make sign, seal, execute, deliver, acknowledge, sign the bid and subsequent correspondence
and negotiations for project of construction/erection, testing and commissioning with your good office.
This Power of Attorney shall remain in force and effect until the owners or revoked by us and notice of such
revocation is received by you, whichever is earlier.
Signature of Mr. Bekele Burusa is attested below.

IN WITNESS WHEREOF, I have executed this power of Attorney for and on behalf of the
Company, on this his office in Adama, Ethiopia.

Signature of BekeleBurusa
General Manager

Attested

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

4- CONTACT
PERSON

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

5- GENERAL

EXPERIENCE

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Technical Qualifications, Competence, and Experience in the
Procurement Object
Summary of Major projects carried out& 100 %completed by BekeleBurusa General Contractor
As Prime contractor in Similar Nature and complexity of work

NO STATE
S
CoNTR
ACTUA
Period of
Name of project/kind of works Value of Works TYPeOf Works Client and Place LLY
Contract
COMM
ETED<
COMP
LETYY
Contract name:- Kilinxo Industry Park
1 Construction Project
Brief Description of the Works
performed by the 2014G. Awash
Store, Curve
Applicant: Building G+5, Store, C. STONE,& International
Curve Stone, Fence, Site Work 2,561,348.00 To fence 100%
Amount of contract:- 2,561,348.00 2015 BankShashemene
ETB G.C.
Name of Employer:- Ethiopian Industry
park ,
Address: Addis Abeba, Ethiopia
2 Illu abba Bore
100
Illuabba Bore BechoWereda education Octobe Becho Wereda
8,715,051.23 Building
office r,2016 %
education office
3 Hope
ARISING.INC.
Construction of HOPE ARISING. FEBR, Address 100
INC. Kinggarten Construction 2,561,348.00 13,201 School ADDisAbeba,
Bole Sub City . %
7

4. Dormitery,
Construction of Haramaya
March, library and 100
UNIVERSITY Research Center 15,025,714.1 Haramaya
28,201 Dining
Construction 5 University %
9 room, fence
and site,
5 Novenb Rationing
Gourge Shoe Ethiopia. Ranting Wall , 100
er, 12| Wall, Gourge Shoe
gabion and Ditch
16/201 Gabion and Ethiopia. %
Address, Modjo, Ethiopia.
9 ditch.
6 100
Gravel Road, Arsi Road Authority and 29,719,801.6 Arsi Road
Gravel Wall
Seru Woreda. 9 Authority %

Attachment 3: - Certificates of satisfactory execution of contract.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

SIMILAR EXPRIANCE
Value of
Client's Contact States
No. Name of Contract Details outstanding Period of Contract Client and Place
100%
work (in birr)
COMMUNITY
Construction of Pond
POND;SPILLW East hararge
Water Supply at
AY;SILT TRAP Agricultural office
1 Harerghe zone 4,413,521.72 June 15,2016 100%
-Water Supply &Gursum woreda
Dhekaba Pond
-Bono Warra alii pond
construction
Description of
2 Contract name: Hayse the Works 2016G.C. SNNPN Roads
Hariro river Bridge performed by 14,281,551.8 To 100%
Construction Project Applicant: 2 Authority.
2017 G.C.
Hawassa, Ethiopia Floor, Curve
Stone Fence

COMMUNITY June 30,2016


POND
Construction of Pond 1 East hararge
SPILLWAY;SI
at Harerghe zone Agricultural office
3 LT TRAP 5,049,573.56 100%
Ware Ali Pond &Gursumworeda.
-pipe Supply
Warraalii pond
-Bono
Construction
-pond Excavatio Jeneoery23,2
Seru Woreda
Construction of -spill way 017-
4 1,063,451.31 mineral &Energy 100%
water Lilo Pond -Feeder Canaal may11,2017
(Seftnet Program)
-Retaining Wall
- 22/3/2019-
ConstrictionOf 22/8/2019 East harargeWater
Firi Qabso Rural
Reservoir Energy Resource
Water Supply And 16,582,230.5
5 -Supply of pipe Office&MelkaBallo 100%
Reservoir 7
& Fitting Civil woreda. FiriKebso
Construction
work. Kebele.
-Retaining Wall

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

6-FAINANCIAL

CAPACIT

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

1. FinancialStatement
BEKELE BURUSAGENERALCONSTRUCTION Financial statement based on annual audited
report and attached it as follows:-
Attachment 4: -Reference Letters from our client banks for line of credit & our financial
standing

1. Average Annual volume of construction


work performed in the previous three year

Summary of Major projects carried out& 100 %completed by BEKELE BURUSA GC


As Prime contractor in Similar Nature and complexity of work

Item No. Year Turn over Amount (Eth. Birr)


1 2007 Construction 2,561,348.00

2 2008 Construction 5,261,123.57

3 2009 Construction
6,817,500.00

4 2010 construction 7,645,455.75


Total volume of years =27,556,994.5

Average of the last three years= 9,185,664.83


Attachment 5: -Reference Letters from our client banks for lone of credit & our financial standing and
Certificates of satisfactory execution of contract.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

2. Audit Report

Attachment 6: - Audit Report and Financial Statement with its necessary business registration
licenses, Audited financial statements and Documents required as proof of Bekele Burusa GC financial
standing

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

7-EQUIPMENT

AND

MACHINERIES

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
1. ROPOSED EQUIPMENT FOR THE EXECUTION OF THE PROJECT WORKS

Source
DESCRIPTION
No of of
No. Power/ capacity Condition Current Location
units equipme
(type/make/model)
nt
Grader /china/ and Rental
320/16 cub.M, 7
1 ITALY/FIAT 1 Excellent on project
cub & 5 cub
Excavator /china/ and Rental
320/16 cub.M, 7
2 ITALY/FIAT 1 Excellent on project
cub & 5 cub
Dump truck/china/genyion and Rental
320/16 cub.M, 7
3 ITALY/FIAT 1 Excellent on project
cub & 5 cub
Dump truck/china/genyion and Owned
320/16 cub.M, 7
4 ITALY/FIAT 2 Excellent on project
cub & 5 cub
Pickup/ Japan/Toyota Owned
5 5persons & 7qtl 1 Excellent on project
Mixer 350 liters’ Owned
6 350lit 2 V.good on project
Water Tank Owned
8 10,000lts 1 V.good Store
Surveying instrument Owned
9 ----- 1 Excellent Store
Concrete vibrator Owned Store
10 4HP 2 V.good
11
12

Attachment 7: - Relevant owner ship documents, Libre etc.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

8-PERSONNEL

CAPABILIT
Y

I. PROPOSED KEY PERSONNEL FOR THE EXECUTION OF THE PROJECT

Name and Nationality Qualifications Proposed Position Year of Years of


& Responsibility Experience at Experience
in general in position
of works
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Comparable
nature and
Complexity

1. Bekele Burusa BSc. Civil Engineering, General Manager 7 7


Gurmu, Ethiopian Fluent in speaking
English, Afaan Oromo
2.Yared Girma Ayela, BSc. Civil Site Engineer 8 8
Engineering, Fluent in
Ethiopian
speaking English
3. Nugussu Haile BSc. Hydraulic and Structural Engineer 9 9
water resource
Ethiopian
engineering
4. Eyob Wondefrash, BSc. Civil Engineering, Project office 7 7
Ethiopian Fluent in speaking
English, Afaan Oromo
5.Meyomi Fayisa Urge BSc. Construction Structural Inspector 4 4
Ethiopiian Engineering, Fluent in
speaking English

6. Wondesan BSc. Civil Material Inspector 4 4


Getachow Engineering, Fluent in
speaking English
Ethiopian
7.Abinat Tetik Bsc. Civil Engineer Hydrolic Engineer 3 3
Ethiopia Construction Engineer

8. Salamon Bogela Level.IvSurvying Surve 5 5


Ethiopia

Attachment 8: -Work experiences, qualifications, educational testimonials, CV, professional


license etc.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

9- ORGANIZATION

BRIEFING OF

Bekele Burusa

GENERAL

CONTRACTOR

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
1. GENERAL STRUCTURAL ORGANIZATION OF THE
COMPANY

General Manager

Executive
Secretary

Finance and Administration Engineering Department Auditor


Fiber Section

Finance Administratio Project Office Engineer


Section n Section Managers

2. PROJECTS STRUCTURAL ORGANIZATION


Project Manager

Project Secretary

Project Administrator Site Engineers Office Engineer

Data Clerk

Finance Human Forman Machine


Clerk Resource Operators
Clerk

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
A.ORGANIZATION BRIEFING OF Bekele Burusa
GENERAL CONTRACTOR Brief description of the Bekele Burusa
GC
The Company Bekele Burusa GC was established in January, 2014 G.C .Company by
well experienced professional engineer Bekele Burusa
who had intensive experience in the construction field of civil engineering projects and Bekele
Burusa as partner who has well experience as sell person & running her own business.
The Primary Objective of the company was to engage in construction of civil
work projects such as Construction of buildings of different categories, construction of
roads & bridges, Construction water related works, Electro-mechanical works & the
secondary objective was to engage Manufacturing industries, Import- Export business
&renting of construction machinery and equipments.
Since its establishment the company the main projects carried out and completed by Bekele
Burusa General and water works contractor in different categories of civil construction
project &Electro-Mechanical sector is summarized as follows:
In building sector: Construction of ware house building,Construction of dressing room,
offices and store building at Adama town in as sub-contract, etc.
In road construction; structural culverts, diche, temporary bridge, abetments and fence
work, and also so many retying walls.
In Water Work construction; Reservoirs, Water Line works, Sewerage line & Pond etc
Organization structure of Bekele Burusa General contractor
structural origination was set out in two levels.
The first levels is Structural organization at Head office Which is the General structure of
the company lead by the General manager followed by different disciplined professionals
to fulfill the objective of the company. General Manager is responsible to over run&
control the overall activities of the company, Other department managers are responsible to
control & administer the over activities under their section.
The second level is Structural organization prepared for particular project site.
The construction duration & complexity of the project are usually factors in determining
the set up of the work organization. Following the information given on the tender
document regarding the magnitude of the project, we usual prepare project organization as
follows.
We will prepare site organization chart in such a manner that the work will be lead by a
competent project manager, who has ambient experience in similar works & could undertake the
overall management & operation of the project. Moreover, the nature and time of completion of
the project requires the deployment of a construction Engineer and Office Engineer. Site
Engineers and superintendents would be assigned as per the requirement and level and intensity
of operation.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Prior to the commencing of the construction activities, the leveling, and aligning of every
elevation and horizontal measurement will be taken jointly with supervisory staff in accordance
with plans and specifications. To execute such activities qualified surveyors will be assigned. On
the other hand, every relevant measurement data's will be taken jointly for filing, with authorized
signatories of the two parties having their respective copies.

Office Engineer, quantity surveyors and other relevant personnel will be assigned in the
office and preparation of working drawings, take-off sheets, quality control etc… will be
controlled and completed through the office Engineer in consultation with the quality control
engineer in the head office.
The office engineer will be responsible for office engineering activities of the project
such as directing & coordinating surveying activities, material production, material quality
control, design, and quantity surveying and above all scheduling and controlling the progress of
the work. On the other hand, the construction engineer will be responsible for overall
construction activity of the project, will organize, coordinate, direct and supervise material, labor
& equipment's allocate for the construction activities. Site engineers are responsible for each
specific site activities and they shall be assisted superintendents and Construction Foremen.
Specific site activities and they shall be assisted superintendents and Construction Foremen.
The pictorial description of the Company Structural organization is illustrated on next pages

Historical Contract Non-Performance

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

Non-Performing Contracts in accordance with Section 3, Evaluation and Qualification Criteria


Contract non-performance did not occur during the stipulated period, in accordance with Sub-Factor
3.3 of Section 3, Evaluation and Qualification Criteria.

Contract non-performance during the stipulated period, in accordance with Sub-Factor 3.3 of Section
3, Evaluation and Qualification Criteria.
Outcome as Total Contract
Year Percent of Contract Identification Amount (current
Total Assets value)
Contract Identification:
Name of Client:
Address of Client:
Matter in dispute:
Pending Litigation, in accordance with Section 3, Evaluation and Qualification Criteria

None
No pending litigation in accordance with Sub-Factor 3.4 of Section 3, Evaluation and Qualification
Criteria

Pending litigation in accordance with Sub-Factor 3.4 of Section 3, Evaluation and Qualification
Criteria, as indicated below
Outcome as Total Contract
Year Percent of Contract Identification Amount (current
Total Assets value)
Contract Identification:
Name of Client:
Address of Client:
Matter in dispute:
Contract Identification:
Name of Client:
Address of Client:
Matter in dispute:

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

SECTION-IX PROPOSED SUB-CONTRACT

NO Other part
None Cause of dispute Amount of involvedwork
1 NONE

SECTION-X INFORMATION ON CURRENT LITIGATION

NONE

5.Professional Qualifications and Capabilities


Bekele Burusa General contractor personnel statistics for the current and the two previous
years.
Average Year before last Last year This year
manpower Overall Specialists in Overall Specialists in Overall Specialists in
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Technical Technical Technical
Area Area Area
Permanent 10 6 11 6

Temporary 35 5 5 2

TOTAL 45 11 16 8

6. Comments and Suggestions on the Schedule of Requirements


First of all we thank THE Haramaya University to give us a chance to participate in legal tender
for construction of Bacho and HOPE IRC,Primary & Secondary School, SNNP BRIDGE,
Gursum Wara Ali Pond , Kurfa Calle Dhakeba pond, ware house, Firi Qabso Water
Supply,Lilo gurati Pond wet station, office, Dry pit latrine in different zone of Oromiya
region. Your good office clearly set out all the works to be executed in the attached bill of
quantities. Our company has no further comment on the requirement of schedule.
QUALITY ASSURANCE / MANAGERIAL AND CONTROL PROCEDURES
1. brief description of quality assurance of Bekele Burusa General and water works
contractor
One of the basic objectives of Bekele Burusa General and water works contractor

is to operate with strong commitment for high quality service at reasonable price, in an efficient
and systematic way. Since its establishment Bekele Burusa General and water works
contractor, used to upgrade the company’s Structural organization managerial Capability &
controlling system by introducing modern Management system, Giving short term training to the
company’s employee , developing Different Control format and procedures to be implement by
each department of the company and Introducing modern Construction technology in the
company. The quality assurance for construction for of Primary & Secondary School, ware
house, station, office, Dry pit latrine in different zone of Oromia region is detailed as
follows:

2. Technical department to manage the project

The management of the site logistics is key to the success of the project and will
require a dedicated logistics team to develop a detailed plan to control and manage the site.
A delivery zone will be established on site and will be able to hold say two to
three trucks at any time with consideration being given to the provision of an off-site
holding area for vehicles with possibly limited material storage to facilitate efficient
deliveries. It is anticipated that site logistics will form a significant part of the work and that

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
regular coordination meetings with the engineer will be held throughout the construction
phase of the project.

In view of the location of the site, the constraints on traffic and the permits that
will be required for vehicles to access the site and public way, a senior project manager will
be appointed to work as a liaison officer and coordinator responsible for communication
with the client, the appointed engineer, and neighbors and the project management as
whole. In this way it is anticipated that the risk of material shortages at key times can be
reduced to a minimum.
So the assigned project manager who is qualified and having experience of
managing similar and higher projects will have responsibilities to;-
 Representation on behalf of the contractor in all discussions, correspondence and matters
relating to the works on site,
 Coordination and monitoring of the contract progress, which shall include the preparation
of the contract program, monitoring of progress and submission of progress reports. At
the discretion of the office engineer, regular meetings shall be called at which the project
managers shall give a full account of the contract progress and program.
 Coordination and checking of designs, drawings and submissions. The office engineer
shall be responsible for coordinating the design and technical information. All
calculations, drawings and information submitted to the engineer shall be checked before
submission.
Contract communication between Awsha International Bank ShashemeneTownand Bekele Burusa
General and water works contractor
. The general managers (team leader for this particular project) or his delegate shall attend all
meetings involving the contractor and the client, and shall have full delegated authority on behalf
of the contractor.
 Coordination and programming of factory tests, and the submission of test certificates.
 Production of detail method statements of any work which involves or affects the
performance of existing equipment, processes, or connections to or disruption of existing
supplies or services.
 Submission of payment changes, variations and claims.
In addition to the above site technical team the following technical departments will
involve in t managerial administration of the project
-. The General Manager (team leader for this particular project) will lead & coordinate the
technical crew assigned for the project with other departments of the company to smooth flow of

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
the work. He receive a day to day report of the project status to assure the timely completion of
the project work
-. The Engineering department at head level assigns competent Project manager for the
project who will responsible to manage Man power, equipment , material utilization, control the
overall activities of project work, make correspondence with the client/consultant representative
on site, Follow & ensure the implement of the company quality assurance & control procedures
by using check list & quality assurance forms of the company at project level and other duties
relevant to the project for the timely completion of the project.
-. The Contract administration department at head level assigns competent office
engineer for the project who will responsible to control The quality of each activities of work,
evaluate & follow timely execution of each activities of work based on the master schedule ,
revise the master schedule for timely completion of the project & other relevant works related to
the project.
- The consultant will be assigned by our company as sub-contractor to assist the technical
staff of our company in preparing working drawing, checking the to execution of the work as to
be per drawings & quality with reference to the proposed architectural, electrical sanitary
drawings.

3.Further Information
Most of the project activities for preparatory school project renovation work are
all most quantified clearly and stated in the tender bill of quantities except the quantity of
dressed masonry wall which our opinion is over estimated.
4.Audit Agency of Ketema and Habtamu General Audit
Name of External auditor: - Ketema and Habtamu General Audit lAuthorized certified
Accountants in Ethiopia
Address: Adama woreda ,Kebele 14 house No. new
Telephone: 251 911-307015
Mobil :251 938303015
Fax: 251

5. Bank Account Number and Bank Address


The bank account into which payment should be made to us and bank address are the following:
1. Bank account number of Ketema and Habtamu General Audit
:- NIB bank A.A.RASbranch,A/CNo. 821

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
:-COMERCHAL BANK OF ETHIOPIA branch, A/C NO.10000246188
Name :-BekeleBurusa

In the capacity of General manager

Signed

Duly authorized to sign the Bid for and on behalf of BEKELE BURUSA GC

Dated on27th day of YEKATIT 2007

Attachments:
1. Statement issued by a power of attorney authorizing the signatory of the Bid and all related
documentation
2. Audited financial statements
3. Documents required as proof of Bekele Burusa General and water works contractor
financial standing
4. Certificates of satisfactory execution of contracts provided by contracting parties to the
contracts successfully completed in the course of the past years.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Technical Proposal

II. Work Plan and Site Organization

1. Introduction
Planning for construction is necessarily broad at this stage and may be subject to modification
during detailed construction planning after signing of the contract. Consequently, a number of
aspects of construction in relation to environmental issues cannot be accurately predicted at this
stage. For example, the number of vehicles required during compound works will be dependent
on progress of the works against the construction program.

Project management and other key technical staff shall be immediately assigned after
notifying and getting letter of award. Skilled workers, semi-skilled labors and unskilled labors
shall be recruited from the project vicinity.
Conducting site possession and a startup meeting with Employer and the Engineer,
identification each work activities to be renovate, undertaking re-survey of the buildings &
associate site works, taking photographic records of the existing building & compound grounds
condition , undertaking quality tests for the proposed construction material from potential quarry
sites, identifying and requesting approval of quarry site, preparation and getting approval of work
program, arranging temporary office and accommodation places, etc will be carried out in
advance.
The re-survey of all existing building structure and Site condition will be conducted
before the commencement of any renovation or construction of the project activities and lists of
the same will be submitted to the engineer/client within reasonable time.

Based the re-survey of the building& the site work a revised working drawing will be
prepared with our professionals and submitted to the client/consultant for approval in the shortest
possible time.

The undertaking of quality tests& for construction materials will be accomplished ahead
of time from the existing quarry sites near the project sites, so that the engineer can facilitate the
purchasing of the material and revise the test result using the submitted test results.

Construction of different facilities to enhance the immediate commencement of the actual


activities of project such as :
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
- Construction of Site Office for own use
- Construction of stores
- Availing a standby Generator
- Preparing stock yards for re-bars, sand & aggregate, etc.
- Acquire telephone & fax lines, power supply & water
Any additional facility as required by the Engineer will carried out in
.

1.1 Work plan & scheduling


Bekele Burusa GC as company believe that before entering into any work, well prepared and
exclusive plan is essential for the successful completion of any project. We summarize below
some of the numerous procedures and documents which make up the overall process of planning
and coordination. All elements of the project including machinery & equipment, labor, materials,
sub-contractors, Site meeting plan and information are covered within the system. In addition to
The above element of planning, the procurement which is a key element in this project will be
considerable giving emphasis on it throughout the contract period.
Immediately after our appointment a meeting of our project team led by the Team
coordinator (Obicha River Bridge Construction work project) will be carried out. Its purpose
is to confirm the construction methods to be used on the contract, and to decide on the specific
planning, progressing and coordination systems required in the execution offorAwash
International Bank Shashemen town, Guji Zone, wet coffee washing station, cooperative
office,Pond, water Supply, Dry pit latrine in different zone of
Oromiaregionsiteworksactivities.
The office engineer at head office will prepare a work schedule using a work flow
diagram for every physical work to be maintained/constructed indicating the time and resources
required to accomplish each activity. The General Schedule of Work (detail is to be submitted to
the client/consulting engineer and to be implemented when approved) starting immediately after
the issue of the notice to commence shall be as follows.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Master Schedule

Based on the discussions at the Project Planning Meeting and methods identified there
(Obicha River Bridge Construction work project) the Head Office Engineering Department
will carry out the initial planning and the development of the Master Schedule. The responsibility
for the production of a realistic Master Schedule, however, still rests with the Project Manager.

The Master Schedule will be prepared using computer based software, including not only
on-site activities but also off-site appointments and procurement items. It will be issued to the
Engineer in the form of a bar chart of site works. Critical project milestones will be highlighted,
and their achievement closely monitored by our project team.

Construction Schedules

As soon as the site office is established, all planning and coordination activities will
become site-based, carried out by the Project Manager and his team for Construction of the
projects.
Detail Schedules
Throughout the construction period, Stage Schedules will be prepared to cover agreed
phases of the project and periods of time in greater detail than the Master Schedule. The day to
day planning and detailed integration and coordination of onsite and offsite activities will be
achieved through the preparation of fortnightly schedules (Obicha River Bridge Construction
work project) They will be discussed and agreed at weekly meetings.

Procurement Schedules
Based on the Master and Construction Schedules, the Procurement Schedules for the
materials to be purchased for the (Obicha River Bridge Construction work project) project
will be prepared. The schedule will be monitored such that they will be delivered in time and
ensure the smooth progress of the project works.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Monitoring and Reporting
Monitoring of the progress of all activities, on-site and off-site will be carried out on a
weekly basis for internal reporting. Subcontractors’ progress will be reviewed with each
specialist at regular meetings for both on-site and off-site activities (Obicha River Bridge
Construction work project) The interfaces of the subcontractor’s activities will be reviewed to
ensure coordination of their activities.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
1.2 Project Site organization & staffing

At the head office level, the General Manager will establish a new desk, which will give
assistance and the required support for the project Managers. This new desk will be directly
accountable for the General Managers for this particular (Obicha River Bridge Construction
work project).
The overall site activity will be under the managerial and technical administration of the
Project Manager. In addition to the desk office established in head office temporary office &
store will be constructed at project site.
The office Engineer of the projects will be responsible for scheduling, surveying works,
quantity surveying, and preparation of payment certificates and for other technical and
engineering works. The material (quality) control engineer is responsible for identifying quarry
sources within economic limit, approving material to be purchased to the specification& testing.
The project Construction/site Engineer will be responsible for the day-to-day construction
activities of the project by organizing labor material and equipment for different activities of the
project by directing the different crew and foreman’s in the project with the objective of assuring
quality of work and standard within the stipulated budget and time frame.
Towards this, the project will be organized as per the organization chart shown herein.

1.3 CONSTRUCTION SAFETY MEASURES

We believe that our firm is pioneer in introducing safety and health system to the
Construction Industry in Ethiopia. Also safety during the construction project is sometimes
influenced by decisions made during the planning and design process; we will establish a sound
safety system in the Project and strictly follow-up its implementation and precautions set out in
our Safety Policy and Procedures manual by assigning a Safety Control, an Engineer with
additional duty of seeing to Safety issues in the Project.
Unless the working environment is made to be safe and conducive for workers, it is clear
that it has a great impact on the progress of the workers in various aspects hence we will
obey all the statutory safety regulations and trade requirement throughout the time of
possible of the site from site handover to the end of the defect liability period. For practical
implementation
 We will erect construction safety signs and barrier as and where directed by the engineer

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
 With backhoes, and similar equipment near power lines (we have seen on the site) and
telephone lines use a signal to warn the operator when any part of the equipment or load
approaches the minimum allowance distance.
 Before moving ladders, rolling scaffoldings, or elevating work plat forms, always we will
check for the existing overhead wires.
 We will use only tools that are grinded or double insulated
 We will use hand tools with insulate handles and grips. Whenever required, wear
protective equipments, safety goggles, insulated gloves, shock resistant footwear.
 All workers should be insured by Group Workmen Insurance. Key Contractor’s staff, the
Engineer’s representatives and visitors should be provided with helmets while working in
or visiting the Project.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

10- PROPOSED

WORK

METHODOLOGY

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
SITE ESTABLISHMENT

Introduction to site establishment

It is our company objectives to mobilize and move onto site as soon as possible after the site is
handed over by the employer. Site establishment is a very important element in the
performance of any contract. If the site establishment is well planned and executed, the
contractor can greatly increase productivity and efficiency. A well -organized site which is neat,
tidy and clean will not only look professional but will also reduce waste, accidents and lost time
in searching for items that are needed.

Site layout considerations

The arrangement of site accommodation such as offices, storage sheds, mechanical service
yards and access routes is normally a first consideration when establishing a site. Other aspects
such as the location of services such as water, electricity and telephones can also play an
important part in the site layout. When planning the layout of the site, it is important to also
consider the owners or occupants of the areas next door to the site. Loud noise from a machine
can disturb the neighbors if it will be running for long periods, and complaints will be received
about this disturbance. In such a case, the machine should be shielded in order to reduce any
possible disturbance to a minimum.
When planning the site layout, our company will consider at least the following:
 Location of the site.
 Conditions on site.
 Access to the site.
 Drainage of the site.
 Ground conditions (wet weather conditions, marshy conditions, ground movements).
 Services available (water, sewers, electricity, telephones, etc.).
 The type and quantities of material that is to be stored.
 The type of construction equipment that is to be used.
 Disposal sites for excess soil or rubbish.
 Security on site (access security, security of materials delivered, etc.).
 Accommodation requirements for the employer and his representatives.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Access
Access to the site and movement around the site must be well planned. This entails the
planning for access by heavy trucks to deliver major plant, materials and equipment as well as
by light vehicles to drop off personnel. There will also be pedestrian access points to consider,
since many people will come to site on foot. Parking space is also needed for site management,
and for the employer and his representatives.

Site facilities

General considerations

Different sites will require different types of site facilities. It is important to know what is to be
accommodated on site when the contractor starts to plan the site establishment. The number
of personnel, types and quantities of materials which will be required, equipment that will be
used, and the security requirements for the site must all be carefully considered.

Administrative offices

The administrative offices will vary depending on the size of the project and the duration of the
works. The number and quality of the office accommodation should be appropriate to the
length of time that site staff will be using them and by the number of personnel that will be
using them. The site offices will be as far as possible watertight, dust proof and of a solid
construction. Suitable lighting and ventilation will be fitted either in the form of windows or
lights.it is our company believes that good internal and external finishes will enhance site staff’s
working environment and will promote pride in their work.

Facilities for workers

Safety tools will be provided for workers. Canteen areas will be provided if the project is on a
remote site far away from existing settlements.

Ablution facilities

Toilets will be provided in sufficient quantity for all staff and workers including those employed
by subcontractors. The number of these ablutions should be appropriate to the size of the site
and should be well - kept. Clean water should be provided at all times for workers to drink and
wash with.

Providing good facilities can result in increased productivity, high morale in the workforce and
reduced labour force turnover.
23

Storage shed and areas

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Depending on the size and nature of the project, other general sheds may also be needed.

Storage sheds are almost always needed to keep small tools, equipment and materials dry and
secure during idle time. These need to be built to the required size, and with the appropriate
amount of security for the site location and the nature of the items to be stored. Storage is
often also to be provided for subcontractors. When positioning storage sheds and areas, it is
important to reduce the amount of handling that is required for those materials. The more
materials are handled, the greater the possibility of damage or contamination and the more
expensive and time consuming it becomes to work with them. The type of materials or
equipment to be stored needs to be considered as well. Fuels have very strict storage
requirements. Plastic pipes may require shade from the sun in order not to be damaged whilst
Stored and electrical equipment will need to be stored in a dry place. Cement is normally stored
either in weatherproof stores, on platforms or pallets off the floor.

Construct ion equipment areas

Certain projects require heavy machinery such as graders, bulldozers, excavators and dump
trucks. These machines need an area in which they can be maintained and also a location where
they can be safely stored overnight. Depending on the nature of the project, the machines may
be stored next to where they happen to be working, well away from the main site offices.
However, security must be provided for this situation. Servicing of machines is normally done
where they are working on a regular scheduled basis. Repairs are often required wherever the
machine breaks down, but often a central workshop is used to do major servicing or larger
repair jobs. A workshops area would be required for this type of support work.

Work areas

Work areas will include those parts of the site where the contractor will construct the works, as
well as any areas that are used to assemble or produce elements for the works. These areas
would include
pre - casting yards, batching plants, areas where reinforcing cages are tied ready to be
positioned and
Other areas where built - in elements are assembled prior to installation. These work areas will
be positioned carefully on the site in order to maximize efficiency in the construction process.
Careful planning will be done over the duration and function of some items that will function
within these working areas, so that they do not need to be relocated during the project, causing
delays to production.
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

Security

Site security is a critical part of the establishment. The perimeter of the site will be secured from
a health and safety perspective to prevent unauthorized persons from gaining access to the site.
Perimeter security is also required to prevent vandalism or damage to the works by
unauthorized people entering the site. Watchmen are usually posted at night or over weekends
when in order to maintain this security. Suitable accommodation needs to be provided for these
watchmen to shelter. Stores should be secured against theft and efficient systems put in place
in order to ensure that materials are not stolen.

METHODES STATEMENT

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
These method of working and quality of work control is a thorough and clear descriptions as
to how to control the construction of Buildings which we,BekeleBurusa GC. , believes will help
in meeting the desired quality with the given time in the budget allocated for it. At the end of
the methodology we have attached the site visit pictures we took in the project site during the
site visit along with your office representative.

General
It is one of the Company’s objectives to introduce modern techniques to the construction
industry. In order to ensure the timely completion and quality of works, we exhibit our
methodology of the works as follows.

1. Mobilization
As soon as contract is signed and the necessary formalities are fulfilled, mobilization will be
started.
The mobilization involves organizing and making available for the construction works all
machinery, equipment, personnel, site offices & stores and the necessary facilities. Set up for
the above resources and facilities will be detailed out on a master plan. The main facilities to be
set up will be the following.
- Construction of Site Office for own use
- Construction of Site Office for Supervisor
- Construction of stores
- Avail construction materials, especially local materials( sand, aggregate, stone &
eucalyptus)
- Make ready both skilled and unskilled manpower
- Preparing stock yards for re-bars (including shade) , sand & aggregate, etc.
- Acquire telephone & fax lines, power supply & water
- Avail standby Generator
- Any additional facility as required by the Engineer
Tentative site arrangement for the above facilities will be made subject to the approval of the
Engineer (supervisor).

2. Site Organization
Site Organization and Management is the planning, running, overseeing and generally
organizing of the construction project. The firm believes that Site Managers and facilities are
the key to the success of a construction project. The firm will deploy a team of prominent
engineers mustered to implement the construction of the project. In addition, it will assign
qualified Office Engineers, Quantity Surveyor, Administrator, Accountant, Purchasers and other
staff to support the construction team.
In particular, the Project Manager will be basically responsible for running the construction site.
The candidate is a highly professional person, with several years in the industry.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
At the Head Office, a full-time Project Coordinator & Office Engineer will be assigned which
attend to the planning, execution, controlling and reporting of the project.

3. Procurement
Procurement is a key element in this project, and there will be a considerable emphasis on it
through out the contract period. An on-site team under the control of a Project Manager will be
responsible for initiating purchase orders and monitoring their progress through various phases
of the procurement process. Regarding the procurement of sub-contract items, the sub-
contractor will be required to work out the procurement schedule based on the master
schedule and submit for approval. Then the status of the procurement schedule will be
monitored by the Project Manager and Chief Engineer at Head Office level.
Purchasing procedures include submission of catalogues & samples for approval to the
consultant in order to ensure that quality standards which are laid down in the specification.
Our procurement schedule will be issued for early vetting, in order to avoid risk of purchasing.

4. Planning
We firmly believe that before entering into any work, well prepared and exhaustive plan is
essential for the successful completion of any project. We summarize below some of the
numerous procedures and documents which make up the overall process of planning and
coordination. All elements of the project including machinery & equipment, labor, materials,
sub-contractors and information are covered within the system.

4.1 Project Planning Meeting


Immediately after our appointment a meeting of our project team led by the Chief Engineer will
be convened. Its purpose is to confirm the construction methods to be used on the contract,
and to decide on the specific planning, progressing and coordination systems required.
Master Schedule (Refere the General, manpower machinery detail schedule attached )
Based on the discussions at the Project Planning Meeting and methods identified there, the
Head Office Engineering Department will carry out the initial planning and the development of
the Master Schedule. The responsibility for the production of a realistic Master Schedule,
however, still rests with the Project Manager.

The Master Schedule will be prepared using computer based software, including not only on-
site activities but also off-site appointments and procurement items. It will be issued to the
Engineer in the form of a bar chart of site works. Critical project milestones will be highlighted,
and their achievement closely monitored by our project team.

Construction Schedules

As soon as the site office is established, all planning and coordination activities will become site-
based, carried out by the Project Manager and his team of Construction & Office Engineers.
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Detail Schedules

Throughout the construction period, Stage Schedules will be prepared to cover agreed phases
of the project and periods of time in greater detail than the Master Schedule. The day to day
planning and detailed integration and coordination of onsite and offsite activities will be
achieved through the preparation of fort nightly schedules. They will be discussed and agreed at
weekly meetings.

Procurement Schedules

Based on the Master and Construction Schedules, the Procurement Schedules for the materials,
equipment & manpower required for the project will be prepared. The schedule will be
monitored such that they will be delivered in time and ensure the smooth progress of the
project works.
Monitoring and Reporting

Monitoring of the progress of all activities, on-site and off-site will be carried out on a weekly
basis for internal reporting. If and when important and if approved by the supervisor,
Subcontractors’ progress will be reviewed with each specialist at regular meetings for both on-
site and off-site activities. The interfaces of the subcontractor’s activities will be reviewed to
ensure coordination of their activities.

5. Construction
5.1 Surveying
The site, at which the construction will be implemented, is closely observed by our company as
we have attached a photograph of it on the last page of methodology and topographic survey of
the overall site will be conducted before commencing the earthwork if we get a chance to work
on the site.
5.2 Earth Work, Bulk and Trench Excavation
Both bulk and trench excavation works will be done by Bulldozer, Excavator and Backhoe
Loader as per the design requirement. A careful consideration will be made to environmental,
infrastructure and social issues. High capacity Dump Trucks will be assigned to cart away and
shuttle the excavated material.

5.3 Concrete Work


In this project all concrete works will be cast-in-situ and site mix will be employed using
Concrete pumps, Truck mixers and cranes for its consistency and quality.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
Materials supply
The materials to be used for the concrete works are sand, crushed aggregate, cement and
water. Sand will be obtained from the surrounding vicinity. The crushed aggregate to be used
for the project will be purchased from local sources or produced at site. But both materials have
to fulfill the test requirement and should get Engineers approval before dumping them on site.

Testing of Materials
Before starting any concrete works of the project physical and chemical tests will be carried out
on sand and aggregate to be used for the works at a laboratory acceptable by the Engineer. The
test results will be submitted to the Engineer for approval. The water to be used for concrete
mixing & curing is to be obtained from the municipality line which is used for drinking water.

Mix Designs
After checking the suitability of sand and aggregate for the use of concrete; and they are
accepted by the Engineer, mix designs for the various grades of concrete will be made using
different proportions of the sand, aggregate, cement and water cement ratio. Based on the mix
design results, the mixes to be used for the various grades of concrete will be submitted to the
Engineer for approval.

Preparation of Ingredients
Standard wooden boxes will be prepared for measuring the quantities of ingredients to be used
for the different grades of concrete based on the mix designs approved by the Engineer. In
order to ensure the production of good quality concrete, the silt contents of the sand
aggregates will be kept to minimum allowable limit, if required even by washing with water.

Mixing
Mixing is a very important parameter in achieving a homogeneous paste which is vital in
attaining the required concrete strength. Therefore, to ensure homogeneous mixing of the
ingredients, efficient mixers will be used.It is evident that such machine-aided methods provide
efficient and quality works.

Casting
Casting of concrete will be done using concrete pumps, Truck mixers, Tower crane, and Mobile
mixer and Hoist pulley where appropriate.The fact that the Firm uses machines for such works,
quality and efficiency can be assured both to the Client and the Contractor. This is one of the
competitive advantages that the Firm enjoys.

Placing of fresh concrete and curing


Timely placing of concrete before it sets is very important. Therefore, this will be ensured by
using crane, dampers & hoists. Curing plays a vital role in preventing the loss of moisture from

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
fresh concrete which necessary for the hydration process. Therefore, the fresh concrete
surfaces will be cured by spraying water and covering with jute for at least 7 days.

Test Cubes
In order to check the quality of concrete works, test cubes will be prepared from the respective
batches of concrete as per the requirements of the contract specification and as directed by the
Engineer.
5.4 Reinforcement
The reinforcement bars to be used for the project will be purchased from reliable suppliers. In
order to ensure the required quality of reinforcements, all reinforcement consignments will be
accompanied with test certificates. Since test certificates could be easily fabricated, we would
also take a sample of bars from each diameter and make a test from a recognized testing
company and then we will ask approval from the supervisor before dumping any sort of
reinforcement on site. Due to the large consumption and size of the reinforcement bar, our firm
will employ qualified Bar Benders and machines to streamline the just-in-time production of the
required steel bar.

5.5 Formwork
Formwork will be supplied by our firm in sufficient amount and good quality. The
formwork to be used will be metal panels, steel scaffolding and props and timber formworks
where appropriate. Regarding the scaffolding, metallic and wooden members will be used for
the deck work. In addition, the firm will ensure that design shape and sizes are followed and
executed by using appropriate material and size of formwork.

5.6 Hollow Block Works

The hollow blocks required for the project will be purchased and or produced on site.
Moreover, samples will be taken and tested at a laboratory acceptable to the Engineer.
Our firm will tweak its standard building methods to suit the required material production need
of the project. For this purpose the block work will be carried out in such a way that the final
outcome ensures standard requirements by using quality hollow blocks and employing qualified
and well-experienced Masons.

5.7 Carpentry and Joinery


All carpentry and joinery works will be made by qualified Forman and Carpenters. Approved
construction material will be used for quality output.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
5.8 Finishing Works
All Finishing works will be made in order to meet the standard specification of the
contract agreement for quality as well as aesthetic value of the entire project. Since the project
has a much work to do finishng items with all the best finishing materials available on the
market, a close follow up on each implementation is a must. Especially finishing materials
should in no way be used on site before it is approved by the Supervisor and for smooth and
fast progress of the project, sample for approval should be submitted prior to starting any type
of the works.

5.9 Sanitary Installation


All sanitary works will be made in order to meet the standard of specification and should be
approved by the supervisor for quality as well as aesthetic value of the entire project. Regarding
the materials to be used for the project, the materials will be purchased from reliable &
dependable suppliers in terms of quality. In order to ensure the required standards & quality of
materials, samples and catalogues will be submitted to the Engineer for approval, when
necessary, before initiating any purchase order.

5.13 Electrical Installation


All Electrical works will be made in order to meet the standard of specification and should be
approved by the supervisor for quality as well as aesthetic value of the entire project. Regarding
the materials to be used for the project, the materials will be purchased from reliable &
dependable suppliers in terms of quality. In order to ensure the required standards & quality of
materials, samples and catalogues will be submitted to the Engineer for approval, when
necessary, before initiating any purchase order.

6. Quality Control
Our Firm believes that as with cost control, the most important decisions regarding the quality
of a completed facility are made during the design and planning stages rather than during
construction. Quality control during the Construction the project consists largely of insuring
conformance to the original designs and planning decisions.
While conformance to existing design decisions is the primary focus of quality control, from
experience we noted that there are exceptions to this rule. For instance, if we found unforeseen
circumstances or incorrect design decisions or changes desired, we will bring the matter to the
Consultant to re-evaluate design decisions during the course of construction.

In our opinion, since the requirement of the Project as regards to quality may be to the highest
standard, we believe that the construction materials to be supplied from local sources and
abroad need approval by the consultant prior to their delivery to the construction site.

Quality work is a function of using approved quality materials, deploying qualified & competent
manpower and appropriate machinery & equipment. Therefore, our firm will do its best to
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
ensure this requirement. In view of this, our firm will give due attention to get approval of all
materials required to undertake the works.

7. Clearing &moving out


Our company gives due consideration to the completion and handing over of the project as
smoothly as possible. In view of this, from the outset of the contract we will pay particular
attention to the regular site clearing of rubbish and debris, both by direct and sub-contract
trades.

Demobilization will be effected with proper site clearing and removing of all ancillary works as
ordered by the Client and the Consultant. The firm will exert all the required effort to comply
with the required precautions, and instructions with special attention to environmental and
social issues.

A great care should be taken in keeping the safety and health of employees, Consulting staff
and Client’s representatives and properties while closing out.

Even though cleanings are carried from time to time final clearing will be performed to the
satisfaction of the engineer. Removal of temporary buildings constructed for the use of the
contractor, the engineer & construction equipment, which was deployed for the work, will be
removed from site. All temporary works, scaffoldings will also be dismantled and removed from
site after completion of the work.

8. Preliminary Work Plan


A Preliminary Work Plan for the project will be presented with the financial proposal in the form
of bar chart including monthly value of activities to be executed during the project period
considering the logical sequence of the construction activities.

Moreover, the monthly cumulative value of planed work during the project period is presented
in the form of S-Curve. This can give a brief indication to the Client about the cash-flow
requirement of the project during the contract period.
The following pages describe the details for quality of work control for each item.

1. INTRODUCTION

The duty or the Project Manager is to ensure that the construction works are executed in
accordance with the contract requirements. Therefore in the application of this check-list the
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
details specified in the contract document always precede before the application and use of it.
There are also checklists and forms that help us record of the incidences affecting the work
and as references. In addition, the standard technical specification is used as references on the
preparation of this check-list.

2. INVITATION AND PREPARATION OF SITE


CHECK:-
2.1 The site visually, if underground utilities cross it.
2.2 The site on maps showing the location of underground structures and utilities to
avoid breaking them during construction.
2.3 The site plan and layout of buildings and shower system especially concerning
levels and soil condition. If changes and necessary submit a written report to the
designer.
2.4 The area to be cleared off and take measurements.
2.5 The trees and buses within the foundation to be cut and rooted up as given in the
standard technical specification.
2.6 Permission is obtained from local authorities to cut down trees outside the
foundation areas.
2.7 Boarder lines are agreed with local municipality and corner stones placed.
2.8 The connection points for water and electricity are agreed upon with local
authorities.
2.9 All necessary temporary drains are constructed to keep the site free of water.

3 SEETING OUT
The overall setting out will be done totally basing it on the city urban and planning master
plan which we are sure considers all the nearby infrastructure especially nearby road. This all
consideration will be done by the collaboration of our supervisor and the city Engineer.

CHECK:-
3.1 The setting out is done correctly with proper measuring tape and accurate
leveling instrument.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
3.2 All measurements to confirm the accuracy and correct locations of working area
are properly stated out.
3.3 The elevation reference point in accordance with the survey map, and confirm.
3.4 All bottom of trenches and floor levels are according to the elevations shown on
the drawings.

4 EXCAVATION & EARTHWORK


CHECK:-
4.1 Check all top soil is excavated separately
4.2 Decide the place to pile up the suitable excavated material and check it is 2 meters
outside the building perimeter.
4.3 Decide the place for the cart away which is not necessary for backfilling or
terracing.
4.4 For sites where blasting is proposed, the explosives are used in the quantities and
manner recommended by the manufactures. Check a written consent is obtained
on each occasion the contractor wished to use explosives.
4.5 All the excavations are carried out to the lines, levels, widths and depts. shown on
the drawings.
4.6 Any discrepancies in levels, dispositions etc. are reported to the engineer prior to
proceeding with the works.
4.7 All necessary temporary drains and culverts are constructed to keep the site free of
water.
4.8 Slops to combats, cuttings, shoulders, ditches etc; are trimmed to the dimensions
and inclinations shown on drawings.
4.9 Cut for roads is carried out until a level of suitable material in allowed.
4.10 Excavations are suitably trimmed and leveled before any concrete or masonry
work in placed.
4.11 In locations where the soil is subject to softening during excavation, a bottom
layer of soil removed immediately before the placing of concrete, in accordance
with the standard technical specification.

5 FOUNADTION TRENCH & PIT EXCAVATION


CHECK:-

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
5.1 The foundation drawings to correspond with the conditions on the site, if not report and
submit to the designer immediately.
5.2 The foundation depth, width, line and levels to correspond the drawings.
5.3 The excavation or foundation executed 25cm wider on each side of the thickness of the
foundation wall as given in the standard technical specification.
5.4 The trench and pits to be clean from grass, bushes and pieces of wood.
5.5 The trench and pits to be kept free of water by pumping or other means.
5.6 The foundation engineer has accepted the excavated foundation depth.
5.7 The foundation excavation is suitably trimmed and leveled before concreter masonry
work is placed.
5.8 In the event of over excavation, without approval the area to be filled with selected
excavation or borrowed material or class 5 concrete in accordance with the standard
technical specification.
5.9 The faces of excavation are retained with shooting, timbering, strutting and shoring to
protect workmen and prevent damage where necessary.

6 FOUNDATION IN STONE MASONARY


CHECK:-
6.1 The trench to be clean from grass, bushes and pieces of wood.
6.2 The stone is of the type given on specifications.
6.3 The stone to be hard & sound free from cracks and decay and not weathered.
6.4 The stone is preferably quarried from an approved quarry.
6.5 The stone not to be round surfaced.
6.6 The stone masonry execution is with specified mortar and with well filled joints.
6.7 The stone masonry during execution is kept free from solid and other kind of dirt.
6.8 The length of stone does not exceed three times its height.
6.9 The mix of lean concert to correspond the specification.
6.10 The mix proportion of mortar is correct.

7 BACKFILLING
CHECK:-
7.1 All backfilling to be in layers and compacted to 95% of maximum dry density in
accordance with the standard technical specification.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
7.2 All internal backfilling is done with approved material, if possible with material
excavated on the site.
7.3 All external backfilling ground foundation walls and behind retaining walls shall be done
with approved selected materials, if possible with material excavated on the site which is
capable of being compacted and form a stable filling.
7.4 All organic materials, such as pieces of wood, roots, bushes and black cotton soil are
removed from all backfill material.
7.5 All ground trenches and places here backfilling shall be executed are clean from grass,
bushes and pieces of wood.
7.6 Where pipes and electrical cables are in connection with the backfilling, the work shall be
executed very carefully, on they do not-break or get damaged.
7.7 Each layer to be well rimmed and consolidated with the addition of water as necessary to
achieve the required compaction.
7.8 The maximum layer of fill for none time compaction does not exceed 20 cm. thicknesses
in accordance with the standard technical specification.
7.9 Depressions or voids that are created during trimming of slopes to embankments,
cuttings, shoulders, ditches etc., are filled with suitable material and to approved
compaction.
7.10 Any material which after repeated compaction does not fulfill the requirements is
removed and replaced.

8 HARD CORE
CHECK:-
8.1 Stone for hardcore is sound and approved quality.
8.2 All stones in the hardcore are of approximately equal and recommended size.
8.3 All hardcore in well rammed and consolidated with the top surface blinded with crushed
aggregate of 20mm. thickness in accordance with the standard technical specification.
8.4 The thickness of the hardcore satisfies the specification or design.
8.5 The placing of stones to result in minimum voids.

9 CONCRETE

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
CHECK:-
9.1 All ingredients cement, aggregates and water are of the type and quality specified.
9.2 Cement is fresh, not older than six months and is delivered to the site in the
manufacturer's original sold bags.
9.3 Cement is stored in a dry and well ventilated store, on a wooden floor raised minimum
20cm. above the ground.
9.4 Cement is stoked separately.
9.5 The cement has markings showing the type and date of consignment pinned to it and
checks it is used in the order of its arrival.
9.6 Cement more than six moths old after production is tested to satisfy the specified
requirements.
9.7 Sand or fine aggregate to be clean river or pits sand of approved quality and consist of
hard, dense, durable uncoated rock fragment.
9.8 Sand to be clear of impurities like dust, mica and organic matter.
9.9 Rejected samples of aggregates are removed from the site with in 24 hours.
9.10 Coarse aggregate to be crushed basaltic stone or gravel of approved quality.
9.11 Coarse aggregate to be bard, dense, durable non-porous and uncoated rock fragments.
9.12 Coarse aggregate to be free from impurities like clay, soft thin elongated or laminated
pieces and shall be free from alkali and organic matter.
9.13 The gradation of coarse aggregate to comply with the standard technical specification
which means a detail sieve analysis check will be done prior to using any of them for
concrete.
9.14 Before any coarse aggregate to comply with the required gradation given by the sieve
analysis test result.
9.15 Aggregate are stored on clear hard surface to prevent contamination by soil.
9.16 Different grades are stocked independently.
9.17 Water used for mixing concrete is clean and free from injurious amounts of oil, acids,
alkalis, organic materials.
9.18 Water is not taken from sea or tidal rivers to be used for structural concrete. If
possible water shall be piped or otherwise stored in an enclosed container free from
contamination.
9.19 If there are any doubts about the quality of the water a sample shall be sent to the
designer or consultant for testing.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
9.20 If the temperature of the water exceeds 600c it is first mixed with the aggregate before
the cement is added.
9.21 The concrete is mixed to a uniform color and consistency prior to placing.
9.22 Hand mixing is not allowed but if unavoidable shall be used only for class II concrete
and shall under no circumstance be allowed for concrete of class C-20 and higher.
9.23 Concrete is mixed in an approved mechanical batch mixer machine; the mixer is
thoroughly cleaned from hardened concrete and other kind of dirt before use.
9.24 Mixer which has been out of use for more than 20 minutes is thoroughly washed
before any fresh concrete is mixed as specified in the standard technical specification.
9.25 The mixer drum is tight to avoid loss of mortar. The valor must not leak mixing water.
9.26 The specified mixing time is carefully adhered to, but in no way shall the mixing
discontinue for less than 2 minutes after adding water as specified in the standard
technical specification.
9.27 The Contractor must not be allowed to exceed the batch capacity when mixing is
proceeded.
9.28 The materials enter the drum rapidly.
9.29 The whole of the mixer batch is removed before materials for fresh batch enter the
mixer.
9.30 Mixed concrete is not modified by the addition of extra water or cement, in order to
facilitate handling or any other purpose.
9.31 Before any casting stars at the site, test cubes of side dimension 15x15x15 or
cylinders of diameter 15cm and length 30m of wood or steel are made ready.
9.32 All reinforcement and formwork are properly placed prior to any concreting and the
mix approved and should be approved by the supervisor.
9.33 For any one structure samples are made at the same time from the same batch and the
date clearly marked on each cube.
9.34 Three Test cubes are made when directed but not less than on sot of nine cubes for
each 100m3 of concrete placed, or if the rate of placing is less than 100m 3 than each 10
days or every floor for multi-storey structures in accordance with the standard
technical specifications.
9.35 There cubes of each set are tested at 3 and 7 and 14 days and the third at 28 days all in
accordance with the code of practice.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
9.36 Before any casting starts the consistency of fresh concrete must be checked by the
supervisor and if necessary a test should be done.
9.37 Concrete is so transported as rapidly practicable and placed such that segregation or
less of consistent materials does not occur.
9.38 All placing of concrete starts from on and continue in the same direction with out any
break.
9.39 Concrete is deposited as near as practicable and no concrete is dropped from a height
exceeding 2 meters as specified on the standard technical specification.
9.40 When cheatingsis used the inclination of the chute shall be such as to allow the
concrete to flow without the use of water in excess of the specified volume for mix
and with out segregation or less of the ingredients. Details of any proposed cutting
plant must be approved before the plant is delivered.
9.41 The vibration carefully done, and continues until a dense homogeneous mass in
produced and surface in fairly smooth.
9.42 Concrete is not over vibrated so that the consistency of the concrete is maintained and
separation of materials is caused.
9.43 If construction joints are necessary they are approved by the designer.
9.44 When concrete casting continues on a construction joint, the joint is clean from
foreign matter.
9.45 When concrete casting continues on a construction joint, the surface of the joint is
roughened and aggregate is exposed.
9.46 The roughened surface of the construction joint is wetted with thin layer of mortar
prior to concreting.
9.47 After casting is completed and for 7 days thereafter that the concrete is kept damp
(cured) to minimize loss of moisture from the concrete.
9.48 Inspection prior to concreting.

CHECK:-
 The rigidity of the scaffolding and buttering
 The leak-tightness of joints between for work cements
 Conformity of the dimensions of the formwork with the (drawings)
 The cleanliness of the formwork

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
 The surface condition of the reinforcement
 The rigidity of the reinforcement securing systems, and the quality of the joints
between bars.
 Cover to reinforcement is correct.
 Class of concrete, mix design and water cement ratio.

10 FORM WORK
CHECK:-
10.1 Formwork is so constructed that it can be stripped from the hardened concrete easily
without hammering or without such shack or vibration in order to protect the concrete
of reduces labor cost.
10.2 The bracing of the formwork. The formwork must be strong enough to carry the load
until the concrete is strong enough to carry itself and hardened sufficiently.
10.3 The inside surface of formworks shall, except for permanent formworks, or unless
otherwise agreed by the engineer, are coated with a release agent.
10.4 Release agents do not came into contact with the reinforcement and anchorages, and
should not be visible on the finished works.
10.5 Wooden formworks for unexposed concrete surface are executed of the same
thickness.
10.6 Wooden formworks for exposed concrete surface are generally of tongued and
grooved boards of the same thickness and formwork knots, bolos, cracks and splits.
10.7 Framework lumber shall be kept under shed ad in varying thickness and width and
shall be constantly aerated and underweight to prevent it from decay.
10.8 Before any concreting stars, the formwork has the right dimensions and is level and
straight.
10.9 Before any concreting starts, all formworks are thoroughly cleaned out and free from
holes and dirt.
10.10 The top level of the formwork is ate the same level as the top of the finished concrete.
10.11 All formwork is removed without any damage to the concrete during the striking.
10.12 After removal of the formwork remedial treatment to surfaces of the burdened
concrete is carried out immediately with cut

Delay and period of removal list as follows.


BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
For vertical formwork to columns, walls, beams .......................16hrs
For soffit Formwork to slab .....................................................21days
For props to slabs.................................................................... 14days
For soffit formwork to beams..................................................... 21days
For props to beams .......................................... ............. ............14days
In according to the standard technical specification.

10.13 Where intended to re-use formwork it is thoroughly cleaned and made good to the
satisfaction of the engineer.
10.14 Stripping of formwork not to be done until concrete is sot i.e. should ring under a
hammer blow. In no circumstances shall formwork be struck until the concrete attains
cube strength of at least twice the stress to which it may be subjected at the time of
striking.
10.15 All formwork construction and quality should comply with the standard technical
specification.

11 STEEL REINFORCEMENT
CHECK:-
11.1 Steel reinforcement is steered in clean condition. it should be free from loss rust.
11.2 All reinforcement bars are of the specified quality and in accordance with the standard
technical specification.
11.3 Given in the design in cases where certificates for ultimate strength, yield stress,
elongation and cold bond tests are not issued by the manufactures.
11.4 The dimension, length and shape of the reinforcement bars is according to the
drawings and specifications.
11.5 Bonding of reinforcement bars is done with adequate bonding tools. But heat is
strictly not allowed for bonding of reinforcement bars.
11.6 All bars with cracks or splits at the bond are not used for construction.
11.7 All mild steels have their ands booed, and the bonding radius meets the specification.
11.8 All reinforcement bars are clan and free from loose rust, grease, oil, or tar and other
kind of dirt.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
11.9 The reinforcement bars are placed in position according to the drawings, and firmly
bound together with mild Stoll wire, diameter 1.6mm in accordance with the standard
technical specification.
11.10 Before any coasting of concrete stars, that pre cast concrete blocks or spacers or metal
chairs are prepared ad all reinforcement bars are placed on then.
11.11 These blocks or spacers do not turn over when concrete is casted.
11.12 The thickness of concrete cove is according to the requirements of the drawings and
specifications.
11.13 And approve the placing of the reinforcement and formwork condition before any
concrete is casted.
11.14 The reinforcement in structures is not welded unless permitted by the designer.
11.15 All reinforcement quality and work comply the standard technical specification.
12 MORTAR
CHECK:-
12.1 All mortar is if possible mixed in an approved mechanical batch mixer. If not possible
it could be mixed by hand until its color and consistency are uniform.
12.2 Lime for mortar is freshly burnt limestone. Lime shall be delivered to the site in large
lumps, slaked, run to putty and nature for not less than two weeks before use.
12.3 If hydraulic lime is used, it is stored in the same manner as described for cement.
12.4 Cement used in mortar is port land cement and of suitably as described for concrete
works.
12.5 Sand for mortar is quality as described for concrete works.
12.6 Water is of quality described for concrete works.
12.7 Cement mortar consists of cement and sand as specified. if not given in the
specification, check that cement mortar consists of one part cement to three parts of
sand (1:3) measured by volume.
12.8 Compo mortar consists of cement, lime and sand as specified. if not specified, check
that the compo mortar is composed of one part cement two parts of lime and nine
parts of sand (1:2:9) measured by volume.
12.9 Cement mortar is used within 30 minutes of the duration of cement.

13 STONE MASONARY WALL


CHECK:-

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
13.1 Stone is of type given on specification
13.2 The stone is hard, sound, free from cracks and decay and not weathered
13.3 The stone is freshly quarried from an approved quarry.
13.4 The stone masonry execution is with specified mortar and with well finished joints.
13.5 All mortar for stone masonry bedding and jointing is 20mm thick.
13.6 Stone masonry during execution is kept free from solid and other kind of dirt.
13.7 Stone walling is carried up with no portion more than 100mm above adjacent wall at
any one time.
13.8 Sample panel of wall not less than 1m2 in area including joint pointing as specified is
prepared and approved.
13.9 The type size and pattern of laying is as detailed on drawing.
13.10 All stone masonry walling comply with the standard technical specification.

14 STRUCTURAL WORK
CHECK:-
14.1 The shape and size of structural steel members comply with the requirements of the
specification and the manufactures standards.
14.2 Size, location, elevation and plumbing of another bolts.
14.3 Condition and capacity of welding equipment.
14.4 Conformity of electrodes to specifications and correct usage.
14.5 Production and assembly of Stoll is carried out in accordance with the detail drawings
and specifications.
14.6 Steel before and after fabrication is straight and free from twist or other damages.
14.7 Cutting is done by shearing, cropping, sawing or machine flame cutting.
14.8 Cutting by hand operated flame is approved.
14.9 Sheared or dropped edges are dressed to a neat machine work and are prepared for
welding finish.
14.10 Welded section are inspected and approved prior to priming.
14.11 The maximum gap for butt welded sections is less than 3mm.
14.12 Each weld is continuous, sound and without interruption and free of creators.
14.13 Slag is taken away immediately after welding and the weld cleared with metal brush.
14.14 All ends of rectangular, square and circular sections (RHS, CHS) are sealed by
welding to prevent ingress of moisture.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
14.15 The steel structure is securely bolted to plates, channels or angle cleats during
erection.
14.16 Direct bolting to sides of steel hollow sections is not carried on.
14.17 Holes for fixing electrical fittings, partitions etc... are correctly positioned.
14.18 All structural steel is protected from chemical solutions.
14.19 All structural steel ready to erect is prevented from water of dirt accumulated against
any of the surfaces.
14.20 All steel which will have concrete cast against them are clean and free from lose rust
at the time of concreting.
14.21 All structural steel work complies with the standard technical specification.
15 THERMAL & MOISTURE PROTECTION
CHECK:-
19.1 The reinforced concrete surfaces must be cleaned & free of laitance, dirt, films,
paint, coatings or other foreign materials.
19.2 Average 6 mm thick light weight concrete spread over & leveled over roof slab
with 2% slope towards the down pipe.
19.3 Cement screed will be applied over the light weight concrete.
19.4 The membrane applied is ProofedTorch seal 4p 0r Dr. Fixit Torch shield APP
modified membrane w/h is manufactured from premium grade heavily modified bitumen,
reinforced with a core of non-woven polyester fabric.
19.5 All surfaces shall be dry & free from frost, laitance & contamination.
19.6 Primer will be applied to the substrate & allowed to dry until it is tack free, prior to the
application of the membrane.
19.7 All surfaces must be re-primed if left more than 24 hours prior to the application of
membranes.
19.8 Make sure the membrane is unrolled & placed in the correct position where it is to be
torched on later.
19.9 During each stage, each roll must overlap the next layer by at least 10 cm.
19.10 The surface will be lightly heated, transversally, by means of a propane gas torch, thus
causing surface melting & subsequent adhesion to the surface. End joints will be made with a
minimum 15 cm overlap.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR
19.11 The tools required to apply the membrane include a propane gas torch with related gas
cylinder, a knife for cutting the membrane to size & trowel with a round trip. Protective
gloves & goggles are also necessary while using the gas torch.
16 PLASTER AND POINTING
CHECK:-
16.1 The cement plaster and compo plaster quality mixture; thickness and type of surface
are according to the specification and drawing.
16.2 That cement plaster is used where water effect is expected such as in toilets, laundries
and external walls while compo mortar is used in all cases unless otherwise specified.
16.3 Before any plaster is applied, the wall is thoroughly cleaned from dirt and dust.
16.4 All plaster is mixed in a mechanical mixer of approved type is possible.
16.5 The wall, depending on the material is kept wet for some time before any plaster is
applied. It's not enough to sprinkle water just before plastering.
16.6 All pointing if prescribed is done with cement mortar.
16.7 All pointing is plumb and level.
16.8 All plastering and pointing comply with the standard technical specification.
17 WALL FINISH
CHECK:-
17.1 High quality porcelain ceramic wall tiles are sacked in clean water before laying and
taken out just before use.
17.2 Tiles are bedded with straight joints in cement and sand (1:3) and grouted in white
cement.
17.3 The work when completed is cleaned properly before approval.
17.4 Only tiles free from defects are used for the construction.

18 FLOOR FINISH
CHECK:-
18.1 Floor tiles are laid on floor screeds with approved glue and in accordance with
manufacture's instruction.
18.2 Only tiles free from defects are used for the construction.
18.3 Damaged tiles are replaced with good ones at the contractor's expense.

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

11
CONSTRUCTION

WORK

SCHEDULE
BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398
Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

WORK SCHDULE
During preparation of the proposed work schedule the following points has been
considered.
 Regular working days are From Monday to Saturday and Eight day hours per day.
 The following public holydays are considered as non-working days.
Ethiopian Christmas Day
Ethiopian Epiphany
Victory of Adwa Commemoration Day
Id-ul-Fitr
Ethiopian Good Friday
Id-ul-Adaha (Arefa)
Birthday of the Prophet
Ethiopian New Year
The Finding of the True Cross (Meskel)
Ethiopian Easter
Downfall of the Dergue
Ethiopian Patriots Victory Commemoration Day
Labour Day

Used tools for scheduling:


MS-Office 2007

Proposed Schedules are attached in the following page:-

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia
BEKELE BURUSA GENERAL CONTRACTOR

Attachment 9: -Proposed Construction work, man power, equipment & machineries and
material delivery schedules

BEKELE BURUSA GENERALCONTRACTOR Tel- 0910377398


Email- bekeleburusa82gc@gmail.com POBOX ____ Adama Ethiopia