AJSL Hardware Primelift Fabricated Passenger ELEVATOR TEMPLATE 4 Floors New Grace Ogena 010324

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

January 3, 2024

Passenger Elevator Installation


Fabricated
Client Name Ms. Grace Ogena
Contact Detail 09088649058/ gsogena@gmail.com
Site Address Batangas
Guarantee: 1 year warranty

Delivery Time: 60 days upon purchase or DP


(Door)
Unit in CIF Manila Price: N/A

Shipping cost N/A

Installation cost 1,300,000.00 PHP

Total Cost Vat Ex 1,300,000.00 PHP

Structural Frame with glass cladding 900,000.00 PHP


(add on)

Lift No. Lift1

Quantity: 1

Standard:

I Basic Data.

1 Model Fabricated Passenger Elevator

2 Capacity 400kg/ 4 person

3 Speed 1 m/s

4 Floor/Stop/Opening 2 floors 2 Stops 2 Doors

5 Machine room NO

6 Traction Machine Gearless (FUJI Brand)

7 Controller Type VVVF

8 Layout type Simplex


9 Power Driving: 220V 3 phase

II Elevator Size Information.

1 Total Height Wait for confirmation

2 Hoist way Construction Black and Concrete

3 Hoist way Net Dimension 1500x1500mm (Inside)

4 Dimension For Cabin 1100x1000x2100mm (Max)

5 Net Opening 800mmx2100mm

6 Opening type Center Opening

7 Open Through door No

8 Overhead Height 4000MM

9 Pit Depth 60CM

10 Floor Marks G/2


11 Base Station No G

12 Height For Each Floor Wait for confirmation

13 Fireman Switch Yes.

14 Machine Room Size Wait for confirmation

15 Person 4

III Cabin Info.

1 Cabin Model Fabricated

2 COP Model Fabricated

3 COP Material Fabricated

4 LOP Model Fabricated

5 Display Type LCD

6 LOP Material Hairline Stainless Steel SS304

7 Hall Call Type Single lift hall indicator combined with button

Hairline stainless steel SS304,

8 Hall Call Material


9 Car Walls hairline stainless steel

10 Car Ceiling Fabricated

11 Handrail Fabricated
C. Important Note

C.1 Pricing Condition

1. Power Supply (220V X 3 PHASE) if not phase inverter will be provided


2. We will only handle installation of the elevator
3. No other charges will be deducted unless agreed upon by the supplier and customer
4. Price indicated is for delivery receipt only non-vat
5. Additional 12% if there is a need for a Sales Invoice

C.2 Mobilization and Boarding:


1. Travel Expense will be shouldered by the client if location is in province
2. Shipping Expense will be shouldered by the client if location is in province
3. We will handle the delivery if within metro manila
4. Delivery to outside metro manila to site will be shouldered by the client
5. Boarding Expense will be shouldered by the client anywhere will do provided there is
bed, electricity and water supply

C.3 Period Of Completion

Approximately Thirty (30) working days maximum of (45) subject to receipt of the down
payment under normal and ordinary condition, availability of electric current and excluding
causes, events and happenings beyond the control of the contractor such as, but not limited to
work stoppages and delays not due to the fault of contractor ,civil disturbances, transport
disturbance, power failure,fire,hidden effects,strikes,floods,earthquake, and other acts of God.

You might also like