ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-012
Page 1 of 2

SECTION A: GENERAL INFORMATION


Work Building
PMB, Office Area and P-Way Yard Section Civil
Task Description Erection of Structures- TSA-012

Method Ref. No. D0201-FAY-ECE-PM-00005 HSE Risk Assessment RA-D0201-FAY-ECE-PM-


Statement Serial No. Serial No. 00005
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Mandatory PPE Wear


Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust
Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
 PTW to be obtained.
1. Planning of
 Slip and fall.  Pre task briefing will be conducted.
work.
 Only required materials to be taken to the site.
2. Loading/  Worker struck by an  Structure materials to be unloaded by mechanical
offloading and object. means.
handling of  Worker struck by the  Area of storage of structure materials to be barricaded.
structure vehicle during  Avoid single man handling of heavy and of lengthy
materials offloading. structure materials.
 The work area will be cleaned and levelled.
 A competent person will be assigned to do the task.
 Ergonomic hazards
 Area to be barricaded and sign board placed.
 Body injuries
 Certified Scaffold inspector will inspect the scaffold
3. Erection of  Falling of structure
before use.
structure materials and hit a
 All personnel involved shall wear the mandatory PPE.
worker.
 Mandatory Use of Body Harness
 Falling from heights.
 In adverse wind or climate/weather conditions high
wind/humidity works will be stop.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-012
Page 2 of 2

Name Signature Date


Completed By
Shamim Abbas
Approved By
Musadiq Hussain
Distribution List