Rev

ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-008
Page 1 of 2

SECTION A: GENERAL INFORMATION


Work Building,
PMB, Office Area P-Way Yard, and External works Section Civil
Task Description Electrical Works – TSA-008

Method Ref. No. D0201-FAY-ECE-PM-00005 HSE Risk Assessment RA-D0201-FAY-ECE-PM-


Statement Serial No. Serial No. 00005
Ref. No. D0201-FAY-GHS-PR-00014 Ref. No. D0201-FAY-GHS-PR-00007
Lifting Plan PTW
Serial No Serial No.
Emergency PMB North, Near Substation 01
+97156-4134006 Assembly Point
Contact No Rest Area, Logistic Area

Specific Training Required Mandatory PPE Wear, Competent Electrician Designated

Adjacent Work Hazards Extreme Weather Excessive Noise/ Dust


Stop Work Conditions Openings / missing edge
Change in Work Conditions Fires & Explosions
(if any, work shall stop& re-assessed) protection
Pollutant Spills/Releases Unusual Odors Evacuation Alarm
SECTION B: TASK PLANNING – HAZARD IDENTIFICATION AND CONTROLS
Task Steps Potential Hazards Mitigation Controls
Electrical Pre-  Slips & Trips  Planned execution.
Checks  Electrocution  Cables shall be arranged properly to avoid slip and
Electrical Fire/hand/body trips.
Operations injuries  All exposed conductors shall be made safe.
 Ensure that both Grounding & Over current protection
are installed correctly.
 Physically securing cables
 Color coding of the power tools along with the
Electrical connection shall be ensured.
 Ensure that switchboards are clearly and correctly
labeled in relation to their status.
 Lock enclosures/cabinets
 Ensure the isolation of electrical power before any
repair.
 Use insulated tools.
 Avoid work if there is water on the ground near the
working area.
 Cable shall be hung to avoid contact with wet surfaces.
Rev
ETIHAD RAIL PROJECT PACKAGE 2F1 Health, Safety & Environment (HSE)
.
Al Faya Depot Expansion for Passenger Services Issued For General Use
Task Safety Analysis (TSA) Reference D0201-FAY-GHS-WX-00006 01
No.
Serial No. TSA-008
Page 2 of 2

 ELCB shall be fixed on the panels.


 Emergency Contact Number shall be posted on the
panels.
 Double insulated cable with required IP rating shall be
ensured.
 Proper coordination while the activities are ongoing.
 Keep sleeves down and wear long trousers.
 Inform relevant parties that the work is not completed.
 Task specific PPEs shall be worn during activities.
 Electrocution/fire/
Uncompleted work Hand / Body/Eye  Inform relevant parties that the work is not completed.
Injuries

Name Signature Date


Completed By
Kamal Nasir
Approved By
Musadiq Hussain
Distribution List