Federal Democratic Republic of Ethiopia

Ministry of Agriculture

Drought Resilience and Sustainable Livelihoods Programme-Ethiopia Project (DRSLP II)


Financed by AfDB

PERIODIC ENVIRONMENTAL AND SOCIAL COMPLIANCE REQUIREMENT


REPORT

JULY, 2021

ADDIS ABABA, ETHIOPIA

Page | 1
Environment and Social Compliance report for DRSLP-I, 2020/2021EFY
Environmental and social management requirements
The selection, planning, design and implementation of the subprojects under DRSLP have to be
consistent with the relevant national environmental and social management requirements as well
as the Africa Development Bank safeguards policies applicable to the program and its
subprojects and international conventions. In each case, national, regional, woreda and local
institutions to be involved in screening, reviewing and approving subprojects; and they were
carrying out their respective roles and responsibilities. The responsibilities may include
identification of subprojects, screening, conducting environmental and social assessment (ESA),
and reviewing the ESA report for ensuring compliance to obligatory requirements under laws
and regulations, and issuing approvals for subproject implementation.
Most of the subprojects planned under the DRSLP were vary in a scale. Due to some of the
DRSLP subproject like development and management of small scale and micro-Dam
construction of rural feeder road, construction of market center, Rangeland management, and
some of the negative environmental and social impacts due to these subprojects may have
localized impact but less sensitive, site specific and perhaps reversible environmental impacts if
appropriate screening was done and if such impacts are not considered with regard to their
locations or in the design of the subprojects.

Adverse Environmental and social impacts should be avoided, if possible or appropriately


mitigated and compensated while implementing any project activities. In such critical context, it
is relevant to prepare a safeguard guideline or implementation manual that can integrate
environmental and social safeguard issues at any levels of project life cycle so as to ultimately
ensure project sustainability.
The processes, procedures and institutional arrangements for addressing adverse environmental
and social concerns when identifying, preparing, approving and implementing subprojects are
defined in generic steps in this ESMF. When demand-driven subprojects are identified and
prepared at Kebele level by the communities or groups, these subprojects were screened at
Kebele level through environmental and social screening checklists prepared for this purpose.
Similarly, these subprojects were screened, ESIA (ESMP/ESIA) carried out, reviewed, and
approved at Woreda levels.

Page | 2
Environment and Social Compliance report for DRSLP-I, 2020/2021EFY
The potential environmental and social impacts were identified by ESIA study and prepared
ESMP for implementation of mitigation measures for identified adverse impacts (23 in Oromia
and 61 in SNNP) 84 different water infrastructures including micro dam, BH, Birka pond, HDW,
etc

Screened format, checklist filled and documented for project infrastructures such as 16 LMCs
and 5 routes feeder access road. The total summary is presented on below table (A. for Oromia
and B. for SNNP).

Page | 3
Environment and Social Compliance report for DRSLP-I, 2020/2021EFY
A. All relevant document/evidence in line with the reporting period.
Oromia Region…….. Project consolidation for
For DRSLP-II ESSG
Type of Sub Location Quarter No of subprojects with
projects/Activiti year F RA PM ESI
es Zone Woreda Kebele DR ESMP Remark
A P P A*
Component 1: Natural Resource Management
Micro Dam
Guji Girja  
construction Gura qorke
Micro Dam
Guji Liben  
construction kalada
Hand pumps Borana Dhas Dhas 
installed on the Guji Girja Haranfama Debisa  
low yield Guji Girja Tuta Mata  
shallow wells Guji Liban Laga Gula  
Zone Woreda Kebele
Guji Liban Arda Bururi  
Water Guji Girja H/dhebisa  
distribution Borana Dhas Borbor  
system until the Guji Goro Dola Nurhamba  
end of EFY West Dugda
2012 Boko Goro Bali  
Guji Dawa
West Dugda
Jigessa Nanessa  
Guji Dawa
Zone Woreda Kebele
Ponds and Ponds
cisterns under Borana Dhas Gorile  
construction in Borana Dhas Mata Arba  
EFY 2012 Borana Arero K/Gumata  
Borana Arero Meder  

4|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
Borana Arero Alona  
West Dugda
Biyo Kundi  
Guji Dawa
West Melka
Galo Bokola  
Guji Soda
Guji Goro Dola Gof Yambo  
Under ground Cistern
Borana Arero Galaba  
Borana Dhas Dhas  
West Dugda
Deru Denfile  
Guji Dawa
Zone Woreda Kebele
Hay store
Guji Liben Qorati 
construction
Borana Arero Alona 
Component 2: Market Access and Trade
Zone Woreda Project kebele
Borana Arero Halona 
Borana Dhas Dhas 
West Dugda
Biyo Kundi 
Livestock Guji Dawa
market centers West Melka
Baya Gundi 
during EFY Guji Soda
2012 Guji Girja Haranfama D. 
Guji Goro Dola Belambel 
Guji Liben Kalada 
Guji Seba Boru Darme 
Guji Liben Laga Gula 
Feeder road Zone Woreda Kebele Route
under Borbor –
construction Borana Dhas Borbor 
Belale
during EFY West Melka Hadha Gora  Birisa –
2012 Guji Soda Mati

5|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
Haranfam
Guji Girja Haranfama Debisa  a–
Shokiso
Okolu –
Guji Seba Boru Haragessa  Haragess
a
Component3: Livelihoods Support

Component4: Project Management and Capacity Building


Training on Environmental and Social
Safeguards (ESS) management for project m= 26, F=-2 sum= Conducted in
staff at regional level for 3 days 28 2011 EFY only
one time
Awareness creation on ESS management
m=326, F=72, Total
at community level for 3 days two times Conducted in
=398
in the project life time 2011 EFY only
one time

* ESIA report was taken from Ethiopian Construction Design and Supervision Works Corporation Water and Energy
Design and Supervision Works Sector (report)

6|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
7|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
I. Environmental Compliance Reporting Format (To be Completed at Federal and
Regional Levels)
Ministry:-MoA----Region: Oromia
Program/Project Type; (DRSLP II -------------------------
Total Number of Project/Program Participating Woredas: -------------------- Date: 02/12/2020
S/ ESIA Prepared & Approved

&approved (in

of
Total No of sub

Implementatio
Environme
N

Category
approved

ved (in
&appro
Prepare
(in.No.)

Certified
Remark/
Screened
Woredas

projects

ntal

No)
d
No)

1 2 3 4 ESIA ESMP PMP

n
1 Arero 6 Screen 6 By 6
ed
2 Dhas 6 Screen 6 6
ed
3 D/ 5 Screen 5 5
Dawa ed
4 M/ 4 Screen 4 4
Soda ed
5 S/Boru 2 Screen 2 2
ed
6 Girja 6 Screen 1 5 5
ed
7 G/ 4 Screen 4 4
Dola ed
8 Liben 4 Screen 1 3 4 1
ed
37 0 0 2 35 0 23 36 1 0 0

List of Outstanding Issues and Responsible Body for Implementation


S/ Name Name of Types Outstandi Recommended Responsible Time
N of subproject of ng Issues actions body for schedule
woreda site subproj implementatio
s ect n

8|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
1 Liben Dam Water RMP Resettling the Zone & Q I & Q
affected people woreda II of 2013
EFY
2 Girja Dam Water RMP Resettling the Zone & Not yet
affected people woreda started
Completed by: [Siraj Hassen-, Email: ----------------------, Phone: +251922511294
Position: [– ESS focal Person]
Date: [July, /2021]

II. Environmental Compliance Reporting Format (Exceptional issues)


1. Name of Region: Oromia Woreda:

Liben
Program/Project Type; (DRSLP II)
Date: --10/07/2021
ESIA Prepared ESMP/
Types Land Prep &approv PMP
Nam Screened acquisit Envir ed
of sub ared implem Remark
e of & ion onme
projects &app ented /
S/N subpr proved format ntal (Yes/No)
/ rove Certifie
oject (Yes/No Cate
activitie d (Yes/N d
site ) gory
s (Yes/ ES PM o)
yes

No

No) MP P
Ye
1 Dam Water yes yes II Yes Yes yes
s
2
Total
2. Name of Region: Oromia Woreda: Girja
Program/Project Type; (DRSLP II) ------
Date: ---10/07/2021

ESIA Prepared ESMP/


Types
Nam Screened Prep & PMP
of sub Land Remark
ared approved
Environmental

e of & implem
projects acquisit /
S/N subpr proved &app ented
/ ion Certifie
oject (Yes/No rove
activitie format (Yes/No) d
site ) d (Yes/N
s
(Yes/ o)

9|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
ESMP
Categ

PMP
ory
yes
No)

No
1 Dam Water yes yes II Yes Yes Yes
2
Total

10 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
B. All relevant document/evidence in line with the reporting period.

For DRSLP-II
SNNP Region……. Project consolidation for ESSG,
Quar
Type of Sub Location No of subprojects with
ter
projects/Activitie
year Remark
s Zone Woreda Kebele DR ESMP FA RAP PMP ESIA *
Component 1: Natural Resource Management
wagilalamu  
M/Shasha
Chiruharut  
Sholatakka  
Borehole West Omo Mallee Golo  
Ajo  
Sharia  
M/Golidiya
Banni  
Hand pumps
Kasi, Gay, Bero 2,
installed on the
West Omo Bero (7) Jonta, Baybanka,  
low yield shallow
Chirit, Garo
wells
Zone Woreda Kebele
Water
wagilalamu  
distribution
West Omo M/Shasha Chiruharut  
system
Haduba  
Zone Woreda Kebele
Spring on spot
Ponds and Spring Wagilalamu (2)  
development and Chiruharut (1)  
M/Shasha
on spot under West Omo Kanti (5)  
(11)
construction Yirmi (1)  
Qira (2)  
M/Goldiya Kushanta, sharia,  

11 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Banni,
Kobid, Berbara,
(6) Gembab
Spring development  
West Omo M/Shasha Bo’ut (1)  
Kumba (3)  
Kaffa Goba (10) Bashigaba (3)  
Shallo (4)  
South Omo Bennatsemay Gone  
Kasi, Jonta,
Bero (3)  
Baybanka
West Omo
Muy, Sisky, kella,
 
Maji (4) Kersy
Water ponds  
Sitinbakeble  
Wururi  
South Omo Benatsemay Ansonda  
Ufi upgrading &
  expansion
Cistern Zone Woreda kebele
(Birkas)/Roof South Omo Bennatsema Wururi, Ansonda,
catchment  
y (4) Ufi and Shalla
Zone Woreda kebele 
M/Shasha Yirmi 
West Omo
Nursery Bero Chirit 
establishment and Malle (2) Bulansa, Doyisa 
South Omo
development Benatsemay Borri 
Menit-Goldia Kushanta 
West Omo
Maji Tume 
Zone Woreda Kebele
Hay store and M/Shasha Yirmi 
West Omo
seed bank Bero Chirit 
South Omo Benatsemay Enchate and Duma 

12 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Component 2: Market Access and Trade
Zone Woreda Project kebele
Bero Jaba 
West Omo
M/Goldiya, Bachuma 
Livestock market Benetsemaye Loka 
South Omo
centers Malle Benta 
M/shasha Jamu 
West Omo
Maji Maji 
kaffa Goba Wudadish 
Feeder road under Zone Woreda Project kebele Route
construction Goba Angella
Kaffa  Angella -uffit
during EFY 2012
Component3: Livelihoods Support

Component4: Project Management and Capacity Building


Training on Environmental and Social Safeguards (ESS) management for
project staff at regional level for 3 days Conducted in 2013 EFY
m=103 F=12 Total 115
Male= 723, Female
Awareness creation on ESS management at community level for 3 days two =274,
Conducted in 2011 EFY
times in the project life time Total=997

* ESIA report was taken from Ethiopian Construction Design and Supervision Works Corporation Water and Energy Design and
Supervision Works Sector (final report)

I. Environmental Compliance Reporting Format (To be Completed at Federal and Regional Levels)
Ministry: - MoA----Region: SNNP
Program/Project Type; (DRSLP II)
Total Number of Project/Program Participating Woredas: ---7 (Seven)--

13 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Date: 10/07/2021
S/N ESIA Prepared & Approved

Implementation of
Total No of sub

&approved (in No)

Environmenta

Remark/ Certified
l Category

approved

approved
Prepared

(in. No)
Screened

(in No)
&

EMP/PMP
Woredas

projects
1 2 3 4 ESIA ESMP PMP
1 Bero 13 Screened 13 10 13
2 M/Goldiya, 10 Screened 10 8 10
3 Benetsemaye 13 Screened 13 9 13
4 Malle 6 Screened 6 3 6
5 M/shasha 20 Screened 20 17 20
6 Goba 12 Screened 12 10 12
7 Maji 6 Screened 6 4 6
Total 80 0 0 80 4 80 0 0

List of Outstanding Issues and Responsible Body for Implementation


S/N Name of Name of Types of Outstanding Recommended Responsible body for Time schedule
woredas subproject site subproject Issues actions implementation
s
1 M/Golidiya Bachuma LMC Land claim Replace the same Woreda and kebele Up to quarter III
land use and size for administration
the land owner

14 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
2 Malle Benta LMC Flood problem Diversion of the flood Town municipality Before rain season
come from the top
Completed by: [Kinfe Gebre-, Email: ----------------------, Phone: +25193205722
Position: [– ESS focal Person]
Date: [22/02/2021]
II. Environmental Compliance Reporting Format (summary by woredas)
Name of Region: SNNP Woreda: 7 Woreda
Program/Project Type; (DRSLP II)
Date: --10/07/2021

Screene Land ESIA Prepared & ESMP/PMP


Name of Types of sub d& acquisition Environm implemented Remark/
Prepared approved
S/N subproject projects/ proved
format ental
(Yes/No &approved (Yes/No) Certified
woreda activities Category
) (Yes/No) (Yes/No)
yes No ESMP PMP
LMC   III 
Hay store   “ 
Nursery   “ 
Bero Spring “
   
development (3)
Hand pumps (7)   “  
Benetsemay LMC   “ 
Hay store and seed “
e   
bank
Nursery   “ 
Spring “
   
development
Birka/cistern (4)   “  
Pond (4)   “  
M/Goldiya, LMC   “ 
Nursery   “ 
Borehole (2)   “  

15 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Spring on spot (6)   “  
Malle LMC   “ 
Nursery (2)   “ 
Borehole (3)   “  
Borehole (2)   “  
Spring on spot (11)   “  
Spring “
   
development
Hay store and seed “
M/shasha bank
  
Water distributions “
   
system (3)
LMC   “ 
Nursery   “ 
Goba Feeder road 22km   “ 
LMC   “ 
Spring “
   
development (10)