Environment and Social Compliance report for DRSLP-I, 2020/2021EFY
Environmental and social management requirements
The selection, planning, design and implementation of the subprojects under DRSLP have to be
consistent with the relevant national environmental and social management requirements as well
as the Africa Development Bank safeguards policies applicable to the program and its
subprojects and international conventions. In each case, national, regional, woreda and local
institutions to be involved in screening, reviewing and approving subprojects; and they were
carrying out their respective roles and responsibilities. The responsibilities may include
identification of subprojects, screening, conducting environmental and social assessment (ESA),
and reviewing the ESA report for ensuring compliance to obligatory requirements under laws
and regulations, and issuing approvals for subproject implementation.
Most of the subprojects planned under the DRSLP were vary in a scale. Due to some of the
DRSLP subproject like development and management of small scale and micro-Dam
construction of rural feeder road, construction of market center, Rangeland management, and
some of the negative environmental and social impacts due to these subprojects may have
localized impact but less sensitive, site specific and perhaps reversible environmental impacts if
appropriate screening was done and if such impacts are not considered with regard to their
locations or in the design of the subprojects.
Page | 2
Environment and Social Compliance report for DRSLP-I, 2020/2021EFY
The potential environmental and social impacts were identified by ESIA study and prepared
ESMP for implementation of mitigation measures for identified adverse impacts (23 in Oromia
and 61 in SNNP) 84 different water infrastructures including micro dam, BH, Birka pond, HDW,
etc
Screened format, checklist filled and documented for project infrastructures such as 16 LMCs
and 5 routes feeder access road. The total summary is presented on below table (A. for Oromia
and B. for SNNP).
Page | 3
Environment and Social Compliance report for DRSLP-I, 2020/2021EFY
A. All relevant document/evidence in line with the reporting period.
Oromia Region…….. Project consolidation for
For DRSLP-II ESSG
Type of Sub Location Quarter No of subprojects with
projects/Activiti year F RA PM ESI
es Zone Woreda Kebele DR ESMP Remark
A P P A*
Component 1: Natural Resource Management
Micro Dam
Guji Girja
construction Gura qorke
Micro Dam
Guji Liben
construction kalada
Hand pumps Borana Dhas Dhas
installed on the Guji Girja Haranfama Debisa
low yield Guji Girja Tuta Mata
shallow wells Guji Liban Laga Gula
Zone Woreda Kebele
Guji Liban Arda Bururi
Water Guji Girja H/dhebisa
distribution Borana Dhas Borbor
system until the Guji Goro Dola Nurhamba
end of EFY West Dugda
2012 Boko Goro Bali
Guji Dawa
West Dugda
Jigessa Nanessa
Guji Dawa
Zone Woreda Kebele
Ponds and Ponds
cisterns under Borana Dhas Gorile
construction in Borana Dhas Mata Arba
EFY 2012 Borana Arero K/Gumata
Borana Arero Meder
4|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
Borana Arero Alona
West Dugda
Biyo Kundi
Guji Dawa
West Melka
Galo Bokola
Guji Soda
Guji Goro Dola Gof Yambo
Under ground Cistern
Borana Arero Galaba
Borana Dhas Dhas
West Dugda
Deru Denfile
Guji Dawa
Zone Woreda Kebele
Hay store
Guji Liben Qorati
construction
Borana Arero Alona
Component 2: Market Access and Trade
Zone Woreda Project kebele
Borana Arero Halona
Borana Dhas Dhas
West Dugda
Biyo Kundi
Livestock Guji Dawa
market centers West Melka
Baya Gundi
during EFY Guji Soda
2012 Guji Girja Haranfama D.
Guji Goro Dola Belambel
Guji Liben Kalada
Guji Seba Boru Darme
Guji Liben Laga Gula
Feeder road Zone Woreda Kebele Route
under Borbor –
construction Borana Dhas Borbor
Belale
during EFY West Melka Hadha Gora Birisa –
2012 Guji Soda Mati
5|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
Haranfam
Guji Girja Haranfama Debisa a–
Shokiso
Okolu –
Guji Seba Boru Haragessa Haragess
a
Component3: Livelihoods Support
* ESIA report was taken from Ethiopian Construction Design and Supervision Works Corporation Water and Energy
Design and Supervision Works Sector (report)
6|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
7|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
I. Environmental Compliance Reporting Format (To be Completed at Federal and
Regional Levels)
Ministry:-MoA----Region: Oromia
Program/Project Type; (DRSLP II -------------------------
Total Number of Project/Program Participating Woredas: -------------------- Date: 02/12/2020
S/ ESIA Prepared & Approved
&approved (in
of
Total No of sub
Implementatio
Environme
N
Category
approved
ved (in
&appro
Prepare
(in.No.)
Certified
Remark/
Screened
Woredas
projects
ntal
No)
d
No)
n
1 Arero 6 Screen 6 By 6
ed
2 Dhas 6 Screen 6 6
ed
3 D/ 5 Screen 5 5
Dawa ed
4 M/ 4 Screen 4 4
Soda ed
5 S/Boru 2 Screen 2 2
ed
6 Girja 6 Screen 1 5 5
ed
7 G/ 4 Screen 4 4
Dola ed
8 Liben 4 Screen 1 3 4 1
ed
37 0 0 2 35 0 23 36 1 0 0
8|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
1 Liben Dam Water RMP Resettling the Zone & Q I & Q
affected people woreda II of 2013
EFY
2 Girja Dam Water RMP Resettling the Zone & Not yet
affected people woreda started
Completed by: [Siraj Hassen-, Email: ----------------------, Phone: +251922511294
Position: [– ESS focal Person]
Date: [July, /2021]
Liben
Program/Project Type; (DRSLP II)
Date: --10/07/2021
ESIA Prepared ESMP/
Types Land Prep &approv PMP
Nam Screened acquisit Envir ed
of sub ared implem Remark
e of & ion onme
projects &app ented /
S/N subpr proved format ntal (Yes/No)
/ rove Certifie
oject (Yes/No Cate
activitie d (Yes/N d
site ) gory
s (Yes/ ES PM o)
yes
No
No) MP P
Ye
1 Dam Water yes yes II Yes Yes yes
s
2
Total
2. Name of Region: Oromia Woreda: Girja
Program/Project Type; (DRSLP II) ------
Date: ---10/07/2021
e of & implem
projects acquisit /
S/N subpr proved &app ented
/ ion Certifie
oject (Yes/No rove
activitie format (Yes/No) d
site ) d (Yes/N
s
(Yes/ o)
9|Page
Environment and Social Compliance requirement report for DRSLP-II, 2021
ESMP
Categ
PMP
ory
yes
No)
No
1 Dam Water yes yes II Yes Yes Yes
2
Total
10 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
B. All relevant document/evidence in line with the reporting period.
For DRSLP-II
SNNP Region……. Project consolidation for ESSG,
Quar
Type of Sub Location No of subprojects with
ter
projects/Activitie
year Remark
s Zone Woreda Kebele DR ESMP FA RAP PMP ESIA *
Component 1: Natural Resource Management
wagilalamu
M/Shasha
Chiruharut
Sholatakka
Borehole West Omo Mallee Golo
Ajo
Sharia
M/Golidiya
Banni
Hand pumps
Kasi, Gay, Bero 2,
installed on the
West Omo Bero (7) Jonta, Baybanka,
low yield shallow
Chirit, Garo
wells
Zone Woreda Kebele
Water
wagilalamu
distribution
West Omo M/Shasha Chiruharut
system
Haduba
Zone Woreda Kebele
Spring on spot
Ponds and Spring Wagilalamu (2)
development and Chiruharut (1)
M/Shasha
on spot under West Omo Kanti (5)
(11)
construction Yirmi (1)
Qira (2)
M/Goldiya Kushanta, sharia,
11 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Banni,
Kobid, Berbara,
(6) Gembab
Spring development
West Omo M/Shasha Bo’ut (1)
Kumba (3)
Kaffa Goba (10) Bashigaba (3)
Shallo (4)
South Omo Bennatsemay Gone
Kasi, Jonta,
Bero (3)
Baybanka
West Omo
Muy, Sisky, kella,
Maji (4) Kersy
Water ponds
Sitinbakeble
Wururi
South Omo Benatsemay Ansonda
Ufi upgrading &
expansion
Cistern Zone Woreda kebele
(Birkas)/Roof South Omo Bennatsema Wururi, Ansonda,
catchment
y (4) Ufi and Shalla
Zone Woreda kebele
M/Shasha Yirmi
West Omo
Nursery Bero Chirit
establishment and Malle (2) Bulansa, Doyisa
South Omo
development Benatsemay Borri
Menit-Goldia Kushanta
West Omo
Maji Tume
Zone Woreda Kebele
Hay store and M/Shasha Yirmi
West Omo
seed bank Bero Chirit
South Omo Benatsemay Enchate and Duma
12 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Component 2: Market Access and Trade
Zone Woreda Project kebele
Bero Jaba
West Omo
M/Goldiya, Bachuma
Livestock market Benetsemaye Loka
South Omo
centers Malle Benta
M/shasha Jamu
West Omo
Maji Maji
kaffa Goba Wudadish
Feeder road under Zone Woreda Project kebele Route
construction Goba Angella
Kaffa Angella -uffit
during EFY 2012
Component3: Livelihoods Support
* ESIA report was taken from Ethiopian Construction Design and Supervision Works Corporation Water and Energy Design and
Supervision Works Sector (final report)
I. Environmental Compliance Reporting Format (To be Completed at Federal and Regional Levels)
Ministry: - MoA----Region: SNNP
Program/Project Type; (DRSLP II)
Total Number of Project/Program Participating Woredas: ---7 (Seven)--
13 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Date: 10/07/2021
S/N ESIA Prepared & Approved
Implementation of
Total No of sub
Environmenta
Remark/ Certified
l Category
approved
approved
Prepared
(in. No)
Screened
(in No)
&
EMP/PMP
Woredas
projects
1 2 3 4 ESIA ESMP PMP
1 Bero 13 Screened 13 10 13
2 M/Goldiya, 10 Screened 10 8 10
3 Benetsemaye 13 Screened 13 9 13
4 Malle 6 Screened 6 3 6
5 M/shasha 20 Screened 20 17 20
6 Goba 12 Screened 12 10 12
7 Maji 6 Screened 6 4 6
Total 80 0 0 80 4 80 0 0
14 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
2 Malle Benta LMC Flood problem Diversion of the flood Town municipality Before rain season
come from the top
Completed by: [Kinfe Gebre-, Email: ----------------------, Phone: +25193205722
Position: [– ESS focal Person]
Date: [22/02/2021]
II. Environmental Compliance Reporting Format (summary by woredas)
Name of Region: SNNP Woreda: 7 Woreda
Program/Project Type; (DRSLP II)
Date: --10/07/2021
15 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021
Spring on spot (6) “
Malle LMC “
Nursery (2) “
Borehole (3) “
Borehole (2) “
Spring on spot (11) “
Spring “
development
Hay store and seed “
M/shasha bank
Water distributions “
system (3)
LMC “
Nursery “
Goba Feeder road 22km “
LMC “
Spring “
development (10)
Maji LMC “
Nursery “
establishment
Spring “
development (4)
16 | P a g e
Environment and Social Compliance requirement report for DRSLP-II, 2021