Environmental Risk Assessment:

Risk
Activities Aspect Impact Control/Mitigation Measures Responsible Party
L S RF
Equipment and Spills Land 4 6 24 Land contamination by oil/chemical PM
Heavy Noise Contamination by spill shall be controlled by well CEM
Transportation Dust spill. maintaining the heavy equipment, CM
Air Quality Environmental use of drip trays along with each
Environmental
Terrestrial & Noise impact equipment.
Marine life Coordinator
during operations
Noise can be controlled by timely Logistics &
both on Maintenance
terrestrial and maintenance of the equipment. Duty
hours can be shuffled to minimize
marine life.
environmental noise impact on
Dust generation
terrestrial and marine environment.
and GHGs
emissions while Dust shall be controlled by doing
operating heavy water sprinkling in the access routes.
equipment.
Marine & Impact on air quality can be
Terrestrial life minimized by operating well
can be impacted maintained heavy equipment.
by vibrations and Equipment with black smoke shall
noise while not be allowed on-site.
working on/off
duty hours. Movement of heavy equipment shall
be set periodically to reduce
environmental impact on marine and
terrestrial environment.

Buildings Waste General & 2 4 8 All type of generated waste from the PM
Transportation Generation Construction said activities shall be segregated, CM
Environmental Waste labelled, and stored in the CEM
Noise designated waste skip.
Environmental
All the waste shall be disposed by Coordinator
the KSA Regulatory Authorities – Site Engineer
MEWA, NCEC & MWAN and approved
service provider.
Welfare Sewage Land 2 2 4 Temporary welfare facility such as PM
Facilities wastewater Contamination toilets shall be installed, and sewage CM
wastewater shall be disposed by our CEM
waste services provider company
Environmental
Coordinator
Site Engineer
maintenance Chemical/Paint Land 4 4 16 All the chemical/hazardous waste PM
of relocated buckets contamination shall be disposed by our waste CM
building Fumes service provider (KAME TC). CEM
Construction Impermeable plastic/plywood sheet
Environmental
waste shall be used while painting.
Hazardous waste shall be stored in Coordinator
General waste
the designated hazardous waste Site Engineer
storage area.
All other waste generated during
office cabins maintenance shall be
disposed according to its type.
Waste Terrestrial & Environmental 4 4 16 All type of waste shall be managed by PM
Management Marine contamination our certified and approved waste CM
Environment management company (KAME TC) CEM
Attraction of vermin Environmental
Coordinator
Site Engineer