Gajukuntapalli Road Data 2023-24
Gajukuntapalli Road Data 2023-24
Gajukuntapalli Road Data 2023-24
#REF!
Name of Work:-
94.00
2 Nos 188.00
188.00
Cum
5 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in
position,Compacting, Vibrating and curing including all other incidental and all other operational charges of
T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure
.
3.60
2 Nos 7.20
8.00
Cum
S.No. Description Nos L B D Quanity
7 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBT crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing
etc., including other incidental hire and operational charges of all T&P etc., complete as per approved
drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished
item as per MoRT&H specification 1500,1600,1700 & 2300 (5th revision ) and as directed by the Engineer-
in-Charge for Deck slab
For Mastipad for expanction joints For Deck 1 X 2 12.00 0.24 5.76
slab
Wing walls 2 X 2 0.900 2.24 8.06
13.82
2 Nos 27.64
28.00
S.No. Description Nos L B D Quanity
Sqm
11 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of
not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the
entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition
including cost and conveyance and all labour charges as directed by the departmental officers as per
drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th
Revision) for finished item of work.
For Deck Slab Behind 1x 2 11.000 0.600 1.700 22.44
For Wing walls behind 0x 2 3.50 0.600 1.700 0.00
Total = 22.44
2 Nos 44.88
Total= 45.00
Cum
12 Back filling behind Abutments with gravel including cost ,conveyance of all materials to site etc., complete
as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per
Drawing and technical specifications fo
Total = 5673.00
Sqm
19 Providing centerline marking of 300 cm length and 10 cm width with a gap of 450
cm with thermoplasticpaints conforming to IS:164-1981 (1st revision reaffiiremed in
1986) and clause 803 of MOST specification for Road & Bridge woorks and also
conforming to IRC 35-1997 Etc complete
for paved shoulder,Nos=1719/7.50=229 1x 229 3.00 0.10 68.70
For edge line 1x 2 1719.0 0.15 515.70
Zeebra Crossings 6 X 20 3.00 0.500 180.00
Total = 764.00
Sqm
20 Providing and fixing Reflective pavement markers (Road studs) made of plastic
body moulded from HIPS or ABS or ASA and reflective panel shall consist of
number of lenses containing single or dual prismatic cubes capable of providing
total internal reflection of the light entering the lens face and conforming to ASTM,
BS and complying to guidelines issued by MORTH circular no. RW/NH-
33023/10/97 - DO III dt.11.6.1997. The height, width shall not exceed 20mm,
130mm and the area of each retro-reflecing surface shall not be less than 13sqcm
and the slope of retro-reflective surface shall preferably be 35+/-5 degree to base.
fixing will be without nails and the reflective marker shal be fixed to the road
surface using the adhesives and the procedure recommended by the manufacturer
and as per para 6.2 of the MORTH circular including cost and conveyance of all
materials, equipment, machinery and labour wiht all leads and lifts, loading,
unloading charges, site clearance etc and complete necessary for successful
completion of the work as directed by the Engineer - in - charge.
Centre line 1 x 229 229.00
for edge line 2 x 229 458.00
Zeebra Crossings 6 X 40 240.00
Total = 927.00
Nos
Sl.
Description Nos. L B D Quantity
No
21 Providing and fixing Cautionary / Warning sign boards size 900 mm
equilateral triangle made out of Type – XI of ASTMD 4956-09 High Intensity
Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full
background of White colour and letters/logos done by screen printing in
Black colour, boarders by screen printing in Red colour and fixed over 4MM
Aluminium Composite Material sheet having minimum 0.5 mm thick
Aluminium skin on both sides with back side painted grey colour and fixed
over back support frame of M.S angle 25x25x3mm all round and fixing with
35x35x4mm and mounted on a MS angle post of size 75x75x6mm with
clear height of not less than 2.1 m from the ground level to the bottom of the
board. The signpost should be painted with one coat of red oxide paint and
2 coats of synthetic enamel paint Black and White colour with bands of
30cm of height. The signpost shall be firmly fixed with MS base angle
35x35x4 mm in to the ground by M-15 Concrete foundation of size
450x450x600mm including cost and conveyance of all
materials ,equipment, machinery and labour with all leads and lift, loading
chages necessary for satisfactory completion of the work as directed by
Engineer -in-Charge.
Drain
Koilkuntal side 1X 2 80.0 1.5 1.6 384.00
Banaganapalli Side 1x 2 80.0 1.5 1.6 384.00
Total = 768.00
Sl.
Description Nos. L B D Quantity
No
Cum
22 Supplying and Filling sand for sand bed cost of filling sand from approved
source including cost and conveyance, seiginiorage of all materials and
labour charges etc complete watering, tampering etc complete for
foundation.
Drain
Koilkuntal side 1X 2 80.0 1.5 0.3 72.00
Banaganapalli Side 1x 2 80.0 1.5 0.3 72.00
Total = 144.00
Cum
22 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBT
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, Vibrating, curing etc., including
all other incidental and operational charges of all T&P etc., complete for
finished item of work as per MoRT&H specification 1500,1700, 2100 (5th
Revision) and as directed by the Engineer-in-Charge for foundation.
Drain-Bed
Koilkuntal side 1X 2 80 1.5 0.3 72.00
Banaganapalli Side 1x 2 80 1.5 0.3 72.00
Total = 144.00
Cum
Providing Vibrated Cement Concrete (1:3:6) using 40mm size HBT crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing,
laying, vibrating, curing etc., including all other incidental and operational charges of all
T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700,
2200 (5th Revision) and as directed by the Engineer-in-Charge for Body walls.
Drain-Walls
Koilkuntal side 2X 2 80 0.375 1.1 132.00
Banaganapalli Side 2x 2 80 0.375 1.1 132.00
b=(0.45+0.3)/2=0.375 Total = 264.00
Cum
Necessity: Pedaballi-Gajukuntapalli via Kondakamarla road is a ZP taken over road which connects
several villages of Puttaparthy and ODC mandals with respective mandal headquarters , because of the
heavy rains happened towards end of SW monsoon, the strteches from km 6/6 to 11/9 and from km 25/0 to
29/4 of this road got damaged severely .Several villages along this road rely on this road to travel to
Puttaparthy and Gorantla mandal headquarters. As the road condition is causing lot of discomfot to
travellers often leading to accidents of two wheelers, inorder to bring this road ride worthy condition this
estimate is prepared with the following provisions.
In order to ensure the free flow of the vehicular traffic and avoid road accidents the estimate is
here with prepared with the following provisions.
RATES:- This estimate is prepared as per SSR of 2023-24 applicable to the state of Andhra Pradesh for
Road work and as per MORTH specifications for Roads and Bridge works (5th revision) and according to
other relevant technical circulars communicated from time to time. Rates used for Bitumen are as on
01/06/2023 & Emulsion as on 01/06/2023
Original
S.No. Description
Amount
Total=A+B= 18711986
Total=A+B+C= 19080698
Sl. Measurements
No. Description of item Nos Quantity Rate/ Amount
L B D
Forming embankment with borrowed useful earth from outside road boundary by mechanical
means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the
1 embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including
all hire and operational charges of T&P , complete for finished item of work as per MoRT&H
specification 305 (5th revision)
For Shoulders
Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix
macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and
including premixing the material with water at OMC in Mechanical mix plant carriage of mixed
2
material by tipper to site , laying in uniform layers with paver in base courses on well prepared
surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the
Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
For Patchwork
704.20
TOTAL 2713.00 1,910,495
cums. cum.
3 Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure
distributor on prepared surface of granular base including clearing of road surface and spraying
emulsion at the rate of 0.70 kg/sqm using emulsion pressure distri
Before BM
Before BC
Working reach km 6/6 to km
11/9
40387.50
TOTAL 40388.00 14.30 577,548
Sl. Measurements
No. Description of item Nos Quantity Rate/ Amount
L B D
6 Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant
producing an average output of 75 tonnes per hour using hard blasted Trap crushed aggregates of
Grading - II as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with
bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over
a previously prepared surface with Hydrostatic paver finisher with sensor control to the required
grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired
compaction for finished item of work as directed by the Engineer-in-Charge including hire and
opeational charges all T&P and all other contingent charges necessary , complete and as per
MoRTH specification No. 504 (5th Revision) .
18290651.00
(B). WEIGHTED AVERAGE LEAD FOR SAND ( REACH AT PUTTAPARTHY BNP ROAD
KM 3/8+0.6KM CT)
km
km
km
km
km
km
km
km
km
km
ROAD METAL RATES (SSR 2022-2023)
For Bulk Bitumen 60/70:-IOCL Price List With effect from Dt.01.07.2023
Bulk 80/100
Bulk 60/70 Emulsion
Grade
Grade (VG-30) (SS1)
(VG-10)
023
Emulsion
(RS1)
Chennai
41050.00
41050.00
1381.30
42431.30
harmavaram.
DATA WITH SSR 2022-23.
NAME OF WORK:-IMPROVEMENTS TO RIDING SURFACE OF PEDABALLI TO GAJUKUNTAPALLI VIA KONDAKAMARLA
ROAD FROM KM 0/0 TO 30/4 IN SRI SATHYA SAI DISTRICT.(WORKING REACH FROM KM 6/6 TO 11/9 AND FROM
KM 25/0 TO 29/4)
Quantity Description of Item Rate per
3 Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-
1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader
or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means
at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of
work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment
will be made based on levels for finished item of work ).
Unit = cum
Taking output = 300 cum Page 95 of MoRT&H SDB
(A) Labour
0.40 day Mate 607.00 day
2.00 day Mazdoor skilled 625.90 day
8.00 day Mazdoor unskilled 560.00 day
Total
(B) Machinery
6.00 hr Motor grader 3.35M Blade @50 cum/Hr 3796.00 hr
12.00 hr Tractor with Rotavator 543.00 hr
6.00 hr Vibratory roller 8T 3499.60 hr
3.00 hr Water tanker 6 KL 822.00 hr
Total
(C) Material
Granular sub-base material as per Table 400-1 of
MORT&H
192.00 cum 1845.58 cum
53 mm to 9.5 mm @ 50%
(Av. rate of 50 - 55 mm, 40-45 mm, 25 - 27 mm, 19
- 22 mm, 12 to 14 mm, 9.5-11.2mm HBT M/C metal)
4 Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix macadem
specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the
material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in
uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to
acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406
(5th revision) for finished item of work.
5 Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on
prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70
kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H
Specification 502 (5th revision) and as directed by the Engineer-in-charge
Unit = sqm
Taking output = 3500 sqm
a) Labour
0.080 day Mate 607.00 day
2.000 day Mazdoor 560.00 day
b) Machinery
2.800 hr Mechanical broom @ 1250 sqm 455.00 hour
2.800 hr Air compressor 250 cfm 633.00 hour
2.000 hr Emulsion pressure distributor @ 1073.00 hour
1.000 hr Water tanker 6 KL capacity @ 1 822.00 hour
c) Material
2.450 MT Bitumen emulsion @ 0.7 kg per sqm 41564.30 MT
a+b+c
4.615 % d) OH Charges on (a+b+c)
a+b+c+d
e) Contractor's profit @ 10 % input on
(a+b+c+d)
Cost for 3500 sqm =
Rate per sqm =
12 Providing and applying tack coat with Bitumen80/100 Grade(Bulk) using Bitumen pressure distributor at the
rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item
of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
13 Providing and applying tack coat with bitumen 80/100 grade (Bulk) using Bitumen pressure distributor at the
rate of 0.25 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical
broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the
Engineer-in-Charge.
unit = sqm Page 124 of MoRT&H SDB
Taking output = 3500 sqm
(A) Labour
0.08 nos Mate 607.00 day
2.00 nos Mazdoor 560.00 day
Total
(B) Machinery
2.80 hr Mechanical broom Hydraulic @ 1250 sqm/hr. 455.00 hr
2.80 hr Air compressor 250 cfm 633.00 hr
2.00 hr bitumen pressure distributor @1750 sqm/hr 1907.00 hr
Total
(C) Material
0.875 MT Bitumen 80/100 grade @ 0.25 Kgs/sqm 41353.30 MT
Total
(D) Over head charges @ 4.615% (10%-VAT-Insurance)
4.615 % Add for Over head charges @ 4.615% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 3500 sqm (E) + (F)
Rate per 1 sqm
Rate to be adopted
7 Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an
average output of 75 tonnes per hour using hard blasted Trap crushed aggregates of Grading - II as per table
500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 %
by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver
finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and
501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge
including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per
MoRTH specification No. 504 (5th Revision) .
Unit = cum
Taking out put = 205 cum (450 tonne) Page 125,126,127 of MoRT&H SDB
(A) Labour
0.84 nos. Mate 607.00 nos.
14.00 nos. Mazdoor working with HMP, mechanical broom, 560.00 nos.
paver, roller, asphalt cutter and assistance for setting
out lines, levels and layout of construction
ii) Aggregate
Total weight of mix = 450 tonnes
weight of bitumen - 15.3 tonnes
Weight of aggregate = 450-15.3 = 434.7 tonnes
Taking density of aggregate = 1.5 tonne/cum
Volume of aggregate = 289.8 cum
Grading - II (19 mm nominal size)
116.04 Cum of 25-10mm @ 40%
115.92 cum IRC & MORT&H HBT M/C chips 25 to 10mm @ 40% 1891.01 cum
115.92 cum IRC &MORT&H HBT M/C chips 10 to 5mm @ 40% 1546.33 cum
8 Providing and laying of Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an
average output of 75 tones per hour using hard blasted Trap crushed aggregates of Grading – II as per Table
500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4
% of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the
required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all
respects as directed by Engineer-in-Charge
TOTAL A=
(B) Machinery
6.00 hour Batch mix Hot Mix Plant @ 75 Tonne per hour 30206.00 1.00
6.00 hour Paver finisher hydrostatic with sensor control 3891.00 1.00
6.00 hour Generator 250 KVA 2572.00 1.00
Quantity Description of Item Rate per
6.00 hour Front end loader 1 cum capacity 2023.00 1.00
3.90 hour Power road roller 8 ton for initial break down rolling 1743.60 1.00
3.90 hour Vibratory roller 8 ton for intermediate rolling 3499.60 1.00
Finish rolling with 6-8 ton. smooth wheeled tandem
3.90 hour roller 2208.00 1.00
TOTAL B=
(C) Material
Bitumen 60/70 Grade @ 5.40 %
24.30 MT Wi. of Bitumen = 450 x 5.4 / 100 = 24.30 MT 42153.30 1.00
ii) Aggregate
TOTAL weight of mix = 450 tones
Weight of bitumen - 24.30 tones
Weight of aggregate = 450-24.30 = 425.70 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 283.8 cum
Grading - II (13 mm nominal size)
IRC & MORT&H HBT M/C chips 13.2-10 mm @ 30%
85.14 cum - Avg. of (12-14 mm),(9.5-11.2 mm) 1727.58 1.00
58 Forming earthen shoulders with selective soils obtained from side earth having MDD of not less than 1.75
gms/cc by mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment,
spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet
requirement of table 300-2 of MORT&H including all hire and operational charges of T&P , complete for finished
item of work as per MORT&H specification 305 (5th revision) (Payment will be made based on levels for
finished item of work)
Unit = cum
Taking output = 100 cum
(A) Labour
0.02 nos Mate 607.00 day
0.50 nos Mason unskilled 560.00 day
Total
(B) Material
1.67 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum 3561.50 hr
per hour
0.00 t.km Tipper 160 12 1920 8.60 cum
Add 10% extra towards cost of carriage to cover cost
of loading and unloading
0.50 hr Dozer 80 HP for spreading @ 200 cum per hour 3050.60 hr
4.00 hr Water tanker 6 KL 822.00 hr
1.00 hr Vibratory roller 8T 3499.60 hr
Total
6.00 hr Generator set 35 KVA 0.00 hr
59 Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from
outside road boundary by mechnical means with all leads and lifts including pre-watering of soil at borrow
area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the
embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @ OMC to
meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P , complete for
finished item of work as per MORT&H specification 305 (5th revision) (Payment will be made based on levels
for finished item of work)
Unit = cum
Taking output = 100 cum
(A) Labour
0.04 nos Mate 607.00 day
1.00 nos Mason unskilled 560.00 day
Total
(B) Material
1.67 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum 3561.50 hr
per hour
800.00 t.km Tipper 160 12 1920 8.60 cum
Add 10% extra towards cost of carriage to cover cost
of loading and unloading
Amount
- V of MoRT&H Table 400-
m layers with motor grader
tavator / approved means
mplete for finished item of
eer-in-charge. ( Payment
242.80
1251.80
4480.00
5974.60
22776.00
6516.00
20997.60
2466.00
52755.60
354351.36
193854.08
59080.32
607285.76
30736.64
696752.60
69675.26
766427.86
2554.76
2555.00
1 Cum
o Wet Mix macadem
d including premixing the
pper to site , laying in
g with Vibratory roller to
MoRT&H specification.406
291.36
1251.80
5600.00
7143.16
13094.40
11016.00
12138.00
17166.00
13648.44
2466.00
Amount
69528.84
167941.62
194350.86
91389.87
453682.35
24475.85
554830.20
55483.02
610313.22
2712.50
2713.00
Cum
n pressure distributor on
mulsion at the rate of 0.70
as per MoRT&H
48.56
1120.00
1168.56
1274.00
1772.40
2146.00
822.00
6014.40
101832.54
109015.50
5031.07
114046.56
11404.66
125451.22
35.84
35.80
1 Sqm
ressure distributor at the
al broom for finished item
eer-in-Charge.
48.56
1120.00
1168.56
1274.00
1772.40
3814.00
6860.40
28947.31
28947.31
Amount
1706.45
38682.72
3868.27
42550.99
12.16
12.20
1 Sqm
pressure distributor at the
cleaned with mechanical
as directed by the
48.56
1120.00
1168.56
1274.00
1772.40
3814.00
6860.40
36184.14
36184.14
2040.43
46253.53
4625.35
50878.88
14.54
14.50
1 Sqm
ot mix plant producing an
of Grading - II as per table
r of VG-30 grade @ 3.4 %
ace with Hydrostatic paver
as per Clauses 501.6 and
by the Engineer-in-Charge
sary , complete and as per
509.88
7840.00
3129.50
11479.38
181236.00
1392.60
23346.00
15432.00
Amount
12138.00
6800.04
13648.44
8611.20
262604.28
644945.49
219206.17
179249.99
65499.15
1108900.80
63824.73
1446809.19
144680.92
1591490.11
7763.37
7763.00
1 Cum
ot mix plant producing an
f Grading – II as per Table
nder of VG 30 Grade @ 5.4
ensor paver finisher to the
ndem rollers to achieve the
inished item of work in all
509.88
7840.00
3129.50
11479.38
11479.38
181236.00
23346.00
15432.00
Amount
12138.00
6800.04
13648.44
8611.20
261211.68
1024325.19
147085.74
109711.76
137907.57
5821.87
1424852.13
1697543.19
78341.62
177588.48
1953473.29
10227.61
10228.00
12.14
280.00
292.14
5947.71
0.00
0.00
1525.30
3288.00
3499.60
14260.61
0.00
0.00
671.61
15224.36
Amount
1522.44
16746.80
167.47
167.00
1 Cum
ess than 1.75 gms/cc from
watering of soil at borrow
depositing the soils on the
atory road roller @ OMC to
rges of T&P , complete for
ll be made based on levels
24.28
560.00
584.28
5947.71
6880.00
688.00
1525.30
3288.00
3499.60
21828.61
0.00
0.00
1034.35
23447.24
2344.72
25791.96
257.92
258.00
1 Cum
CALCULATION OF SEIGNIORAGE CHARGES
Seignior
Sl.
Description of item Estimate quantity Factor ge Amount
No.
charge
Road Work
Certified that the leads mentioned are the shortest and there is sufficient
yield from the proposed quaries and they are as per the RMR of (R&B)
Division of Ananthapuramu
1) Certified that the leads provided in the lead statement are shortast.
5) Certified that the discription of he variaty of materials noted is corect to the best
my knowledge.
6) Certified that the land available for the road formation is sufficient and no land
acquisition ids required.
7) Certified that the earth for construction of Embankment/Shoulders is to be
conveyed a lead of 5 Kms over the initial lead.
Certified that the proposed stretch of road not covered in any other scheme
(Lead) (Lead)
(Lead) Charges for Charges for
(Lead) Charges
Charges for trucks and trucks and (Lead)
for trucks and
trucks and tippers for tippers per Charges for (Lead)
tippers for
tippers for Cement/ Cum .meter trucks and Charges for
Sl. Rubble/Size
Distance Earth/Sand/ Steel/RCC for PCC tippers per trucks per
No. Stones/Cut
Gravel/Murr Poles/AC&GI Slabs/Shahab Cum .meter 1000 Nos. of
stones/Coarse
um/Lime/ Sheets/Packe ad slabs/CC& water/1000li bricks
aggregatesPer
Surki/Per d Laterite ters.
Cum.meter.
Cum.meter. materials blocks/Wood
/Tonne. /Cum.
for every km
6 beyond 5 km up 14.90 14.40 9.00 21.10 9.10 23.90
to 30 km
for every km
7 12.40 12.00 7.50 17.60 7.50 19.90
beyond
E.LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)
Note: The lead & lift charges are Exclusive of 13.615% Contractor Profit and Over Head charges