INDUSTRY CODE
EXTERNAL COMMUNICATION
CABLE NETWORKS
This Code was issued in draft form for comment as DR2 C524
Disclaimers
1. Notwithstanding anything contained in this Code:
(a) ACIF disclaims responsibility (including where ACIF or any of its
officers, employees, agents or contractors has been negligent) for
any direct or indirect loss, damage, claim, or liability any person
may incur as a result of any:
(i) reliance on or compliance with this Code;
(ii) inaccuracy or inappropriateness of this Code; or
(iii) inconsistency of this Code with any law; and
(b) ACIF disclaims responsibility (including where ACIF or any of its
officers, employees, agents or contractors has been negligent) for
ensuring compliance by any person with this Code.
2. The above disclaimers will not apply to the extent they are inconsistent
with any relevant legislation.
Copyright
This document is copyright. You may reproduce it only as necessary
for the purposes of you or your organisation considering or pursuing
compliance with this Code. You must not alter or amend this Code.
INDUSTRY CODE
EXPLANATORY
STATEMENT
Explanatory Statement
The new telecommunications legislation accords significant priority to
industry self-regulation and provides for important delegation to the industry
and relevant stakeholders of the development of operations industry codes.
ACIF’s Communication Network Installation, Maintenance and Safety
Working Committee developed this Code to describe the minimum
requirements expected of Carriers installing, operating and maintaining
Communication Networks.
These requirements strive to ensure electrical, structural and network
reliability, as well as setting out the minimum provisions that are considered
necessary for the safety of employees and the public under the specified
conditions.
This Industry Code also sets out the basic principles of installation,
maintenance and safety of External Communication Networks.
Since 1 July 1997 when Australia’s telecommunications industry was opened
to full competition, the Australian Communications Industry Forum (ACIF)
was established to develop and administer industry technical and operating
arrangements that promote both the long-term interests of end-users and the
efficiency and international competitiveness of the Australian
communications industry.
Compliance with this Code will not result in a substantial cost impost on the
industry. The Code rules can be characterised as good business practice and
should be incorporated to improve and streamline business processes.
ACIF’s Communication Network Installation, Maintenance and Safety
Working Committee was supported by the ACIF’s Operations Codes
Reference Panel which has wide representation from participants in many
sectors of the telecommunications industry and organisations representing
carriers, carriage service providers, business users and consumers. In the
development of this Code, this Working Committee followed guidelines
developed by the Reference Panel and the ACIF’s procedures on Industry
Code development and committee operation. A draft of this Code was made
publicly available for a period of consultation. This Code is submitted for
publication with ACIF.
Brendan Ede
Chairman
OCRP/WC4 – Communications Network Installation, Maintenance and
Safety Working Committee
INDUSTRY CODE
CONTENTS
TABLE OF CONTENTS
1.1 Scope 1
1.2 Objectives 1
2. PARTICIPANTS 3
4. INTERPRETATION 9
5. GENERAL CONDITIONS 11
5.1 Review 11
5.4 Waiver 11
5.7 Responsibilities 12
5.7.3 Ownership 12
6.1 General 13
6.2 Materials 13
6.11 Records 15
7. AERIAL CONSTRUCTION 17
7.1 Accessibility 17
7.4.1 General 17
7.4.10Aerial Installation 24
8. UNDERGROUND CONSTRUCTION 27
8.1 Accessibility 27
9.1 General 33
10.1 General 37
11. TRAINING 39
11.1 General 39
12.1 General 41
13.1 General 43
13.3.1General 44
13.4.1General 45
13.4.2Cable Identification 45
14.1 General 47
1.2 Overview
1.2.1 This Code provides guidance on the basic principles of installation,
maintenance and safety of External Communication Networks with
the purpose of achieving the minimum requirements for electrical,
structural and network reliability, as well as setting out the minimum
provisions that are considered necessary for the safety of Employees
and the public under the specified conditions.
2. PARTICIPANTS
The group that developed this Code consisted of the following organisations
and their representatives:
Representative Organisation
Brendan Ede (Chairman) Telstra Corporation
Paul Boes (Secretary) Telstra Corporation
John Pack ATUG
Keith Hobby Cable & Wireless Optus
Mick Kirwan Cable & Wireless Optus
Chris Willis Cable & Wireless Optus
Bob Burgstad Office of Energy Policy (South Australia)
Bill Greenland Office of the Chief Electrical Inspector
(Victoria)
Mike Hennessey Telstra Corporation
Andrew Chappell Telstra Corporation
John McDonald Telstra Corporation
Terry Andersen of ACIF supplied project management support.
(c) (c) any line, equipment, apparatus, tower, mast, antenna, tunnel, duct, hole,
pit, pipe, pole or other structure or thing used, including Support Structure as
described in this Code, or for use, in or in connection with a
telecommunications network or Utility network or system. Footpath means a
public way reserved for the movement of pedestrians and of manually propelled
vehicles.
High Voltage or HV means a voltage exceeding Low Voltage.
Insulated means provisioned with insulating material or medium of the
appropriate grade and voltage, and which must be maintained in sound
condition.
Isolated means disconnected from all possible sources of electrical energy by
the opening of switches, withdrawal of circuit breakers, removal of fuses,
links, connections and the like and rendered incapable of being made Live
unintentionally.
Limited Power Awareness means when a person has some understanding of
power line identification but is limited in the extent of work undertaken on an
External Communication Network in accordance with the Carrier’s approved
procedures.
Live means connected to a source of electrical energy or subject to hazardous
induced or capacitive voltages.
Low Voltage or LV means voltage exceeding Extra Low Voltage, but not
exceeding 1000 V AC or 1500 V DC
Multiple Earthed Neutral System or MEN System means a system of
Earthing in which the parts of an electrical installation to be Earthed:
(a) are connected to the general mass of earth; and
(b) are connected within the installation to the Neutral Conductor of the
Supply system.
Neutral Conductor means a Conductor or a group of Conductors of a multi-
wire system of Supply which is maintained at an intermediate and
approximate uniform electrical potential in respect of the other Conductors of
the same Circuit or the Conductor of a two wire system which is Earthed at
its origin.
Other Cable Systems means communication, supervisory and control cables,
aerial Earthed cables or electrolysis drainage cables attached to or crossing an
electricity supply Utility’s overhead Power Line or otherwise in the proximity
of the overhead Power Line, but not belonging to a Carrier.
Point of Attachment means the point at which a Communication Cable is
fixed to a Supporting Structure.
Potential Gradient means the rate of change of potential difference between
unit distance contours of equal potential in a conductive body carrying
current, ie. a voltage difference between two points a distance apart. This may
be uniform as in a uniform conductor carrying current or non-uniform as in
the case of the spread of current in the earth from an injection point.
Power Line means a Conductor or cable used for the purpose of transmitting,
distributing or supplying electricity with any casing, coating, covering to,
pipe, bracket or insulator enclosing, surrounding or supporting it or any part
thereof or any apparatus connected therewith for the purpose of transmitting,
distributing or conveying electricity, but excluding Service Line.
4. INTERPRETATION
In this Code, unless the context requires otherwise:
(a) the singular includes the plural and vice versa;
(b) the Table of Contents and the headings are used for convenience only
and do not affect the interpretation of this Code;
(c) a reference to a thing includes a reference to a part of that thing;
(d) a reference to any statute, proclamation, rule, regulation or ordinance
including any amendment, consolidation, modification, re-enactment
or reprint of it or any statute, proclamation, rule, regulation or
ordinance replacing it. A reference to a specific section, clause,
paragraph, schedule or item of any statute, proclamation, rule,
regulation or ordinance means a reference to the equivalent section of
the statute, proclamation, rule, regulation or ordinance which is for the
time being in force;
(e) the word “person” includes a firm, a body corporate, an
unincorporated association or an authority;
(f) a reference to a person includes a reference to the person’s executors,
administrators, successors, permitted substitutes (including, without
limitation, persons taking by novation) and permitted assigns;
(g) the word “must” indicates provisions that are mandatory; and
(h) the word “may” or “should” indicates provisions that are normally and
generally practical for the specified conditions.
5. GENERAL CONDITIONS
5.1 Review
5.1.1 Where any Carrier, or another interested party, requests the review
or revision of any of the conditions of this Code such conditions must
be reviewed in accordance with ACIF’s Code Administration and
Compliance Scheme (refer to Section 15).
5.4 Waiver
5.4.1 The Carrier who is responsible for an External Communication
Network installation may modify or waive rules of this Code in the
case of Emergency Installations or temporary installations.
5.4.2 The Carrier upon whose behalf an Emergency Installation or
temporary installation was installed must ensure that the installation
is removed, replaced, or relocated, as desired, as soon as reasonably
practicable.
5.4.3 The Carrier must ensure that any Emergency Installation or
temporary installation, which is anticipated to be used for longer
than 6 months must be constructed as a permanent construction in
accordance with the provisions of this Code.
5.7 Responsibilities
5.7.1 Occupational Health and Safety (OH&S)
5.7.1.1 The Carrier must be responsible for managing occupational health
and safety matters associated with the construction and maintenance
of its External Communication Network. In certain circumstances,
legislative and/or contractual provisions may also place OH&S
responsibilities to another party. This does not negate the need for
the Carrier to ensure that these issues are appropriately managed.
5.7.3 Ownership
5.7.3.1 A Carrier must be fully responsible for their construction,
maintenance and renewal of their External Communication
Networks as referred to in Clause 1.1.2.
6.2 Materials
6.2.1 The Carrier must ensure that all materials used for the External
Communication Network, their components, accessories and support
structures meet or exceed safe operational performance under
expected operational conditions.
6.11 Records
6.10.1 The Carrier should keep construction, operations or maintenance
records that are relevant to safety in an accessible form, in
accordance with relevant occupational health and safety
requirements and environmental requirements.
7. AERIAL CONSTRUCTION
7.1 Accessibility
7.1.1 The Carrier should ensure that all parts of an Aerial External
Communication Network which are attached to a pole are arranged
so as to provide adequate climbing space, working space and
clearances between all other cables and equipment to enable any
necessary work on the pole to be carried out safely and in a practical
manner by the Carrier and the Supporting Structure owner.
TABLE 1
Clearances to Ground of Communication Lines
TABLE 2
Minimum Clearances to Ground of Customer Leads
Customer Lead Location Minimum
Clearance from
Ground in any
direction (mm)
Over any part of a freeway, highway, or over- 5500 Note 1 & 2
dimensional route
Over the centre of each carriageway of a Roadway 4900Note 2
Over any part of a carriageway of a Roadway (other 4600
than the centre)
Over a vehicular crossing of a Footpath in a Roadway 4300
entering a commercial/industrial Premises (other than
a residential driveway)
Over a vehicular crossing of a Footpath in a Roadway 3500
for a residential driveway and any other part of a
Footpath, and over land not normally traversable by
road vehicles
On customer Premises land or over land which, due to 2700
its steepness, swampiness or other reason, is not
traversable by road vehicles
TABLE 3
Minimum Clearances from Structures of Communication Cable
Direction from Structure Minimum Clearance from Structure
(mm)
Insulated Bare Strand Wire
Communication
Cable Note 1
A. Vertically above those parts of 2400 2700
any structure normally accessible
to persons
B. Vertically above those parts of 100 2700
any structure not normally
accessible to persons but on
which a person can stand
C. In any direction (other than 100 900
vertically above) from those parts
of any structure normally
accessible to persons or from any
part not normally accessible to
persons but on which a person
can stand
D. In any direction from those 100 Note 2 300 Note 3
parts of any structure not
normally accessible to persons
FIGURE 1
Minimum Clearances from Structures
A B
C
C
W indow
A
Opening
FIGURE 2
Minimum clearances between External Communication
Networks belonging to different Carriers on a pole
2a) Horizontal cross-sectional view of a round pole with
attached riser pipe, wire, or cable.
7.4.5.6 If the shape of the pole, or other aspect of the pole, does not allow
specified minimum clearances, as shown in Figures 2a and 2b, to be
achieved, then the impacted Carriers must agree to apply alternate
safe and practical working clearances between External
Communication Networks.
7.4.5.7 Where other Facilities exist on a pole, it is the attaching Carrier’s
responsibility to maintain sufficient accessibility to the existing
attached Facilities, in accordance with Clause 7.1 (Accessibility).
8. UNDERGROUND CONSTRUCTION
8.1 Accessibility
8.1.1 The Carrier should arrange its underground External
Communication Network so as to provide a reasonable working
space around the cables and equipment, adequate clearances between
all other cables and equipment to enable any necessary work on the
underground External Communication Network to be carried out
safely and in as economical a manner as possible.
8.1.2 The Carrier should locate its underground External Communication
Network equipment and cables so as to not hinder the access of other
Utility owners and staff to their own Facilities to carry out necessary
work from time to time.
8.3.1.2 The Carrier should ensure plastic and/or steel pipe materials
conform to appropriate AS requirements. Colour of plastic pipes
should be in accordance with AS requirements, including AS 1345.
8.3.1.3 The Carrier must ensure conduit bends are designed to allow easy
and practical installation of anticipated cable types, taking into
consideration relevant cable manufacturer’s design specifications
and limitations.
8.3.1.4 Where Communication Cable is buried direct into the ground or
installed by underground boring, the Carrier should ensure the
surface of the ground is marked to indicate the route of the cable
using marker posts, plates or similar devices appropriate to the
circumstances. Where installed by ploughing or trenching, and
depending upon the level of risk assessment with the cable route, its
location should be indicated by an appropriate marker tape to warn
others subsequently excavating the trench. If the cable is completely
non-metallic, the Carrier should consider incorporating a metallic
element, tracer wire or detectable marker/warning tape laid with and
above the cable to facilitate its detection by cable locating equipment.
8.3.1.5 The Carrier should ensure ownership is identified by visibly marking
the outer surface of conduits and direct buried/bored cable, or by the
use of identified marker tape.
TABLE 4
Clearance from other Underground Utility and Carrier Services
Underground Plant Item Minimum Radial Clearance
from Underground
Communications Cable Note 1
Gas Pipe
Large Main (Over 110 mm diameter) 300 mm
Small Main (75 mm diameter or less) 150 mm
Power Line and Service Lines
High Voltage 300 mm Note 2
Low Voltage 100 mm Note 3
Water Main
High Capacity Main 300 mm
Local Reticulation 150 mm
Sewer
Mains 300 mm
Connections to Mains 150 mm
Other Carriers’ Communication Cables 100 mm Note 3
9.3.3 A Carrier must ensure it does not remove, relocate, rearrange or alter
in any way the existing Earthing System owned by another Carrier,
unless otherwise agreed to by the Carrier who owns the existing
Earthing System.
10.3.2 Activities involving the cutting down or lopping of any tree may be
carried out in accordance with Australian Standard AS 4373 –
Pruning of amenity trees. Activities involving Communication Cable
excavation within a tree ‘drip zone’ may be done in a manner which
minimises impact on tree roots.
10.3.3 Wherever practicable either:
(a) boring or other form of excavation to a depth below the tree
roots mass; or
(b) redirection of the cable route to avoid the tree ‘drip zone’
may be undertaken by the Carrier to avoid substantial impact on the
tree root system. Where trenching within the tree drip zone cannot
be practicably avoided, mechanical devices must not be utilised by
the Carrier if they are likely to impact on greater than 25% of the
overall tree root mass.
11. TRAINING
11.1 General
11.1.1 This Section applies to Employee training for any work activities
engaged by the Carrier on its External Communication Network.
The Carrier must ensure the requirements of this Section can be
applied to its Employees prior to the engagement of any related work
activities on its External Communication Network.
TABLE 5
Minimum Safe Working Distances from exposed aerial Electrical
Apparatus and Exposed Conductors
Publication Title
Mechanical Loading Conditions
ESAA C(b)-1- Guidelines for the Design and Maintenance of
1991 Overhead Distribution and Transmission Lines
Structures and Footings
AS 2209:1994 Timber – Poles for overhead lines
AS 2878:1986 Timber – Classification into strength groups
Clearance from the Ground
ESAA C(b)-1991 Guidelines for the Design and Maintenance of
Overhead Distribution and Transmission Lines
Clearance from Structures
ESAA C(b)-1- Guidelines for the Design and Maintenance of
1991 Overhead Distribution and Transmission Lines
Services
1996 The New South Wales Service and Installation Rules
1995 The Victorian Service and Installation Rules
Installation
SAA HB87-1997 Joint use of poles: The placement on poles of power
(CJC 1) lines and paired cable telecommunications lines
SAA HB103- Coordination of power and telecommunications –
1997 (CJC 7) Crossings Code: The arrangement of overhead power
and telecommunications lines, pole stay wires, and
suspension wires
AS 3000:1991 Electrical installations – Buildings, structures and
premises (known as the SAA Wiring Rules)
ESAA C(b)-2- ESAA Guide to the Installation of Underground
1989 Cables
AUSTEL TS 009 AUSTEL Technical Standard 009 (TS 009) –
Installation Requirements for Customer Cabling
(Wiring Rules)
AS 3798:1990 Guidelines on earthworks for commercial and
Publication Title
residential developments
ESAA – Sharing of Trenches – Arrangements between ESAA
Australian Post and APO (27/08/1973)
Office
ESAA – Australia Recommended Practices for Plant Underground
Telecommunicati (07/07/1983)
ons Commission
Telstra/Optus Code of Practice for Installation of Underground
Code of Practice, Plant
Issue 1 - 24/02/97
1993 draft AUSTROADS Code of Practice for
Telecommunications Plant in Road Reserves
(Formally the NAASCR Code of Practice)
1997 The New South Wales Streets Opening Conference,
“Information Bulletin Codes of Practices 1997”
- Telstra - Local Government Association: “Code of
Engineering Practice between Telstra and the Local
Government Association”
- Streets Opening Committee convened by Brisbane
City Council and serving the “Greater Brisbane
Area”, Queensland
3rd edition, 1979 Public Utilities Advisory Coordinating Committee:
“Code of Practice – coordination of work and
allocation of space on roads and footways for
underground and overhead services”, South
Australia
- Tasmanian Public Utilities Advisory Committee:
“Tasmanian Public Utilities Information Manual”
March 1999 Code of Practice for Telecommunications Facilities
in Victoria, Prepared by Local Government
Association of Victoria.
1980 and Victorian Local Government Street Works Co-
Addendum 1990 ordination Committee: “Co-ordination of
Streetworks – Code of Practice”, Victoria 1980 and
Addendum 1990
March 1984 Municipal Association of Victoria: “Municipal –
Telstra, Code of Engineering Practice”
- Utility Providers Code of Practice for Western
Australia
Electrical Protection
SAA HB88-1997 Unbalanced high voltage power lines: Code of
(CJC 2) practice for the mitigation of noise induced into
paired cable telecommunications lines from
unbalanced high voltage power lines
SAA HB101- Co-ordination of power and telecommunications –
1997 (CJC 5) Low Frequency Induction (LFI): Code of practice for
the migration of hazardous voltages induced into
telecommunication lines
ACIF C524:2001 COPYRIGHT
52 INDUSTRY CODE – EXTERNAL COMMUNICATION CABLE NETWORKS
APPENDIX A
Publication Title
SAA HB102- Co-ordination of power and telecommunications –
1997 (CJC 6) Low Frequency Induction (LFI): Application Guide
to the LFI Code
ESAA – Australia Code of Practice for Earth Return High Voltage
Telecommunicati Power Lines (1969)
ons Commission
ESAA – Australia Earth Potential Rise Code.
Telecommunicati
Code of Practice for the Protection of Personnel and
ons Commission
Equipment against Earth Potential Rise caused by
High Voltage Power System Faults (1984).
(Revision of this Code is in progress and will be in a
form of a CJC-SAA publication.)
Maintenance
AS 2865:1995 Safe working in a confined space
AS 2430.1:1987 Classification of hazardous areas - Explosive gas
atmospheres
AS 1742.3:1996 Manual of uniform traffic control devices - Traffic
control devices for work on roads
AS 4373:1996 Pruning of amenity trees
Materials
AS 1049:1996 Telecommunication cables - Insulation, sheath and
jacket
AS 1074:1989 Steel tubes and tubulars for ordinary service
AS 1345:1995 Identification of the contents of pipes, conduits and
ducts
AS 2053.1:1995 Conduits and fittings for electrical installations -
General requirements
AS/NZS 1477- PVC pipes and fittings for pressure applications
1996
AS/NZS 2648.1- Underground marking tape - Non-detectable tape
1995
Optical Fibre Safety
AS/NZS 2211.1- Laser safety - Equipment classification, requirements
1997 and user’s guide
AS/NZS 2211.2- Laser Safety - Safety of optical fibre communication
1997 systems
checked before use to ensure that they are still the most current and
appropriate issue, and that all associated amendments are considered.
Published by:
THE AUSTRALIAN COMMUNICATIONS
INDUSTRY FORUM LTD
Level 9, 32 Walker Street
North Sydney NSW 2060
Correspondence: PO Box 444
Milsons Point NSW 1565
Telephone: (02) 9959 9111
Facsimile: (02) 9954 6136
E-mail: acif@acif.org.au
Web Site: http://www.acif.org.au/