PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST

10 ENERGY EFFICIENCY GB Code Developer Regulator Regulator


Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability value
Design Value Document Document
Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
Provided? Provided?
Building Envelope Yes/No Yes/No Remarks Yes/No Yes/No Remarks
Required? Complied?
10.1.1 Air Tightness & Moisture Protection
Ocular Inspection &
a Sealed window and door assemblies Bay wall sections
Verification

Enlarged details of building


Applies to all envelope showing required
b Sealed utility services air tightness & moisture
Product labels
building occupancies
except building and protection elements
spaces without air-
conditioning system Building elevations &
c Sealed walls sections
Brochures & Catalogs

d Sealed roofing Not Complied Technical specifications of Shopdrawings


required air tightness &
e Sealed ceiling Not Complied moisture protection
elements As-built Drawings
f Sealed flooring Not Complied
Use SHGC
Design Value Documentation
Document Documentation Document
10.1.2 Glass Properties Design Specification Relevant GB Measure Applied
Calculator needed Provided? needed Provided?
Architectural floor plans, Ocular Inspection &
a Solar Heat Gain Coefficient (SHGC) 0.44 Building elevations & Verification
Applies to all sections
b Visual Light Transmittance (VLT) building occupancies 0.55 Window Schedule Product labels
without exceptions
WWR Computation Table Brochures & Catalogs
Window Glass Shopdrawings
specifications
As-built Drawings

Applies to all Operable Document Document


10.1.3 Natural Ventilation building occupancies Window Design Value Documentation Design Specification Relevant Documentation
GB Measure Applied
without exceptions Calculator needed Provided? needed Provided?

Operable windows or balcony doors at least Applies to regularly Architectural floor plans, Ocular Inspection &
a 10% Not Complied Building elevations &
10% of room space floor area occupied spaces
sections
Verification

b Operable window with safety features Window Schedule Product labels


Operable Window Brochures & Catalogs
Computation Table
Window Details on Shopdrawings
operation & safety
As-built Drawings
Required? Complied? Documentation Document Documentation Document
10.1.4 Building Envelope Color Design Specification Relevant GB Measure Applied
needed Provided? needed Provided?
Applies to all
Building metal roof surface color white or with building occupancies Ocular Inspection &
a without exceptions Roof plan
min. SRI of 70 Verification
Technical specs of roof Product labels
Brochures & Catalogs
Shopdrawings
As-built Drawings
Thermal Document Document
10.1.5 Roof Insulation Resistance Design Value Documentation Design Specification Relevant Documentation
GB Measure Applied
Calculator needed Provided? needed Provided?
Roof insulation at least R-8 in thermal Ocular Inspection &
a Applies to all R-8.0 1.17 Roof plan & section
resistance building occupancies
Verification
without exceptions Technical specification of Product labels
insulation
Roof Insulation Brochures & Catalogs
Computation Table
Shopdrawings
As-built Drawings
Electrical Systems Yes/No Yes/No Remarks Yes/No Yes/No Remarks
Required? Complied? Documentation Document Documentation Document
10.6.1 Daylight Provision Design Specification Relevant GB Measure Applied
needed Provided? needed Provided?
Applies to all Architectural floor Ocular Inspection &
a Window regularly occupied plans,roof plan, building Verification
spaces of all building elevations & sections
occupancies except
b Light Shelf building spaces Product labels
where daylight
c Clerestorey access hinders Brochures & Catalogs
d Skylight intended functions Daylight provision details Shopdrawings
e Light monitor/light scoop
As-built Drawings
f Other devices
12 MATERIAL SUSTAINABILITY GB Code Developer Regulator Regulator
Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability value
Design Value Documentati Documentati
Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
on Provided? on Provided?
Required? Complied?
12.1 Non-Toxic Materials Yes/No Yes/No Remarks Yes/No Yes/No Remarks

Paints, coatings, ashesives and sealants shall Architectural floor plans,


elevations and sections Ocular Inspection &
a have no VOC or within tolerable levels as per showing callouts and ID Verification
Table 14 tags of materials
Applies to all
building occupancies
b Composite wood with no urea formaldehyde without exceptions
Room Finish Schedule Product labels

c No other materials with harmful content Technical specs/MSDS Brochures & Catalogs
Non-Toxic Materials Shopdrawings
Confirmation Table
Material Safety Data Sheet
(MSDS)
13 SOLID WASTE MANAGEMENT GB Code Developer Regulator Regulator
Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability Design Value Documentati Documentati
value Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
on Provided? on Provided?
MRF floor area
13.1 Material Recovery Facility (MRF) Calculator Yes/No Yes/No Remarks Yes/No Yes/No Remarks

Architectural floor plans & Ocular Inspection &


a 0.00 0.00
Verification
MRF with minimum floor area as per Table 15 site development plan
showing location of MRF
b MRF fully enclosed & easily accessible Applies to all
Product labels
building occupancies
Solid waste containers for 4 types of waste; without exceptions MRF Floor Area
c compostable; non-recyclable; recyclable; Computation Table
Brochures & Catalogs
special
Technical specifications for
d For hospitals, isolated bins for hazardous the MRF
Shopdrawings
wastes
As-built Drawings
14 SITE SUSTAINABILITY GB Code Developer Regulator Regulator
Design Compliance Construction Compliance
Required
Item Philippine Green Building Code Requirement Applicability Design Value Documentati Documentati
value Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
on Provided? on Provided?
Required? Complied?
14.1 Site / Ground Preparation and Earthworks Yes/No Yes/No Remarks Yes/No Yes/No Remarks

a Building site and erosion control


Applies to all Site Erosion and Ocular Inspection &
Pollution mitigation and construction safety Sedimentation Control Plan Verification
b building occupancies
per Rule XI of the NBC without exceptions
c Storm water collection management plan Technical specifications in Shopdrawings
support of the erosion &
control plan
d Storm water collection facilities As-built Drawings
14.2 Open Space Utilization USA Calculator Design Value

Applies to all Ocular Inspection &


a Minimum 50% of the required Unpaved building occupancies 50% Not Complied Site Development Plan
Verification
Surface Area (USA) shall be vegetated
without exceptions
Technical specifications Shopdrawings
USA Computation Table As-built Drawings
DECLARED BY Signature Signature Signature

(Name of Design Professional)


DECLARED BY Signature

(Name of In-charge of Construction)


VERIFIED BY Signature Signature Signature

(Name of LGU OBO Checker)


SHGC CALCULATOR
Building Elevations Gross Net Window MAXIMU MINIMU Horizontal
Wall Glazing Wall M M VLT Overhang
Area Area Ratio (%) REQUIRE Depth (m)
(m2) (m2) D SHGC

10.00 5.00
0.00 0.00
0.00 0.00
0.00 0.00
50% 0.44 0.55 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
TOTAL 10.00 5.00
Return to Architectural GB Checklist
Height from D/H Correction Vertical Distance from D/H Correctio ADJUST
Window Sill Factor Fin Depth Opposite n Factor ED SHGC
to Bottom of (m) Window Edge
Overhang (m) to Fin (m)

0.00 0.0 1 0.00 0.00 0.0 1 0.44


OPERABLE WINDOW CALCULATOR
Frequently Occupied Building SpacFloor AreaRequired Operable Window Are
Delete Unused Rows (m2) (Min. 10% of Floor Area) (m2)

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Return to Architectural GB Checklist
Designed Operable Window AreaNot Complied
(m2)
100
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
0.00 Not Complied
THERMAL RESISTANCE CALCULATOR
Building Roof / Deck Component Thickness (mm)R-Value per 25.44 m Total Insulating Value
Outdoor surface, any position, moving air NA NA 0.25
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
Horizontal Indoor Surface NA NA 0.92
TOTAL 1.17
Return to Architectural GB Checklist
lating Value
MRF FLOOR AREA CALCULATOR
Building Use Building TGFA Computed Required MRF Floor
(m2) Area
(m2)
0.00 0.00
Return to Architectural GB Checklist
Designed MRF
Provision
(m2)
0.00
Not Complied
UNPAVED SURFACE AREA CALCULATOR
Building Use/Occupancy Lot Required Total Open Designed Total Open
Area Space Space
(m2) (m2) (m2)

0.00 0.00 0.00


Not Complied 2 Not Complied
Return to Architectural GB Checklist
Required Minimum USA as per GB Code Required Designed USA
NBC Minimum USA w/ w/Vegetation
(m2) Vegetation (m2)
(m2)

0.00 0.00 0.00


Not Complied
Required Complied YesNo Provided ElevationsInsulation
Required Complied Yes Provided North Polyisocyanurate
Not Required Not Complied No Not Provided Northeast Polyurethane
Exempt Not Applicable East Closed cell spray foam
Southeast Phenolic foam
South Urea formaldehyde foam
Southwest Plastic fiber
West Mineral fiber
Northwest Cementitious foam
Polystyrene
Fiberglass
Rockwool
Rigid foam
Cellulose
Open cell spray foam
Sheep's wool
Hemp
Cotton
Loose cellulose
Mineral wool
Straw
Vermiculite / Perlite
Reflective bubble foil
Poured Concrete
R-Value / Inch (25.44 mm)Use/Occupancy Requirement
5.6 Residential 0.0006
5.6 Hotel 0.0006
5.5 School 0.005
4.8 Hospital 0.0012
4.6 Office 0.001071429
4.3 Mercantile/Retail 0.00375
4.2
3.9
3.8
3.7
3.7
3.6
3.6
3.6
3.5
3.5
3.4
3
2.8
2.4
2.4
1
0.08