1 2 3 1 2 3

7.00
7.00
3.50 3.50
1.10
6-12mmØ MAIN BARS
WF2
3.50 3.50 WITH 10mmØ LATERAL
TIES SP. 4@50, 3@100,

WF2

WF2
1.20

1.20

1.45

1.45
CB

CB
REST @ 150mm O.C.
C1-F1 WF1 C1-F1 WF1 C1-F1
RB2 RB2
C C C C
NGL
4.50

4.50
WF1

4.50

4.50
WF1

RB1

RB1
RB1
0.60

100mm THK. SLAB W/ 0.80 METERS


10mmØ MATTING BARS
@ 500mm O.C. B.W.

C1-F1 EL.±0.15 mts. C1-F1


9.00

9.00
0.20

9.00

9.00
B S.
T. O. B B B
0.05

SECTION
4.50

4.50
WF1

WF1

4.50

4.50
RB1

RB1
RB1
0.80 METERS

0.28 0.25 0.28

WF1 WF1
C1-F1 C1-F1 C1-F1
A A A A
RB2 RB2
1.20

1.20

0.28
1.45

1.45
CONCRETE PAVEMENT ( T=100mm )
CB

CB
0.80 METERS 0.25
5-12mmØ BED BARS

FOUNDATION PLAN ROOF BEAM LAYOUT


SP. EQUALY O.C. B.W.

SCALE 1 : 100 METERS SCALE 1 : 100 METERS


0.28

PLAN

C1F1 DETAIL
SCALE 1 : 20 METERS

CONTRACTOR: PROJECT TITLE: PREPARED BY: REVIEWED: RECOMMENDING APPROVAL: APPROVED: SHEET NO.

REY MICHAEL F. GURREA JHOREN PATRICK M. PAGADUAN


CONSTRUCTION OF SCIENCE & COMPUTER PROPRIETOR PROJECT/AREA ENGINEER - SOUTH

LABORATORY BUILDING CHECKED: SUBMITTED:


EDGAR E. CARREDO HECTOR P. JAMORA
AS - BUILT PLAN MARLON B. BALITA-AN JOANNE TEODORA E. LAO OIC - CONSTRUCTION & MAINTENANCE DIVISION PROVINCIAL ENGINEER
QUANTITY ENGINEER - SOUTH SECTION HEAD, CONSTRUCTION DIVISION