Professional Documents
Culture Documents
CMX CM 240312 Domestic Water System
CMX CM 240312 Domestic Water System
ACTION TIME
Nº STOP DATE RESET DATE STOP TIME RESET TIME
1 11/03/2024 18:30
DESCRIPTION OF THE ACTION / INSPECTION CARRIED OUT
- Some pipe positions located deep in the previous concrete layer, supplying water to the Guard House, Office Area, need
to be repaired.
- The water pipes connected to the pressure compensation pump to supply water to the transformer station leak at the
joints and are often damaged, causing water loss.
- Reinstalling new water pipes, purchasing additional supplies to connect pipes to the Guard House, Office Area and
Transformer Station.
ROOT-CAUSE ANALYSIS
The reason is that the old water pipe has rotted, peeled off the surface and cannot be reused.
TECHNICIANS WHO PARTICIPATED IN THE ACTION / INSPECTION
FULL NAME COMPANY ID CARD Nº DATE SIGNATURE
Vu Van Tan POM 036090022323 12/03/2024
Nguyen Anh Khoa POM 058094009879 12/03/2024
Truong Nam Gioi POM 045098004381 12/03/2024
PICTURE REPORT