PRETENSIONING STEEL
Interior Girder Exterior Girder x 2'-3" threaded 1
"D" "D" Provide 2" dia. 7-wire low relaxation strands conforming to
rods @ exterior girders
AASHTO M203 (ASTMA416), Grade 270, Supplement 1.
2"cl. 1'-2" "a" spaces @ 6" "b" spaces @ 12" Equal spaces @ "e" maximum ctrs. "b" spaces @ 12" "a" spaces @ 6" 1'-2" 2"cl. Provide reinforcing steel as specified in the General Notes for the
6 sets of #5 "U1" #4 "U1" bars #4 "U1" bars #4 "U1" bars #4 "U1" bars #4 "U1" bars project unless shown otherwise.
2-#3 bars "U3" and
bars ea. end. Vary 2-#6 bars x cont. HANDLING PRESTRESSED CONCRETE GIRDERS
2"
2-#3 x 12" bars
5"±
4"
spc'g. to avoid insert Midspan
exterior girders only 2" Keep girders in an upright position with the support points within
or hole locations
2'-0" of the girder ends.
Provide temporary diaphragm beams as required, see BR350.
12"±
3'-4"
DIAPHRAGM BEAMS
Add #4 "U1" stirrups at
1" dia. hole for cable restraint each transverse beam See structure plans for diaphragm beam locations.
when alternate A restraint is used Pour transverse beams a minimum of three days before deck pour.
(typ.) locate at12 girder depth Strand Provide structural concrete inserts:
c.g. Expanded coil concrete inserts with closed-back ferrule
1'-7"
"ye"
1'-7"
threaded to receive 1" dia. x 2'-3" rods AASHTO M314,
03-2017
"G"
10"
1 "g" tubes 1
8 2" "B" 8 2"
"
"A"
5
'-
2"
1
2"
1
BACK END OF GIRDER
5'-7
AHEAD END OF GIRDER
1
Note TYPICAL ELEVATION
2"
8
(on stationing) Note (on stationing)
1
Girder details are symmetrical about These sections for dimensions only.
4
2-#3 bars x 12"
6"
6"
and 2 - #3 "U3" midspan unless shown otherwise
See Figures on the Girder Schedule
bars @ each upper
insert 1'-8" Sheet for the actual strand
9" 2'-0"
arrangements to be used.
2" cl.
1'-3" o-o
4"
1" 1" BAR "U2a"
2 - #6 x cont. o-o
1
BAR "U2"
5
BAR "U1" (Use in lieu of "U2" when
8"
5"
5"
o-o
o-o
2 - #6 x cont. 4 - #4 "U6" bars
Deflected strands
6" 2-#4 "U3" bars 1'-3" 3'-0"
o-o o-o
at ea. hole
BAR "U3"
at 2" ctrs.
BAR "U4"
2'-8"
1
� 1 2" dia. holes
2"
6"
o-o
in internal girders.
o-o
Lower deflected strand
1
Inserts in exterior
4
group (14 max. except 16 Upper group 4'-10"
girders. when the number of strands
c.g. strands at end 3'-8"
contains o-o o-o
9"
#3 "U2" bars N is 66 or greater) deflected strands
Tube strand when needed,
#4 "U1" bars BAR "U5"
see Girder Schedule. BAR "U6"
at ea. pair of 1 c.g. strands in excess of 14
2" spacing
at midspan Do not tube strand in bottom layer.
"U1" bars on unless shown
deflected
"he"
9"
"ye"
strands at
2"
spc'g
2"
"yc"
"hc" 3" NOTE: All material and workmanship shall be in accordance with
the current Oregon Standard Specifications
#3 "U2" bar at ea. at midspan
2"
The selection and use of this
OREGON STANDARD DRAWINGS
pair of "U1" bars. Chamfer 1"
2'-2" #6 "U5" bar
soffit corner
3" Spc'g @ 2" 3" 3" Spc'g @ 2" 3" Standard Drawing, while de-
1" max. typ.
signed in accordance with TYPE V - PRESTRESSED
MIDSPAN SECTION END VIEW generally accepted engineer-
MIDSPAN SECTION END VIEW
CONCRETE GIRDERS
ing principles and practices,
STRAND ARRANGEMENTS is the sole responsibility of
the user and should not be
BR340
2022
used without consulting a DATE REVISION DESCRIPTION
- -
Registered Professional En-
- -
gineer. - -
- -
- -