AMC CHECKLIST

FIRE PROTECTION AND DETECTION SYSTEM


Location : Almarai Bakery Alkharj Inspection No. :
Contractor : Arab Projects for Safety Co. Date :

DELUGE SYSTEM
Completed
Inspection Parameters
OK

1 Ensure that the solenoid for the deluge valve is closed after the test.
2 Ensure that no fault Signals exist on Fire Alarm Control Panel.
3 Check the 1st stage signal LED is operated in Extinguishing panel.
4 Check the panel transmits signals to FAS panel.
5 Check the internet buzzer is operated
6 Ensure that first stage alarm bell is operated.

7 Check th panel indicates asecond stage pre discharge audible and visual alarm.

8 Check internal buzzer operated.


9 Check the signal sent to the FAS panels.
Check solenoid on the deluge valve will activate the system once both the
10
dectector zones are activated.
Yearly Inspection Parameters

Performed by Client
Date : Date :

Name : Name :

Signature : Signature :
TION SYSTEM
Inspection No. : Q1-240205
Date :

Completed
NOT Remarks
OK

Client Approval
Date :

Name :

Signature :