To
The Engineer
MAHSR Package C-7,
National High Speed Rail Corporation Ltd.
Ahmedabad
Kind Attn: Mr. Lokesh Kumar
Subject: Design and Construction of Civil and Building Works including Testing and Commissioning on Design
Build Lump Sum Price Basis for Double Line High Speed Railway involving Ahmedabad Station,
Sabarmati Station, Viaduct & Bridges, Crossing Bridges (excluding fabrication and transportation of
steel truss girders) and Associated works between MAHSR Km. 489.467 and MAHSR Km. 507.599
in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail” –
Submission of Source Approval of Material –Steel Reinforcement
Dear Sir,
With reference to captioned subject, we are submitting herewith source for approval of following materials required
at our project site :
Thanking you,
Authorized Signat
Encl: As above
NATIONAL HIGH SPEED RAIL CORPORATION LIMITED (NHSRCL)
Employer / Engineer
CONSTRUCTION OF
MUMBAI – AHMEDABAD HIGH SPEED RAIL
(Package No. MAHSR– C7)
1|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
CONSTRUCTION OF
MUMBAI – AHMEDABAD HIGH SPEED RAIL
(Package No. MAHSR– C7)
2|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
Deputy Project
Designation: Senior Manager QC CPM
Director
Signature:
3|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
TABLE OF CONTENTS
Sr No Description Page No
1 INTRODUCTION 5
2 SCOPE OF WORK 6
3 MATERIAL REFERENCE 6
4 INSPECTION AND TEST PLAN (ITP) 10
5 ANNEXURE-I (COMPANY PROFILE) 11
6 ANNEXURE-II (MANUFACTURE TESTING CERTIFICATE) 18
7 ANNEXURE-II (THIRD PARTY TEST REPORT) 20
4|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
1 INTRODUCTION
The main object of this document is to briefly describe the methodology for requisition of
source approval of material – steel reinforcement for the implied project “Mumbai -
Ahmedabad High Speed Rail Project (Package No. MAHSR C-7) including
Ahmedabad & Sabarmati station”.
Mumbai – Ahmedabad High Speed Rail (MAHSR) Project is the first High Speed Rail
(HSR) network planned to be constructed in India. The MAHSR Project line connects
Mumbai, located in Maharashtra State with Ahmedabad in Gujarat State, passing through
one Union Territory, Dadra and Nagar Haveli. The entire stretch is divided into 8 packages
from C1 to C8. The Package C7 of High-Speed Rail Project is awarded to IRCON –
DINESHCHANDRA JV. The scope of work of Package C-7 consists of Design and
Construction of Civil and Building Works including Testing and Commissioning on Design
Build Lump Sum Price basis for Double Line High Speed Railway involving Ahmedabad
Station, Sabarmati Station, viaduct & Bridges , Crossing bridges (Excluding fabrication and
transportation of steel truss girders) and associated works between MAHSR Km. 489.467
and MAHSR Km. 507.599 in the State of Gujarat for the Project for Construction of
Mumbai-Ahmedabad High Speed Rail. The alignment of the MAHSR C7 package is shown
in Figure 1.
5|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
2. SCOPE OF WORK
The scope of this document covers the proposal for approval of material for using steel
reinforcement in Structural concrete works.
6 Location Ahmedabad
3. MATERIAL REFERENCE
6|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
7|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
8|Page
IRCON – DINESHCHANDRA JV SUBMISSION FOR SOURCE APPROVAL OF
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7) MAHSR/C7/MSA/0005
9|Page
IRCON – DINESHCHANDRA JV SUBMISSION OF SOURCE APPROVAL
Mumbai – Ahmedabad High Speed Rail MATERIAL – STEEL REINFORCEMENT
(Package No. MAHSR C-7)
MAHSR/C7/MSA/0005
Responsibility
Characterist Reference for
Sr Name of Nature of Test Frequency of Format of IRCON-
ics to be Acceptance Acceptance Criteria
No. Material Inspection Method Test/Quantum of check Record DINESHCHANDRA ENGINEER
checked Criteria
JV
Clause no.3.1 of
Division 2000, High strength deformed steel bars of FE 500D TMT
Steel Grade of IS 1786- Technical grade conforming to IS 1786 & manufactured by MTC
1 - - - -
Reinforcement Steel 2008 Specifications of SAIL/TATA STEEL/JINDAL/JSW
Employer STEEL/RINL/IISCO/any other approved source
Requirement
Clause no.3.2 of
Division 2000, Shall conform to Fe 500D properties as mentioned
Ultimate IS 1786- Clause no.11.1 of IS Technical in IS 1786- 2008< 3% (Natural Sand), <15%
2 TPT TPR C&R R/H
Tensile Test 2008 1786-2008 Specifications of (Crushed Sand), <12% (Mixed Sand), <10%
Employer (Manufactured Sand) by weight
Requirement
Steel 0.2% proof
3 Reinforcement Stress/Yield TPT -do- -do- -do- -do- TPR C&R R/H
– Mechanical Stress
Test
4 Elongation TPT -do- -do- -do- -do- TPR C&R R/H
5 Bend Rest TPT -do- -do- -do- -do- TPR C&R R/H
Rebend
6 TPT -do- -do- -do- -do- TPR C&R R/H
Test
7 Unit Test TPT -do- -do- -do- -do- TPR C&R R/H
Steel Carbon,
Reinforcement Sulphur,
8 TPT -do- -do- -do- -do- TPR C&R R/H
– Chemical Phosphorus
Analysis Content
Legends: TPT: Third Party Testing, MTC: Manufacture Test Certificate, LTR: Lab Testing Report, C: To be Check, R: Review, H: Hold
10 | P a g e
ANNEXURE-I
COMPANY PROFILE
ANNEXURE-II
MANUFACTURE TESTING CERTIFICATE
Scanned by CamScanner
ANNEXURE-III
THIRD PARTY TEST REPORT