L= 3.500 m
Wall thk. At top (m) = 0.200 W= 3.000 m
Wall thk. At btm (m) = 0.200 2.400 2.700 m
2.400 m
EL- -1.850
0.300 m
0.350 m
Length of Raft = 4.600 m
Width Of Raft = 4.100 m
Design
Design Parameters
3
1) Density Of Water 10 kN/m
3
2) Density Of Liquid inside the Pit 10 kN/m
3) Density Of Reinforced Concrete 25 kN/m3
4) Density Of PCC 24 kN/m3
5) Density Of Soil 18 kN/m3 Note - Since the buoyant force is considered for full size of raft,
the soil density is considered as Dry Density.
2
6) SBC used for Design 60 kN/m
7) Grade of Concrete (fck) 25 N/mm2
8) Grade of Steel (fy) 415 N/mm2
9) Co-efficient of friction (μ) 0.5
10) Co-efficient of active earth pressure (Ka) 0.64
Width = 3 + 2 x 0.2
= 3.4 m
lx = 3.5
a=lx/2 lz = 2.4 m
2.400 =b
1.5 36 36
1 24
2
= 200.19 mm
Ast,min = 0.12% b D
= 0.0012 x 1000 x 200
2
= 240 mm - Reinforcement equally distributed on both face
Modular Ratio αe = Es
Ec
= 200
25
= 8
523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165
= 0.00317
Distance of Neutral Axis from top face in Stress ((-8 x 0.00317 ) + (( 8 x 8 x 0.00317 x 0.00317 ) + ( 2 x 8 x 0.00317)) ^ 0.5 )
Block x = x 165
= 33.21 mm
2
= 96.7 N/mm < 230N/mm^2, Safe
= 0.0005
acr = SQRT((150/2)^2+30^2)
80.78 mm
= 3 x 80.78 x 0.0005
1 + 2((80.78 - 30) / (200 - 33.21)
= 0.075 mm
Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 5810000 2870000 7790000 1930000
Clear Cover mm 30 30 30 30
αe 8 8 8 8
lx = 3.5
a=lx/2 lz = 2.4 m
2.400 =b
we
1 27.648
= 231.44 mm2
Ast,min = 0.12% b D
= 0.0012 x 1000 x 200
= 240 mm2 - Reinforcement equally distributed on both face
Modular Ratio αe = Es
Ec
= 200
25
= 8
523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165
= 0.0032
Distance of Neutral Axis from top face in Stress ((-8 x 0.0032 ) + (( 8 x 8 x 0.0032 x 0.0032 ) + ( 2 x 8 x 0.0032)) ^ 0.5 ) x
Block x = 165
= 33.35 mm
2
= 111.39 N/mm < 230N/mm^2, Safe
= 0.00059
acr = SQRT((150/2)^2+30^2)
80.78 mm
= 3 x 80.78 x 0.00059
1 + 2((80.78 - 30) / (200 - 33.35)
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
= 0.089 mm
Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 6700000 3300000 8970000 2230000
Clear Cover mm 30 30 30 30
αe 8 8 8 8
a=lx/2 lz = 2.4 m
2.400 =b
1.5 36 36
1 24
= 162.71 mm2
2
Astprovided = 523.33 mm
Modular Ratio αe = Es
Ec
= 200
25
= 8
523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165
= 0.0032
Distance of Neutral Axis from top face in Stress ((-8 x 0.0032 ) + (( 8 x 8 x 0.0032 x 0.0032 ) + ( 2 x 8 x 0.0032)) ^ 0.5 ) x
Block x = 165
= 33.35 mm
= 0.00039
acr = SQRT((150/2)^2+30^2)
80.78 mm
= 3 x 80.78 x 0.00039
1 + 2((80.78 - 30) / (200 - 33.35)
= 0.059 mm
Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 4950000 2410000 6350000 1720000
Clear Cover mm 30 30 30 30
αe 8 8 8 8
lx = 3
a=lx/2 lz =
2.400 =b
2.4 m
1 27.648
2
= 187.96 mm
Modular Ratio αe = Es
Ec
= 200
25
= 8
523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165
= 0.0032
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Distance of Neutral Axis from top face in Stress ((-8 x 0.0032 ) + (( 8 x 8 x 0.0032 x 0.0032 ) + ( 2 x 8 x 0.0032)) ^ 0.5 ) x
Block x = 165
= 33.35 mm
2
= 90.9 N/mm < 230 Hence Safe
= 0.00046
acr = SQRT((150/2)^2+30^2)
80.78 mm
= 3 x 80.78 x 0.00046
1 + 2((80.78 - 30) / (200 - 33.35)
= 0.069 mm
Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 5700000 2780000 7320000 1980000
Clear Cover mm 30 30 30 30
αe 8 8 8 8
c) Design Of Raft
ly = 4.600
4.100 = lx
ly/lx = 4.6
4.1
= 1.12 Two Way Behaviour
1.5 29.25
1 19.5
= 348.21 mm2
Modular Ratio αe = Es
Ec
= 200
25
= 8
523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 245
= 0.0021
Distance of Neutral Axis from top face in Stress ((-8 x 0.0021 ) + (( 8 x 8 x 0.0021 x 0.0021 ) + ( 2 x 8 x 0.0021)) ^ 0.5 ) x
Block x = 245
= 40.98 mm
2
= 165.53 N/mm Safe
= 0.00055
acr = SQRT((150/2)^2+50^2)
= 90.14 mm
= 3 x 90.14 x 0.00055
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
1 + 2((90.14 - 50) / (200 - 40.98)
= 0.099 mm
Clear Cover mm 50 50 50 50
αe 8 8 8 8
0.150 m
Design Parameters
1) Density Of Reinforced Concrete 25 kN/m3
2) Density of Brick Masonry 21 kN/m3
3) Grade of Concrete (fck) 25 N/mm2 - As per design basis
4) Grade of Steel (fy) 415 N/mm2 - As per design basis
5) Permissible Stresses in Steel
Reinforcement (σs)
230 N/mm2 - Table 22 IS 456:2000
6) Elastic modulus of steel (Es) 200000 N/mm2 - Annex F IS456: 2000
7) Thickness of brick Platform above Septic
Tank 0.15 m
9) Slab Thk. 0.15 m
Diagram
ly = 4.6
4.1 = lx
ly/lx = 4.6
4.1
= 1.12 Two Way Behaviour
Calculation of Loads
Self weight of Slab = 3.75 kN/m2
Weight of Brick Platform = 3.15 kN/m2
Live Load= 3 kN/m2
Total Load= 9.9 kN/m2
1.5 14.85
1 9.9
= 387.5 mm2
Modular Ratio αe = Es
Ec
= 200
25
= 8
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
001
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR 0
Max. Strain in steel = 0.8 x 415/ 0.2 - Annex F IS456: 2000
= 0.00166
= 0.0042
Distance of Neutral Axis from top face in ((-8 x 0.0042 ) + (( 8 x 8 x 0.0042 x 0.0042 ) + ( 2 x 8 x 0.0042)) ^ 0.5 ) x
Stress Block x = 125
= 28.47 mm
Lever arm z = 125 - 28.47 / 3
= 115.51 mm
Stress in Steel σs = 11050000
523.33 x 115.51
= 182.8 N/mm2 Safe
= 3 x 77.62 x 0.00066
1 + 2((77.62 - 20) / (150 - 28.47)
= 0.079 mm
As 0.079 < 0.2, Crack width accepted
Clear Cover mm 30 20
αe 8 8
Summary :
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR
COUNTER SIGNED BY
MAHARASHTRA METRO
PROJECT: NAGPUR METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. Metro House, 28/2, CK Naidu Marg, Anand Nagar,
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. "................................REV......." APPROVED ON DATE .............. EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Civil Lines, Nagpur - 440 001
FOR GFC / NO OBJECTION'. Phone No: 07122554217
DDC / CONTRACTOR CONTRACTOR / DDC
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO NMRP
T BLE
DATE: 01.02.18 DATE: 01.02.18 DATE: 01.02.18 DATE: 01.02.18 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
NO CA
NAME: NAME: NAME: NAME: NAME: DATE: DATE: LOCATION: SITABURDI S/s
NAME:
DRAWN BY DESIGN BY CHECKED BY APPROVED BY
I
ACCEPTED BY
L
NAME:
TITLE:
132 kV GIS BUILDING AT SITABURDI RSS
L P LAYOUT & DETAILS OF BURNT OIL PIT
A P SYSTRA-AECOM-EGIS-RITES SCALE: 1:50 DATE: 01.02.18 STATUS: 1 OF 1 REVISION NO:
Church House, Above SBI Bank,
B01 01.02.18 ISSUED FOR APPROVAL DRG NO:
REV NO DATE DESCRIPTION SIGN
First floor, Civil Lines Nagpur- 440001 PWB02-SNW-AP-PES-RS1-DRE-0110 B01
1 2 3 4 5 6 7 8 9 10 11 12 plot scale
15 16
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A W A
S
B B
C C
D D
E E
F F
G G
TT-2
TT-1
AMT-2
AMT-1
AUTO PATH: \\10.1.2.23\EPC\PROJECTS UNDER EXECUTION\NMRC\2. ENGINEERING\03. ELECTRICAL\RSS SITABURDI\CABLE TRENCH & FOUNDATION LAYOUT\CABLE TRENCH & FOUNDATION LAYOUT_22-01-2018.DWG
H H
I I
J J
NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS
1) ALL DIMENSIONS ARE IN MM. INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR
COUNTER SIGNED BY
MAHARASHTRA METRO
PROJECT: NAGPUR METRO RAIL PROJECT
2) OIL SUMP PIT WILL BE LOCATED SUITABLY AS PER SITE DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. Metro House, 28/2, CK Naidu Marg, Anand Nagar,
K CONDITION. IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Civil Lines, Nagpur - 440 001 K
3) WATER SUMP WILL BE LOCATED SUITABLY AS PER SITE FOR GFC / NO OBJECTION'. Phone No: 07122554217
CONDITION. DDC / CONTRACTOR CONTRACTOR / DDC
4) FOR FOUNDATION DETAILS OF CONTROL ROOM REF PROOF CONSULTANT GENERAL CONSULTANT TO NMRCL NMRCL
SIGN: SIGN: SIGN: SIGN: SIGN:
DRG NO:- PWB02-S&W-PES-RS1-DRE-0001 SHEET 1 0F 2_R3 CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
T BLE
PWB02-S&W-PES-RS1-DRE-0002 SHEET 2 0F 2_R3 DATE: 30.01.2018 DATE: 30.01.2018 DATE: 30.01.2018 DATE: 30.01.2018 DATE: SIGN: SIGN:
DATE:
NAME: B.A.R. NAME: A.V.P. NAME: K.K.L. NAME: S.S. NAME: DATE: LOCATION: RSS SITABURDI NAGPUR METRO
DRAWN BY DESIGN BY CHECKED BY APPROVED BY
NO CA
ACCEPTED BY NAME: NAME:
L STERLING & WILSON PVT LTD. L I TITLE: FOUNDATION AND CABLE TRENCH LAYOUT RSS - SITABURDI
L
Universal Majestic, 13th Floor,
P P PROOFCONSULTANT
SYSTRA-AECOM-EGIS-RITES SCALE: AS NOTED DATE: 30.01.2018 STATUS: - SHEET: 1 OF 1 REVISION NO: