ANNEXURE G

DESIGN OF BURNT OIL PIT


DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

1.0 Design of Burnt Oil Pit

1.1 Design of walls & Raft of Burnt Oil Pit EL + 0.550 m


(TOC)
Sketch EL 0.550 m 0.000
G.L. + 0.550 m (max. LL) m

L= 3.500 m
Wall thk. At top (m) = 0.200 W= 3.000 m
Wall thk. At btm (m) = 0.200 2.400 2.700 m
2.400 m

EL- -1.850

0.300 m
0.350 m
Length of Raft = 4.600 m
Width Of Raft = 4.100 m
Design
Design Parameters
3
1) Density Of Water 10 kN/m
3
2) Density Of Liquid inside the Pit 10 kN/m
3) Density Of Reinforced Concrete 25 kN/m3
4) Density Of PCC 24 kN/m3
5) Density Of Soil 18 kN/m3 Note - Since the buoyant force is considered for full size of raft,
the soil density is considered as Dry Density.
2
6) SBC used for Design 60 kN/m
7) Grade of Concrete (fck) 25 N/mm2
8) Grade of Steel (fy) 415 N/mm2
9) Co-efficient of friction (μ) 0.5
10) Co-efficient of active earth pressure (Ka) 0.64

11) Permissible bending stresses in concrete for


compression (σcbc)
8.5 N/mm2 - Table 21 IS 456:2000
12) Permissible Stresses in Steel Reinforcement (σs)
230 N/mm2 - Table 22 IS 456:2000
13) Elastic modulus of steel (Es) 200000 N/mm2
14) Surcharge load 0 kN/sq.m
12) Internal Length of pit 3.5 m
13) Internal Width of pit 3 m
14) Internal Depth of pit 2.400 m
15) Wall Thk. 0.2 m
16) Raft Thk. 0.3 m
17) Raft Projection along length 0.35 m
18) Raft Projection along width 0.35 m
19) Thickness of Slab 0.15 m
20) Height of wall above paving area 0 m
22) Density of Brick 21 kN/m3

Out To Out Dimension Of Pit Wall


DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Length = 3.5 + 2 x 0.2
= 3.9 m

Width = 3 + 2 x 0.2
= 3.4 m

Length Of Long Wall = 3.5 + 2 x 0.2


= 3.9 m

Height Of Long Wall = 2.4


= 2.4 m

Length Of Short Walls = 3.000 m

Height Of Short Wall = 2.4


= 2.4 m
Calculation Of Upward Forces Due To Buoyancy

Note : Tank dimensions below ground shall affect buoyancy


Buoyant force on full raft are considered for calculations.

Length Of Raft = 3.5 + 2 x 0.2 + 2 x 0.35


= 4.6 m

Width Of Raft = 3 + 2 x 0.2 + 2 x 0.35


= 4.1 m

Depth = 2.4 + 0.3


= 2.700 m

Buoyant Force = 10x 3.5 x 3 x 2.55


= 267.75 kN
Calculation Of Downward Load
Weight Of Raft = 25 x 4.6 x 4.1 x 0.3
= 141.45 kN
Weight Of Long Walls = 2 x 25 x 3.9 x 0.2 x 2.4
= 93.6 kN
Weight Of Short Walls = 2 x 25 x 3 x 0.2 x 2.4
= 72 kN
Weight Of Slab= 25 x 3.9 x 3.4 x 0.15
= 49.73 kN

Soil On projection = 18 x ( 4.6 x 4.1 - 3.9 x 3.4 ) x ( 2.4 )


= 242.00 kN

Total = 141.45 + 93.6 + 72 + 242 + 49.73


= 598.78 kN

Factor Of Safety Against Buoyancy


FOS = 598.78 / 267.75
= 2.236
More Than 1.25 Hence Safe
Check For Bearing Pressure
Weight Of Water Inside Pit= 10 x 3.5 x 3 x 2.4
= 252 kN
Total Weight = 252 + 598.78
= 850.78 kN
Bearing Pressure = 850.78 / ( 4.6 * 4.1 )
= 45.11 kN/sqm
Less Than 60 kN/sqm Hence Safe
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
DESIGN OF WALLS:
A )Design of Long Wall:
Case 1: When Tank is full without pressure from outside.
Case 2: When Tank is empty with pressure from outside

Case:1 When Tank is full without pressure from outside

lx = 3.5

a=lx/2 lz = 2.4 m
2.400 =b

End Condition :- Three edges fixed top edge freely supported


Ratio (lx/lz) = 3.5
2.4
= 1.46 Two Way Behaviour

Total factored Action =γf x max(γw,γl) x b


Limit state of collapse Limit state of Limit state of
Partial Factors of Safety as per IS (Operating Load) collapse (Accidental Serviceability
456:2000 (γf ) kN/sq.m per m kN/sq.m per m kN/sq.m per m

1.5 36 36

1 24

By Moody's Chart for Triangularly distributed loads


Ratio for a/b = 0.73
Shear Force calculation
Section Shear Force =co-efficient x w x b
Limit state of collapse Limit state of
Maximum Shear Co-efficient Ry
(Operating Load) collapse (Accidental
kN per m kN per m

Max. Shear Force = 0.398948 34.47 34.47

Bending Moment calculation


Section Bending Moment=co-efficient x w x b2
Bending Moment Co-efficients Limit state of collapse Limit state of Limit state of
from Moody's chart (applicable for (Operating Load) collapse (Accidental Serviceability
two-way Panels) kNm per m kNm per m kNm per m

Max. Positive Horizontal


Moment = 0.042052 8.72 8.72 5.81
Max.Negative Horizontal
Moment= 0.020744 4.3 4.3 2.87
Max. Positive Vertical
Moment = 0.056328 11.68 11.68 7.79
Max. Negative Vertical
Moment = 0.013988 2.9 2.9 1.93

Sample Calculation of Reinforcement


Nominal Cover = 30 mm
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Bar dia = 10 mm
dprov = 165 mm

Mu,max = 11680000 Nmm

Ast,actual = 0.5 fck x b x d 1- 1- 4.6 x Mu,max


fy fck x b x d2

= 0.5 x 25 x 1000 x 165 1- 1- 4.6 x 11680000


415 25 x 1000 x 165^2

2
= 200.19 mm

Ast,min = 0.12% b D
= 0.0012 x 1000 x 200
2
= 240 mm - Reinforcement equally distributed on both face

Area of Reinforcement calculations


BM Dia deff Ast Ast Spacing Spacing Ast Remark
Section Actual Minimu Req. Provided Provided
Nmm mm mm
(sq.mm) m (mm) (mm) (sq.mm)
Max. Positive Horizontal To Suit
8720000 10 155 158.59 240 327 150 523.33
Moment = crack width
Max.Negative Horizontal To Suit
4300000 10 155 77.52 240 327 150 523.33
Moment= crack width
Max. Positive Vertical To Suit
11680000 10 165 200.19 240 327 150 523.33
Moment = crack width
Max. Negative Vertical To Suit
2900000 10 165 48.94 240 327 150 523.33
Moment = crack width

Sample Crack Width Calculation

Maximum allowable Crack width w k = 0.2 mm - Cl 35.3.2 IS 456: 2000


2
Astprovided = 523.33 mm

BM = 7790000 Nmm -Limit state of Serviceabilty Bending Moment

Es = Elastic Modulus of steel


= 200 kN/mm2

Ec = Elastic Modulus of Concrete


= 25 kN/mm2

Modular Ratio αe = Es
Ec
= 200
25

= 8

Max. Strain in steel = 0.8 x 415/ 0.2 - Annex F IS456: 2000


= 0.00166
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165

= 0.00317

Distance of Neutral Axis from top face in Stress ((-8 x 0.00317 ) + (( 8 x 8 x 0.00317 x 0.00317 ) + ( 2 x 8 x 0.00317)) ^ 0.5 )
Block x = x 165
= 33.21 mm

Lever arm z = 165 - 33.21 / 3


= 153.93 mm

Stress in Steel σs = 7790000


523.33 x 153.93

2
= 96.7 N/mm < 230N/mm^2, Safe

Strain at extreme fibre є1= (96.7/200000) x (200-33.21)/(165-33.21)


2
= 0.000611905 N/mm

єm = 0.000611905 - 165 x (200-33.21) x (200- 33.21)


3 x 200000 x 523.33 x ( 165-33.21)

= 0.0005

acr = SQRT((150/2)^2+30^2)
80.78 mm

Calculation for Maximum spacing of bar,

Design Surface Crack width wk = 3 x acr x єm


1+2((acr-Cmin)/(h-x))

= 3 x 80.78 x 0.0005
1 + 2((80.78 - 30) / (200 - 33.21)

= 0.075 mm

As 0.075 < 0.2, Crack width accepted

calculation for crackwidth for all other cases

Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 5810000 2870000 7790000 1930000

Ast Provided (sq.mm) 523.33 523.33 523.33 523.33

Spacing Provided mm 150 150 150 150

Clear Cover mm 30 30 30 30

deff mm 155 155 165 165


DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

αe 8 8 8 8

Max strain 0.00166 0.00166 0.00166 0.00166


ρ 0.00338 0.00338 0.00317 0.00317
x mm 32.1 32.1 33.21 33.21
z mm 144.3 144.3 153.93 153.93
σs N/sq.mm 76.94 38 96.7 23.96
є1 0.000525558 0.000259569 0.00061191 0.00015
єm 0.00041 0.00015 0.0005 0.00004
acr mm 80.78 80.78 80.78 80.78
wk mm 0.062 0.023 0.075 0.006
wk, permissible mm 0.2 0.2 0.2 0.2
Check Safe Safe Safe Safe

Check for shear in Wall

% Pt = 0.32 100 As/b d


Nominal shear stress τv = 0.210 N/mm2 τv =Vu/bd cl. 40.1 IS 456:2000
Design Shear strength of concrete τc = 0.41 N/mm
2
- Table 19 , IS 456:2000
τv<τc hence safe

Case:2 When Tank is empty with pressure from outside

lx = 3.5

a=lx/2 lz = 2.4 m
2.400 =b

we

End Condition :- Three edges fixed top edge freely supported


Ratio (lx/lz) = 3.5
2.4
= 1.46 Two Way Behaviour

Total factored Action due to soil (we) =γf x ka x γsoil x b


Limit state of
Limit state of collapse collapse (Accidental Limit state of
Partial Factors of Safety as per IS (Operating Load) Load) Serviceability
456:2000 (γf ) kN/sq.m per m kN/sq.m per m kN/sq.m per m

1.5 41.47 41.472

1 27.648

By Moody's Chart for Triangularly distributed loads


Ratio for a/b = 0.73

Shear Force calculation


Section Shear Force =co-efficient x w x b
Maximum Shear Co-efficient Ry
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Limit state of collapse Limit state of
Maximum Shear Co-efficient Ry
(Operating Load) collapse (Accidental
kN per m kN per m

Max. Shear Force = 0.398948 39.71 39.71

Bending Moment calculation


2
Section Bending Moment=co-efficient x w x b
Bending Moment Co-efficients Limit state of collapse ( Limit state of Limit state of
from Moody's chart (applicable for Operating Load) collapse (Accidental Serviceability
two-way Panels) kNm per m kNm per m kNm per m
Max. Positive Horizontal For we
Moment = 0.042052 10.04 10.05 6.7
Max.Negative Horizontal
Moment= 0.020744 4.96 4.96 3.3
Max. Positive Vertical
Moment = 0.056328 13.45 13.46 8.97
Max. Negative Vertical
Moment = 0.013988 3.34 3.34 2.23

Sample Calculation of Reinforcement


Nominal Cover = 30 mm
Bar dia = 10 mm
dprov = 165 mm

Mu,max = 13460000 Nmm

Ast,actual = 0.5 fck x b x d 1- 1 - 4.6 x Mu,max


fy 2
fck x b x d

= 0.5 x 25 x 1000 x 165 1- 1- 4.6 x 13460000


415 25 x 1000 x 165^2

= 231.44 mm2

Ast,min = 0.12% b D
= 0.0012 x 1000 x 200
= 240 mm2 - Reinforcement equally distributed on both face

Area of Reinforcement calculations


BM Dia deff Ast Ast Spacing Spacing Ast Remark
Section Actual Minimu Req. Provided Provided
Nmm mm mm
(sq.mm) m (mm) (mm) (sq.mm)
Max. Positive Horizontal To Suit
10050000 10 155 183.27 240 327 150 523.33
Moment = crack width
Max.Negative Horizontal To Suit
4960000 10 155 89.53 240 327 150 523.33
Moment= crack width
Max. Positive Vertical To Suit
13460000 10 165 231.44 240 327 150 523.33
Moment = crack width
Max. Negative Vertical To Suit
3340000 10 165 56.41 240 327 150 523.33
Moment = crack width

Sample Crack Width Calculation


Maximum allowable Crack width w k = 0.2 mm - Cl 35.3.2 IS 456: 2000
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Astprovided = 523.33 mm2
BM = 8970000 Nmm -Limit state of Serviceabilty Bending Moment

Es = Elastic Modulus of steel


2
= 200 kN/mm
Ec = Elastic Modulus of Concrete
2
= 25 kN/mm

Modular Ratio αe = Es
Ec
= 200
25

= 8

Max. Strain in steel = 0.8 x 415/ 0.2 - Annex F IS456: 2000


= 0.00166

523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165

= 0.0032

Distance of Neutral Axis from top face in Stress ((-8 x 0.0032 ) + (( 8 x 8 x 0.0032 x 0.0032 ) + ( 2 x 8 x 0.0032)) ^ 0.5 ) x
Block x = 165
= 33.35 mm

Lever arm z = 165 - 33.35 / 3


= 153.88 mm

Stress in Steel σs = 8970000


523.33 x 153.88

2
= 111.39 N/mm < 230N/mm^2, Safe

Strain at extreme fibre є1= (111.39/200000) x (200-33.35)/(165-33.35)


2
= 0.000705019 N/mm

єm = 0.000705019 - 165 x (200-33.35) x (200- 33.35)


3 x 200000 x 523.33 x ( 165-33.35)

= 0.00059

acr = SQRT((150/2)^2+30^2)
80.78 mm

Calculation for Maximum spacing of bar,

Design Surface Crack width wk = 3 x acr x єm


1+2((acr-Cmin)/(h-x))

= 3 x 80.78 x 0.00059
1 + 2((80.78 - 30) / (200 - 33.35)
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

= 0.089 mm

As 0.089 < 0.2, Crack width accepted

calculation for crackwidth for all other cases

Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 6700000 3300000 8970000 2230000

Ast Provided (sq.mm) 523.33 523.33 523.33 523.33

Spacing Provided mm 150 150 150 150

Clear Cover mm 30 30 30 30

deff mm 155 155 165 165

αe 8 8 8 8

Max strain 0.00166 0.00166 0.00166 0.00166


ρ 0.00338 0.00338 0.00317 0.00317
x mm 32.1 32.1 33.21 33.21
z mm 144.3 144.3 153.93 153.93
σs N/sq.mm 88.73 43.7 111.36 27.69
є1 0.000606093 0.000298504 0.00070467 0.00018
єm 0.00049 0.00019 0.00059 0.00006
acr mm 80.78 80.78 80.78 80.78
wk mm 0.074 0.029 0.089 0.009
wk, permissible mm 0.2 0.2 0.2 0.2
Check Safe Safe Safe Safe

Check for shear in Wall


% Pt = 0.32 100 As/b d
Nominal shear stress τv = 0.240 N/mm2 τv =Vu/bd cl. 40.1 IS 456:2000
Design Shear strength of concrete τc = 0.41 N/mm2 - Table 19 , IS 456:2000
τv<τc hence safe

B )Design of Short Wall:


Case 1: When Tank is full without soil pressure from outside.
Case 2: When Tank is empty with soil pressure and wheel load from outside

Case:1 When Tank is full without soil pressure from outside


lx = 3

a=lx/2 lz = 2.4 m

2.400 =b

End Condition :- Three edges fixed top edge freely supported


Ratio (lx/lz) = 3
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
2.4
= 1.25 Two Way Behaviour

Total factored Action =γf x max(γw,γl) x b


Limit state of
Limit state of collapse collapse (Accidental Limit state of
Partial Factors of Safety as per IS (Operating Load) Load) Serviceability
456:2000 (γf ) kN/sq.m per m kN/sq.m per m kN/sq.m per m

1.5 36 36

1 24

By Moody's Chart for Triangularly distributed loads


Ratio for a/b = 0.63
Shear Force calculation
Section Shear Force =co-efficient x w x b
Limit state of
Maximum Shear Co-efficient Ry Limit state of collapse collapse (Accidental
(Operating Load) Load)
kN per m kN per m

Max. Shear Force = 0.366188 31.64 31.64

Bending Moment calculation


Section Bending Moment=co-efficient x w x b2
Bending Moment Co-efficients Limit state of collapse ( Limit state of Limit state of
from Moody's chart (applicable for Operating Load) collapse (Accidental Serviceability
two-way Panels) kNm per m kNm per m kNm per m
Max. Positive Horizontal
Moment = 0.035812 7.43 7.43 4.95
Max.Negative Horizontal
Moment= 0.017464 3.62 3.62 2.41
Max. Positive Vertical
Moment = 0.045968 9.53 9.53 6.35
Max. Negative Vertical
Moment = 0.012428 2.58 2.58 1.72

Sample Calculation of Reinforcement


Nominal Cover = 30 mm
Bar dia = 10 mm
dprov = 165 mm

Mu,max = 9530000 Nmm

Ast,actual = 0.5 fck x b x d 1- 1 - 4.6 x Mu,max


fy fck x b x d2

= 0.5 x 25 x 1000 x 165 1- 1- 4.6 x 9530000


415 25 x 1000 x 165^2

= 162.71 mm2

Ast,min = 0.12% b D - cl. 8.1.1 IS 3370:2009 Part 2


= 0.0012 x 1000 x 200
= 240 mm2 - Reinforcement equally distributed on both face
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

Area of Reinforcement calculations


BM Dia deff Ast Ast Spacing Spacing Ast Remark
Section Actual Minimu Req. Provided Provided
Nmm mm mm
(sq.mm) m (mm) (mm) (sq.mm)
Max. Positive Horizontal To Suit
7430000 10 155 134.78 240 327 150 523.33
Moment = crack width
Max.Negative Horizontal To Suit
3620000 10 155 65.17 240 327 150 523.33
Moment= crack width
Max. Positive Vertical To Suit
9530000 10 165 162.71 240 327 150 523.33
Moment = crack width
Max. Negative Vertical To Suit
2580000 10 165 43.52 240 327 150 523.33
Moment = crack width

Sample Crack Width Calculation

Maximum allowable Crack width w k = 0.2 mm - Cl 35.3.2 IS 456: 2000

2
Astprovided = 523.33 mm

BM = 6350000 Nmm -Limit state of Serviceabilty Bending Moment

Es = Elastic Modulus of steel


2
= 200 kN/mm - Annex F IS456: 2000
Ec = Elastic Modulus of Concrete
2
= 25 kN/mm - BS EN 1992-1-1 2004 Table 3

Modular Ratio αe = Es
Ec
= 200
25

= 8

Max. Strain in steel = 0.8 x 415/ 200000 - Annex F IS456: 2000


= 0.00166

523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165

= 0.0032

Distance of Neutral Axis from top face in Stress ((-8 x 0.0032 ) + (( 8 x 8 x 0.0032 x 0.0032 ) + ( 2 x 8 x 0.0032)) ^ 0.5 ) x
Block x = 165
= 33.35 mm

Lever arm z = 165 - 33.35 / 3


= 153.88 mm

Stress in Steel σs = 6350000


523.33 x 153.88

= 78.85 N/mm2 < 230 Hence, Safe

Strain at extreme fibre є1= (78.85/200000) x (200-33.35)/(165-33.35)


= 0.000499064 N/mm2
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
єm = 0.000499064 - 165 x (200-33.35) x (200- 33.35)
3 x 200000 x 523.33 x ( 165-33.35)

= 0.00039

acr = SQRT((150/2)^2+30^2)
80.78 mm

Calculation for Maximum spacing of bar,

Design Surface Crack width wk = 3 x acr x єm


1+2((acr-Cmin)/(h-x))

= 3 x 80.78 x 0.00039
1 + 2((80.78 - 30) / (200 - 33.35)

= 0.059 mm

As 0.059 < 0.2, Crack width accepted

calculation for crackwidth for all other cases

Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 4950000 2410000 6350000 1720000

Ast Provided (sq.mm) 523.33 523.33 523.33 523.33

Spacing Provided mm 150 150 150 150

Clear Cover mm 30 30 30 30

deff mm 155 155 165 165

αe 8 8 8 8

Max strain 0.00166 0.00166 0.00166 0.00166


ρ 0.00338 0.00338 0.00317 0.00317
x mm 32.1 32.1 33.21 33.21
z mm 144.3 144.3 153.93 153.93
σs N/sq.mm 65.55 31.92 78.83 21.36
є1 0.000447756 0.000218038 0.00049883 0.00014
єm 0.00033 0.0001 0.00039 0.00002
acr mm 80.78 80.78 80.78 80.78
wk mm 0.05 0.015 0.059 0.003
wk, permissible mm 0.2 0.2 0.2 0.2
Check Safe Safe Safe Safe

% Pt = 0.32 100 As/b d


Nominal shear stress τv = 0.190 N/mm2 τv =Vu/bd cl. 40.1 IS 456:2000
Design Shear strength of concrete τc = 0.41 N/mm2 - Table 19 , IS 456:2000
τv<τc hence safe
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

Case:2 When Tank is empty with pressure from outside

lx = 3

a=lx/2 lz =
2.400 =b
2.4 m

End Condition :- Three edges fixed top edge freely supported


Ratio (lx/lz) = 3
2.4
= 1.25 Two Way Behaviour

Total factored Action (w) =γf x ka x γsoil x b


Limit state of
Limit state of collapse collapse (Accidental Limit state of
Partial Factors of Safety as per IS (Operating Load) Load) Serviceability
456:2000 (γf ) kN/sq.m per m kN/sq.m per m kN/sq.m per m

1.5 41.47 41.472

1 27.648

By Moody's Chart for Triangularly distributed loads


Ratio for a/b = 0.63
Shear Force calculation
Section Shear Force =co-efficient x w x b
Limit state of collapse Limit state of
Maximum Shear Co-efficient Ry
(Operating Load) collapse (Accidental
kN per m kN per m

Max. Shear Force = 0.366188 36.45 36.45

Bending Moment calculation


Section Bending Moment=co-efficient x w x b2
Limit state of
Bending Moment Co-efficients Limit state of collapse collapse (Accidental Limit state of
from Moody's chart (applicable for (Operating Load) Load) Serviceability
two-way Panels) kNm per m kNm per m kNm per m
Max. Positive Horizontal
Moment = 0.035812 8.55 8.55 5.7
Max.Negative Horizontal
Moment= 0.017464 4.17 4.17 2.78
Max. Positive Vertical
Moment = 0.045968 10.98 10.98 7.32
Max. Negative Vertical
Moment = 0.012428 2.97 2.97 1.98

Sample Calculation of Reinforcement


Nominal Cover = 30 mm
Bar dia = 10 mm
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
dprov = 165 mm

Mu,max = 10980000 Nmm

Ast,actual = 0.5 fck x b x d 1- 1 - 4.6 x Mu,max


fy 2
fck x b x d

= 0.5 x 25 x 1000 x 165 1- 1- 4.6 x 10980000


415 25 x 1000 x 165^2

2
= 187.96 mm

Ast,min = 0.12% b D - cl. 8.1.1 IS 3370:2009 Part 2


= 0.0012 x 1000 x 200
2
= 120 mm - Reinforcement equally distributed on both face

Area of Reinforcement calculations


BM Dia deff Ast Ast Spacing Spacing Ast Remark
Section Actual Minimu Req. Provided Provided
Nmm mm mm
(sq.mm) m (mm) (mm) (sq.mm)
Max. Positive Horizontal To Suit
8550000 10 155 155.44 240 327 150 523.33
Moment = crack width
Max.Negative Horizontal To Suit
4170000 10 155 75.16 240 327 150 523.33
Moment= crack width
Max. Positive Vertical To Suit
10980000 10 165 187.96 240 327 150 523.33
Moment = crack width
Max. Negative Vertical To Suit
2970000 10 165 50.13 240 327 150 523.33
Moment = crack width

Sample Crack Width Calculation

Maximum allowable Crack width w k = 0.2 mm - Cl 35.3.2 IS 456: 2000

Astprovided = 523.33 mm2

BM = 7320000 Nmm -Limit state of Serviceabilty Bending Moment

Es = Elastic Modulus of steel


= 200 kN/mm2
Ec = Elastic Modulus of Concrete
2
= 25 kN/mm

Modular Ratio αe = Es
Ec
= 200
25
= 8

Max. Strain in steel = 0.8 x 415/ 0.2 - Annex F IS456: 2000


= 0.00166

523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 165

= 0.0032
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Distance of Neutral Axis from top face in Stress ((-8 x 0.0032 ) + (( 8 x 8 x 0.0032 x 0.0032 ) + ( 2 x 8 x 0.0032)) ^ 0.5 ) x
Block x = 165
= 33.35 mm

Lever arm z = 165 - 33.35 / 3


= 153.88 mm

Stress in Steel σs = 7320000


523.33 x 153.88

2
= 90.9 N/mm < 230 Hence Safe

Strain at extreme fibre є1= (90.9/200000) x (200-33.35)/(165-33.35)


2
= 0.000575332 N/mm

єm = 0.000575332 - 165 x (200-33.35) x (200- 33.35)


3 x 200000 x 523.33 x ( 165-33.35)

= 0.00046

acr = SQRT((150/2)^2+30^2)
80.78 mm

Calculation for Maximum spacing of bar,

Design Surface Crack width wk = 3 x acr x єm


1+2((acr-Cmin)/(h-x))

= 3 x 80.78 x 0.00046
1 + 2((80.78 - 30) / (200 - 33.35)

= 0.069 mm

As 0.069 < 0.2, Crack width accepted

Max. Max.
Max. Positive Max.Negative
Positive Negative
Section Unit Horizontal Horizontal
Vertical Vertical
Moment = Moment=
Moment = Moment
BM Nmm 5700000 2780000 7320000 1980000

Ast Provided (sq.mm) 523.33 523.33 523.33 523.33

Spacing Provided mm 150 150 150 150

Clear Cover mm 30 30 30 30

deff mm 155 155 165 165

αe 8 8 8 8

Max strain 0.00166 0.00166 0.00166 0.00166


ρ 0.00338 0.00338 0.00317 0.00317
x mm 32.1 32.1 33.21 33.21
z mm 144.3 144.3 153.93 153.93
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
σs N/sq.mm 75.49 36.82 90.87 24.58
є1 0.000515654 0.000251508 0.00057501 0.00016
єm 0.0004 0.00014 0.00046 0.00004
acr mm 80.78 80.78 80.78 80.78
wk mm 0.06 0.021 0.069 0.006
wk, permissible mm 0.2 0.2 0.2 0.2
Check Safe Safe Safe Safe

Check for shear in Wall

% Pt = 0.32 100 As/b d


Nominal shear stress τv = 0.220 N/mm2 τv =Vu/bd cl. 40.1 IS 456:2000
Design Shear strength of concrete τc = 0.41 N/mm
2
- Table 19 , IS 456:2000
τv<τc hence safe

c) Design Of Raft

ly = 4.600

4.100 = lx

Note :- Bottom raft is subjected to upward thrust due to water.

ly/lx = 4.6
4.1
= 1.12 Two Way Behaviour

Calculation of upward pressure


Upward water pressure from outside = 10 x 2.7 - 0.3 x 25
2
= 19.5 kN/m

Total factored Action =γf x net upward pressure from outside


Limit state of
Partial Factors of Safety as per IS Limit state of collapse Serviceability
456:2000 (γf ) kN/sq.m per m kN/sq.m per m

1.5 29.25

1 19.5

Shear Force calculation


Section Shear Force =co-efficient x w x b
Maximum Shear Co-efficient Ry
Limit state of collapse
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
Maximum Shear Co-efficient Ry
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
kN per m

Max. Shear Force = 0.5 59.96

Bending Moment calculation


Section Bending Moment=co-efficient x w x lx2
Bending Moment Co-efficients Limit state of
Limit state of collapse
from Table-26 IS 456:2000 Serviceability
kNm per m kNm per m
Long Span
Negative Moment at
continuous edge = 0.032 29.18 19.46
Positive Moment at Mid-
span = 0.024 11.8 7.87
Short Span
Negative Moment at
continuous edge = 0.0388 30.06 20.04
Positive Moment at Mid-
span = 0.0292 14.36 9.57

Sample Calculation of Reinforcement


Nominal Cover = 50 mm
Bar dia = 10 mm
dprov = 245 mm

Mu,max = 30060000 Nmm

Ast,actual = 0.5 fck x b x d 1- 1 - 4.6 x Mu,max


fy 2
fck x b x d

= 0.5 x 25 x 1000 x 245 1- 1- 4.6 x 30060000


415 25 x 1000 x 245^2

= 348.21 mm2

Ast,min = 0.12% b D - cl. 8.1.1 IS 3370:2009 Part 2


= 0.0012 x 1000 x 300
= 360 mm2 - Reinforcement equally distributed on both face

Area of Reinforcement calculations


BM Dia deff Ast Ast Spacing Spacing Ast Remark
Section Actual Minimu Req. Provided Provided
Nmm mm mm
(sq.mm) m (mm) (mm) (sq.mm)
Negative Moment at To Suit
29180000 10 245 337.77 360 218 150 523.33
continuous edge = crack width
Positive Moment at Mid- To Suit
11800000 10 245 134.69 360 218 150 523.33
span = crack width
Negative Moment at To Suit
30060000 10 245 348.21 360 218 150 523.33
continuous edge = crack width
Positive Moment at Mid- To Suit
14360000 10 245 164.25 360 218 150 523.33
span = crack width

Sample Crack Width Calculation

Maximum allowable Crack width w k = 0.2 mm - Cl 35.3.2 IS 456: 2000

Astprovided = 523.33 mm2


DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01

BM = 20040000 Nmm -Limit state of Serviceabilty Bending Moment

Es = Elastic Modulus of steel


2
= 200 kN/mm - Annex F IS456: 2000

Ec = Elastic Modulus of Concrete


2
= 25 kN/mm

Modular Ratio αe = Es
Ec
= 200
25

= 8

Max. Strain in steel = 0.8 x 415/ 0.2 - Annex F IS456: 2000


= 0.00166

523.33
Ratio of Ast Provided to C/s of Concrete ρ = 1000 x 245

= 0.0021

Distance of Neutral Axis from top face in Stress ((-8 x 0.0021 ) + (( 8 x 8 x 0.0021 x 0.0021 ) + ( 2 x 8 x 0.0021)) ^ 0.5 ) x
Block x = 245
= 40.98 mm

Lever arm z = 245 - 40.98 / 3


= 231.34 mm

Stress in Steel σs = 20040000


523.33 x 231.34

2
= 165.53 N/mm Safe

Strain at extreme fibre є1= (165.53/200000) x (200-40.98)/(245-40.98)


2
= 0.000645098 N/mm

єm = 0.000645098 - 245 x (200-40.98) x (200- 40.98)


3 x 200000 x 523.33 x ( 245-40.98)

= 0.00055

acr = SQRT((150/2)^2+50^2)

= 90.14 mm

Calculation for Maximum spacing of bar,

Design Surface Crack width wk = 3 x acr x єm


1+2((acr-Cmin)/(h-x))

= 3 x 90.14 x 0.00055
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
1 + 2((90.14 - 50) / (200 - 40.98)

= 0.099 mm

As 0.099 < 0.2, Crack width accepted

calculation for crackwidth for all other cases

Long Span Short Span


Negative Positive
Negative Moment Positive
Moment at Moment
Section Unit at continuous edge Moment at Mid-
continuous at Mid-
= span =
edge = span =
BM Nmm 19460000 7870000 20040000 9570000

Ast Provided (sq.mm) 523.33 523.33 523.33 523.33

Spacing Provided mm 150 150 150 150

Clear Cover mm 50 50 50 50

deff mm 245 245 245 245

αe 8 8 8 8

Max strain 0.00166 0.00166 0.00166 0.00166


ρ 0.00214 0.00214 0.00214 0.00214
x mm 41.33 41.33 41.33 41.33
z mm 231.22 231.22 231.22 231.22
σs N/sq.mm 160.82 65.04 165.61 79.09
є1 0.000626438 0.000253348 0.0006451 0.00031
єm 0.00053 0.00016 0.00055 0.00021
acr mm 90.14 90.14 90.14 90.14
wk mm 0.095 0.029 0.099 0.038
wk, permissible mm 0.2 0.2 0.2 0.2
Check Safe Safe Safe Safe

Check for shear in Wall

% Pt = 0.21 100 As/b d


Nominal shear stress τv = 0.240 N/mm2 τv =Vu/bd cl. 40.1 IS 456:2000
Design Shear strength of concrete τc = 0.34 N/mm2 - Table 19 , IS 456:2000
τv<τc hence safe
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
0110
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR B01
Summary :

Design Details for Wall,

Provided Thickness = 200 mm


Vertical Reinforcement = T10 @ 150mmC/c
Horizontal Reinforcement = T10 @ 150mmC/c

Design Details of Raft,

Raft Projections = 350 mm


Provided Thickness = 300 mm
Reinforcement = T10 @ 150mm c/c bothways
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
001
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR 0

1.2 Design of Top Slab


Sketch

0.150 m

11. Design of Slab S1

Design Parameters
1) Density Of Reinforced Concrete 25 kN/m3
2) Density of Brick Masonry 21 kN/m3
3) Grade of Concrete (fck) 25 N/mm2 - As per design basis
4) Grade of Steel (fy) 415 N/mm2 - As per design basis
5) Permissible Stresses in Steel
Reinforcement (σs)
230 N/mm2 - Table 22 IS 456:2000
6) Elastic modulus of steel (Es) 200000 N/mm2 - Annex F IS456: 2000
7) Thickness of brick Platform above Septic
Tank 0.15 m
9) Slab Thk. 0.15 m
Diagram
ly = 4.6

4.1 = lx

ly/lx = 4.6
4.1
= 1.12 Two Way Behaviour
Calculation of Loads
Self weight of Slab = 3.75 kN/m2
Weight of Brick Platform = 3.15 kN/m2
Live Load= 3 kN/m2
Total Load= 9.9 kN/m2

Total factored Action (w) =γf x Total Load


Limit state of
Partial Factors of Safety as Limit state of collapse Serviceability
per IS 456:2000 (γf ) kN/sq.m per m kN/sq.m per m

1.5 14.85

1 9.9

Shear Force calculation


Section Shear Force =co-efficient x w x b
Maximum Shear Co-
efficient Ry Limit state of collapse
kN per m

Max. Shear Force = 0.5 30.44


DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
001
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR 0

Bending Moment calculation


Section Bending Moment=co-efficient x w x lx2
Bending Moment Co-
Limit state of
efficients from Table-26 IS Limit state of collapse
Serviceability
456:2000
kNm per m kNm per m
Long Span
Positive Moment at Mid-
span = 0.056 13.98 9.32
Short Span
Positive Moment at Mid-
span = 0.0664 16.58 11.05

Sample Calculation of Reinforcement


Nominal Cover = 20 mm
Bar dia = 10 mm
dprov = 125 mm

Mu,max = 16580000 Nmm

Ast,actual = 0.5 fck x b x d 1- 1 - 4.6 x Mu,max


fy fck x b x d2

= 0.5 x 25 x 1000 x 125 1- 1- 4.6 x 16580000


415 25 x 1000 x 125^2

= 387.5 mm2

Ast,min = 0.12% b D - cl. 8.1.1 IS 3370:2009 Part 2


= 0.0012 x 1000 x 150
= 180 mm2 - Reinforcement equally distributed on both face

Area of Reinforcement calculations


BM Dia deff Ast Ast Spacing Spacing Ast Remark
Section Actual Minimum Req. Provided Provided
Nmm mm mm
(sq.mm) (sq.mm) (mm) (mm) (sq.mm)
To Suit
Long Span - Positive
13980000 10 125 323.85 180 242 150 523.33 crack
Moment at Mid-span =
width
To Suit
Short Span - Positive
16580000 10 125 387.5 180 203 150 523.33 crack
Moment at Mid-span =
width

Sample Crack Width Calculation


Maximum allowable Crack width w k = 0.2 mm - Cl 35.3.2 IS 456: 2000

Astprovided = 523.33 mm2


BM = 11050000 Nmm -Limit state of Serviceabilty Bending Moment

Es = Elastic Modulus of steel


= 200 kN/mm2 - Annex F IS456: 2000
Ec = Elastic Modulus of Concrete
= 25 kN/mm2

Modular Ratio αe = Es
Ec
= 200
25
= 8
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
001
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR 0
Max. Strain in steel = 0.8 x 415/ 0.2 - Annex F IS456: 2000
= 0.00166

Ratio of Ast Provided to C/s of Concrete ρ 523.33


= 1000 x 125

= 0.0042
Distance of Neutral Axis from top face in ((-8 x 0.0042 ) + (( 8 x 8 x 0.0042 x 0.0042 ) + ( 2 x 8 x 0.0042)) ^ 0.5 ) x
Stress Block x = 125
= 28.47 mm
Lever arm z = 125 - 28.47 / 3
= 115.51 mm
Stress in Steel σs = 11050000
523.33 x 115.51
= 182.8 N/mm2 Safe

Strain at extreme fibre є1= (182.8/200000) x (150-28.47)/(125-28.47)


= 0.00115071 N/mm2
єm = 0.00115071 - 1000 x (150-28.47) x (150- 28.47)
3 x 200000 x 523.33 x ( 125-28.47)
= 0.00066
acr = SQRT((150/2)^2+20^2)
77.62 mm
Calculation for Maximum spacing of bar,
Design Surface Crack width wk = 3 x acr x єm
1+2((acr-Cmin)/(h-x))

= 3 x 77.62 x 0.00066
1 + 2((77.62 - 20) / (150 - 28.47)
= 0.079 mm
As 0.079 < 0.2, Crack width accepted

calculation for crackwidth


Long Span Short Span
Long Span - Short Span -
Positive Positive
Section Unit
Moment at Moment at
Mid-span = Mid-span =
BM Nmm 9320000 11050000

Ast Provided (sq.mm) 523.33 523.33

Spacing Provided mm 150 150

Clear Cover mm 30 20

deff mm 125 125

αe 8 8

Max strain 0.00166 0.00166


ρ 0.00419 0.00419
x mm 28.45 28.45
z mm 115.52 115.52
σs N/sq.mm 154.16 182.78
є1 0.000970386 0.00115054
єm 0.00048 0.00066
acr mm 80.78 77.62
wk mm 0.063 0.079
wk, permissible mm 0.2 0.2
Check Safe Safe
DOC. No.
PWB02-SNW-AP-PES-RS1-DES-
001
Rev.
ISSUED 02/02/2018 132KV GIS BLDG AT SITABURDI, NAGPUR 0

Check for shear

% Pt = 0.35 100 As/b D


Nominal shear stress τv = 0.240 N/mm2 τv =Vu/bd cl. 40.1 IS 456:2000
Design Shear strength of concrete τc = 0.42 N/mm2 - Table 19 , IS 456:2000
τv<τc hence safe

Check for Deflection

Ref IS 456:2000 Fig 4

fy fs pt req. pt prov. MFt Basic Modified Deff Deff Check


N/mm2 N/mm2 % % L/deff L/deff Required Provied
415 177.66 0.258 0.35 1.9500 20 39 118 125 Safe

Summary :

Design Details of Slab,

Provided Thickness = 150 mm


Short span Reinforcement = T10 dia @ 150 c/c
Long Span Reinforcement = T10 dia @ 150 c/c
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS
INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR
COUNTER SIGNED BY
MAHARASHTRA METRO
PROJECT: NAGPUR METRO RAIL PROJECT
DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. Metro House, 28/2, CK Naidu Marg, Anand Nagar,
K IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. "................................REV......." APPROVED ON DATE .............. EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Civil Lines, Nagpur - 440 001
FOR GFC / NO OBJECTION'. Phone No: 07122554217
DDC / CONTRACTOR CONTRACTOR / DDC
SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO NMRP

T BLE
DATE: 01.02.18 DATE: 01.02.18 DATE: 01.02.18 DATE: 01.02.18 DATE: SIGN: SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.

NO CA
NAME: NAME: NAME: NAME: NAME: DATE: DATE: LOCATION: SITABURDI S/s
NAME:
DRAWN BY DESIGN BY CHECKED BY APPROVED BY
I
ACCEPTED BY

L
NAME:
TITLE:
132 kV GIS BUILDING AT SITABURDI RSS
L P LAYOUT & DETAILS OF BURNT OIL PIT
A P SYSTRA-AECOM-EGIS-RITES SCALE: 1:50 DATE: 01.02.18 STATUS: 1 OF 1 REVISION NO:
Church House, Above SBI Bank,
B01 01.02.18 ISSUED FOR APPROVAL DRG NO:
REV NO DATE DESCRIPTION SIGN
First floor, Civil Lines Nagpur- 440001 PWB02-SNW-AP-PES-RS1-DRE-0110 B01

1 2 3 4 5 6 7 8 9 10 11 12 plot scale
15 16
TBA 50mm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A W A
S

B B

C C

D D

E E

F F

G G

TT-2
TT-1

AMT-2
AMT-1
AUTO PATH: \\10.1.2.23\EPC\PROJECTS UNDER EXECUTION\NMRC\2. ENGINEERING\03. ELECTRICAL\RSS SITABURDI\CABLE TRENCH & FOUNDATION LAYOUT\CABLE TRENCH & FOUNDATION LAYOUT_22-01-2018.DWG

H H

I I

J J

NOTES: THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS
1) ALL DIMENSIONS ARE IN MM. INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE FOR
COUNTER SIGNED BY
MAHARASHTRA METRO
PROJECT: NAGPUR METRO RAIL PROJECT
2) OIL SUMP PIT WILL BE LOCATED SUITABLY AS PER SITE DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. INDEPENDENTLY AND FOUND SUITABLE FOR THE THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR RAIL CORPORATION LTD. Metro House, 28/2, CK Naidu Marg, Anand Nagar,
K CONDITION. IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................ EXECUTION PURPOSE AND IS RECOMMENDED CONSTRUCTION'/BEING GIVEN NO OBJECTION Civil Lines, Nagpur - 440 001 K
3) WATER SUMP WILL BE LOCATED SUITABLY AS PER SITE FOR GFC / NO OBJECTION'. Phone No: 07122554217
CONDITION. DDC / CONTRACTOR CONTRACTOR / DDC
4) FOR FOUNDATION DETAILS OF CONTROL ROOM REF PROOF CONSULTANT GENERAL CONSULTANT TO NMRCL NMRCL
SIGN: SIGN: SIGN: SIGN: SIGN:
DRG NO:- PWB02-S&W-PES-RS1-DRE-0001 SHEET 1 0F 2_R3 CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
T BLE
PWB02-S&W-PES-RS1-DRE-0002 SHEET 2 0F 2_R3 DATE: 30.01.2018 DATE: 30.01.2018 DATE: 30.01.2018 DATE: 30.01.2018 DATE: SIGN: SIGN:

DATE:
NAME: B.A.R. NAME: A.V.P. NAME: K.K.L. NAME: S.S. NAME: DATE: LOCATION: RSS SITABURDI NAGPUR METRO
DRAWN BY DESIGN BY CHECKED BY APPROVED BY
NO CA
ACCEPTED BY NAME: NAME:

L STERLING & WILSON PVT LTD. L I TITLE: FOUNDATION AND CABLE TRENCH LAYOUT RSS - SITABURDI
L
Universal Majestic, 13th Floor,
P P PROOFCONSULTANT
SYSTRA-AECOM-EGIS-RITES SCALE: AS NOTED DATE: 30.01.2018 STATUS: - SHEET: 1 OF 1 REVISION NO:

R1 30.01.2018 ISSUE FOR APPROVAL


P.L. Lokhande Marg, Chembur (W),
Mumbai - 400043 A Church House, Above SBI Bank,
First floor, Civil Lines Nagpur- 440001
DRG NO:
PWB02-SNW-AP-PES-RS1-DRP-0034 R1
REV NO DATE DESCRIPTION SIGN
1 2 3 4 5 6 7 8 9 10 11 12 plot scale
15 16
50mm