A1 P1 P2 A2
FR FR FR FX FX
"1"
FR
"2"
·
·
·
·
·
·
·
·
AT SUPPORT AT MID ·
FRL OF SR (m) ·
·
GROUND LEVEL (LHS) DETAILS OF RCC GIRDER ·
GROUND LEVEL (RHS) (FOR SPAN 20.0 M) ·
HYDROLOGICAL DATA
C B VELOCITY
HFL
MSL AT ABUT.
MSL AT PIER
A BH-A2 A
NOTE :-
WHEREVER FOUNDATION IS RESTING ON CLAY IT IS
RECOMMENDED TO REPLACE SUCH STRATA DOWN TO
MINIMUM 1000MM DEPTH BELOW THE FOUNDING
LEVEL PROVIDING SUITABLE GRANULAR MATERIAL.
COMPACTION SHOULD BE DONE IN LAYERED
BH-P1 MANNERS AND MINIMUM COMPACTION SHOULD BE AT
95% OF MDD OR 75% OF RELATIVE DENSITY. THE
AB
AB
COMPACTED GRANULAR BED SHALL BE PROJECTION
OF MINIMUM 1.0M ALL-ROUND THE FOUNDATION.
TO DELHI TO KATRA
538+200
538+300
CO-ORDINATES:
E- 490329.242,
CO-ORDINATES:
N- 3630728.873
E- 490328.043,
A1 P1 P2 A2
N- 3630700.18
A A A
A BH-P1 BH-A2
MH MH
CH CH
CH
MH
MH
AB
AB
SB
K25
K2
K2
K25 55
AB
AB
AB
AB
AB
AB
BH-A1 C BH-P2 B
A
A
NALA
ROW ROW ROW ROW ROW ROW
ROW BH-A1 BH-P2
A1 P1 P2 A2
CO-ORDINATES:
NALA
CO-ORDINATES:
A1 P1 TOP PLAN P2 A2 E- 490367.74,
N- 3630677.335
E-490372.411,
N- 3630707.269
KEY PLAN
CLIENT: CONTRACTOR: DESIGN CONSULTANT: PROJECT:
US
M/S GAWAR CONSTRUCTION LTD. ECSTATIC ENGINEERING CONSULTANTS APPROVED BY: Development and Upgradation up to Four lane Access Control
NATIONAL HIGHWAY SF-01,JMD Galleria, Sector-48, Sohna Road, PRIVATE LIMITED Expressway from Design Chainage Km 530.000 to Km 545.300
Gurgaon-122002 (Hr.) 545, Dundahera Road, Shankar Chowk Rd, CHECKED BY: NS (Sidhra to Ban Village Section of NH-44) on EPC Mode under
AUTHORITY OF INDIA (NHAI) Tel.: +91-124-4854001/02 Gurugram, Haryana 12201 Bharatmala Pariyojna in the UT of J&K. (Phase II-Package XVIII).
E-mail :gcl@gawar.in
DESIGNED BY: VK
AUTHORITY ENGINEER SEFETY CONSULTANT: PROOF CONSULTANT:
22.02.2024 R2 HR AS PER AUTHORITY COMMENT TITLE: GENERAL ARRANGEMENT DRAWING FOR MAJOR BRIDGE
INTERCONTINENTAL CONSULTANTS AND
12.02.2024 R1 HR AS PER AUTHORITY COMMENT TECHNOCRATS PVT. LTD. TTL ENGINEERING PVT LTD M/S PK ENGINEERS DRAWN BY: HR (SPAN 3x20.0m) AT LHS CH. 538+195.935 TO 538+255.935
A-8 & A-9, Green Park Main, New Delhi - 110 016, INDIA SCO-75,2nd Floor,HUDA Market Sector 10A 2nd floor, T.C. Tower Opp Metro Pillar No.29, & RHS CH. 538+196.880 TO 538+256.880
16.10.2023 R0 HR ISSUED FOR APPROVAL Tel : +91-11-40863000, 40863100 Near Hero Honda Chowk,Gurgaon, mansarovar metro station, Nirman Nagar, SCALE: AS SHOWN DRG NO.: SHEET NO. REV.
E-mail : info@ictonline.com Haryana-122001 Mob-9999841336 Mansarovar, Jaipur, Rajasthan 302019
DATE REV BY DESCRIPTION OF REVISIONS website : www.ictonline.com DATE: OCT.- 2023 DEL-KAT/NHAI/PKG-18/STR/MJB/GAD-101 01 OF 04 R2
TO DELHI A1 P1 P2 A2 TO KATRA
P1
C B
A BH-A2 A
BH-P1
AB
AB
DETAIL AT - "2"
A
A
A1
BH-A1 C BH-P2 B
A1 P1 BOTTOM PLAN P2 A2
DETAIL AT - "1"
SECTION AT B-B
G.L. G.L.
G.L. G.L.
SECTION AT C-C
P2
BORE LOG BH-A1 BORE LOG BH-P1 BORE LOG BH-P2 BORE LOG BH-A2
G.L. G.L.
G.L. G.L.
FREE P1 FREE
SECTION AT A-A (L-L AXIS)
TRAFFIC DIRECTION
T
B P1
L L
A A
DETAILS "X"
B T
FOUNDATION PLAN
D D
D D
UNFAVOURABLE BOND CONDITION
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
C C
SCHEDULE OF REINFORCEMENT
C C BAR
SL. NO. BAR DIA. NO./SPACING SHAPES
MKD.
PIER FOOTING-
SECTION A-A
SECTION B-B
TRAFFIC DIRECTION PIER SHAFT-
B
LEGENDS:-
REINF. AT TOP
FACE/NEAR FACE
A A
REINF. AT BOTTOM
FACE/FAR FACE
"1"
"1" DRAWING APPLICABLE FOR PIER NOS:-
LP1 & RP1.
DETAILS `1'
GOOD FOR CONSTRUCTION
B
PLAN SHOWING REINFORCEMENT DETAILS IN FOOTING
SECTION AT D-D
B D
L C
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
T-T AXIS
T T
A A L-L AXIS
D REINFORCEMENT DETAILS:-
BAR MKD. BAR DIA & SPACING / NOS BAR SHAPE
PLAN SHOWING TYPICAL REINF.
PIER CAP:-
DETAILS OF BEARING PEDESTAL
B L C
SIZE OF BEARING PEDESTAL SHALL BE (L+300)
REINFORCEMENT DETAILS IN PLAN x (T+300) WHERE `L' AND `T' ARE LENGTH OF
BEARING IN LONGITUDINAL AND
TRANSVERSE DIRECTION RESPECTIVELY.
LEGEND:-
SECTION AT C-C
G.L. G.L.
FIX P2 FIX
SECTION AT A-A (L-L AXIS)
TRAFFIC DIRECTION
T
B P2
FX FX
L L
A A
T DETAILS "X"
B FOUNDATION PLAN
D D
D D
UNFAVOURABLE BOND CONDITION
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
C C
C C SCHEDULE OF REINFORCEMENT
SL. NO. BAR
BAR DIA. NO./SPACING SHAPES
MKD.
PIER FOOTING-
SECTION A-A
SECTION B-B
TRAFFIC DIRECTION PIER SHAFT-
B
LEGENDS:-
REINF. AT TOP
A A FACE/NEAR FACE
REINF. AT BOTTOM
FACE/FAR FACE
"1" "1"
DRAWING APPLICABLE FOR PIER NOS:-
LP2 & RP2.
SECTION AT D-D
SECTION AT A-A
D
B C
L
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
T-T AXIS
T T L-L AXIS
A A
D REINFORCEMENT DETAILS:-
BAR MKD. BAR DIA & SPACING / NOS BAR SHAPE
PLAN SHOWING TYPICAL REINF.
PIER CAP:-
DETAILS OF BEARING PEDESTAL
LEGEND:-
SECTION AT C-C
S1 S1 S1 S1
S2 S3 S2
FAVOURABLE ZONE:-
S2 S3 S2 UNFAVOURABLE ZONE:-
S1 S1 S1 S1
PLAN AT PIER CAP TOP LEVEL PLAN AT PIER CAP TOP LEVEL GOOD FOR CONSTRUCTION
SECTION AT 5-5
SECTION AT 4-4
SECTION AT 1-1
TRAFFIC DIRECTION
SECTION AT 6-6
2
TRAFFIC DIRECTION LEGEND:-
1 SECTION AT 3-3
1 5
TRAFFIC DIRECTION
6 6
2
4