ITEM DESCRIPTION UNID. SPECIFICATION PROPOSED
1 GENERAL CHARACTERISTICS
2 Manufacturer: - Inform
30 Speed (maximum): -
31 Suction: m/s 0,88
32 Recalc: m/s 2,07
1) The PROPOSER must provide all the fields requested and confirm other items.
2) The CONTRACTED PARTY must submit a list of deviations from the specification for the proposed equipment.
3) For pumps with flanged nozzles, which do not comply with ANSI B-16.5, the manufacturer must supply the necessary counter-flanges, nuts,
washers and bolts.
4) Provide certificate.
5) The supplier must comply with Standards AC/4-M(96)001 - NATO TECHNICAL CRITERIA AND STANDARDS FOR POL FACILITIES and Bi-
SC Directive 085-008 - NATO CRITERIA AND STANDARDS FOR MARITIME FACILITIES
6) The noise level, 1m from the equipment, cannot be greater than 85 db(A).
Instructions for completion by the supplier::
I - The Supplier must fill in the column on the left-hand side of the "Proposed" field with one of the following options: "A" (meets) or "D" (deviates).
II - The items marked as "D", as well as the relevant clarifications, must be informed by the Supplier via the "List of Deviations". The Supplier must proceed in the same
way when submitting additional information to that contained in this Data Sheet.
III - The Explanatory Notes at the end of the Data Sheet are to be filled in exclusively by the Issuer and must not be filled in by the Supplier. 5/7
ITEM DESCRIPTION UNID. SPECIFICATION PROPOSED
1 GENERAL CHARACTERISTICS
2 Manufacturer: - Inform
3 Place: - Pipeline
5 Type: - CENTRIFUGA
6 Model: - Inform
Pump Bp-01-
7 Item: -
01/02/03/04/05/06
6 (four operating + two
8 Quantity: -
standing)
9 OPERATING CONDITIONS
10 Work cycle (hours/day; days/week/days/year): - 24; 7; 365
11 Service (heavy, medium, light): - Heavy
12 Environment (dusty; humid; corrosive): - Poeirento; úmido; corrosivo
13 Fluid: - kerosene JP8 F34 (JET A1)
14 Average local altitude : m 193,8
15 Ambient temperature: °C 25
See Data Sheet of the
16 Power supply: V; Hz; ф
Engine`s
17 Cinematic viscosity -20ºC cSt 8000
18 Minimum flow rate (per pump): m³/h 60
19 Design flow rate (per pump): m³/h 150
20 Suction pressure at minimum flow rate: mca 0,12
21 Suction pressure at design flow rate: mca 0,18
22 Discharge pressure at minimum flow: kgf/cm² 1,68
23 Discharge pressure at design flow: kgf/cm² 1,5
24 AMT at minimum flow: mca 8,5
25 AMT at design flow: mca 18,65
26 NPSH available: mca 93,22
27 PIPING: -
28 Suction: pol 4"
4" (NORTH POL)/ 6"
29 Recalc: pol
(Pipeline)
30 Speed (maximum): -
31 Suction: m/s 0,88
32 Recalc: m/s 2,07
1) The PROPOSER must provide all the fields requested and confirm other items.
2) The CONTRACTED PARTY must submit a list of deviations from the specification for the proposed equipment.
3) For pumps with flanged nozzles, which do not comply with ANSI B-16.5, the manufacturer must supply the necessary counter-flanges, nuts,
washers and bolts.
4) Provide certificate.
5) The supplier must comply with Standards AC/4-M(96)001 - NATO TECHNICAL CRITERIA AND STANDARDS FOR POL FACILITIES and Bi-
SC Directive 085-008 - NATO CRITERIA AND STANDARDS FOR MARITIME FACILITIES
6) The noise level, 1m from the equipment, cannot be greater than 85 db(A).