Investment Budget & Ratio of 2 x 6000TPA Magnesium Plant

2x6000TPA 金属镁项目投资预算及占比

Invest Budget
S.N. Item Name Ratio Remark
(RMB ¥)
序号 工段 占比 备注
投资预算
Process Equipment Includes the refractory materials
1 ¥ 8,8720,000 52.2%
工艺设备及耐火材料 含耐火材料
Contains circulating water, air
Auxiliary Production Facilities compressor station, transformer
2 ¥ 7,680,000 4.5%
生产辅助设施 and distribution facilities, etc
循环水,空压站,变配电设施等
Electrical Equipment & Automation
3 ¥ 13,920,000 8.2%
电气及自控
Including concrete, steel and
Civil Construction Cost
4 ¥ 39,360,000 23.2% steel structures
建筑工程费
含混凝土、钢筋和钢结构
Installation Cost
5 ¥ 18,400,000 10.8%
安装工程费
Pipelines and General Transportation
6 ¥ 1,920,000 1.1%
外网及总图运输
In Total
总计
¥ 170,000,000 100.0%

Remark /备注:

1. The above investment budget and proportion are referred to the same capacity project in China, which is for
reference only.
以上投资预算和占比参考中国国内同等产量项目,仅为参考。

2. According to the flatness of the site venue, the quality of the geological conditions will cause the changes of
process design, as well as the different construction cost in different project location, etc. Kinds of factors will
cause the difference in investment.
每个项目根据现场土地的平整度,地质条件好坏都会引起工艺布置的变动,以及不同项目地施工成本的差异等
各因素,从而产生投资额的差异。