INSTALLATION WORK PACKAGE

Project: 116005 - USGCII - OSBL

BMZ IWP No: IWP-036B-12-41SW-003 Schedule ID: CN036B1241SW003

IWP CWP Craft Code CWP Type IWP # REV #

IWP - 036B - 12 - 41SW - 003 0

Description BACKFILL FOR WEST OSBL / EAST PE - SW


Created By /
CORBIN PHELTS / RAMIRO RUIZ
Superintendent

MODEL SHOT

SAFETY
Safety Concerns: Ensure proper use of equipment and flaggers. Watch for human/machine interface. Wear proper PPE and avoid being in the line of fire.

Applicable JSA's:

O BATHTUB EXCAVATION O DIKE WALL INSTALL

O PIPE TRENCH / FOUNDATION EXCAVATION O LIME STABILIZATION

O TRENCHING AND EXCAVATION WITH TRENCHER O GENERAL BACKFILL

O POND EXCAVATIONS O

O AUGER EXCAVATIONS O

X PIPE TRENCH BACKFILL O

O ELECTRICAL DUCKBANK BACKFILL O

O STRUCTURAL FOUNDATION BACKFILL O

O PRE-CAST STRUCTURE INSTALL O

O PRE-CAST RCP/CHDPE INSTALL O

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


INSTALLATION WORK PACKAGE
Project: 116005 - USGCII - OSBL

BMZ IWP No: IWP-036B-12-41SW-003 Schedule ID: CN036B1241SW003

IWP CWP Craft Code CWP Type IWP # REV #

IWP - 036B - 12 - 41SW - 003 - 0

Description BACKFILL FOR WEST OSBL / EAST PE - SW

Created By CORBIN PHELTS / RAMIRO RUIZ

QUALITY
ITP Hold Point Required Document No.
O 50-QAIP-00002 O 1.1 Facilitate an ITP review O Attendance Sheet
O 50-QAIP-00002 O 2.1 Third Party Testing O 50-QAIR-00005
O 50-QAIP-00002 O 3.1 Verifiy Contol Monuments O N/A
O 50-QAIP-00002 O 4.1 Inspection of Backfill Material O 50-QAIR-00001
O 50-QAIP-00002 O 6.1 Notifiy QC for Pre-Cast Structure Inpestion O 50-QAIR-00003
6.2 Notifiy QC for Pre-Cast Structure Inspection
O 50-QAIP-00002 O O 50-QAIR-00004
Before Backfill

O 50-QAIP-00002 O 7.1 Non-Conformance Identified (Repair or Replace) O 50-QAAR-00002

O 50-QAIP-00002 O 7.2 Non-Conformance Identified (Use-As-Is) O 50-QAAR-00002

WORK PLAN DETAILS


Schedule Duration: IWP Field Received Date

Scope Description: BACKFILL FOR WEST OSBL / EAST PE - SW


Earnable Hours for Package
Known Constraints in Work Area: None
Critical Equipment: Excavator, Dozer, Haul Truck, Skid Steer, Roller
Other Craft Interface: None
Required Permits: None
Scaffold Required: None
Hold Points Identified: Yes
*Reference Drawings for Required Materials (Included in Work Package)
*Reference Safety, QA/QC and Specification / Standard Drawing Print Shack Books (Included in Work Package)

WORK PACKAGE RELEASE - AUTHORIZATION

Responsible: Name (Print): Signature: Comments / Hold Points: Date

General Foreman:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)

Field QA/QC /
QA-QC / Turnover Admin:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)

HSE:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)

Scaffold:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)

NDE Coordinator:
(Acknowledgement/Familiarity of NDE Prior
To Proceeding)
IF APPLICABLE

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


INSTALLATION WORK PACKAGE
Project: 116005 - USGCII - OSBL

BMZ IWP No: IWP-036B-12-41SW-003 Schedule ID: CN036B1241SW003

IWP CWP Craft Code CWP Type IWP # REV #

IWP - 036B - 12 - 41SW - 003 - 0

Description BACKFILL FOR WEST OSBL / EAST PE - SW

Created By CORBIN PHELTS / RAMIRO RUIZ

WORK PACKAGE / DRAWING REFERENCE # 1


Associated Work Packages:

CWP Number: Description

CWP-036B-12-41SW BACKFILL FOR WEST OSBL / EAST PE - SW

Referenced Specifications:

60-CVES-00004 OVERLAY TO PIP CVS02100 SITE PREPARATION, EXCAVATION, AND BACKFILL SPECIFICATION

60-CVES-00006 OVERLAY TO PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION

50-CVES-00006 SITE PREPARATION AND EARTHWORK SPECIFICATION

Standard Details

60-CVDSW-08805 USGC II PETROCHEMICAL PROJECT STORM WATER DETAIL

60-CVDSW-08806 USGC II PETROCHEMICAL PROJECT STORM WATER DETAIL

60-CVDSW-08807 USGC II PETROCHEMICAL PROJECT STORM WATER DETAIL

60-CVDSW-08808 USGC II PETROCHEMICAL PROJECT STORM WATER DETAIL

Drawings:

60-CVDSW-03601 STORM SEWER OVERALL KEY PLAN

60-CVDSW-03602 STORM SEWER KEY PLAN

60-CVDSW-03607 STORM SEWER SHT 6

60-CVDSW-03610 STORM SEWER SHT 7

60-CVDSW-03613 STORM SEWER SHT 10

030-220252 MH-042 Shop Drawing MH-42 SHOP DRAWINGS

030-220252 MH-043 Shop Drawing MH-43 SHOP DRAWINGS

030-220252 MH-044 Shop Drawing MH-44 SHOP DRAWINGS

030-220252 MH-045 Shop Drawing MH-45 SHOP DRAWINGS

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


INSTALLATION WORK PACKAGE
Project: 116005 - USGCII - OSBL

BMZ IWP No: IWP-036B-12-41SW-003 Schedule ID: CN036B1241SW003

IWP CWP Craft Code CWP Type IWP # REV #

IWP - 036B - 12 - 41SW - 003 - 0

Description BACKFILL FOR WEST OSBL / EAST PE - SW

Created By CORBIN PHELTS / RAMIRO RUIZ

WORK PACKAGE COMPLETE - AUTHORIZATION

Responsible: Name (Print): Signature: Date:

Foreman:
(Verification scope of work is
complete)

General Foreman:
(Verification scope of work is
complete)

QA/QC:
(Verification scope of work is
complete by Field Inspector)

Workface Planner:
(Verification scope of work is
complete / Submit to Document
Management)
QA-QC Admin / Turnover Admin
Review:
(Verification scope of work is
complete by Admin)

NDE Coordinator:
(Verification scope of work is
complete and in ZPTS) IF APPLICABLE

Lessons
Learned:

Additional
Comments:

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


Assigned To: —

IWP-036B-12-41SW-003
Percent Complete: 0.00% MTO: 103.6 Earned: 0 Remaining: 103.6
Start: 3/22/2024 Finish: 5/16/2024
Qty / Rem. Qty /
Iso Rev StepID Area Identifier Description Cost Code Hours Comp% Rem. Hours Mon Tues Wed Thurs Fri Sat Sun PCA
60-CVDSW-03610 0 599 27 LINE B.6 LOAD FROM STOCKPILE 12450 21 0.0% 21
1 1
60-CVDSW-03610 0 600 27 LINE B.6 MACHINE BACKFILL 12407 21 0.0% 21
5 5
60-CVDSW-03610 0 609 28 LINE B.8 LOAD FROM STOCKPILE 12450 151 0.0% 151
6 6
60-CVDSW-03610 0 610 28 LINE B.8 MACHINE BACKFILL 12407 151 0.0% 151
36 36
60-CVDSW-03610 0 994 27 MH-042 LOAD FROM STOCKPILE 12450 32 0.0% 32
1 1
60-CVDSW-03610 0 995 27 MH-042 MACHINE BACKFILL 12407 32 0.0% 32
8 8
60-CVDSW-03610 0 999 27 MH-043 LOAD FROM STOCKPILE 12450 32 0.0% 32
1 1
60-CVDSW-03610 0 1000 27 MH-043 MACHINE BACKFILL 12407 32 0.0% 32
8 8
60-CVDSW-03613 0 619 28 LINE B.10 LOAD FROM STOCKPILE 12450 42 0.0% 42
2 2
60-CVDSW-03613 0 620 28 LINE B.10 MACHINE BACKFILL 12407 42 0.0% 42
10 10
60-CVDSW-03613 0 1004 27 MH-044 LOAD FROM STOCKPILE 12450 35 0.0% 35
2 2
60-CVDSW-03613 0 1005 27 MH-044 MACHINE BACKFILL 12407 35 0.0% 35
8 8

60-CVDSW-03613 0 1009 28 MH-045 LOAD FROM STOCKPILE 12450 54 0.0% 54


2 2
60-CVDSW-03613 0 1010 28 MH-045 MACHINE BACKFILL 12407 54 0.0% 54
13 13

Page 1
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
PROD. NO.

APPROVED | Action Code: A | 6/23/2023 | BMCD# 116058-M-004-04673


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
BAR SCHEDULE
QTY SIZE LENGTH MARK TYPE _A_ _B_ _C_ _D_ _E_ F/R _G_ _J_ _O_ _H_ _K_ NOTE
20 #5 13-02 501 2 3-09¾ 5-06½ 3-09¾ 501 "C" BAR
20 #5 13-11 502 2 4-00 5-10¾ 4-00 502 "C" BAR
14 #5 20-10 516 2 7-08¼ 5-05¼ 7-08¼ 516 "U" BAR
18 #5 22-02 517 2 8-00¾ 6-00 8-00¾ 517 "U" BAR
8 #5 11-04 511 14 2-10¾ 1-10 1-10½ 1-10 2-10¾ 4-05½ 1-03½ 1-03½ BLOCKOUT
8 #5 14-11 512 14 4-06¼ 1-11¼ 2-00¼ 1-11¼ 4-06¼ 4-09½ 1-04½ 1-04½ BLOCKOUT
8 #5 13-01 513 14 3-04¼ 2-01¼ 2-01¾ 2-01¼ 3-04¼ 5-01½ 1-05¾ 1-05¾ BLOCKOUT
12 #5 7-00 BASE
36 #5 6-00 LID
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
PROD. NO.

APPROVED | Action Code: A | 6/23/2023 | BMCD# 116058-M-004-04673


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
BAR SCHEDULE
QTY SIZE LENGTH MARK TYPE _A_ _B_ _C_ _D_ _E_ F/R _G_ _J_ _O_ _H_ _K_ NOTE
20 #5 13-02 501 2 3-09¾ 5-06½ 3-09¾ 501 "C" BAR
20 #5 13-11 502 2 4-00 5-10¾ 4-00 502 "C" BAR
14 #5 20-11 518 2 7-08¾ 5-05¼ 7-08¾ 518 "U" BAR
18 #5 22-02 519 2 8-01 6-00 8-01 519 "U" BAR
8 #5 11-04 511 14 2-10¾ 1-10 1-10½ 1-10 2-10¾ 4-05½ 1-03½ 1-03½ BLOCKOUT
8 #5 14-11 512 14 4-06¼ 1-11¼ 2-00¼ 1-11¼ 4-06¼ 4-09½ 1-04½ 1-04½ BLOCKOUT
8 #5 13-01 513 14 3-04¼ 2-01¼ 2-01¾ 2-01¼ 3-04¼ 5-01½ 1-05¾ 1-05¾ BLOCKOUT
12 #5 7-00 BASE
36 #5 6-00 LID
8 #5 5-10 BLOCKOUT
8 #5 8-01 BLOCKOUT
16 #5 4-06 BLOCKOUT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
PROD. NO.

APPROVED | Action Code: A | 6/23/2023 | BMCD# 116058-M-004-04673


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
BAR SCHEDULE
QTY SIZE LENGTH MARK TYPE _A_ _B_ _C_ _D_ _E_ F/R _G_ _J_ _O_ _H_ _K_ NOTE
20 #5 13-02 501 2 3-09¾ 5-06½ 3-09¾ 501 "C" BAR
20 #5 13-11 502 2 4-00 5-10¾ 4-00 502 "C" BAR
14 #5 21-04 520 2 7-11¼ 5-05¼ 7-11¼ 520 "U" BAR
18 #5 22-07 521 2 8-03½ 6-00 8-03½ 521 "U" BAR
8 #5 11-04 511 14 2-10¾ 1-10 1-10½ 1-10 2-10¾ 4-05½ 1-03½ 1-03½ BLOCKOUT
8 #5 14-11 512 14 4-06¼ 1-11¼ 2-00¼ 1-11¼ 4-06¼ 4-09½ 1-04½ 1-04½ BLOCKOUT
8 #5 13-01 513 14 3-04¼ 2-01¼ 2-01¾ 2-01¼ 3-04¼ 5-01½ 1-05¾ 1-05¾ BLOCKOUT
12 #5 7-00 BASE
36 #5 6-00 LID
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
PROD. NO.

APPROVED | Action Code: A | 6/23/2023 | BMCD# 116058-M-004-04673


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
BAR SCHEDULE
QTY SIZE LENGTH MARK TYPE _A_ _B_ _C_ _D_ _E_ F/R _G_ _J_ _O_ _H_ _K_ NOTE
24 #5 15-02 524 2 4-03¾ 6-06½ 4-03¾ 524 "C" BAR
24 #5 15-11 525 2 4-06 6-10¾ 4-06 525 "C" BAR
18 #5 22-09 526 2 8-01¾ 6-05¼ 8-01¾ 526 "U" BAR
22 #5 23-11 527 2 8-05½ 7-00 8-05½ 527 "U" BAR
4 #5 11-04 511 14 2-10¾ 1-10 1-10½ 1-10 2-10¾ 4-05½ 1-03½ 1-03½ BLOCKOUT
4 #5 14-11 512 14 4-06¼ 1-11¼ 2-00¼ 1-11¼ 4-06¼ 4-09½ 1-04½ 1-04½ BLOCKOUT
4 #5 13-01 513 14 3-04¼ 2-01¼ 2-01¾ 2-01¼ 3-04¼ 5-01½ 1-05¾ 1-05¾ BLOCKOUT
12 #5 8-00 BASE
40 #5 7-00 LID
4 #5 15-00 528 14 3-11¼ 2-04¼ 2-05 2-04¼ 3-11¼ 5-09 1-08 1-08 BLOCKOUT
4 #5 15-11 529 14 4-02 2-06 2-06½ 2-06 4-02 6-01 1-09¼ 1-09¼ BLOCKOUT
4 #5 16-09 530 14 4-04¾ 2-07¾ 2-08¼ 2-07¾ 4-04¾ 6-05 1-10¼ 1-10¼ BLOCKOUT
8 #5 6-10 BLOCKOUT
8 #5 8-05 BLOCKOUT
16 #5 4-00 BLOCKOUT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GENERAL NOTES:
1. FOR MONUMENT PLAN SEE DRAWING 60-CVDSW-08032.
A
2. FOR ABBREVIATIONS AND NOTES SEE DRAWING
60-CVDSW-08001.
3. COORDINATES AND ELEVATIONS FOR STORM SEWER
ARE PROVIDED IN THE USGC II PLANT COORDINATE
SYSTEM.
PLANT EL. 100'-0" = EL 13'-6" NAVD88.

60-CVDSW-03602

C
Millimeters

D
Scale For Microfilming

60-CVDSW-03603
Inches

STORM SEWER OVERAL KEY PLAN

This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC

USGC II PETROCHEMICALS PROJECT


STORM SEWER
OVERALL KEY PLAN

project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.

0 08/26/2022 LZD JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-03601 0


designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R. HALLER V. SARANG

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


116058-OSBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GENERAL NOTES:
1. FOR STORM SEWER SYSTEM OVERALL KEY PLAN SEE
DRAWING 60-CVDSW-03601.
A
60-CVDSW-03604 60-CVDSW-03605 60-CVDSW-03606
2. FOR MONUMENT PLAN SEE DRAWING 60-CVDSW-08032.
3. FOR ABBREVIATIONS AND NOTES SEE DRAWING
60-CVDSW-08001.

60-CVDSW-03609
60-CVDSW-03607 60-CVDSW-03608

60-CVDSW-03610 60-CVDSW-03611 60-CVDSW-03612


Millimeters

60-CVDSW-03613 60-CVDSW-03614
60-CVDSW-03615
Scale For Microfilming

60-CVDSW-03616 60-CVDSW-03617
60-CVDSW-03618
Inches

60-CVDSW-03619 60-CVDSW-03620

60-CVDSW-03621
G

60-CVDSW-03622

MATCHLINE N 5674'-0" SEE DWG 60-CVDSW-03603

STORM SEWER KEY PLAN

This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC

USGC II PETROCHEMICALS PROJECT


STORM SEWER
KEY PLAN

project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.

0 08/26/2022 LZD JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-03602 0


designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R. HALLER V. SARANG

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


116058-OSBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GENERAL NOTES:
MATCHLINE N 6959'-0" DWG 60-CVDSW-03604
1. FOR STORM SEWER SYSTEM KEY PLAN SEE
DRAWING 60-CVDSW-03601. A
2. STORM SEWER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH 60-CVES-00006.

36" DIA CHDPE


3. SEE DRAWING 60-CVDSW-08805 AND 60-CVDSW-08806
FOR STORM SEWER DETAILS.

LINE B.1
4. SEE DRAWING 60-CVDSW-08807 FOR MANHOLE
SCHEDULE.
5. SEE DRAWING 60-CVDSW-08808 FOR STORM SEWER
PIPING SCHEDULE.
6. FOR SANITARY SEWER AND POTABLE WATER KEY PLAN B
SEE DRAWING 60-PIDKP-00001.
SANITARY SEWER
MH-038 IE 92'-10 5/8" 7. FOR FIREWATER KEY PLAN SEE DRAWING
N 6890'-7" 60-PIDKP-00002.
E 3295'-0"
TOP EL 100'-0" 8. FOR CONSTRUCTION POWER KEY PLAN SEE DRAWING
POTABLE WATER 60-ELDSK-00200.
IE 92'-10 5/8"
9. FOR COOLING WATER KEY PLAN SEE DRAWING
50-PIDKP-00001.

LEGEND:
FIREWATER C
IE = INVERT ELEVATION

36" DIA CHDPE


= FLOW DIRECTION
= ROAD/ACCESSWAY
DRAWING LIMITS E 3085'-0"

MATCHLINE E 3495'-0" DWG 60-CVDSW-03608


LINE B.2
COOLING WATER
Millimeters

IE 92'-9 5/8"

MH-040
N 6796'-0"
LINE B.3 E 3295'-0"
30'' DIA CHDPE TOP EL 100'-0"

IE 92'-9 5/8"
Scale For Microfilming

IE 92'-9 5/8"

36" DIA CHDPE


E
IE 92'-10 9/16"
MH-039

4 TH.ST.
N 6796'-0"

LINE B.4
E 3215'-0"
TOP EL 100'-0"

IE 92'-8 5/8" MH-041


Inches

N 6727'-8"
E 3295'-0" F
TOP EL 100'-0"
IE 92'-8 5/8"
36" DIA CHDPE
LINE B.5

B AVENUE B AVENUE
G
MATCHLINE N 6685'-0" DWG 60-CVDSW-03610

STORM SEWER PLAN

This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC

USGC II PETROCHEMICALS PROJECT


STORM SEWER
PLAN SHT 4

project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.

0 08/26/2022 LZD JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-03607 0


designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R. HALLER T. SONNE

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


116058-OSBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GENERAL NOTES:
1. FOR STORM SEWER SYSTEM KEY PLAN SEE
DRAWING 60-CVDSW-03601. A
2. STORM SEWER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH 60-CVES-00006.
3. SEE DRAWING 60-CVDSW-08805 AND 60-CVDSW-08806
MATCHLINE N 6685'-0" DWG 60-CVDSW-03607 FOR STORM SEWER DETAILS.
4. SEE DRAWING 60-CVDSW-08807 FOR MANHOLE
B AVENUE SCHEDULE.
B AVENUE
5. SEE DRAWING 60-CVDSW-08808 FOR STORM SEWER
PIPING SCHEDULE.
6. FOR SANITARY SEWER AND POTABLE WATER KEY PLAN B
SEE DRAWING 60-PIDKP-00001.
7. FOR FIREWATER KEY PLAN SEE DRAWING
60-PIDKP-00002.
FIREWATER
8. FOR CONSTRUCTION POWER KEY PLAN SEE DRAWING
60-ELDSK-00200.

36'' DIA CHDPE


9. END OF PIPE SHALL BE PLUGGED AND BURIED BY

LINE B.5
CONTRACTOR. MANHOLE TO BE PLACED BY OTHERS.
10. CALLED COORDINATES AND ELEVATIONS ARE IN PLANT

4TH. ST.
1 GRID COORDINATES.
C

LEGEND:

MATCHLINE E 3495'-0" DWG 60-CVDSW-03611


IE 92'-7 1/16"
DRAWING LIMITS E 3085'-0"

1 IE = INVERT ELEVATION

36'' DIA CHDPE


MH-042
OPTIONAL FIELD INTERFACE PT N 6600'-0" = FLOW DIRECTION
N 6570'-0"

LINE B.6
E 3295'-0"
IP-50-20-CI-0001 E 3251'-6" TOP EL 100'-0" = ROAD/ACCESSWAY
1 N 6570'-0" IE 92'-7 3/8"
E 3178'-0"
IE 92'-8 1/2"
IE 92'-7 1/16"
IE 92'-6 5/8"
Millimeters

30'' DIA CHDPE D


LINE B.7 MH-043
IE 92'-6 5/8" N 6570'-0"
E 3295'-0"

36'' DIA CHDPE


1 N 6570'-0" TOP EL 100'-0"
E 3175'-6"

LINE B.8
SEE NOTE 9
IE 92'-6 5/8"
Scale For Microfilming

SANITARY SEWER

POTABLE WATER
Inches

MATCHLINE N 6471'-0" DWG 60-CVDSW-03613

STORM SEWER PLAN

This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC

USGC II PETROCHEMICALS PROJECT


STORM SEWER
PLAN SHT 7

project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
1 12/22/2022 LZD JBB ATK REVISED IP-50-20-CI-0001, ADDED NOTE 10 Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.

0 08/26/2022 LZD JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-03610 1


designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R. HALLER V. SARANG

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


116058-OSBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GENERAL NOTES:

MATCHLINE N 6471'-0" DWG 60-CVDSW-03610 1. FOR STORM SEWER SYSTEM KEY PLAN SEE
DRAWING 60-CVDSW-03601. A
2. STORM SEWER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH 60-CVES-00006.
3. SEE DRAWING 60-CVDSW-08805 AND 60-CVDSW-08806
FOR STORM SEWER DETAILS.
4. SEE DRAWING 60-CVDSW-08807 FOR MANHOLE
SCHEDULE.
5. SEE DRAWING 60-CVDSW-08808 FOR STORM SEWER

36'' DIA CHDPE


PIPING SCHEDULE.
SANITARY SEWER

LINE B.8
6. FOR SANITARY SEWER AND POTABLE WATER KEY PLAN B
SEE DRAWING 60-PIDKP-00001.

4TH. ST.
7. FOR FIREWATER KEY PLAN SEE DRAWING
POTABLE WATER 60-PIDKP-00002.
8. FOR CONSTRUCTION POWER KEY PLAN SEE DRAWING
60-ELDSK-00200.
9. END OF PIPE SHALL BE PLUGGED AND BURIED BY
CONTRACTOR. MANHOLE TO BE PLACED BY OTHERS.
10. CALLED COORDINATES AND ELEVATIONS ARE IN PLANT
1 GRID COORDINATES.
IP-50-20-CI-0003 IE 92'-4 1/4" C
N 6364'-0"
E 3249'-6" IE 93'-11 3/8" MH-044
IE 94'-0" N 6364'-0" LEGEND:
E 3295'-0"
36'' DIA CHDPE TOP EL 100'-0" IE = INVERT ELEVATION
LINE B.9 = FLOW DIRECTION
DRAWING LIMITS E 3085'-0"

36'' DIA CHDPE


N 6364'-0" IE 92'-4 1/4" = ROAD/ACCESSWAY
E 3247'-10"

LINE B.10
SEE NOTE 9
Millimeters

MATCHLINE E 3495'-0" DWG 60-CVDSW-03614


IP-50-20-CI-0004 IE 92'-3 1/2"
1
N 6310'-0"
E 3197'-0" MH-045
IE 93'-5 1/2" N 6310'-0"
IE 93'-3 3/4" E 3295'-0"
24'' DIA CHDPE TOP EL 100'-0"
LINE B.11
Scale For Microfilming

N 6310'-0" 1 IE 92'-3 1/2"


E 3194'-6" OPTIONAL FIELD INTERFACE PT
SEE NOTE 9 N 6310'-0" E
E 3251'-6"

48'' DIA RCP-SW


IE 93'-4 1/2"

LINE B.12
FIREWATER
Inches

MATCHLINE N 6197'-0" DWG 60-CVDSW-03616

STORM SEWER PLAN

This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC

USGC II PETROCHEMICALS PROJECT


STORM SEWER
PLAN SHT 10

project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
1 12/22/2022 LZD JBB ATK REVISED IP-50-20-CI-0004, ADDED NOTE 10 Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.

0 08/26/2022 LZD JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-03613 1


designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R. HALLER V. SARANG

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


116058-OSBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

FINISH GRADE
A
FINISH GRADE

GENERAL BACKFILL
AS SPECIFIED GENERAL BACKFILL
AS SPECIFIED
TRENCH WIDTH
TRENCH WIDTH AS SPECIFIED
TOP EL (SEE SCHEDULE) CL STRUCTURE LOCATION AS SPECIFIED TRENCH GENERAL BACKFILL

12"
AS SPECIFIED B
GROUT FRAME NOTE 2 1
TRENCH GENERAL BACKFILL

12"
TO MANHOLE

PIPE OD
AS SPECIFIED
FRAMES & COVERS: NOTE 2 1
ADJUSTING RINGS STORM MANHOLE COVERS SHALL HAVE SPRING LINE

PIPE OD
OR BRICK AS REQ'D "STORM SEWER" CAST ON THE COVER AND

6"
SHALL BE NEENAH R-1678-A OR SPRING LINE
FINISH GRADE FLOWABLE FILL OR FINE
ENGINEER APPROVED EQUAL GRANULAR MATERIAL
NOTE 2 1
FLOWABLE FILL OR FINE
GRANULAR MATERIAL DOUBLE BARREL CONCRETE PIPE TRENCH
NOTE 2 1
NOT TO SCALE
NOTES: C

6"
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
CONCRETE PIPE TRENCH PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
ECCENTRIC CONE (ALL PRECAST RISERS NOT TO SCALE
DEPTH VARIES - SEE PLANS

AND TOPS SHALL CONFORM TO ASTM C478) NOTES: 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
USE O-RING OR OTHER APPROVED PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
(20' MAX)

METHOD TO MAKE ALL JOINTS


4'-0" MIN WATERTIGHT 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
TABLE SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
Millimeters

PRECAST REINFORCED FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT D
DIMENSIONS 1
CONCRETE MANHOLE EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. FINISH GRADE
SECTIONS (ASTM C478)
6"
MIN NOTE 2
ID/2
6" MIN

INV EL (SEE PLANS) GENERAL BACKFILL


ID
Scale For Microfilming

AS SPECIFIED
INVERT CONCRETE, SEE NOTE 1 NOTE 2 & 3
12"

TRENCH WIDTH E
AS SPECIFIED
PIPE (SEE PLAN
6" MIN FOR SIZE, LOCATION, 2"
AND INVERT ELEVATION)
BASE SLAB SECTION

12"
MIN
(SEE SCHEDULE FOR DIMENSIONS) TRENCH GENERAL BACKFILL
AS SPECIFIED
1
NOTE 2

PIPE OD
6" MINIMUM DEPTH
TXDOT ITEM 247 (GRADE A), INV EL (SEE PLAN) SPRING LINE
SEAL SLAB OR 3/4" GRAVEL
Inches

FLOWABLE FILL OR F
PRECAST CIRCULAR CONCRETE MANHOLE DETAIL FINE GRANULAR MATERIAL
NOTE 4 NOTE 2
NOT TO SCALE 1

6"
EXIST REINF CONC
NOTES: OR PRECAST STRUCTURE
CHDPE PIPE TRENCH
1. FLOWLINE OF MANHOLE MAY BE FORMED IN CONCRETE; BUILT UP WITH MORTAR; NOT TO SCALE
OR BY LAYING A PIPE THROUGH MANHOLE, THE TOP BEING BROKEN OUT LATER.
TYPICAL CONNECTION TO
2. SEE TYPICAL CONNECTION TO MANHOLE STRUCTURE. NOTES:
MANHOLE STRUCTURE
NOT TO SCALE 1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
3. BASE SLAB SHALL BE CONNECTED WITH PRECAST MANHOLE STRUCTURE. PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
NOTES: G
4. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. 1. STORM SEWER CONNECTIONS PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
TO PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
5. MANHOLE AND MANHOLE COVER SHALL BE RATED FOR AN HS-20 LOADING 3 EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
2. CHDPE PIPE MANHOLE CONNECTION AS MANUFACTURED BY A-LOK, Z-LOK STM
MECHANICAL BOOT CONNECTION OR ENGINEERING APPROVED EQUAL. INSTALL PER
MANUFACTURER'S SPECIFICATIONS. 1

3. CONCRETE PIPE MANHOLE CONNECTION SHALL BE GROUTED WITH USE OF A WATER-STOP


PIPE SLEEVE BY A-LOK. INSTALL PER MANUFACTURER'S SPECIFICATIONS, PROVIDE KBA-1510FP
BUTYL STRIP AT GROUT-MANHOLE INTERFACE.
H
4. FOR CONCRETE PIPE MANHOLE CONNECTION GROUT ANNULAR SPACE BETWEEN WALL
AND PIPE FOR WATERTIGHT SEAL. GROUT PER PIP STS03600.
3
2 1

This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, L

GOLDEN TRIANGLE POLYMERS PROJECT


STORM SEWER DETAILS
3 07/31/2023 RPH JBB ATK UPDATED NOTES

2 01/30/2023 RPH JBB ATK UPDATED TYPICAL CONNECTION TO MANHOLE STRUCTURE NOTES project contract
9400 WARD PARKWAY 116058 -
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08805 3
designed detailed
no. date by ckd app'd Description DWG No. Reference Drawings ORANGE, TEXAS
R.HALLER C.DONNICI

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

A
CL STRUCTURE LOCATION

FRAMES & COVERS:


TOP EL (SEE SCHEDULE) STORM MANHOLE COVERS SHALL HAVE
"STORM SEWER" CAST ON THE COVER AND
SHALL BE NEENAH R-1678-A OR
ENGINEER APPROVED EQUAL
FINISH GRADE

DEPTH VARIES - SEE PLANS 4'-0" MIN


TABLE
DIMENSIONS
USE O-RING OR OTHER APPROVED
(20' MAX)

METHOD TO MAKE ALL JOINTS


WATERTIGHT C

PRECAST REINFORCED
CONCRETE MANHOLE
SECTIONS (ASTM C913)

6" MIN
ID/2
6" MIN

NOTE 2
INV EL (SEE PLANS)
ID
Millimeters

FORMED FLOWLINE, SEE NOTE 1 D


12"

6" MIN
BASE SLAB SECTION
(SEE SCHEDULE FOR DIMENSIONS)
Scale For Microfilming

6" MINIMUM DEPTH


TXDOT ITEM 247 (GRADE A),
SEAL SLAB OR 3/4" GRAVEL E

PRECAST SQUARE CONCRETE MANHOLE DETAIL


NOT TO SCALE
NOTES:

1. FLOWLINE OF MANHOLE MAY BE FORMED IN CONCRETE; BUILT UP WITH MORTAR;


Inches

OR BY LAYING A PIPE THROUGH MANHOLE, THE TOP BEING BROKEN OUT LATER.
F
2. SEE TYPICAL CONNECTION TO MANHOLE STRUCTURE.

3. BASE SLAB SHALL BE CONNECTED WITH PRECAST MANHOLE BASE SECTION.

4. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO


PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.

5. MANHOLE AND MANHOLE COVER SHALL BE RATED FOR AN HS-20 LOADING 1

This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, L

GOLDEN TRIANGLE POLYMERS PROJECT


STORM SEWER DETAILS

project contract
9400 WARD PARKWAY 116058 -
KANSAS CITY, MO 64114
1 07/31/2023 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK UPDATED NOTES 60-CVDSW-08806 1
designed detailed
no. date by ckd app'd Description DWG No. Reference Drawings R.HALLER C.DONNICI ORANGE, TEXAS

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MANHOLE SCHEDULE MANHOLE SCHEDULE


COORDINATE LOCATION MANHOLE DIMENSIONS 2 BASE SLAB DIMENSIONS * COORDINATE LOCATION MANHOLE DIMENSIONS 2 BASE SLAB DIMENSIONS *
MANHOLE NO. TOP EL. FRAME REMARKS MANHOLE NO. TOP EL. FRAME REMARKS
EASTING NORTHING WIDTH LENGTH DEPTH * WIDTH * LENGTH * HEIGHT * EASTING NORTHING WIDTH LENGTH DEPTH * WIDTH * LENGTH * HEIGHT * A
MH-001 4180'-5" 7095'-0" 5'-0" 5'-0" 7'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-062 3236'-0" 4956'-0" 9'-0" 9'-0" 13'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1
MH-002 3695'-0" 7095'-0" 5'-0" 5'-0" 7' -6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-063 3329'-3" 4956'-0" 9'-0" 9'-0" 13'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1
MH-003 3695'-0" 7037'-0" 5'-0" 5'-0" 7' -6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-064 2649'-0" 5768'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-004 3695'-0" 6990'-0" 5'-0" 5'-0" 8'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-065 2649'-0" 5693'-6" 5'-0" 5'-0" 7'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-005 3695'-0" 6846'-0" 5'-0" 5'-0" 8'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-066 2649'-0" 5645'-0" 6'-0" 6'-0" 8'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-006 3695'-0" 6745'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-067 2649'-0" 5456'-0" 6'-0" 6'-0" 8'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-007 3695'-0" 6623'-10" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-068 - - - - - - - - - - DELETED 2

MH-008 3695'-0" 6523'-10" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-069 2649'-0" 5265'-9" 6'-0" 6'-0" 8'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
B
MH-009 3695'-0" 6435' -10" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-070 2649'-0" 5130'-0" 6'-0" 6'-0" 8'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-010 3695'-0" 6400'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-071 - - - - - - - - - - DELETED 2

MH-011 3695'-0" 6335'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-072 2649'-0" 4955'-0" 6'-0" 6'-0" 9'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-012 3695'-0" 6206'-2" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-073 2446'-8" 4855'-0" 5'-0" 5'-0" 7'-0" 7'-8" 7-8" 1'-0" 2 99' - 10" SEE NOTE 1
MH-013 3695'-0" 6145'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-074 2557'-11" 4855'-0" 5'-0" 5'-0" 7'-0" 7'-8" 7'-8" 1'-0" 99' - 8" SEE NOTE 1
MH-014 3695'-0" 6099'-5" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-075 2649'-0" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-015 3695'-0" 6004'-6" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-076 2717'-2" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-016 3695'-0" 5960'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-077 2812'-2" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-017 3695'-0" 5823'-9" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-078 - - - - - - - - - - DELETED C
2
MH-018 3695'-0" 5724'-6" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-079 - - - - - - - - - - DELETED
MH-019 3695'-0" 5606'-2" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-080 3005'-0" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-020 3695'-0" 5505'-0" 7'-0" 7'-0" 11'-6" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 MH-081 3156'-2" 4855'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-021 3695'-0" 5443'-10" 7'-0" 7'-0" 11'-6" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 MH-082 3236'-0" 4855'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-022 3695'-0" 5324'-6" 7'-0" 7'-0" 11'-6" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
* DIMENSIONS ARE APPROXIMATE. REFER TO FABRICATOR DRAWINGS FOR ACTUAL DIMENSIONS. 2
MH-023 3695'-0" 5145'-0" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-024 3695'-0" 5010'-6" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 NOTES:
MH-025 3640'-0" 5010'-6" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 1. NEENAH R-1678-A FRAME AND GRATE OR ENGINEER APPROVED EQUAL.
Millimeters

D
MH-026 3640'-0" 4956'-0" 9'-0" 9'-0" 13'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1
2. MANHOLE LENGTH AND WIDTH DIMENSIONS SHOWN ARE TO THE INNER WALL OF THE MANHOLE. MANHOLES ARE PRECAST SQUARE CONCRETE UNLESS NOTED OTHERWISE.
MH-027 3595'-6" 4956'-0" 9'-0" 19'-0" 14'-0" 11'-8" 21'-8" 1'-0" 100' SEE NOTE 1
MH-028 4488'-0" 6895'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 3. FOR MANHOLE DETAILS, SEE DRAWINGS 60-CVDSW-08805 & 60-CVDSW-08806.
MH-029 4488'-0" 6639'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 1
4. FOR STORM SEWER PLAN SHEETS, SEE DRAWINGS 60-CVDSW-03601 THRU 60-CVDSW-03640.
MH-030 4488'-0" 6383'-0" 6'-0" 6'-0" 8'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-031 4488'-0" 5883'-0" 6'-0" 6'-0" 9'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 5. MANHOLES SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH 60-CVES-00006 OVERLAY TO PIP CVS02700 UNDERGROUND GRAVITY SEWER SPECIFICATION.
Scale For Microfilming

MH-032 4488'-0" 5506'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-033 4488'-0" 5252'-7" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-034 4488'-0" 4956'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 E
MH-035 4084'-0" 4956'-0" 6'-0" 6'-0" 11'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-036 3776'-0" 4956'-0" 6'-0" 6'-0" 11'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-037 3295'-0" 6997'-2" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-038 3295'-0" 6890'-7" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-039 3215'-0" 6796'-0" 5'-0" 5'-0" 8'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-040 3295'-0" 6796'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-041 3295'-0" 6727'-8" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
Inches

MH-042 3295'-0" 6600'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
F
MH-043 3295'-0" 6570'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-044 3295'-0" 6364'-0" 5'-0" 5'-0" 9'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-045 3295'-0" 6310'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-046 3295'-0" 6140'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-047 3295'-0" 6099'-1" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-048 3295'-0" 6002'-7" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-049 3295'-0" 5934'-0" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-050 3295'-0" 5880'-0" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-051 3295'-0" 5839'-11" 9'-0" * N/A * 10'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1 CUSTOM MANHOLE G
2
MH-052 3236'-0" 5780'-11" 9'-0" * N/A * 10'-6" 11'-8" 11'-8" 1'-0" 99' - 10" SEE NOTE 1 CUSTOM MANHOLE
MH-053 3236'-0" 5708'-6" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-054 3236'-0" 5636'-2" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-055 3236'-0" 5580'-3" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-056 3236'-0" 5465'-0" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-057 3236'-0" 5390'-0" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-058 3236'-0" 5308'-2" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-059 3236'-0" 5182'-3" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 H
MH-060 3236'-0" 5132'-8" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-061 3236'-0" 5018'-10" 9'-0" 9'-0" 12'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1

This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is not
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, LLC.

GOLDEN TRIANGLE POLYMERS PROJECT


MANHOLE SCHEDULE

2 05/08/2023 RPH JBB ATK REVISED TO MATCH FABRICATION DRAWINGS project contract
9400 WARD PARKWAY
116058
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08807 2
designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R.HALLER C.DONNICI

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

STORM SEWER PIPING SCHEDULE STORM SEWER PIPING SCHEDULE


LINE NO. UPPER STRUCTURE LOWER STRUCTURE LENGTH (FT)* MATERIAL SIZE (IN) TYPE REMARKS LINE NO. UPPER STRUCTURE LOWER STRUCTURE LENGTH (FT) * MATERIAL SIZE (IN) TYPE REMARKS A
LINE A.1 MH-001 MH-002 486 CHDPE 30 LINE B.30 MH-060 MH-061 114 CONCRETE 60 CLASS III
LINE A.2 MH-002 MH-003 58 CHDPE 30 LINE B.31 MH-061 MH-062 63 CONCRETE 60 CLASS III
LINE A.3 MH-003 MH-004 47 CHDPE 30 LINE B.32 MH-062 MH-063 94 CONCRETE 72 CLASS III
LINE A.4 ** MH-004 62 CHDPE 36 LINE B.33 MH-063 MH-027 267 CONCRETE 72 CLASS III
LINE A.5 MH-004 MH-005 144 CHDPE 36 LINE B.34 MH-027 DIVERTER 106 CONCRETE 72 CLASS III
LINE A.6 MH-005 MH-006 101 CHDPE 36 LINE C.1 ** MH-028 46 CHDPE 36
LINE A.7 MH-006 MH-007 122 CHDPE 36 LINE C.2 MH-028 MH-029 256 CHDPE 36
LINE A.8 MH-007 MH-008 100 CHDPE 36 LINE C.3 MH-029 MH-030 256 CHDPE 36
B
LINE A.9 MH-008 MH-009 88 CHDPE 36 LINE C.4 ** MH-030 46 CHDPE 36
LINE A.10 MH-009 MH-010 36 CHDPE 36 LINE C.5 ** MH-030 42 CHDPE 24
LINE A.11 ** MH-010 62 CHDPE 36 LINE C.6 MH-030 MH-031 500 CONCRETE 42 CLASS III
LINE A.12 MH-010 MH-011 65 CONCRETE 48 CLASS III LINE C.7 ** MH-031 46 CHDPE 24
LINE A.13 MH-011 MH-012 129 CONCRETE 48 CLASS III LINE C.8 MH-031 MH-032 377 CONCRETE 42 CLASS III
LINE A.14 MH-012 MH-013 62 CONCRETE 48 CLASS III LINE C.9 ** MH-032 46 CHDPE 30
LINE A.15 MH-013 MH-014 46 CONCRETE 48 CLASS III LINE C.10 MH-032 MH-033 254 CONCRETE 42 CLASS III
LINE A.16 MH-014 MH-015 95 CONCRETE 48 CLASS III LINE C.11 MH-033 MH-034 297 CONCRETE 42 CLASS III
LINE A.17 MH-015 MH-016 45 CONCRETE 48 CLASS III LINE C.12 MH-034 MH-035 404 CONCRETE 42 CLASS III C
LINE A.18 ** MH-016 62 CHDPE 36 LINE C.13 MH-035 MH-036 308 CONCRETE 48 CLASS III
LINE A.19 MH-016 MH-017 137 CONCRETE 48 CLASS III LINE C.14 MH-036 MH-026 136 CONCRETE 48 CLASS III
LINE A.20 MH-017 MH-018 100 CONCRETE 48 CLASS III 1 LINE D.1 ** PELLET SUMP 72 CHDPE 30
LINE A.21 MH-018 MH-019 119 CONCRETE 48 CLASS III LINE D.2 PELLET SUMP MH-064 146 CHDPE 36
LINE A.22 MH-019 MH-020 102 CONCRETE 48 CLASS III LINE D.3 MH-064 MH-065 75 CHDPE 36
LINE A.23 ** MH-020 92 CHDPE 36 LINE D.4 MH-065 MH-066 49 CHDPE 36
LINE A.24 MH-020 MH-021 62 CONCRETE 60 CLASS III LINE D.5 MH-066 MH-067 189 CONCRETE 42 CLASS III
Millimeters

LINE A.25 MH-021 MH-022 120 CONCRETE 60 CLASS III LINE D.6 MH-067 MH-069 191 CONCRETE 42 CLASS III D
LINE A.26 MH-022 MH-023 180 CONCRETE 60 CLASS III LINE D.7 - - - - - - DELETED 2

LINE A.27 MH-023 MH-024 135 CONCRETE 60 CLASS III LINE D.8 MH-069 MH-070 136 CONCRETE 42 CLASS III
LINE A.28 MH-024 MH-025 55 CONCRETE 60 CLASS III LINE D.9 - - - - - - DELETED 2

LINE A.29 MH-025 MH-026 55 CONCRETE 60 CLASS III LINE D.10 MH-070 MH-072 175 CONCRETE 42 CLASS III
LINE A.30 MH-026 MH-027 45 CONCRETE 72 CLASS III LINE D.11 MH-072 MH-075 100 CONCRETE 48 CLASS III
LINE A.31 MH-027 DIVERTER 106 CONCRETE 72 CLASS III LINE D.12 MH-073 MH-074 112 CHDPE 24
Scale For Microfilming

LINE B.1 MH-037 MH-038 107 CHDPE 36 LINE D.13 MH-074 MH-075 92 CHDPE 24
LINE B.2 MH-038 MH-040 95 CHDPE 36 LINE D.14 MH-075 MH-076 69 CONCRETE 48 CLASS III
E
LINE B.3 MH-039 MH-040 80 CHDPE 30 LINE D.15 MH-076 MH-077 95 CONCRETE 48 CLASS III
LINE B.4 MH-040 MH-041 69 CHDPE 36 LINE D.16 - - - - - - DELETED
2
LINE B.5 MH-041 MH-042 128 CHDPE 36 LINE D.17 - - - - - - DELETED
LINE B.6 MH-042 MH-043 30 CHDPE 36 LINE D.18 MH-077 MH-080 194 CONCRETE 48 CLASS III
1 LINE B.7 ** MH-043 120 CHDPE 30 LINE D.19 MH-080 MH-081 152 CONCRETE 48 CLASS III
LINE B.8 MH-043 MH-044 206 CHDPE 36 LINE D.20 MH-081 MH-082 80 CONCRETE 48 CLASS III
LINE B.9 ** MH-044 48 CHDPE 36 LINE D.21 MH-082 MH-062 101 CONCRETE 48 CLASS III
Inches

LINE B.10 MH-044 MH-045 54 CHDPE 36 1 LINE E.1 ** PELLET SUMP 45 CHDPE 18
F
LINE B.11 ** MH-045 101 CHDPE 24
LINE B.12 MH-045 MH-046 170 CONCRETE 48 CLASS III
1 LINE B.13 ** MH-046 120 CHDPE 30 * LENGTH SHOWN IS HORIZONTAL, MEASURED FROM CENTER OF MANHOLE TO CENTER OF MANHOLE AND ROUNDED UP TO THE NEAREST FOOT.
LINE B.14 MH-046 MH-047 41 CONCRETE 48 CLASS III ** MANHOLE STRUCTURE WILL BE PLACED BY OTHERS.
LINE B.15 MH-047 MH-048 97 CONCRETE 48 CLASS III
LINE B.16 MH-048 MH-049 69 CONCRETE 48 CLASS III
LINE B.17 ** MH-049 48 CHDPE 36 NOTES:
LINE B.18 MH-049 MH-050 54 CONCRETE 48 CLASS III
1. STORM SEWER PIPE SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH 60-CVES-00006 OVERLAY TO PIP CVS02700
LINE B.19 ** MH-050 101 CHDPE 24 UNDERGROUND GRAVITY SEWERS SPECIFICATION. G
LINE B.20 MH-050 MH-051 41 CONCRETE 48 CLASS III
2. MAINTAIN MINIMUM 1.75 FOOT OF COVER OVER CHDPE STORM SEWER PIPE ON ROADWAY CROSSINGS. 1
LINE B.21 MH-051 MH-052 84 CONCRETE 48 CLASS III
LINE B.22 MH-052 MH-053 73 CONCRETE 48 CLASS III
LINE B.23 MH-053 MH-054 73 CONCRETE 48 CLASS III
LINE B.24 MH-054 MH-055 56 CONCRETE 48 CLASS III
LINE B.25 MH-055 MH-056 116 CONCRETE 48 CLASS III
LINE B.26 MH-056 MH-057 75 CONCRETE 60 CLASS III
LINE B.27 MH-057 MH-058 82 CONCRETE 60 CLASS III H
LINE B.28 MH-058 MH-059 126 CONCRETE 60 CLASS III
LINE B.29 MH-059 MH-060 50 CONCRETE 60 CLASS III

This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is not
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, LLC.

GOLDEN TRIANGLE POLYMERS PROJECT


STORM SEWER PIPING SCHEDULE

2 05/08/2023 RPH JBB ATK REVISED PIPES FOR DELETED MANHOLES project contract
9400 WARD PARKWAY
116058
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK MODIFIED PIPE LENGTHS AND ADDED LINE E.1 Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08808 2
designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R.HALLER C.DONNICI

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


'*&-%$0/4536$5*0/$0/53"$503
REQUEST FOR INFORMATION (RFI)
Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

RFI No.: REVISION: ISSUE DATE: 10/20/2022


RFI-BMZ-00000-20-00002 0 PROPOSED RESPONSE DATE: 10/25/2022

P/$17: USGC II OSBL AREA: 00 &5$)7&2'(

UNIT: 00 - General Notes/Specs 20 - SITEWORK

CONTRACTOR: BMZ TURNOVER SYS / COMMISSIONING PACK:

CWP: Required Field

FROM (Requestor): Tyler White REQUEST TO:


CONTACT (0$,/: whitet@zachrygroup.com

RFI TITLE: 60-CVES-00006 Clarifications

SPECIFICATIONS / DOCUMENTS / DWGS REFERENCED OR IMPACTED:


60-CVES-00006

TAG NUMBERS IMPACTED? YES NO IF YES TAG NUMBERS:

ATTACHMENTS: 60-CVES-00006

REQUESTED INFORMATION:
Zachry request clarifications are the following,
1) 4.3.6.1 A, will this addition represent the flow fill requirement on storm water pipe for road crossings?
2) 4.4.2 "Substitute", if the sections will not be tested under a road or rail, is it acceptable to block off the pipe at the nearest manholes on either side of the road?
3) 4.3.2.7 Revise, is flowfill acceptable for the replacement of unacceptable soils and what is the required depth of the "over excavation"?

PROPOSED RESOLUTION:
1) Zachry would like clarification if this will be for CHDPE & RCP pipe type and if this will be a flowfill requirement, if so is there a required PSI?
2) If the culverts under the roadway are not to be tested, Zachry would like to block off these section from the nearest manhole connections.
3) Zachry would like to use flowfill for soil improvements.

RESPONSE:
1) The requirement for flowfill to be used as backfill for pipes beneath road crossings will be addressed on the standard details dwg (60-CVDSW-08805 :
REV 1 [UPCOMING]).
Per 4.3.4.8, CLSM shall be in accordance with 60-CVES-00004. 4.2.5.2 of 60-CVES-00004 states that mix design compressive strength shall be between
50 and 100 psi for general fill applications.

2) This section is related to culverts open to air on both sides of road. No testing required.

3) Flowfill is an acceptable backfill material as per 4.3.6.8.

RESPONDER: Bryce Oswald TITLE: Structural Engineer DATE: 10/20/2022

RFI CATEGORY: CC DC DD MC QC VC EC OC OT IF OT EXPLAIN:

REDLINE REQUIRED YES NO MATERIAL IMPACT: ARE THE QUESTION & RESPONSE ADEQUATE FOR CLOSURE OF
THIS RFI? YES NO

REDLINE DOCUMENT NUMBER: YES NO


IF NO EXPLAIN:

IS THERE A COST/SCHEDULE/SAFETY IMPACT DUE TO THIS RFI? IF YES EXPLAIN:

NO
✔ COST SCHEDULE SAFETY

%0=(1*,1((5$33529(5 SIGNATURE / DATE 4&&/26(287 4&&/26(287'$7(

RE-WORK REQUIRED: YES NO &5$)7683(5,17(1'(17&/26(287

5),&$7(*25</(*(1'
CC – CONSTRUCTION CLARIFICATION '&±'(6,*1&/$5,),&$7,21  ''±'(6,*1'(9,$7,21
0&±0$7(5,$/&/$5,),&$7,21 4&±48$/,7<121&21)250$1&( 9&±9(1'25&/$5,),&$7,21
EC±EXISTING CONDITION 2&±2:1(5&+$1*( 27±27+(5&+$1*(
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 1 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
Document Number Specification Title Rev Date Sheet
60-CVES-00006 OVERLAY TO PIP CVS02700 AA 0--2020 1 of 11

Project, Location Title

USGC II Petrochemicals Project OVERLAY TO PIP CVS02700


UNDERGROUND GRAVITY SEWERS
SPECIFICATION
In-House Review Client Approval Design Entire Document Attached

Fabrication Construction Editing Revised Sheets Only Attached

Approvals
Rev Date By Ck Contract Project Chief Protect Remarks
Engr Mgr
Engr Mgr Engr Engr Mgr

AA 07-28-20 VVL JBB Issued for Design

This sheet is a record of each issue or revision to the subject document. The exact sheets changed, and the nature of the change should be
noted in the Remarks column; however, these remarks are not a part of the document. The revised sheets shall become part of the original
document and shall be complied with in their entirety.

CONFIDENTIAL INFORMATION
Reproduction and use prohibited except in accordance with Company's written permission.

Chevron Phillips Chemical Company LP Overlay Page 1 of 11


CONFIDENTIAL INFORMATION

Issued for Design Page 1 of 28 Rev AA


7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 2 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 2 of 11

60-CVES-00006

OVERLAY TO PIP CVS02700


UNDERGROUND GRAVITY SEWERS SPECIFICATION

Revision Date Description Author


AA 07-28-2020 Issued for Design V. Larson

DOCUMENT OWNER: Comments or recommended alterations to this document should be communicated directly to the
USGC II Document Owner.
Confidential Information - This document is for use by the intended recipient(s) and contains
REVIEW REQUIREMENTS: privileged and confidential information. Unauthorized use, copying or distribution of this
N/A document, in whole or in part, is strictly prohibited.

Chevron Phillips Chemical Company LP Overlay Page 2 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 2 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 3 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 3 of 11

OVERLAY INSTRUCTIONS
1.1 General
a. Paragraph numbers and modifications provided in Table 1 refer to PIP CVS02700,
October 2004 revision. Paragraph numbers may not be consecutive, and all PIP
paragraphs not mentioned herein shall be verbatim requirements of this Practice.
b. Any referral to approval by Owner or Company shall mean approval of Owner’s
Engineer.
1.2 Overlay Modification Terms
a. (Add) – If information is “added” to an existing paragraph in the PIP standard, the
requirements of this Practice shall be read as a continuation of that particular PIP
paragraph.
b. (Substitute) – If information is “substituted”, the affected PIP requirement shall be
replaced in its entirety by the requirements of this Practice.
c. (Revise) – If information is “revised”, the requirements of this Practice shall be read
as a revision to part of the particular PIP paragraph (i.e. changed sentence).
d. (New) – If information is “New”, it shall be read as an added requirement to the PIP
standard (i.e. new paragraph).
e. (Delete) – If information is “Delete”, to an existing paragraph in the PIP standard,
the requirements of that particular PIP paragraph shall be ignored.

Table 1 – Modifications to PIP CVS02700, Underground Gravity Sewers Specification

Overlay
PIP 02100
Modification Description
Paragraph
Term

2. References

Revise Applicable parts of the following Practices, industry


codes and standards, and references shall be
considered an integral part of this Practice. The
edition date stated within this Practice shall be used,
except as otherwise noted. Short titles are used
herein where appropriate.

2.1 Process Industry Practices (PIP)

Substitute - 60-CVES-00011 – OVERLAY TO PIP


CVC01015, Civil Design Criteria

- 60-CVES-0004 – Overlay to PIP CVS02100,


Site Preparation, Excavation, and Backfill
Specification

Chevron Phillips Chemical Company LP Overlay Page 3 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 3 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 4 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 4 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term
- 50-STES-00004 – Overlay to PIP STS03001,
Plain and Reinforced Concrete Specification
with Overlay

Delete - PIP CVI02720 – Sewer Details

2.2 Industry Codes and Standards

Add - AASHTO M252 – Standard Specification for


Corrugated Polyethylene Drainage Pipe

2.4 Related Requirements:

Add x 60-CVES-00014 – Temporary Construction


Dewatering

Add x 60-CVES-00015 – Temporary Excavation


Support system

3. Definitions

Revise Purchaser: The party who awards contract to the


supplier.

Add Constructor: Party responsible for excavation, backfill,


and pipe installation, including work executed through
the use of sub-contractors.

Add Supplier: The party responsible for supplying


materials associated with underground gravity sewer
system, such as but not limited to pipes and joints,
culverts, manholes, inlet structures, frames, and
covers.

Add Professional engineer: An engineer, other than


engineer of record licensed as defined by laws of the
locality in which the work is to be performed, and
qualified to practice in the specialty discipline required
for the work described in contract documents

Add Culvert: Pipe(s) allow water to flow under a road,


railroad, trail, or similar obstruction from one side to
the other

4. Requirements

Chevron Phillips Chemical Company LP Overlay Page 4 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 4 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 5 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 5 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term

4.1 General

4.1.1 Quality control

4.1.1.4 Revise All defective materials shall be repaired or replaced at


no additional cost to purchaser.

4.1.1.5 a. Add Tests to determine conformance with all requirements


of this Specification for quality and properties of all
supplier secured materials, shall be performed by an
independent commercial laboratory retained and
compensated by supplier, and approved by purchaser.

4.1.2 Submittals

4.1.2.1 Revise The following documentation shall be submitted to the


purchaser professional engineer 2 weeks before
installation:

b. Delete

c. Delete

4.1.2.2 Revise As-built documentation showing location, line, and


grade of newly installed sewer systems shall be
submitted to owner after completion of testing and
installation of the system.

4.1.3 Safety

4.1.3.1 Revise Field Construction activities within project property


boundary shall conform to owner’s and purchaser’s
safety requirements, including any special rules that
may be in effect at a specific site.

4.1.3.3 Revise Hazardous and hot work permits for chemical


exposure, open flames, spark-producing mechanical
equipment, potential explosive mixtures, and any
other hazardous conditions are required in areas
specified by purchaser.
4.1.3.4 Revise All excavation and trenching shall be in accordance
with OSHA standards, industry codes, and local
requirements listed in Section 2.0.

Chevron Phillips Chemical Company LP Overlay Page 5 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 5 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 6 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 6 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term

4.1.4 Environmental

4.1.4.2 Revise Before discharging any liquid into drains, catch basins,
or manholes in connection with trench dewatering
activities, testing, or other activities for which liquids
need to be disposed, the constructor shall verify that
the applicable permit will allow intermittent non-storm
flows into storm sewers.

4.1.4.3 Revise Excavated material shall be managed in accordance


with site safety plan.

4.1.4.4 Delete

4.2 Materials

4.2.1 Pipe and Joints

4.2.1.4 Vitrified Clay Pipe (VCP) – Rigid Pipe

1. Delete

2. Delete

3. Delete

4.2.1.6 Cast ductile Iron Soil Pipe (DISP) – Rigid Pipe

1. Delete

2. Delete

4.2.1.7 High-Density Polyethylene (HDPE) Pipe – Flexible Pipe

4. Revise HDPE mechanical coupling joints are also acceptable


if approved by professional engineer.

4.2.1.8 Reinforced Concrete Box (RCB) Sections – Rigid Pipe

3. Revise Joints shall be pre-formed plastic gasket-type joint


sealant, unless specified otherwise in the contract
documents or per manufacturer’s recommendations.

4.2.1.9 Substitute Corrugated High Density Polyethylene


(CHDPE) Pipe

Chevron Phillips Chemical Company LP Overlay Page 6 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 6 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 7 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 7 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term

1. Substitute CHDPE shall have a smooth interior and annular


exterior corrugation

a. Add 4- through 10-inch pipe shall meet AASHTO M252,


Type S or SP.

b. Add 12- through 60-inch pipe shall meet AASHTO M294,


type S or SP, or ASTM F2306.

2. Substitute Perforated pipe shall meet AASHTO M252 and


AASHTO 294 respectively. Class II perforation
pattern shall be used unless otherwise specified in
contract documents.

3. Substitute CHDPE and fittings shall be bell and spigot type,


manufacture in accordance with AASHTO M252 and
AASHTO M294. Bell shall be an integral part of the
pipe.

4. Add Joints shall be sealed using elastomeric gaskets in


accordance with ASTM F477 unless otherwise
specified in the contract documents.

4.2.2 Manholes, Inlet Structures, Frames, and Covers

4.2.2.1 Revise Manholes and inlet structures (catch basins) shall be


precast (monolithic) with integral bottom. See contract
drawings for layout.

4.2.2.2 Revise Precast concrete manholes and inlet structures shall


conform to ACI 318 requirements and National
Precast Concrete Association recommendations.

4.2.3 Cast-in-Place Concrete

Revise Cast-in-place concrete used for sewers shall be


constructed in accordance with 50-STES-00004.

4.3 Construction

4.3.1 Receiving and Handling

4.3.1.2 Revise Pipe materials and all precast structures shall be


inspected before installation. Any damaged materials

Chevron Phillips Chemical Company LP Overlay Page 7 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 7 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 8 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 8 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term
that are not acceptable to purchaser shall be rejected
and replaced at no cost to purchaser.

4.3.2 Trench Excavation

4.3.2.1 Revise All excavation and trenching shall be made in


accordance with 60-CVES-00004, OSHA standards,
and owner’s local requirements and guidelines (as
applicable) for the following:

a. Revise Shoring, bracing, and/or sloping wall construction shall


be in accordance with 60-CVES-00015 and site safety
plan.

b. thru e. Delete

4.3.2.7 Revise If unacceptable soil is encountered, as determined by


on-site purchaser’s geotechnical engineer, such soils
shall be removed. The resulting over-excavation shall
be backfilled with suitable material to the specified
grade.

4.3.2.10 Revise Erosion control measures shall be incorporated as


required by applicable regulations and by purchaser’s
requirements.

4.3.3 Dewatering

4.3.3.1 Substitute All dewatering methods and disposal of water shall be


as approved by constructor.

4.3.3.3 Delete
4.3.3.5 Delete
4.3.3.7 Revise Surface water shall be diverted away from the work
area as directed by purchaser.

4.3.4 Bedding

4.3.4.1 Revise Bedding material shall be granular material or flowable


fil, or as specified in contract documents.

a. Add Granular material such as sand shall pass a ½-inch


sieve and shall be at least 90% retained on No. 200
sieve as determined in accordance with ASTM D422.

Chevron Phillips Chemical Company LP Overlay Page 8 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 8 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 9 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 9 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term

b. Add Granular material such as aggregate fill shall consist


of crushed stone or recycled concrete meeting the
gradation and plasticity requirement of TxDOT Item
247, Type A or D, Grade 1 or 2, minus Wet Ball Mill or
Triaxial Compressive Strength requirements

c. Add Flowable fill described in 60-CVES-00004 may be


used for bedding material.

4.3.4.3 Revise Bedding material shall be compacted to a minimum of


95% of the maximum dry density as determined by
ASTM D698 Standard Proctor unless flowable fill is
used.

4.3.4.6 Revise Bedding shall conform to Class B, Class C, or Class


D.

4.3.4.7 a. Revise Class B bedding shall be obtained by installing the


box section on a minimum thickness of fine granular
material of at least 12 inches. Compacted granular
material shall be placed on each side of the box
section and up to at least 1 ft over the top of the box.
4.3.4.7 b. Revise Class C bedding shall be obtained by placing the
box section on a flat trench bottom. Lightly
compacted fill shall be placed on each side of the
box section and up to 12 inches over the top of the
box.
4.3.4.8 Revise Flowable fill (controlled low-strength material,
CLSM) may be used for Class B, C, or D bedding
material. CLSM shall be in accordance with 60-
CVES-00004.
4.3.5 Pipe laying and Jointing

4.3.5.5 Revise Pipe laying and joining shall be carried out in a dry
trench inspected and approved in accordance with site
safety plan.

4.3.5.8 Delete

4.3.5.11 Revise Manholes, catch basins, dry boxes, etc., shall be


constructed in accordance with PIP CVI02720, and
contract drawings.

Chevron Phillips Chemical Company LP Overlay Page 9 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 9 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 10 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 10 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term

4.3.6 Backfilling

4.3.6.1 Revise Backfill and compaction material shall be in


accordance with 60-CVES-0004 and this Practice and
shall be similar to in-situ material.

a. Add Backfill for culverts beneath roadway pavements or


railways shall consist of the same bedding materials
up to the bottom of the pavement subbase or railroad
subballast layer. Backfill shall be compacted to a
minimum of 95% of the maximum dry density as
determined by ASTM D698 standard proctor.

4.3.6.4 Revise If backfill material other than flowable fill (CLSM) is


used, Joints shall be left exposed until completion of
leak testing.

4.3.6.8 Revise Flowable fill may be used for backfill material where
appropriate.

4.4 Exfiltration Test

4.4.1 Substitute Only gravity storm sewer and gravity portion of


sanitary sewer system shall be exfiltration tested.

a. Add Test shall consist of closing the lower end of each


system or section of the system, filling the system to
top of precast or cast-in-place structure and/or the top
of open trench.

b. Add In situation where precast or cast-in-place structure


has opening to a ditch, the system shall be filled to the
bottom of that opening.

c. Add Water shall be kept in test portion for a 2-hour period


before test.

d. Add The test shall be maintained for not less than 30


minutes plus any additional time required to inspect
the pipe joints for leaks.

4.4.2 Substitute Culverts under roads and railway tracks shall not be
tested.

Chevron Phillips Chemical Company LP Overlay Page 10 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 10 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 11 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Specification Title Specification Number Rev Date Sheet
Required Fields *
OVERLAY TO PIP CVS02700 GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
60-CVES-00006 AA 0--2020 11 of 11

Overlay
PIP 02100
Modification Description
Paragraph
Term

4.4.3 Substitute Valve boxes designed as dry systems shall not be


tested.

Figure A (in its Delete


entirety)

Chevron Phillips Chemical Company LP Overlay Page 11 of 11


Issued for Design
CONFIDENTIAL INFORMATION
Page 11 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 12 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION
Required Fields *
October 2004
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

Process Industry Practices


Civil

PIP CVS02700
Underground Gravity Sewers Specification

Issued for Design Page 12 of 28 Rev AA


7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 13 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

In an effort to minimize the cost of process industry facilities, this Practice has
been prepared from the technical requirements in the existing standards of major
industrial users, contractors, or standards organizations. By harmonizing these
technical requirements into a single set of Practices, administrative, application, and
engineering costs to both the purchaser and the manufacturer should be reduced. While
this Practice is expected to incorporate the majority of requirements of most users,
individual applications may involve requirements that will be appended to and take
precedence over this Practice. Determinations concerning fitness for purpose and
particular matters or application of the Practice to particular project or engineering
situations should not be made solely on information contained in these materials. The
use of trade names from time to time should not be viewed as an expression of
preference but rather recognized as normal usage in the trade. Other brands having the
same specifications are equally correct and may be substituted for those named. All
Practices or guidelines are intended to be consistent with applicable laws and
regulations including OSHA requirements. To the extent these Practices or guidelines
should conflict with OSHA or other applicable laws or regulations, such laws or
regulations must be followed. Consult an appropriate professional before applying or
acting on any material contained in or suggested by the Practice.

This Practice is subject to revision at any time by the responsible Function Team and
will be reviewed every 5 years. This Practice will be revised, reaffirmed, or withdrawn.
Information on whether this Practice has been revised may be found at www.pip.org.

© Process Industry Practices (PIP), Construction Industry Institute, The


University of Texas at Austin, 3925 West Braker Lane (R4500), Austin,
Texas 78759. PIP member companies and subscribers may copy this Practice
for their internal use. Changes, overlays, addenda, or modifications of any
kind are not permitted within any PIP Practice without the express written
authorization of PIP.

PIP will not consider requests for interpretations (inquiries) for this Practice.

PRINTING HISTORY
April 1995 Issued October 2004 Complete Revision
August 2000 Complete Revision

Not printed with State funds

Issued for Design Page 13 of 28 Rev AA


7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 14 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION
Required Fields *
October 2004
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

Process Industry Practices


Civil

PIP CVS02700
Underground Gravity Sewers Specification
Table of Contents

1. Introduction .................................. 2
1.1 Purpose ............................................. 2
1.2 Scope................................................. 2

2. References.................................... 2
2.1 Process Industry Practices ................ 2
2.2 Industry Codes and Standards .......... 2
2.3 Government Regulations ................... 3

3. Definitions .................................... 3

4. Requirements ............................... 4
4.1 General .............................................. 4
4.2 Materials ............................................ 5
4.3 Construction....................................... 8
4.4 Exfiltration Test ................................ 14
4.5 Considerations for
Existing Facilities ............................. 14

Figure A - Bedding Methods for


Trench Conduits ....................... 15

Process Industry Practices Page 1 of 15


Issued for Design Page 14 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 15 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

1. Introduction

1.1 Purpose
This Practice provides requirements for the installation contractor for fabricating and
installing underground gravity sewers.

1.2 Scope
This Practice describes the requirements for materials, installation, and testing of
underground gravity sewers. Requirements for pipe, inlet structures, manholes, and
appurtenances for sanitary, storm, and industrial process sewers are included.
Requirements for pressurized pipe, double-contained, and emission-controlled
industrial process sewers in environmental applications are not included.

2. References
Applicable parts of the following Practices, industry codes and standards, and references
shall be considered an integral part of this Practice. The edition in effect on the date of
contract award shall be used, except as otherwise noted. Short titles will be used herein
where appropriate.

2.1 Process Industry Practices (PIP)


– PIP CVC01015 - Civil Design Criteria
– PIP CVS02100 - Site Preparation, Excavation, and Backfill Specification
– PIP CVI02720 - Sewer Details
– PIP STS03001 - Plain and Reinforced Concrete Specification

2.2 Industry Codes and Standards

• American Society for Testing and Materials (ASTM)


– ASTM A36 - Standard Specification for Carbon Structural Steel
– ASTM A74 - Standard Specification for Cast Iron Soil Pipe and Fittings
– ASTM C14 - Standard Specification for Concrete Sewer, Storm Drain, and
Culvert Pipe
– ASTM C76 - Standard Specification for Reinforced Concrete Culvert, Storm
Drain, and Sewer Pipe
– ASTM C425 - Standard Specification for Compression Joints for Vitrified
Clay Pipe and Fittings
– ASTM C443 - Standard Specification for Joints for Circular Concrete Sewer
and Culvert Pipe, Using Rubber Gaskets
– ASTM C478 - Standard Specification for Precast Reinforced Concrete
Manhole Sections
– ASTM C564 - Standard Specification for Rubber Gaskets for Cast Iron Soil
Pipe and Fittings

Page 2 of 15 Process Industry Practices


Issued for Design Page 15 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 16 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

– ASTM C700 - Standard Specification for Vitrified Clay Pipe, Extra Strength,
Standard Strength, and Perforated
– ASTM C969 - Standard Practice for Infiltration and Exfiltration Acceptance
Testing of Installed Precast Concrete Pipe Sewer Lines
– ASTM C1433 - Standard Specification for Precast Reinforced Concrete Box
Sections for Culverts, Storm Drains, and Sewers
– ASTM D422 - Standard Test Method for Particle - Size Analysis of Soils
– ASTM D1248 - Standard Specification for Polyethylene Plastics Molding and
Extrusion Materials
– ASTM D2321 - Standard Practice for Underground Installation of
Thermoplastic Pipe for Sewers and Other Gravity Flow Applications
– ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic
Pipe, Schedules 40, 80, and 120
– ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl
Chloride) (PVC) Plastic Piping Systems
– ASTM D2855 - Standard Practice for Making Solvent-Cemented Joints with
Poly(Vinyl Chloride) (PVC) Pipe and Fittings
– ASTM D3212 - Standard Specification for Joints for Drain and Sewer Plastic
Pipes Using Flexible Elastomeric Seals
– ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and
Fittings Materials
– ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for
Joining Plastic Pipe
• American Association of State Highway and Transportation Officials (AASHTO)
– AASHTO M 36 - Interim Specification for Corrugated Steel Pipe, Metallic
Coated for Sewers and Drains
– AASHTO M 294 - Standard Specification for Corrugated Polyethylene Pipe,
300- to 1200-mm Diameter (for Storm Sewers and Culverts)

2.3 Government Regulations

• Occupational Safety and Health Administration


– 29 CFR 1926 Subpart P - Excavations

3. Definitions
contract documents: Any and all documents, including design drawings, that purchaser has
transmitted or otherwise communicated, either by incorporation or by reference, and made
part of the legal contract or purchase order agreement between purchaser and supplier

supplier: The party responsible for performing excavation, backfill, and pipe installation,
including work executed through the use of sub-contractors

Process Industry Practices Page 3 of 15


Issued for Design Page 16 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 17 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

owner: The party who owns the facility wherein the underground gravity sewer will be
installed

purchaser: The party who awards the contract to the supplier. The purchaser may be the
owner or the owner’s authorized agent.

flowable fill: An engineered blend of materials (controlled low-strength material) used as


self-leveling and self-compacting backfill and bedding

standard dimension ratio (SDR): The ratio of the pipe outside diameter (inches) to the
minimum wall thickness (inches)

4. Requirements

4.1 General
4.1.1 Quality Control
4.1.1.1 Sewers shall be fabricated, installed, and tested in accordance with
this Practice; with codes, standards, and procedures specified in this
Practice; and with all applicable codes and regulations of the
controlling federal, state, and local jurisdictions.
4.1.1.2 Purchaser shall have the right to inspect, at purchaser’s expense, all
materials and workmanship and shall have unrestricted entry to the
fabrication shop at all times work is being performed.
4.1.1.3 Purchaser can reject improper, inferior, or defective materials and
workmanship at any stage of production.
4.1.1.4 All defective materials and workmanship shall be repaired or
replaced at no additional cost to purchaser.
4.1.15 Purchaser inspection shall not replace the supplier’s quality control
procedures and responsibility for compliance with all applicable
requirements for the material, fabrication, and installation.
4.1.1.6 Unless directed otherwise by purchaser, if at any time during
installation and testing, weather or any other factor causes the
degradation of the pipe foundation, pipe and/or fitting installation,
bedding, or backfill, all affected materials shall be removed and the
work shall be reinstalled in accordance with this Practice.
4.1.2 Submittals
4.1.2.1 The following documentation shall be submitted to the purchaser
2 weeks before installation:
a. Fabrication drawings and instructions for the installation of
pipe and appurtenances
b. Certification that an OSHA-defined excavation-competent
person (ECP) shall oversee all excavation

Page 4 of 15 Process Industry Practices


Issued for Design Page 17 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 18 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

c. Documentation of all trench work requiring an ECP


d. Certification in writing that the materials to be used under the
contract satisfy all the requirements of the project.
4.1.2.2 As-built documentation showing location, line, and grade of newly
installed sewer systems shall be submitted to purchaser within
4 weeks after installation.
4.1.3 Safety
4.1.3.1 Field construction activities on owner’s property shall conform to
owner’s safety requirements, including any special rules that may be
in effect at a specific site.
4.1.3.2 Good housekeeping practices shall be maintained in and around the
work site throughout the duration of the work.
4.1.3.3 Hazardous and hot work permits for chemical exposure, open
flames, spark-producing mechanical equipment, potential explosive
mixtures, and any other hazardous conditions shall be required in
areas specified by owner.
4.1.3.4 All excavation and trenching shall be in accordance with OSHA
standards and owner’s local requirements and guidelines (as
applicable) for the following:
a. Shoring, bracing, and/or sloping wall construction
b. Marking and flagging open excavations
c. Permitting and confined space entry requirements
4.1.4 Environmental
4.1.4.1 All sewer outfalls are required to be permitted by applicable
regulations.
4.1.4.2 Before discharging any liquid into drains, catch basins, or manholes
in connection with trench dewatering activities, testing, or other
activities for which liquids need to be disposed, the owner shall
verify that the applicable permit will allow intermittent non-storm
flows into storm sewers.
4.1.4.3 Excavated material shall be managed in accordance with a soil
management plan.
4.1.4.4 Unless provided by owner, the soil management plan shall be
developed by supplier and approved by owner before the start of
excavation activities.

4.2 Materials
4.2.1 Pipe and Joints
4.2.1.1 Specifications for materials other than those listed in the following
section (such as welded, coated, and wrapped carbon steel) that are

Process Industry Practices Page 5 of 15


Issued for Design Page 18 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 19 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

required for the project shall be as specified in the contract


documents.
4.2.1.2 Concrete Pipe/Reinforced Concrete Pipe (CP/RCP) - Rigid Pipe
1. Concrete sewer pipe 10 inches (250 mm) and smaller shall be
in accordance with ASTM C14 (class as specified in the
contract documents) non-reinforced, bell and spigot, or tongue
and groove sewer pipe.
2. Concrete sewer pipe 12 inches (300 mm) and larger shall be in
accordance with ASTM C76, reinforced sewer pipe (class and
wall as specified in the contract documents).
3. Joints shall be sealed using elastomeric “O” rings in accordance
with ASTM C443 unless otherwise specified in the contract
documents.
4. Joints may be sealed with cement grout if the service is for
storm sewer lines that are 24 inches (600 mm) in diameter and
larger.
4.2.1.3 Corrugated Steel Pipe (CSP) - Flexible Pipe
1. CSP shall be metallic-coated (galvanized) pipe in accordance
with AASHTO M 36 (sheet metal thickness and corrugation size
as specified in the contract documents).
2. CSP shall be connected with locking corrugated coupling bands
of the design indicated in AASHTO M 36, “Coupling Bands”
section.
3. Connecting bands shall be coated in accordance with the pipe
coating requirements.
4.2.1.4 Vitrified Clay Pipe (VCP) - Rigid Pipe
1. VCP shall be used only to the extent required to tie into
existing VCP systems. Alternative materials should be selected
for new piping installations.
2. VCP shall be extra strength in accordance with ASTM C700.
3. Joints shall be compression type in accordance with
ASTM C425, unless otherwise specified in the contract
documents.
4.2.1.5 Polyvinyl Chloride Plastic (PVC) Pipe - Flexible Pipe
1. PVC pipe 12 inches (300 mm) or less in diameter shall be
minimum schedule 40 pipe in accordance with ASTM D1785.
2. Joints shall be solvent cemented in accordance with
ASTM D2855, using cement in accordance with ASTM D2564
or shall have elastomeric ring gaskets in accordance with
ASTM D3212.

Page 6 of 15 Process Industry Practices


Issued for Design Page 19 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 20 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

4.2.1.6 Cast Ductile Iron Soil Pipe (DISP) - Rigid Pipe


1. Cast DISP and fittings shall be hub and plain end coated service
weight in accordance with ASTM A74.
2. Joints shall be neoprene sleeve gasketed, push-on type in
accordance with ASTM C564.
4.2.1.7 High-Density Polyethylene (HDPE) Pipe - Flexible Pipe
1. HDPE pipe and fittings shall be manufactured from virgin high-
density polyethylene resin, in accordance with ASTM D3350,
Cell Class PE345434C minimum, with a standard dimension
ratio (SDR) as specified in the contract documents.
2. Joints shall be butt fusion welded, socket fusion welded, or
flanged.
3. Alternate joining method shall consist of arch-band split sleeve
couplings made of carbon steel conforming to ASTM A36 or
stainless steel grade 304L or 316L. The coupling shall be
designed with closure plates and sealing pads for installation
and a leak-proof seal. O-Ring gaskets shall be used and shall
consist of ethylene propylene diene monomer (EPDM), nitrile,
silicon, or polyisoprene as required for the service intended.
Couplings shall allow for angular deflection, expansion, and
vibration if required. If a restrained joint is required, it shall be
accomplished with restraining rings welded to the exterior of
the pipe and a restraining-type coupling.
4. HDPE mechanical coupling joints are also acceptable if
approved by the purchaser.
5. Wall thickness shall be specified as follows:
NPS SDR
4 – 16 inches 17
18 – 48 inches 32.5

4.2.1.8 Reinforced Concrete Box (RCB) Sections - Rigid Pipe


1. RCB sections shall be in accordance with ASTM C1433 unless
otherwise specified in the contract documents.
2. The appropriate table of section requirements from the listed
ASTM standard shall be used for the design loading specified
in the contract documents.
3. Joints shall be pre-formed plastic gasket-type joint sealant,
unless specified otherwise in the contract documents.
4.2.1.9 Corrugated Polyethylene Pipe (CPP) - Flexible Pipe
1. CPP and fittings shall be bell and spigot type, manufactured in
accordance with AASHTO M 294. Bell shall be an integral part
of the pipe.

Process Industry Practices Page 7 of 15


Issued for Design Page 20 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 21 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

2. Pipe shall be Type S with a smooth inner liner unless otherwise


specified in the contract documents.
3. Joints shall be sealed using elastomeric gaskets in accordance
with ASTM F477 unless otherwise specified in the contract
documents.
4.2.2 Manholes, Inlet Structures, Frames, and Covers
4.2.2.1 Manholes and inlet structures (catch basins) shall be precast
(monolithic) with integral bottom. See PIP CVC01015 for manhole-
spacing criteria.
4.2.2.2 Precast concrete manholes shall conform to ASTM C478.
4.2.2.3 HDPE plate used for manholes and inlet structures shall be
manufactured from virgin high-density polyethylene resin in
accordance with ASTM D1248-IIIC5-P34 pipe grade resin.
4.2.2.4 HDPE pipe components used for manholes and inlet structures shall
be as specified in Section 4.2.1.7 (this Practice).
4.2.2.5 Site-built concrete manholes shall be in accordance with the contract
documents.
4.2.3 Cast-in-Place Concrete
Cast-in-place concrete used for sewers shall be constructed in accordance
with PIP STS03001.

4.3 Construction
4.3.1 Receiving and Handling
4.3.1.1 Care shall be taken during handling and storage so as not to damage
or to cause stresses or deformation in pipe materials.
4.3.1.2 Pipe materials shall be inspected before installation. Any damaged
materials that are not acceptable to purchaser shall be rejected and
replaced at no cost to purchaser.
4.3.2 Trench Excavation
4.3.2.1 All excavation and trenching shall be made in accordance with
PIP CVS02100, OSHA standards, and owner’s local requirements
and guidelines (as applicable) for the following:
a. Shoring, bracing, and/or sloping wall construction
b. Marking and flagging open excavations
c. Permitting and confined space entry requirements
d. Employing excavation-competent person (ECP)
e. Handling and storing excavated materials
4.3.2.2 Proper care and protection shall be provided to prevent damage to all
existing facilities (e.g., foundations, services, pipelines, etc.) on,

Page 8 of 15 Process Industry Practices


Issued for Design Page 21 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 22 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

above, or below the surface of the area where excavation and


backfill operations are to be performed.
4.3.2.3 Underground obstructions (e.g., piping, foundations, structures, etc.)
shall not be removed or altered without owner’s approval.
4.3.2.4 Trench depth shall be based on the specified invert of the pipe plus
the bedding requirements as specified in this Practice and in the
contract documents.
4.3.2.5 Trench width shall be as narrow as possible while still permitting
proper access for bedding and assembly of the pipe. If practical,
maximum trench width from bottom of the trench to 12 inches
(300 mm) above the pipe shall be 4/3 the nominal diameter of the
pipe plus 8 inches (200 mm).
4.3.2.6 If rock or other unyielding material is encountered, the bottom of the
trench shall be over-excavated 1/6 of the pipe diameter but in no
case less than 4 inches (100 mm).
4.3.2.7 If unacceptable soil is encountered, as determined by owner, such
soils shall be removed. The resulting over-excavation shall be
backfilled with suitable material to the specified grade. (See bedding
requirements specified in this Practice.)
4.3.2.8 The bottoms of trenches or bedding material (as applicable) shall be
firm and graded to provide uniform bearing of the pipe.
4.3.2.9 If pipe joint diameter exceeds pipe outside diameter (e.g., bell and
spigot piping), bell holes shall be manually excavated after the
trench bottom has been graded.
4.3.2.10 Erosion control measures shall be incorporated as required by
applicable regulations and by owner’s requirements.
4.3.2.11 Flexible Conduit
1. Only as much trench shall be opened as can be safely
maintained by available equipment.
2. All trenches shall be backfilled as soon as practicable but not
later than the end or each working day.
3. The space between the conduit and trench wall shall be wider
than the compaction equipment used in the conduit zone;
however, in no case shall it be wider than the conduit diameter
times 1.5 plus 12 inches (300 mm).
Comment: Flexible conduit requires stable trench walls to
assure proper embedment of pipe and
compaction of the bedding materials.

Process Industry Practices Page 9 of 15


Issued for Design Page 22 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 23 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

4.3.2.12 Wall Supports


1. If trench wall supports such as sheeting are required, these
supports must be left in place to preclude loss of support for the
pipe.
2. If sheeting is to be cut off, cuts shall be made a minimum of
1.5 ft (450 mm) above the crown of the pipe.
3. Rangers, whalers, and braces shall be left in place as required
to support cutoff sheeting.
4. If timber sheeting is used, it shall be treated as a permanent
structure and treated against biological degradation.
4.3.2.13 If ledge rock, hard pan, shale, or other unyielding material, cobbles,
rubble, debris, boulders, or stones larger than 1.5 inches (40 mm) are
encountered in the trench bottom, the trench shall be excavated to a
minimum depth of 6 inches (150 mm) below the bottom of pipe
elevation. The excavated materials shall be replaced with proper
embedment material.
4.3.3 Dewatering
4.3.3.1 Equipment necessary to collect and discharge water away from
excavations, such as pumps, sumps, suction and discharge lines, and
all other dewatering system components, shall be provided, installed,
and maintained.
4.3.3.2 All water encountered shall be disposed of in such a manner that
property is not damaged and no nuisance or health menace results.
4.3.3.3 If required by owner, a means of desilting the water before disposal
shall be provided.
4.3.3.4 At any time, the length of open trench shall be limited to that which
can be dewatered with methods and equipment available.
4.3.3.5 Dewatering methods shall be used to minimize softening of the soil
supporting the pipe and changes in soil characteristics that are
detrimental to subgrade stability.
4.3.3.6 Water shall not be allowed to accumulate in excavations. Subsurface
water flowing into excavations shall be removed by pumping or if
possible by gravity drainage.
4.3.3.7 Surface water shall be diverted away from the work area as directed
by owner.
4.3.3.8 The trench shall not be used as a temporary drainage ditch.
4.3.4 Bedding
4.3.4.1 Bedding material shall be granular and well graded. All material
shall pass a 1/2-inch (12.5-mm) sieve and shall be at least 90%
retained on No. 200 (75 microns) sieve as determined in accordance
with ASTM D422.

Page 10 of 15 Process Industry Practices


Issued for Design Page 23 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 24 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

4.3.4.2 Bedding material shall be placed under and equally along both sides
of the pipe in uniform layers not exceeding 6 inches (150 mm) loose
depth to a height of the centerline of the pipe and compacted by
hand, pneumatic tamper, or other owner-approved means.
4.3.4.3 Bedding material shall be compacted to a density approximately that
of the undisturbed site soil materials or as specified in the contract
documents.
4.3.4.4 If compacted, the pipe bed shall provide uniform bearing for the
bottom of the pipe (see trenching requirements specified in this
Practice).
4.3.4.5 Localized loading and differential settlement shall be minimized
where the pipe crosses other utilities or subsurface structures or in
areas having special foundations such as pile caps or sheeting. A
cushion of bedding shall be provided between the pipe and any such
point of localized loading.
4.3.4.6 Bedding shall conform to one of the following classes. Class C
bedding shall be used if no class is specified in the contract
documents. See Figure A for details.
a. Class A - concrete cradle bedding - requires embedment of the
lower part of the pipe in plain or reinforced concrete of suitable
thickness and extending up to the sides of the pipe a distance
not less than 25% of the pipe outside diameter.
b. Class B - first class bedding - requires the pipe to be placed on
the fine granular materials foundation extending up to the
center line of the pipe. The trench shall then be filled to 1 ft
(300 mm) over the top of the pipe with granular material in
6-inch (150-mm) layers and compacted to fill all the space
around the pipe.
c. Class C - ordinary bedding - requires placing the pipe on fine
granular material cradle extending up to the sides of the pipe a
distance not less than 1/6 of the pipe outside diameter. The
trench shall then be filled to 6 inches (150 mm) over the top of
the pipe with granular material placed and compacted to fill all
space around the pipe.
d. Class D - impermissible bedding - allows the pipe to be placed
on the bottom of the trench with no effort to shape the trench to
fit the pipe. Fill shall be placed around the pipe.
4.3.4.7 Bedding for box culverts shall conform to one of the following
classes. Class C bedding shall be used if no class is specified in the
contract documents.
a. Class B bedding shall be obtained by installing the box section
on a minimum thickness of fine granular material of at least
2 inches (50 mm). Compacted granular material shall be placed

Process Industry Practices Page 11 of 15


Issued for Design Page 24 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 25 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

on each side of the box section and up to at least 1 ft (300 mm)


over the top of the box.
b. Class C bedding shall be obtained by placing the box section on
a flat trench bottom. Lightly compacted fill shall be placed on
each side of the box section and up to 6 inches (150 mm) over
the top of the box.
4.3.4.8 Flowable fill (controlled low-strength material, CLSM) may be used
for Class B, C, or D bedding material. CLSM shall be in accordance
with PIP CVS02100.
4.3.5 Pipe Laying and Jointing
4.3.5.1 Pipe shall be laid beginning at the lowest point in trenches.
4.3.5.2 Pipes with spigot or tongue ends shall be laid with spigot ends
pointing in the direction of flow.
4.3.5.3 Pipe types other than those with spigot or tongue ends shall be laid
in accordance with the pipe manufacturer’s recommendations or
instructions.
4.3.5.4 Pipe shall be laid true to line and grade and kept clean and sound.
4.3.5.5 Pipe laying and joining shall be carried out in a dry trench.
4.3.5.6 Each length of pipe shall be inspected for loose gaskets, cracks, and
other defects before installation.
4.3.5.7 After inspection, each acceptable length of pipe shall be carefully
placed to the line and grade specified and nested in the bedding in
such a manner as to provide uniform support throughout its entire
length.
4.3.5.8 If pipe laying is suspended, the ends of the pipe shall be kept closed
and sealed to keep out soil and foreign materials.
4.3.5.9 After the joints have been made, the pipe shall not be disturbed in
any manner.
4.3.5.10 HDPE pipe shall be welded by experienced, qualified welders. All
welds shall be fusion welds except at manholes, where extrusion
welds are permitted.
4.3.5.11 Manholes, catch basins, dry boxes, etc., shall be constructed in
accordance with PIP CVI02720.
4.3.5.12 Bell and spigot joints shall be clean and dry. A lubricant
recommended by the pipe manufacturer shall be applied to the joint
materials. The spigot shall have full bell penetration.
4.3.6 Backfilling
4.3.6.1 Backfill and compaction material shall be in accordance with
PIP CVS02100 and this Practice and shall be similar to in-situ
material.

Page 12 of 15 Process Industry Practices


Issued for Design Page 25 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 26 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

4.3.6.2 The trench shall be backfilled and compacted to a density equal to


that specified on the contract documents or equal to that of the
adjacent in situ material.
4.3.6.3 As soon as possible after pipe joints are made, backfill material shall
be placed along the sides of the pipe with care to prevent movement
of the line or grade.
4.3.6.4 Joints shall be left exposed until completion of leak testing.
4.3.6.5 Backfilling of trenches shall be completed immediately after testing.
4.3.6.6 Backfilling shall be compacted in a manner that avoids displacement
or damage to the pipe.
4.3.6.7 Construction machinery or vehicles shall not be allowed to pass over
the trench until the trench is backfilled and compacted sufficiently to
prevent damage to the pipe.
4.3.6.8 Flowable fill (CLSM) may be used for backfill material if specified
in contract documents.
4.3.7 Embedment of Flexible Conduit
4.3.7.1 Embedment configuration, materials, and compaction requirements
shall be in accordance with the contract documents.
4.3.7.2 If embedment materials are not specified in the contract documents,
Class II or Class III materials shall be in accordance with Table 1 of
ASTM D2321, determined to be compatible with pipe and suitable to
prevent migration of adjacent soils.
4.3.7.3 If embedment installation requirements are not specified in the
contract documents, installation shall be in accordance with the
recommendations given in Table 2 of ASTM D2321.
4.3.7.4 Embedment materials shall be placed into the trench, using methods
that will not disturb or damage the conduit.
4.3.7.5 Material in the area between the bedding and the underside of the
conduit shall be worked in and tamped before placing and
compacting the rest of the embedment.
4.3.7.6 Compaction equipment shall not be allowed to contact the conduit
and damage the conduit wall.
4.3.7.7 Embedment shall not be compacted by running over the materials
with earthmoving equipment.
4.3.7.8 To preclude damage to the installed conduit and disturbance of the
conduit embedment, a minimum depth of at least 24 inches
(600 mm) or 1 pipe diameter of cover, whichever is greater, shall be
maintained over the top of conduit before allowing vehicles to
traverse the conduit trench.
4.3.7.9 To preclude potential floatation of the installed conduit, a minimum
depth of backfill over the top of conduit of at least 24 inches

Process Industry Practices Page 13 of 15


Issued for Design Page 26 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 27 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
PIP CVS02700 COMPLETE REVISION
Underground Gravity Sewers Specification October 2004Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

(600 mm) or 1 pipe diameter of cover over the pipe, whichever is


greater, shall be maintained.

4.4 Exfiltration Test


4.4.1 Setup
1. Exfiltration shall be measured at a manhole.
2. The section of pipe to be tested shall be plugged at the downstream end
of pipe (e.g., as at a manhole).
3. The lateral pipe in the section being tested shall be plugged with
removable stoppers.
4.4.2 Procedure for Process and Sanitary Sewers
1. Sections of pipe shall be filled, 400-ft (122-m) maximum length at a
time, with water to the top of the manhole but not less than 5 ft (1.5 m)
above the top of the pipe.
2. If required, a standpipe shall be used to bring the water level to 5 ft
(1.5 m) above the top of the pipe.
3. Water shall be allowed to stand for 4 hours.
4. Manhole shall be refilled and the drop shall be measured after 1 hour.
5. Maximum allowable exfiltration shall be as follows:
a. Process sewers - no measurable amount
b. Sanitary sewers - 0.0008 gallons/inch diameter/ft/hour
(0.00039 liters/mm diameter/m/hour)
4.4.3 Exfiltration testing of storm sewers shall be done in accordance with
ASTM C969.

4.5 Considerations for Existing Facilities


4.5.1 If construction of new sewers interferes with existing sewers, satisfactory
temporary bypass facilities shall be provided.
4.5.2 Open ends of existing sewers that are cut or abandoned in place shall be
securely closed with a plug or wall of concrete having a minimum thickness
of 3 pipe diameters.

Page 14 of 15 Process Industry Practices


Issued for Design Page 27 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 28 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
#Qr#ixuwkhu#uhsurgxfwlrq#ru#glvwulexwlrq#lv#shuplwwhg1
Frs|uljkwhg#pdwhuldo#olfhqvhg#wr#Exuqv#)#PfGrqqhoo#e|#Fodulydwh#Dqdo|wlfv#+XV,#OOF/#vxevfulswlrqv1whfkvwuhhw1frp/#grzqordghg#rq#535303903;#48=47=76#.3333#e|##Ylyldq#Oduvrq0loolj1
COMPLETE REVISION PIP CVS02700
October 2004 Required Fields *
Underground Gravity Sewers Specification
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

Figure A - Bedding Methods for Trench Conduits

CLASS "A" CLASS "B"


Reinforced A s = 1.0% L f = 4.8 Lf = 1.9
Reinforced A s = 0.4% Lf = 3.4
Plain Lf = 2.8 Densely
4/3 Bc+ 8 inches (200 mm) min. compacted
backfill
1 1/4 Bc

12 inch 12 inch
(300 mm) min. (300 mm) min.

Compacted
Bc Bc
granular
1/4 Bc material
1/4 D max. d

Concrete
CONCRETE CRADLE GRANULAR FOUNDATION

CLASS "C" Lightly CLASS "D"


Lf = 1.5 compacted backfill L f = 1.1

H 6 inch H 6 inch
(150 mm) min. (150 mm) min.
Compacted
Bc granular material
Bc
1/6 B c
d Loose backfill

GRANULAR FOUNDATION FLAT SUBGRADE

Legend
Depth of bedding
material below pipe
Bc = outside diameter
H = backfill cover above top of pipe D d (min.)
D = inside diameter
d = depth of bedding material below pipe 27 inches (690 mm) 3 inches (75 mm)
As = area of transverse steel in the & smaller
cradle or arch expressed as a 30 inches (760 mm 4 inches (100 mm)
percent of area of concrete at invert to 60 inch (1.53 m)
or crown. 66 inches (1.68 m) 6 inches (150 mm)
L f = bedding factor & larger

Process Industry Practices Page 15 of 15


Issued for Design Page 28 of 28 Rev AA
7/28/2020
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 29 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
'*&-%$0/4536$5*0/$0/53"$503
REQUEST FOR INFORMATION (RFI)
Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

RFI No.: REVISION: ISSUE DATE: 02/02/2023


RFI-BMZ-00000-20-00003 0 PROPOSED RESPONSE DATE: 02/09/2023

P/$17: USGC II OSBL AREA: 00 &5$)7&2'(

UNIT: 00 - General Notes/Specs 20 - SITEWORK

CONTRACTOR: BMZ TURNOVER SYS / COMMISSIONING PACK:

CWP: Required Field

FROM (Requestor): Tyler White REQUEST TO:


CONTACT (0$,/: whitet@zachrygroup.com

RFI TITLE: General Fill Material

SPECIFICATIONS / DOCUMENTS / DWGS REFERENCED OR IMPACTED:


60-CVES-0004

TAG NUMBERS IMPACTED? YES NO IF YES TAG NUMBERS:

ATTACHMENTS:

REQUESTED INFORMATION:
Per 60-CVES-0004 section 4.2.3 in the overlay, General fill should meet the requirements of section 4.3.7.8(b). 4.3.7.8(b) requires the compaction to be 95% of the
standard proctor, it also states in section C "Moisture content of material being compacted shall be between minus 2% and plus 3%" Then, section D states that
"Chemical stabilization may be used provided the engineer of record approves modifications". The moisture in the soil is too high to achieve the minus 2% and plus
3%, without extensively disking the area and letting the material dry in the sun for long periods of the time.

Due to the extensive work involved and the weather conditions in the area, as well as the test that have been ran on the general fill material that WT-BYLER used to
raise the cooling tower pads, Zachry is requesting engineering approval to use chemical stabilization for areas that require general fill as backfill.

PROPOSED RESOLUTION:
Zachry would like to use chemical stabilization on the general fill backfill material, to lower the moisture in the soil and help achieve compact/moisture
requirements in a more timely manner.

RESPONSE:

Use of lime is approved. Several lime series tests were performed by WTB as part of the HC contract and can be made available if desired. Recommend
mixing in the lime in percentage increments until the placed material meets the moisture and compaction requirements.

RESPONDER: M. Warnecke TITLE: Overall Lead Civil/Structural Engr DATE: 02/03/2023

RFI CATEGORY: CC DC DD MC QC VC EC OC OT IF OT EXPLAIN:

REDLINE REQUIRED YES NO MATERIAL IMPACT: ARE THE QUESTION & RESPONSE ADEQUATE FOR CLOSURE OF
THIS RFI? YES NO

REDLINE DOCUMENT NUMBER: YES NO


IF NO EXPLAIN:

IS THERE A COST/SCHEDULE/SAFETY IMPACT DUE TO THIS RFI? IF YES EXPLAIN:

NO COST
✔ SCHEDULE
✔ SAFETY
Liming the material will save time in the schedule, but liming budget will need

%0=(1*,1((5$33529(5 SIGNATURE / DATE 4&&/26(287 4&&/26(287'$7(

RE-WORK REQUIRED: YES NO &5$)7683(5,17(1'(17&/26(287

5),&$7(*25</(*(1'
CC – CONSTRUCTION CLARIFICATION '&±'(6,*1&/$5,),&$7,21  ''±'(6,*1'(9,$7,21
0&±0$7(5,$/&/$5,),&$7,21 4&±48$/,7<121&21)250$1&( 9&±9(1'25&/$5,),&$7,21
EC±EXISTING CONDITION 2&±2:1(5&+$1*( 27±27+(5&+$1*(
IWP-036B-12-41SW-003
50-CMRI-00007
116005-USGC
Page 1 of 1
II OSBL NOV. 7, 2023 Revision
- YT 0
FIELD CONSTRUCTION CONTRACTOR
Required Fields *
REQUEST FOR INFORMATION (RFI)
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

RFI No.: REVISION:* ISSUE DATE:* 09/22/2023


0 PROPOSED RESPONSE DATE:* 09/25/2023

AREA:* OSBL CWA 50-Area 47-Ground Flare Area CRAFT CODE:* 18 - STRUCTURAL CONCRETE

SYSTEM: TURNOVER SYS/COMMISSIONING PACK:

SUB-SYSTEM:
CWP/SWP:* CWP-310-12-41SW IWP:* IWP-310-12-41SW-001

ORIGINATOR'S OPERATION CENTER:* ZACHRY


FROM (Requestor's Name):* TYLER WHITE CONTACT EMAIL:* Whitet@Zachrygroup.com

RFI TITLE:* Storm Water Manhole Pipe Penetration


SPECIFICATIONS / DOCUMENTS / DWGS REFERENCED OR IMPACTED:

TAG NUMBERS IMPACTED? YES NO IF YES TAG NUMBERS:

ATTACHMENTS: Field Photos, DAM-IT Data sheet, Adeka P-201 Data Sheet
RFI CATEGORY:* CC DC
C DD MC QC VC EC OC OT
(Legend below)
IF OT EXPLAIN:

REDLINE REQUIRED: YES NO REDLINE DOCUMENT NUMBERS: POTENTIAL FOR COST/SCHEDULE/SAFETY/MATERIAL IMPACT DUE TO THIS RFI?*
NO COST SCHEDULE ✔ SAFETY MATERIAL

REQUESTED INFORMATION:*

During the ex-filtration test on an RCP section, a leak was discovered, upon further inspection it was noted that the gasket
on a section of pipe had protruded inward. Should on the attached photos, a section of gasket has rolled inward.

After speaking with the manufacture (Ameritex), the following option was give.

1) Apply a hydrophilic elastic sealant to the back section of the gasket


2) Reform gasket into wall section
3) Apply a non-shrink hydraulic grout to the joint section

Is the manufactures recommendation acceptable?

PROPOSED RESOLUTION:*
Zachry would like to place Adeka P-201 as the elastic sealant and DAM-IT as the grout.

IS THE RESPONSE ADEQUATE FOR CLOSURE OF THIS RFI? YES NO


IF NO, EXPLAIN:

RESPONDER: TITLE: DATE:

BMZ ENGINEER APPROVER SIGNATURE / DATE QC CLOSE OUT QC CLOSE OUT DATE

CRAFT SUPERINTENDENT
RE-WORK REQUIRED: YES NO
CLOSE OUT:

RFI CATEGORY LEGEND: RFI TEMPLATE - REVISION 1 - 05-04-2023

CC – CONSTRUCTION CLARIFICATION DC – DESIGN CLARIFICATION DD – DESIGN DEVIATION


MC – MATERIAL CLARIFICATION QC – QUALITY NON CONFORMANCE VC – VENDOR CLARIFICATION
IWP-036B-12-41SW-003
EC – EXISTING CONDITION OC116005-USGC
– OWNER CHANGE II OSBL NOV. 7, CHANGE
OT – OTHER 2023 - YT
Continued if Additional Space is needed
REQUESTED INFORMATION:

PROPOSED RESOLUTION:

RESPONSE:

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


PROD. NO.
EXAMPLE

Application were the box is


locked in loaction and the RCP
has to be tilted to be installed

Modify the inner invert pour that was


preformed by Waskey in shop before
shipping to BMZ.

APPROVED AS NOTED | Action Code: B | 3/28/2023 | BMCD# 116058-M-004-01716


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
FIELD CONSTRUCTION CONTRACTOR
Required Fields *
REQUEST FOR INFORMATION (RFI)
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

RFI No.: REVISION:* ISSUE DATE:* 09/22/2023


0 PROPOSED RESPONSE DATE:* 09/25/2023

AREA:* OSBL CWA 50-Area 47-Ground Flare Area CRAFT CODE:* 18 - STRUCTURAL CONCRETE

SYSTEM: TURNOVER SYS/COMMISSIONING PACK:

SUB-SYSTEM:
CWP/SWP:* CWP-310-12-41SW IWP:* IWP-310-12-41SW-001

ORIGINATOR'S OPERATION CENTER:* ZACHRY


FROM (Requestor's Name):* TYLER WHITE CONTACT EMAIL:* Whitet@Zachrygroup.com

RFI TITLE:* Storm Water Manhole Pipe Penetration

SPECIFICATIONS / DOCUMENTS / DWGS REFERENCED OR IMPACTED:


60-CVDSW-08805
TAG NUMBERS IMPACTED? YES NO IF YES TAG NUMBERS:

ATTACHMENTS: Field Photos, DAM-IT Data sheet, Adeka P-201 Data Sheet
RFI CATEGORY:* CC DC
C DD MC QC VC EC OC OT
(Legend below)
IF OT EXPLAIN:

REDLINE REQUIRED: YES NO REDLINE DOCUMENT NUMBERS: POTENTIAL FOR COST/SCHEDULE/SAFETY/MATERIAL IMPACT DUE TO THIS RFI?*
NO COST SCHEDULE ✔ SAFETY MATERIAL

REQUESTED INFORMATION:*

During the ex-filtration test on an RCP section, a leak was discovered, upon further inspection it was noted that the gasket
on a section of pipe had protruded inward. Should on the attached photos, a section of gasket has rolled inward.

After speaking with the manufacture (Ameritex), the following option was give.

1) Apply a hydrophilic elastic sealant to the back section of the gasket


2) Reform gasket into wall section
3) Apply a non-shrink hydraulic grout to the joint section

Is the manufactures recommendation acceptable?

PROPOSED RESOLUTION:*
Zachry would like to place Adeka P-201 as the elastic sealant and DAM-IT as the grout.

IS THE RESPONSE ADEQUATE FOR CLOSURE OF THIS RFI? YES NO


IF NO, EXPLAIN:

RESPONDER: Bryce Oswald TITLE: C iv il/S tru ctu ral E n g in eer DATE: 7 /1 8 /2 0 2 3
BMZ ENGINEER APPROVER SIGNATURE / DATE 7 /1 8 /2 0 2 3 QC CLOSE OUT QC CLOSE OUT DATE

Bryce Oswald
CRAFT SUPERINTENDENT
RE-WORK REQUIRED: YES NO
CLOSE OUT:

RFI CATEGORY LEGEND:


CC – CONSTRUCTION CLARIFICATION DC – DESIGN CLARIFICATION DD – DESIGN DEVIATION
MC – MATERIAL CLARIFICATION QC – QUALITY NON CONFORMANCE VC – VENDOR CLARIFICATION
IWP-036B-12-41SW-003
EC – EXISTING CONDITION OC116005-USGC
– OWNER CHANGE II OSBL NOV. 7, CHANGE
OT – OTHER 2023 - YT
Continued if Additional Space is needed
REQUESTED INFORMATION:

PROPOSED RESOLUTION:

RESPONSE:

The proposed solution is acceptable. Care shall be taken to ensure the entire annular space is
filled with grout. Exfiltration testing still needs to be met. If leakage is detected or we are having a
hard time sealing the connection, we would recommend flow filling around the pipe connection on
the exterior face of the manhole.

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

FINISH GRADE
A
FINISH GRADE

GENERAL BACKFILL
AS SPECIFIED GENERAL BACKFILL
AS SPECIFIED
TRENCH WIDTH
TRENCH WIDTH AS SPECIFIED
TOP EL (SEE SCHEDULE) CL STRUCTURE LOCATION AS SPECIFIED TRENCH GENERAL BACKFILL

12"
AS SPECIFIED B
GROUT FRAME NOTE 2 1
TRENCH GENERAL BACKFILL

12"
TO MANHOLE

PIPE OD
AS SPECIFIED
FRAMES & COVERS: NOTE 2 1
ADJUSTING RINGS STORM MANHOLE COVERS SHALL HAVE SPRING LINE

PIPE OD
OR BRICK AS REQ'D "STORM SEWER" CAST ON THE COVER AND

6"
SHALL BE NEENAH R-1678-A OR SPRING LINE
FINISH GRADE FLOWABLE FILL OR FINE
ENGINEER APPROVED EQUAL GRANULAR MATERIAL
NOTE 2 1
FLOWABLE FILL OR FINE
GRANULAR MATERIAL DOUBLE BARREL CONCRETE PIPE TRENCH
NOTE 2 1
NOT TO SCALE
NOTES: C

6"
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
CONCRETE PIPE TRENCH PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
ECCENTRIC CONE (ALL PRECAST RISERS NOT TO SCALE
DEPTH VARIES - SEE PLANS

AND TOPS SHALL CONFORM TO ASTM C478) NOTES: 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
USE O-RING OR OTHER APPROVED PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
(20' MAX)

METHOD TO MAKE ALL JOINTS


4'-0" MIN WATERTIGHT 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
TABLE SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
Millimeters

PRECAST REINFORCED FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT D
DIMENSIONS 1
CONCRETE MANHOLE EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. FINISH GRADE
SECTIONS (ASTM C478)
6"
MIN NOTE 2
ID/2
6" MIN

INV EL (SEE PLANS) GENERAL BACKFILL


ID
Scale For Microfilming

AS SPECIFIED
INVERT CONCRETE, SEE NOTE 1 NOTE 2 & 3
12"

TRENCH WIDTH E
AS SPECIFIED
PIPE (SEE PLAN
6" MIN FOR SIZE, LOCATION, 2"
AND INVERT ELEVATION)
BASE SLAB SECTION

12"
MIN
(SEE SCHEDULE FOR DIMENSIONS) TRENCH GENERAL BACKFILL
AS SPECIFIED
1
NOTE 2

PIPE OD
6" MINIMUM DEPTH
TXDOT ITEM 247 (GRADE A), INV EL (SEE PLAN) SPRING LINE
SEAL SLAB OR 3/4" GRAVEL
Inches

NOTES: FLOWABLE FILL OR F


NOTE 4 FINE GRANULAR MATERIAL
1. FLOWLINE OF MANHOLE MAY BE FORMED IN CONCRETE; BUILT UP WITH MORTAR; NOTE 2 1

6"
OR BY LAYING A PIPE THROUGH MANHOLE, THE TOP BEING BROKEN OUT LATER. EXIST REINF CONC
OR PRECAST STRUCTURE
2. SEE TYPICAL CONNECTION TO MANHOLE STRUCTURE. CHDPE PIPE TRENCH
NOT TO SCALE
3. BASE SLAB SHALL BE CONNECTED WITH PRECAST MANHOLE STRUCTURE.
TYPICAL CONNECTION TO
4. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO NOTES:
MANHOLE STRUCTURE
PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. NOT TO SCALE 1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
PRECAST CIRCULAR CONCRETE MANHOLE DETAIL NOTES: G
NOT TO SCALE 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
1. STORM SEWER CONNECTIONS PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
TO PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
2. CHDPE PIPE MANHOLE CONNECTION AS MANUFACTURED BY A-LOK, Z-LOK STM
MECHANICAL BOOT CONNECTION OR ENGINEERING APPROVED EQUAL. INSTALL PER
MANUFACTURER'S SPECIFICATIONS. 1

3. CONCRETE PIPE MANHOLE CONNECTION SHALL BE GROUTED WITH USE OF A WATER-STOP


PIPE SLEEVE BY A-LOK. INSTALL PER MANUFACTURER'S SPECIFICATIONS, PROVIDE KBA-1510FP
BUTYL STRIP AT GROUT-MANHOLE INTERFACE.
H
4. FOR CONCRETE PIPE MANHOLE CONNECTION GROUT ANNULAR SPACE BETWEEN WALL
AND PIPE FOR WATERTIGHT SEAL. GROUT PER PIP STS03600. APPLY BONDING COMPOUND
2 TO ALL SURFACES PRIOR TO PLACING GROUT. 1

This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, L

GOLDEN TRIANGLE POLYMERS PROJECT


STORM SEWER DETAILS

2 01/30/2023 RPH JBB ATK UPDATED TYPICAL CONNECTION TO MANHOLE STRUCTURE NOTES project contract
9400 WARD PARKWAY 116058 -
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2021 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08805 2
designed detailed
no. date by ckd app'd Description DWG No. Reference Drawings ORANGE, TEXAS
R.HALLER C.DONNICI

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
FIELD CONSTRUCTION CONTRACTOR
Required Fields *
REQUEST FOR INFORMATION (RFI)
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL

RFI No.:
RFI-BMZ-5037-12-00001 REVISION:* ISSUE DATE:* 09/22/2023
0 PROPOSED RESPONSE DATE:* 09/25/2023

AREA:* CWA-3700 CRAFT CODE:* 18 - STRUCTURAL CONCRETE

SYSTEM: TURNOVER SYS/COMMISSIONING PACK:

SUB-SYSTEM:
CWP/SWP:* CWP-310-12-41SW IWP:* IWP-310-12-41SW-001

ORIGINATOR'S OPERATION CENTER:* ZACHRY


FROM (Requestor's Name):* TYLER WHITE CONTACT EMAIL:* WHITET@ZACHRYGROUP.COM

RFI TITLE:* Stormwater RCP Infiltration

SPECIFICATIONS / DOCUMENTS / DWGS REFERENCED OR IMPACTED:

TAG NUMBERS IMPACTED? YES NO IF YES TAG NUMBERS:

ATTACHMENTS: Field Photos, DAM-IT Data sheet, Adeka P-201 Data Sheet

RFI CATEGORY:* CC DC
C DD MC QC VC EC OC OT
(Legend below)
IF OT EXPLAIN:

REDLINE REQUIRED: YES NO REDLINE DOCUMENT NUMBERS: POTENTIAL FOR COST/SCHEDULE/SAFETY/MATERIAL IMPACT DUE TO THIS RFI?*
NO COST SCHEDULE ✔ SAFETY MATERIAL

REQUESTED INFORMATION:*

During the ex-filtration test on an RCP section, a leak was discovered, upon further inspection it was noted
that the gasket on a section of pipe had protruded inward. Should on the attached photos, a section of gasket
has rolled inward.

After speaking with the manufacture (Ameritex), the following option was give.

1) Apply a hydrophilic elastic sealant to the back section of the gasket


2) Reform gasket into wall section
3) Apply a non-shrink hydraulic grout to the joint section

Is the manufactures recommendation acceptable?


PROPOSED RESOLUTION:*

Zachry would like to place Adeka P-201 as the elastic sealant and DAM-IT as the grout.

IS THE RESPONSE ADEQUATE FOR CLOSURE OF THIS RFI? YES NO


IF NO, EXPLAIN:

RESPONDER: Bryce Oswald TITLE: C iv il/S tru ctu ral E n g in eer DATE: 9 /2 5 /2 0 2 3
BMZ ENGINEER APPROVER SIGNATURE / DATE 9 /2 5 /2 0 2 3 QC CLOSE OUT QC CLOSE OUT DATE

Bryce Oswald
RE-WORK FIELD WORK CRAFT SUPERINTENDENT
REQUIRED: YES NO REQUIRED: YES NO
CLOSE OUT:

RFI CATEGORY LEGEND: RFI TEMPLATE - REVISION 2 - 06-27-2023

CC – CONSTRUCTION CLARIFICATION DC – DESIGN CLARIFICATION DD – DESIGN DEVIATION


MC – MATERIAL CLARIFICATION QC – QUALITY NON CONFORMANCE VC – VENDOR CLARIFICATION
IWP-036B-12-41SW-003
EC – EXISTING CONDITION OC116005-USGC
– OWNER CHANGE II OSBL NOV. 7, CHANGE
OT – OTHER 2023 - YT
Continued if Additional Space is needed
REQUESTED INFORMATION:

PROPOSED RESOLUTION:

RESPONSE:

B. Oswald R esp o n se:

E n g in eerin g ag rees with so lu tio n p ro p o sed b y m an u factu rer. C lean th e jo in t th o ro u g h ly p rio r to p lacin g to
adh esiv e. E n su re th e g ask et is p laced b etween g ro u t an d h ydro p h ilic/swellin g sealan t to allo w fo r ex p an sio n
with o u t o v erstressin g th e g ro u t.

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
THE EUCLID CHEMICAL COMPANY
19218 REDWOOD ROAD • Cleveland, OH 44110
(216) 531-9222 • (800) 321-7628 • FAX (216) 531-9596
www.euclidchemical.com

✖ ENG.SPECS ◆ CATALOG INDEX


DAM-IT® ◆ MSDS ◆ SECTION INDEX
◆ ◆ ◆ ◆ ◆ ◆ ◆ FRENCH ◆ PRINT
NON-SHRINK FAST SETTING ◆ SPANISH ◆ EXIT CATALOG
HYDRAULIC CEMENTITIOUS PRODUCT

DAM-IT is a fast setting, hydraulic cement product TECHNICAL INFORMATION


formulated to stop leaks in concrete and masonry Typical Engineering Data
surfaces. It is particularly effective for stopping the flow The following results were developed under labo-
of running water. DAM-IT is ready to use and requires ratory conditions.
only the addition of water before plugging and sealing Compressive Strength
cracks. ASTM C 109, 2" (50 mm) cubes
Age Strength
PRIMARY APPLICATIONS 1 hour 1,100 psi (8 MPa)
• Basement repairs 1 day 2,400 psi (17 MPa)
• Manhole repairs 7 days 4,000 psi (28 MPa)
• Concrete pipe and bell repairs 28 days 4,700 psi (32 MPa)
• Anchoring bolts and hand rail setting
The standard formula DAM-IT typically has a reaction
FEATURES / BENEFITS time of 3 to 5 minutes. A slower setting formula (12-15
• Plug wet cracks in concrete and masonry surfaces to minutes) is also available upon request.
seal out water Shelf life is 1 year in original, unopened package.
• Stops running water, reducing damage
• Stops water seepage at floor and wall junctions Appearance
• Expands as it sets for a water tight repair DAM-IT is a free flowing powder as packaged. After
• Will set up under water mixing with water and placing, the color may initially
appear much darker than the surrounding concrete.
PACKAGING / YIELD While this color will lighten up substantially as the
DAM-IT is packaged in 60 lb (27 kg) pails, 4/12 lb (5.4 concrete cures and dries out, the repair may always
kg) pails per case, 4/12 lb (5.4 kg) bags per case and appear somewhat darker than the surrounding con-
12/3 lb (1.4 kg) bags per case. crete.
The final troweled appearance can be any texture
60 lb (27 kg) pail yields 0.6 ft3 (0.02 m3) consistent with that expected from concrete and should
12 lb (5.4 kg) bag yields 208 in3 (0.003 m3) be specified by the owner.
12 lb (5.4 kg) pail yields 208 in3 (0.003 m3)
3 lb (1.4 kg) bag yields 52 in3 (0.001 m3) DIRECTIONS FOR USE
Surface Preparation-Concrete must be clean and
Mix approximately 1 quart (950 ml) of water for each rough. All oil, dirt, debris, paint and unsound concrete
12 lb (5.4 kg) unit. must be removed. The surface must be prepared
mechanically using a scabbler, bushhammer, shotblast
COVERAGE or scarifier which will give a surface profile of a mini-
A 12 lb (5.4 kg) quantity of DAM-IT will cover approxi- mum 1/8" (3.2 mm) and expose the large aggregate of
mately 34 in2 (.022 m2) at a depth of 1/2" (12.7 mm). the concrete. The final step in cleaning should be the
complete removal of all residue with a vacuum cleaner
or pressure washing.
Bonding-DAM-IT requires no special bonding proce-
dures, just a clean sound surface.

The Euclid Chemical Company is ISO 9001 Certified Cert.#109877


IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
Mixing-Quantities may be mixed by hand or with a drill Curing & Sealing-DAM-IT requires no special curing
and "jiffy" mixer. All materials should be in the proper procedures. If a sealer other than EUCOSEAL is de-
temperature range of 60oF-90oF (16oC-32oC). Add sired, use a product such as SUPER AQUA-CURE
the appropriate amount of water for the batch size and VOX or SUPER DIAMOND CLEAR VOX.
then add the dry product. Mix about one minute. The
mixed product should be placed immediately. CLEAN-UP
Placement: Clean tools and equipment with water before the
Cracks-Widen out and clean cracks to at least 3/4" material hardens.
(19.1 mm) in width and depth. Force the DAM-IT plug
into the prepared crack with a pointing trowel and slick PRECAUTIONS / LIMITATIONS
off the surface. Prepare a cove at the junction. If more • Mass placement of DAM-IT [greater than 60 lb (27
time is desired when preparing the cove, mix the DAM- kg)], may result in very rapid and unstable curing.
IT with ice water. • Large area placements over 3" (76.2 mm) in depth
Running Water-Dam up running water. Prepare all should be avoided.
cracks properly and, if possible, relieve excess hydro- • The temperature of the patch should not be allowed
static pressure by drilling a relief hole or by chiseling out to increase over 125oF (52oC).
the crack at its very lowest point. Mix an adequate • Use of cold mixing water or application of cold water
quantity of DAM-IT. After mixing, immediately place the to the repair surface is advised if large placements
plug of DAM-IT in your hand and hold it until it suddenly are expected.
begins to get warm. This will take 2-3 minutes from the • Store product in a dry place.
start of mixing. At this point, speed in working is essen-
tial. Force the DAM-IT plug into the hole or crack which
is to be sealed off. Start filling cracks or holes at the top.
To close the final opening and seal off a stream of water,
make sure the DAM-IT plug is starting to warm up. At
that moment force into the hole and exert pressure
either with your hand or trowel for a full 5 minutes or
longer to assure setting of the plug. In some cases
where the water is extremely cool, it may be necessary
to hold the plug in place for a little longer.
Cement Plaster-When treating seeping walls, remove
all foreign materials such as white wash, loose particles
of concrete or block, oils or paint. Add an equal quantity
of standard portland cement and fine mason sand to
DAM-IT. Use cool mixing water to make a slurry of the
cement, sand and DAM-IT. Apply the heavy slurry to the
seeping wall where it will set up and stop water seepage
in 10 minutes time.
Bolt and Hand Rail Anchoring-Use a star drill to
make a hole approximately 1-1/2" (38 mm) larger than
the anchor. Mix enough DAM-IT to fill the area and pour
and tamp it into place around the anchor.

Finishing-Finish DAM-IT to the desired texture to


match the surrounding concrete. Do not add additional
water to the surface during the finishing operation. Use
EUCOSEAL as a final waterproofing coating for addi-
tional protection against water seepage and to improve
the appearance and uniformity of the repair area.

Form Dam-It-6.97

WARRANTY: The Euclid Chemical Company ("Euclid") solely and expressly warrants that its products shall be free from defects in materials and workmanship for six (6) months from the date of purchase. Unless
authorized in writing by an officer of Euclid, no other representations or statements made by Euclid or its representatives, in writing or orally, shall alter this warranty. EUCLID MAKES NO WARRANTIES, IMPLIED
OR OTHERWISE, AS TO THE MERCHANTABILITY OR FITNESS FOR ORDINARY OR PARTICULAR PURPOSES OF ITS PRODUCTS AND EXCLUDES THE SAME. If any Euclid product fails to conform with
this warranty, Euclid will replace the product at no cost to Buyer. Replacement of any product shall be the sole and exclusive remedy available and buyer shall have no claim for incidental or consequential damages.
Any warranty claim must be made within one (1) year from the date of the claimed breach. Euclid does not authorize anyone on its behalf to make any written or oral statements which in any way alter Euclid's
installation information or instructions in its product literature or on its packaging labels. Any installation of Euclid products which fails to conform with such installation information or instructions shall void this warranty.
Product demonstrations, if any, are done for illustrative purposes only and do not constitute a warranty or warranty alteration of any kind. Buyer shall be solely responsible for determining the suitability of Euclid's
IWP-036B-12-41SW-003
products for the Buyer's intended purposes.
116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
P-201
Technical Product Data Sheet

GENERAL DESCRIPTION
PRODUCT DESCRIPTION
ADEKA ULTRASEAL® P-201 is a water-swelling, single
Single component hydrophilic grey paste
component, elastic sealant. P201 is packaged in 320 ml
(10.8 oz) cartridges or in 3.17 gallon bulk pails. 24 Cartridges per Case,
320 ml (10.8 oz) per Cartridge
Packaging
WATERSTOP FOR: OR
3.17 Gallon Bulk Pails—Special Order
• Cold/construction/control joints
• Expanded metal forms PROPERTIES
• Piping penetrations Expansion Information Approximately 100%
• Crack / joint repair by Volume (2 Times by Volume)
• Sheet pile interlock sealant HYDROPHILIC WATERSTOP IN A CARTRIDGE
• Precast segment sealant One of the most versatile Adeka products.
- Utility vaults
- Manholes STAND ALONE WATERSTOP
- Tunnels Use in below grade cast-in-place concrete joints. P201 can
- Riser rings
replace conventional waterstop in nonmoving joints.
P-201 is used as a waterstop in new construction and in CAVEAT: P-201 must cure before placing second concrete.
repair applications. It can be placed on damp or uneven Curing time varies by bead size, temperature and humidity.
surfaces and functions in a wide range of temperatures and Place concrete without displacing or deforming the bead of
ground water conditions water. P-201.

TYPICAL USES

P-201 will expand up to 2 times (100%) by volume in the


presence of water. It will expand in the direction of least
resistance. When expansion is inhibited, the product will
produce expansion pressure against the resisting sub-
stance. This expansion pressure will effectively seal off wa-
ter penetration. The amount of concrete coverage required PIPE PENETRATIONS
depends on bead size. The coverage may range from
ADEKA ULTRASEAL® P-201 is an excellent product to
2” (¼” bead) to 4” inside a double mat of rebar (½” bead).
seal CIP pipe penetrations or in “block out” pipe penetra-
Bead size also determines hydrostatic head resistance
tions. Check www.adeka.com for details concerning
annular spaces greater than 2”.
P-201 (3/16 x 3/4) 50 ft. 21.8 0.15

P-201 (3/8 x 3/4) 150 ft. 72.5 0.50

OCM, Inc.
1120 Peterson Road, Grayslake, IL 60030
Toll Free: 866-457-5710 • Phone: 847-462-4258
FAX: 847-462-4259
www.adeka.com • www.ocm-inc.com
sales@ocm-inc.com
PIPE PENETRATION WITH SMALL ANNULAR SPACE
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
ULTRASEAL ® P-201

EXPANDED METAL WATERSTOP OTHER USES FOR P-201

Use to waterproof expanded metal (stay in place) forms.


Allow curing time before placing second concrete.

Use to fill in rough areas when using Adeka strip products.


Apply on PVC waterstop weld seams.

Waterstop H-Piles

PRECAST SEGMENTS

Excellent product to seal joints between precast segments.


Use on box culverts, manhole, utility vaults, riser rings and
many other precast units. Apply bead of P-201 and place
second segment before P-201 cures.

Waterstop Open Joints/Cracks

SEALING SHEET PILE INTERLOCKS

Use P-201 to seal PVC and AZ sheet pile interlocks.

NOTE: The information contained herein is based on our present state of


knowledge and is intended to provide general notes on Adeka Waterstops
and their use. Any recommendations or suggestions, which may be made,
are without guarantee, since the conditions of use are beyond our control.
Furthermore, nothing contained in this publication shall be construed as a
recommendation for any use that may infringe patent rights. Readers are
cautioned to satisfy themselves as to the suitability of such goods for the
purposes intended prior to use.

IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT