Installation Work Package: Model Shot
Installation Work Package: Model Shot
MODEL SHOT
SAFETY
Safety Concerns: Ensure proper use of equipment and flaggers. Watch for human/machine interface. Wear proper PPE and avoid being in the line of fire.
Applicable JSA's:
O POND EXCAVATIONS O
O AUGER EXCAVATIONS O
QUALITY
ITP Hold Point Required Document No.
O 50-QAIP-00002 O 1.1 Facilitate an ITP review O Attendance Sheet
O 50-QAIP-00002 O 2.1 Third Party Testing O 50-QAIR-00005
O 50-QAIP-00002 O 3.1 Verifiy Contol Monuments O N/A
O 50-QAIP-00002 O 4.1 Inspection of Backfill Material O 50-QAIR-00001
O 50-QAIP-00002 O 6.1 Notifiy QC for Pre-Cast Structure Inpestion O 50-QAIR-00003
6.2 Notifiy QC for Pre-Cast Structure Inspection
O 50-QAIP-00002 O O 50-QAIR-00004
Before Backfill
General Foreman:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)
Field QA/QC /
QA-QC / Turnover Admin:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)
HSE:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)
Scaffold:
(Acknowledgement/Familiarity of Work Prior
To Proceeding)
NDE Coordinator:
(Acknowledgement/Familiarity of NDE Prior
To Proceeding)
IF APPLICABLE
Referenced Specifications:
60-CVES-00004 OVERLAY TO PIP CVS02100 SITE PREPARATION, EXCAVATION, AND BACKFILL SPECIFICATION
Standard Details
Drawings:
Foreman:
(Verification scope of work is
complete)
General Foreman:
(Verification scope of work is
complete)
QA/QC:
(Verification scope of work is
complete by Field Inspector)
Workface Planner:
(Verification scope of work is
complete / Submit to Document
Management)
QA-QC Admin / Turnover Admin
Review:
(Verification scope of work is
complete by Admin)
NDE Coordinator:
(Verification scope of work is
complete and in ZPTS) IF APPLICABLE
Lessons
Learned:
Additional
Comments:
IWP-036B-12-41SW-003
Percent Complete: 0.00% MTO: 103.6 Earned: 0 Remaining: 103.6
Start: 3/22/2024 Finish: 5/16/2024
Qty / Rem. Qty /
Iso Rev StepID Area Identifier Description Cost Code Hours Comp% Rem. Hours Mon Tues Wed Thurs Fri Sat Sun PCA
60-CVDSW-03610 0 599 27 LINE B.6 LOAD FROM STOCKPILE 12450 21 0.0% 21
1 1
60-CVDSW-03610 0 600 27 LINE B.6 MACHINE BACKFILL 12407 21 0.0% 21
5 5
60-CVDSW-03610 0 609 28 LINE B.8 LOAD FROM STOCKPILE 12450 151 0.0% 151
6 6
60-CVDSW-03610 0 610 28 LINE B.8 MACHINE BACKFILL 12407 151 0.0% 151
36 36
60-CVDSW-03610 0 994 27 MH-042 LOAD FROM STOCKPILE 12450 32 0.0% 32
1 1
60-CVDSW-03610 0 995 27 MH-042 MACHINE BACKFILL 12407 32 0.0% 32
8 8
60-CVDSW-03610 0 999 27 MH-043 LOAD FROM STOCKPILE 12450 32 0.0% 32
1 1
60-CVDSW-03610 0 1000 27 MH-043 MACHINE BACKFILL 12407 32 0.0% 32
8 8
60-CVDSW-03613 0 619 28 LINE B.10 LOAD FROM STOCKPILE 12450 42 0.0% 42
2 2
60-CVDSW-03613 0 620 28 LINE B.10 MACHINE BACKFILL 12407 42 0.0% 42
10 10
60-CVDSW-03613 0 1004 27 MH-044 LOAD FROM STOCKPILE 12450 35 0.0% 35
2 2
60-CVDSW-03613 0 1005 27 MH-044 MACHINE BACKFILL 12407 35 0.0% 35
8 8
Page 1
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
PROD. NO.
GENERAL NOTES:
1. FOR MONUMENT PLAN SEE DRAWING 60-CVDSW-08032.
A
2. FOR ABBREVIATIONS AND NOTES SEE DRAWING
60-CVDSW-08001.
3. COORDINATES AND ELEVATIONS FOR STORM SEWER
ARE PROVIDED IN THE USGC II PLANT COORDINATE
SYSTEM.
PLANT EL. 100'-0" = EL 13'-6" NAVD88.
60-CVDSW-03602
C
Millimeters
D
Scale For Microfilming
60-CVDSW-03603
Inches
This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC
project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.
GENERAL NOTES:
1. FOR STORM SEWER SYSTEM OVERALL KEY PLAN SEE
DRAWING 60-CVDSW-03601.
A
60-CVDSW-03604 60-CVDSW-03605 60-CVDSW-03606
2. FOR MONUMENT PLAN SEE DRAWING 60-CVDSW-08032.
3. FOR ABBREVIATIONS AND NOTES SEE DRAWING
60-CVDSW-08001.
60-CVDSW-03609
60-CVDSW-03607 60-CVDSW-03608
60-CVDSW-03613 60-CVDSW-03614
60-CVDSW-03615
Scale For Microfilming
60-CVDSW-03616 60-CVDSW-03617
60-CVDSW-03618
Inches
60-CVDSW-03619 60-CVDSW-03620
60-CVDSW-03621
G
60-CVDSW-03622
This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC
project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.
GENERAL NOTES:
MATCHLINE N 6959'-0" DWG 60-CVDSW-03604
1. FOR STORM SEWER SYSTEM KEY PLAN SEE
DRAWING 60-CVDSW-03601. A
2. STORM SEWER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH 60-CVES-00006.
LINE B.1
4. SEE DRAWING 60-CVDSW-08807 FOR MANHOLE
SCHEDULE.
5. SEE DRAWING 60-CVDSW-08808 FOR STORM SEWER
PIPING SCHEDULE.
6. FOR SANITARY SEWER AND POTABLE WATER KEY PLAN B
SEE DRAWING 60-PIDKP-00001.
SANITARY SEWER
MH-038 IE 92'-10 5/8" 7. FOR FIREWATER KEY PLAN SEE DRAWING
N 6890'-7" 60-PIDKP-00002.
E 3295'-0"
TOP EL 100'-0" 8. FOR CONSTRUCTION POWER KEY PLAN SEE DRAWING
POTABLE WATER 60-ELDSK-00200.
IE 92'-10 5/8"
9. FOR COOLING WATER KEY PLAN SEE DRAWING
50-PIDKP-00001.
LEGEND:
FIREWATER C
IE = INVERT ELEVATION
IE 92'-9 5/8"
MH-040
N 6796'-0"
LINE B.3 E 3295'-0"
30'' DIA CHDPE TOP EL 100'-0"
IE 92'-9 5/8"
Scale For Microfilming
IE 92'-9 5/8"
4 TH.ST.
N 6796'-0"
LINE B.4
E 3215'-0"
TOP EL 100'-0"
N 6727'-8"
E 3295'-0" F
TOP EL 100'-0"
IE 92'-8 5/8"
36" DIA CHDPE
LINE B.5
B AVENUE B AVENUE
G
MATCHLINE N 6685'-0" DWG 60-CVDSW-03610
This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC
project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.
GENERAL NOTES:
1. FOR STORM SEWER SYSTEM KEY PLAN SEE
DRAWING 60-CVDSW-03601. A
2. STORM SEWER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH 60-CVES-00006.
3. SEE DRAWING 60-CVDSW-08805 AND 60-CVDSW-08806
MATCHLINE N 6685'-0" DWG 60-CVDSW-03607 FOR STORM SEWER DETAILS.
4. SEE DRAWING 60-CVDSW-08807 FOR MANHOLE
B AVENUE SCHEDULE.
B AVENUE
5. SEE DRAWING 60-CVDSW-08808 FOR STORM SEWER
PIPING SCHEDULE.
6. FOR SANITARY SEWER AND POTABLE WATER KEY PLAN B
SEE DRAWING 60-PIDKP-00001.
7. FOR FIREWATER KEY PLAN SEE DRAWING
60-PIDKP-00002.
FIREWATER
8. FOR CONSTRUCTION POWER KEY PLAN SEE DRAWING
60-ELDSK-00200.
LINE B.5
CONTRACTOR. MANHOLE TO BE PLACED BY OTHERS.
10. CALLED COORDINATES AND ELEVATIONS ARE IN PLANT
4TH. ST.
1 GRID COORDINATES.
C
LEGEND:
1 IE = INVERT ELEVATION
LINE B.6
E 3295'-0"
IP-50-20-CI-0001 E 3251'-6" TOP EL 100'-0" = ROAD/ACCESSWAY
1 N 6570'-0" IE 92'-7 3/8"
E 3178'-0"
IE 92'-8 1/2"
IE 92'-7 1/16"
IE 92'-6 5/8"
Millimeters
LINE B.8
SEE NOTE 9
IE 92'-6 5/8"
Scale For Microfilming
SANITARY SEWER
POTABLE WATER
Inches
This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC
project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
1 12/22/2022 LZD JBB ATK REVISED IP-50-20-CI-0001, ADDED NOTE 10 Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.
GENERAL NOTES:
MATCHLINE N 6471'-0" DWG 60-CVDSW-03610 1. FOR STORM SEWER SYSTEM KEY PLAN SEE
DRAWING 60-CVDSW-03601. A
2. STORM SEWER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH 60-CVES-00006.
3. SEE DRAWING 60-CVDSW-08805 AND 60-CVDSW-08806
FOR STORM SEWER DETAILS.
4. SEE DRAWING 60-CVDSW-08807 FOR MANHOLE
SCHEDULE.
5. SEE DRAWING 60-CVDSW-08808 FOR STORM SEWER
LINE B.8
6. FOR SANITARY SEWER AND POTABLE WATER KEY PLAN B
SEE DRAWING 60-PIDKP-00001.
4TH. ST.
7. FOR FIREWATER KEY PLAN SEE DRAWING
POTABLE WATER 60-PIDKP-00002.
8. FOR CONSTRUCTION POWER KEY PLAN SEE DRAWING
60-ELDSK-00200.
9. END OF PIPE SHALL BE PLUGGED AND BURIED BY
CONTRACTOR. MANHOLE TO BE PLACED BY OTHERS.
10. CALLED COORDINATES AND ELEVATIONS ARE IN PLANT
1 GRID COORDINATES.
IP-50-20-CI-0003 IE 92'-4 1/4" C
N 6364'-0"
E 3249'-6" IE 93'-11 3/8" MH-044
IE 94'-0" N 6364'-0" LEGEND:
E 3295'-0"
36'' DIA CHDPE TOP EL 100'-0" IE = INVERT ELEVATION
LINE B.9 = FLOW DIRECTION
DRAWING LIMITS E 3085'-0"
LINE B.10
SEE NOTE 9
Millimeters
LINE B.12
FIREWATER
Inches
This information is proprietary and confidential to Chevron Phillips Chemical Company, LLC and is not
to be used or disclosed without written authorization of the Chevron Phillips Chemical Company, LLC
project contract
9400 WARD PARKWAY
KANSAS CITY, MO 64114 116058
1 12/22/2022 LZD JBB ATK REVISED IP-50-20-CI-0004, ADDED NOTE 10 Burns & McDonnell Engineering Co, Inc.
Firm Reg. No. F-845 drawing rev.
FINISH GRADE
A
FINISH GRADE
GENERAL BACKFILL
AS SPECIFIED GENERAL BACKFILL
AS SPECIFIED
TRENCH WIDTH
TRENCH WIDTH AS SPECIFIED
TOP EL (SEE SCHEDULE) CL STRUCTURE LOCATION AS SPECIFIED TRENCH GENERAL BACKFILL
12"
AS SPECIFIED B
GROUT FRAME NOTE 2 1
TRENCH GENERAL BACKFILL
12"
TO MANHOLE
PIPE OD
AS SPECIFIED
FRAMES & COVERS: NOTE 2 1
ADJUSTING RINGS STORM MANHOLE COVERS SHALL HAVE SPRING LINE
PIPE OD
OR BRICK AS REQ'D "STORM SEWER" CAST ON THE COVER AND
6"
SHALL BE NEENAH R-1678-A OR SPRING LINE
FINISH GRADE FLOWABLE FILL OR FINE
ENGINEER APPROVED EQUAL GRANULAR MATERIAL
NOTE 2 1
FLOWABLE FILL OR FINE
GRANULAR MATERIAL DOUBLE BARREL CONCRETE PIPE TRENCH
NOTE 2 1
NOT TO SCALE
NOTES: C
6"
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
CONCRETE PIPE TRENCH PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
ECCENTRIC CONE (ALL PRECAST RISERS NOT TO SCALE
DEPTH VARIES - SEE PLANS
AND TOPS SHALL CONFORM TO ASTM C478) NOTES: 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
USE O-RING OR OTHER APPROVED PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
(20' MAX)
PRECAST REINFORCED FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT D
DIMENSIONS 1
CONCRETE MANHOLE EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. FINISH GRADE
SECTIONS (ASTM C478)
6"
MIN NOTE 2
ID/2
6" MIN
AS SPECIFIED
INVERT CONCRETE, SEE NOTE 1 NOTE 2 & 3
12"
TRENCH WIDTH E
AS SPECIFIED
PIPE (SEE PLAN
6" MIN FOR SIZE, LOCATION, 2"
AND INVERT ELEVATION)
BASE SLAB SECTION
12"
MIN
(SEE SCHEDULE FOR DIMENSIONS) TRENCH GENERAL BACKFILL
AS SPECIFIED
1
NOTE 2
PIPE OD
6" MINIMUM DEPTH
TXDOT ITEM 247 (GRADE A), INV EL (SEE PLAN) SPRING LINE
SEAL SLAB OR 3/4" GRAVEL
Inches
FLOWABLE FILL OR F
PRECAST CIRCULAR CONCRETE MANHOLE DETAIL FINE GRANULAR MATERIAL
NOTE 4 NOTE 2
NOT TO SCALE 1
6"
EXIST REINF CONC
NOTES: OR PRECAST STRUCTURE
CHDPE PIPE TRENCH
1. FLOWLINE OF MANHOLE MAY BE FORMED IN CONCRETE; BUILT UP WITH MORTAR; NOT TO SCALE
OR BY LAYING A PIPE THROUGH MANHOLE, THE TOP BEING BROKEN OUT LATER.
TYPICAL CONNECTION TO
2. SEE TYPICAL CONNECTION TO MANHOLE STRUCTURE. NOTES:
MANHOLE STRUCTURE
NOT TO SCALE 1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
3. BASE SLAB SHALL BE CONNECTED WITH PRECAST MANHOLE STRUCTURE. PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
NOTES: G
4. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. 1. STORM SEWER CONNECTIONS PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
TO PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
5. MANHOLE AND MANHOLE COVER SHALL BE RATED FOR AN HS-20 LOADING 3 EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
2. CHDPE PIPE MANHOLE CONNECTION AS MANUFACTURED BY A-LOK, Z-LOK STM
MECHANICAL BOOT CONNECTION OR ENGINEERING APPROVED EQUAL. INSTALL PER
MANUFACTURER'S SPECIFICATIONS. 1
This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, L
2 01/30/2023 RPH JBB ATK UPDATED TYPICAL CONNECTION TO MANHOLE STRUCTURE NOTES project contract
9400 WARD PARKWAY 116058 -
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08805 3
designed detailed
no. date by ckd app'd Description DWG No. Reference Drawings ORANGE, TEXAS
R.HALLER C.DONNICI
A
CL STRUCTURE LOCATION
PRECAST REINFORCED
CONCRETE MANHOLE
SECTIONS (ASTM C913)
6" MIN
ID/2
6" MIN
NOTE 2
INV EL (SEE PLANS)
ID
Millimeters
6" MIN
BASE SLAB SECTION
(SEE SCHEDULE FOR DIMENSIONS)
Scale For Microfilming
OR BY LAYING A PIPE THROUGH MANHOLE, THE TOP BEING BROKEN OUT LATER.
F
2. SEE TYPICAL CONNECTION TO MANHOLE STRUCTURE.
This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, L
project contract
9400 WARD PARKWAY 116058 -
KANSAS CITY, MO 64114
1 07/31/2023 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK UPDATED NOTES 60-CVDSW-08806 1
designed detailed
no. date by ckd app'd Description DWG No. Reference Drawings R.HALLER C.DONNICI ORANGE, TEXAS
MH-008 3695'-0" 6523'-10" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-069 2649'-0" 5265'-9" 6'-0" 6'-0" 8'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
B
MH-009 3695'-0" 6435' -10" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 MH-070 2649'-0" 5130'-0" 6'-0" 6'-0" 8'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-010 3695'-0" 6400'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-071 - - - - - - - - - - DELETED 2
MH-011 3695'-0" 6335'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-072 2649'-0" 4955'-0" 6'-0" 6'-0" 9'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-012 3695'-0" 6206'-2" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-073 2446'-8" 4855'-0" 5'-0" 5'-0" 7'-0" 7'-8" 7-8" 1'-0" 2 99' - 10" SEE NOTE 1
MH-013 3695'-0" 6145'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-074 2557'-11" 4855'-0" 5'-0" 5'-0" 7'-0" 7'-8" 7'-8" 1'-0" 99' - 8" SEE NOTE 1
MH-014 3695'-0" 6099'-5" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-075 2649'-0" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-015 3695'-0" 6004'-6" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-076 2717'-2" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-016 3695'-0" 5960'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-077 2812'-2" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-017 3695'-0" 5823'-9" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-078 - - - - - - - - - - DELETED C
2
MH-018 3695'-0" 5724'-6" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-079 - - - - - - - - - - DELETED
MH-019 3695'-0" 5606'-2" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 MH-080 3005'-0" 4855'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-020 3695'-0" 5505'-0" 7'-0" 7'-0" 11'-6" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 MH-081 3156'-2" 4855'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-021 3695'-0" 5443'-10" 7'-0" 7'-0" 11'-6" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 MH-082 3236'-0" 4855'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-022 3695'-0" 5324'-6" 7'-0" 7'-0" 11'-6" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
* DIMENSIONS ARE APPROXIMATE. REFER TO FABRICATOR DRAWINGS FOR ACTUAL DIMENSIONS. 2
MH-023 3695'-0" 5145'-0" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-024 3695'-0" 5010'-6" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 NOTES:
MH-025 3640'-0" 5010'-6" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 1. NEENAH R-1678-A FRAME AND GRATE OR ENGINEER APPROVED EQUAL.
Millimeters
D
MH-026 3640'-0" 4956'-0" 9'-0" 9'-0" 13'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1
2. MANHOLE LENGTH AND WIDTH DIMENSIONS SHOWN ARE TO THE INNER WALL OF THE MANHOLE. MANHOLES ARE PRECAST SQUARE CONCRETE UNLESS NOTED OTHERWISE.
MH-027 3595'-6" 4956'-0" 9'-0" 19'-0" 14'-0" 11'-8" 21'-8" 1'-0" 100' SEE NOTE 1
MH-028 4488'-0" 6895'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 3. FOR MANHOLE DETAILS, SEE DRAWINGS 60-CVDSW-08805 & 60-CVDSW-08806.
MH-029 4488'-0" 6639'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1 1
4. FOR STORM SEWER PLAN SHEETS, SEE DRAWINGS 60-CVDSW-03601 THRU 60-CVDSW-03640.
MH-030 4488'-0" 6383'-0" 6'-0" 6'-0" 8'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-031 4488'-0" 5883'-0" 6'-0" 6'-0" 9'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 5. MANHOLES SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH 60-CVES-00006 OVERLAY TO PIP CVS02700 UNDERGROUND GRAVITY SEWER SPECIFICATION.
Scale For Microfilming
MH-032 4488'-0" 5506'-0" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-033 4488'-0" 5252'-7" 6'-0" 6'-0" 9'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-034 4488'-0" 4956'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1 E
MH-035 4084'-0" 4956'-0" 6'-0" 6'-0" 11'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-036 3776'-0" 4956'-0" 6'-0" 6'-0" 11'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-037 3295'-0" 6997'-2" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-038 3295'-0" 6890'-7" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-039 3215'-0" 6796'-0" 5'-0" 5'-0" 8'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-040 3295'-0" 6796'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-041 3295'-0" 6727'-8" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
Inches
MH-042 3295'-0" 6600'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
F
MH-043 3295'-0" 6570'-0" 5'-0" 5'-0" 8'-6" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-044 3295'-0" 6364'-0" 5'-0" 5'-0" 9'-0" 7'-8" 7'-8" 1'-0" 100' SEE NOTE 1
MH-045 3295'-0" 6310'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-046 3295'-0" 6140'-0" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-047 3295'-0" 6099'-1" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-048 3295'-0" 6002'-7" 6'-0" 6'-0" 10'-0" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-049 3295'-0" 5934'-0" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-050 3295'-0" 5880'-0" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 100' SEE NOTE 1
MH-051 3295'-0" 5839'-11" 9'-0" * N/A * 10'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1 CUSTOM MANHOLE G
2
MH-052 3236'-0" 5780'-11" 9'-0" * N/A * 10'-6" 11'-8" 11'-8" 1'-0" 99' - 10" SEE NOTE 1 CUSTOM MANHOLE
MH-053 3236'-0" 5708'-6" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-054 3236'-0" 5636'-2" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-055 3236'-0" 5580'-3" 6'-0" 6'-0" 10'-6" 8'-8" 8'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-056 3236'-0" 5465'-0" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 99' - 10" SEE NOTE 1
MH-057 3236'-0" 5390'-0" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-058 3236'-0" 5308'-2" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-059 3236'-0" 5182'-3" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1 H
MH-060 3236'-0" 5132'-8" 7'-0" 7'-0" 12'-0" 9'-8" 9'-8" 1'-0" 100' SEE NOTE 1
MH-061 3236'-0" 5018'-10" 9'-0" 9'-0" 12'-6" 11'-8" 11'-8" 1'-0" 100' SEE NOTE 1
This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is not
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, LLC.
2 05/08/2023 RPH JBB ATK REVISED TO MATCH FABRICATION DRAWINGS project contract
9400 WARD PARKWAY
116058
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08807 2
designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R.HALLER C.DONNICI
LINE A.25 MH-021 MH-022 120 CONCRETE 60 CLASS III LINE D.6 MH-067 MH-069 191 CONCRETE 42 CLASS III D
LINE A.26 MH-022 MH-023 180 CONCRETE 60 CLASS III LINE D.7 - - - - - - DELETED 2
LINE A.27 MH-023 MH-024 135 CONCRETE 60 CLASS III LINE D.8 MH-069 MH-070 136 CONCRETE 42 CLASS III
LINE A.28 MH-024 MH-025 55 CONCRETE 60 CLASS III LINE D.9 - - - - - - DELETED 2
LINE A.29 MH-025 MH-026 55 CONCRETE 60 CLASS III LINE D.10 MH-070 MH-072 175 CONCRETE 42 CLASS III
LINE A.30 MH-026 MH-027 45 CONCRETE 72 CLASS III LINE D.11 MH-072 MH-075 100 CONCRETE 48 CLASS III
LINE A.31 MH-027 DIVERTER 106 CONCRETE 72 CLASS III LINE D.12 MH-073 MH-074 112 CHDPE 24
Scale For Microfilming
LINE B.1 MH-037 MH-038 107 CHDPE 36 LINE D.13 MH-074 MH-075 92 CHDPE 24
LINE B.2 MH-038 MH-040 95 CHDPE 36 LINE D.14 MH-075 MH-076 69 CONCRETE 48 CLASS III
E
LINE B.3 MH-039 MH-040 80 CHDPE 30 LINE D.15 MH-076 MH-077 95 CONCRETE 48 CLASS III
LINE B.4 MH-040 MH-041 69 CHDPE 36 LINE D.16 - - - - - - DELETED
2
LINE B.5 MH-041 MH-042 128 CHDPE 36 LINE D.17 - - - - - - DELETED
LINE B.6 MH-042 MH-043 30 CHDPE 36 LINE D.18 MH-077 MH-080 194 CONCRETE 48 CLASS III
1 LINE B.7 ** MH-043 120 CHDPE 30 LINE D.19 MH-080 MH-081 152 CONCRETE 48 CLASS III
LINE B.8 MH-043 MH-044 206 CHDPE 36 LINE D.20 MH-081 MH-082 80 CONCRETE 48 CLASS III
LINE B.9 ** MH-044 48 CHDPE 36 LINE D.21 MH-082 MH-062 101 CONCRETE 48 CLASS III
Inches
LINE B.10 MH-044 MH-045 54 CHDPE 36 1 LINE E.1 ** PELLET SUMP 45 CHDPE 18
F
LINE B.11 ** MH-045 101 CHDPE 24
LINE B.12 MH-045 MH-046 170 CONCRETE 48 CLASS III
1 LINE B.13 ** MH-046 120 CHDPE 30 * LENGTH SHOWN IS HORIZONTAL, MEASURED FROM CENTER OF MANHOLE TO CENTER OF MANHOLE AND ROUNDED UP TO THE NEAREST FOOT.
LINE B.14 MH-046 MH-047 41 CONCRETE 48 CLASS III ** MANHOLE STRUCTURE WILL BE PLACED BY OTHERS.
LINE B.15 MH-047 MH-048 97 CONCRETE 48 CLASS III
LINE B.16 MH-048 MH-049 69 CONCRETE 48 CLASS III
LINE B.17 ** MH-049 48 CHDPE 36 NOTES:
LINE B.18 MH-049 MH-050 54 CONCRETE 48 CLASS III
1. STORM SEWER PIPE SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH 60-CVES-00006 OVERLAY TO PIP CVS02700
LINE B.19 ** MH-050 101 CHDPE 24 UNDERGROUND GRAVITY SEWERS SPECIFICATION. G
LINE B.20 MH-050 MH-051 41 CONCRETE 48 CLASS III
2. MAINTAIN MINIMUM 1.75 FOOT OF COVER OVER CHDPE STORM SEWER PIPE ON ROADWAY CROSSINGS. 1
LINE B.21 MH-051 MH-052 84 CONCRETE 48 CLASS III
LINE B.22 MH-052 MH-053 73 CONCRETE 48 CLASS III
LINE B.23 MH-053 MH-054 73 CONCRETE 48 CLASS III
LINE B.24 MH-054 MH-055 56 CONCRETE 48 CLASS III
LINE B.25 MH-055 MH-056 116 CONCRETE 48 CLASS III
LINE B.26 MH-056 MH-057 75 CONCRETE 60 CLASS III
LINE B.27 MH-057 MH-058 82 CONCRETE 60 CLASS III H
LINE B.28 MH-058 MH-059 126 CONCRETE 60 CLASS III
LINE B.29 MH-059 MH-060 50 CONCRETE 60 CLASS III
This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is not
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, LLC.
2 05/08/2023 RPH JBB ATK REVISED PIPES FOR DELETED MANHOLES project contract
9400 WARD PARKWAY
116058
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK MODIFIED PIPE LENGTHS AND ADDED LINE E.1 Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2022 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08808 2
designed detailed
ORANGE, TEXAS
no. date by ckd app'd Description DWG No. Reference Drawings R.HALLER C.DONNICI
ATTACHMENTS: 60-CVES-00006
REQUESTED INFORMATION:
Zachry request clarifications are the following,
1) 4.3.6.1 A, will this addition represent the flow fill requirement on storm water pipe for road crossings?
2) 4.4.2 "Substitute", if the sections will not be tested under a road or rail, is it acceptable to block off the pipe at the nearest manholes on either side of the road?
3) 4.3.2.7 Revise, is flowfill acceptable for the replacement of unacceptable soils and what is the required depth of the "over excavation"?
PROPOSED RESOLUTION:
1) Zachry would like clarification if this will be for CHDPE & RCP pipe type and if this will be a flowfill requirement, if so is there a required PSI?
2) If the culverts under the roadway are not to be tested, Zachry would like to block off these section from the nearest manhole connections.
3) Zachry would like to use flowfill for soil improvements.
RESPONSE:
1) The requirement for flowfill to be used as backfill for pipes beneath road crossings will be addressed on the standard details dwg (60-CVDSW-08805 :
REV 1 [UPCOMING]).
Per 4.3.4.8, CLSM shall be in accordance with 60-CVES-00004. 4.2.5.2 of 60-CVES-00004 states that mix design compressive strength shall be between
50 and 100 psi for general fill applications.
2) This section is related to culverts open to air on both sides of road. No testing required.
REDLINE REQUIRED YES NO MATERIAL IMPACT: ARE THE QUESTION & RESPONSE ADEQUATE FOR CLOSURE OF
THIS RFI? YES NO
NO
✔ COST SCHEDULE SAFETY
5),&$7(*25</(*(1'
CC – CONSTRUCTION CLARIFICATION '&±'(6,*1&/$5,),&$7,21 ''±'(6,*1'(9,$7,21
0&±0$7(5,$/&/$5,),&$7,21 4&±48$/,7<121&21)250$1&( 9&±9(1'25&/$5,),&$7,21
EC±EXISTING CONDITION 2&±2:1(5&+$1*( 27±27+(5&+$1*(
IWP-036B-12-41SW-003
50-CMRI-00006
116005-USGC
Page 1 of 29
II OSBL NOV. 7, 2023 Revision
- YT 0
Required Fields *
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
Document Number Specification Title Rev Date Sheet
60-CVES-00006 OVERLAY TO PIP CVS02700 AA 0--2020 1 of 11
Approvals
Rev Date By Ck Contract Project Chief Protect Remarks
Engr Mgr
Engr Mgr Engr Engr Mgr
This sheet is a record of each issue or revision to the subject document. The exact sheets changed, and the nature of the change should be
noted in the Remarks column; however, these remarks are not a part of the document. The revised sheets shall become part of the original
document and shall be complied with in their entirety.
CONFIDENTIAL INFORMATION
Reproduction and use prohibited except in accordance with Company's written permission.
60-CVES-00006
DOCUMENT OWNER: Comments or recommended alterations to this document should be communicated directly to the
USGC II Document Owner.
Confidential Information - This document is for use by the intended recipient(s) and contains
REVIEW REQUIREMENTS: privileged and confidential information. Unauthorized use, copying or distribution of this
N/A document, in whole or in part, is strictly prohibited.
OVERLAY INSTRUCTIONS
1.1 General
a. Paragraph numbers and modifications provided in Table 1 refer to PIP CVS02700,
October 2004 revision. Paragraph numbers may not be consecutive, and all PIP
paragraphs not mentioned herein shall be verbatim requirements of this Practice.
b. Any referral to approval by Owner or Company shall mean approval of Owner’s
Engineer.
1.2 Overlay Modification Terms
a. (Add) – If information is “added” to an existing paragraph in the PIP standard, the
requirements of this Practice shall be read as a continuation of that particular PIP
paragraph.
b. (Substitute) – If information is “substituted”, the affected PIP requirement shall be
replaced in its entirety by the requirements of this Practice.
c. (Revise) – If information is “revised”, the requirements of this Practice shall be read
as a revision to part of the particular PIP paragraph (i.e. changed sentence).
d. (New) – If information is “New”, it shall be read as an added requirement to the PIP
standard (i.e. new paragraph).
e. (Delete) – If information is “Delete”, to an existing paragraph in the PIP standard,
the requirements of that particular PIP paragraph shall be ignored.
Overlay
PIP 02100
Modification Description
Paragraph
Term
2. References
Overlay
PIP 02100
Modification Description
Paragraph
Term
- 50-STES-00004 – Overlay to PIP STS03001,
Plain and Reinforced Concrete Specification
with Overlay
3. Definitions
4. Requirements
Overlay
PIP 02100
Modification Description
Paragraph
Term
4.1 General
4.1.2 Submittals
b. Delete
c. Delete
4.1.3 Safety
Overlay
PIP 02100
Modification Description
Paragraph
Term
4.1.4 Environmental
4.1.4.2 Revise Before discharging any liquid into drains, catch basins,
or manholes in connection with trench dewatering
activities, testing, or other activities for which liquids
need to be disposed, the constructor shall verify that
the applicable permit will allow intermittent non-storm
flows into storm sewers.
4.1.4.4 Delete
4.2 Materials
1. Delete
2. Delete
3. Delete
1. Delete
2. Delete
Overlay
PIP 02100
Modification Description
Paragraph
Term
4.3 Construction
Overlay
PIP 02100
Modification Description
Paragraph
Term
that are not acceptable to purchaser shall be rejected
and replaced at no cost to purchaser.
b. thru e. Delete
4.3.3 Dewatering
4.3.3.3 Delete
4.3.3.5 Delete
4.3.3.7 Revise Surface water shall be diverted away from the work
area as directed by purchaser.
4.3.4 Bedding
Overlay
PIP 02100
Modification Description
Paragraph
Term
4.3.5.5 Revise Pipe laying and joining shall be carried out in a dry
trench inspected and approved in accordance with site
safety plan.
4.3.5.8 Delete
Overlay
PIP 02100
Modification Description
Paragraph
Term
4.3.6 Backfilling
4.3.6.8 Revise Flowable fill may be used for backfill material where
appropriate.
4.4.2 Substitute Culverts under roads and railway tracks shall not be
tested.
Overlay
PIP 02100
Modification Description
Paragraph
Term
PIP CVS02700
Underground Gravity Sewers Specification
In an effort to minimize the cost of process industry facilities, this Practice has
been prepared from the technical requirements in the existing standards of major
industrial users, contractors, or standards organizations. By harmonizing these
technical requirements into a single set of Practices, administrative, application, and
engineering costs to both the purchaser and the manufacturer should be reduced. While
this Practice is expected to incorporate the majority of requirements of most users,
individual applications may involve requirements that will be appended to and take
precedence over this Practice. Determinations concerning fitness for purpose and
particular matters or application of the Practice to particular project or engineering
situations should not be made solely on information contained in these materials. The
use of trade names from time to time should not be viewed as an expression of
preference but rather recognized as normal usage in the trade. Other brands having the
same specifications are equally correct and may be substituted for those named. All
Practices or guidelines are intended to be consistent with applicable laws and
regulations including OSHA requirements. To the extent these Practices or guidelines
should conflict with OSHA or other applicable laws or regulations, such laws or
regulations must be followed. Consult an appropriate professional before applying or
acting on any material contained in or suggested by the Practice.
This Practice is subject to revision at any time by the responsible Function Team and
will be reviewed every 5 years. This Practice will be revised, reaffirmed, or withdrawn.
Information on whether this Practice has been revised may be found at www.pip.org.
PIP will not consider requests for interpretations (inquiries) for this Practice.
PRINTING HISTORY
April 1995 Issued October 2004 Complete Revision
August 2000 Complete Revision
PIP CVS02700
Underground Gravity Sewers Specification
Table of Contents
1. Introduction .................................. 2
1.1 Purpose ............................................. 2
1.2 Scope................................................. 2
2. References.................................... 2
2.1 Process Industry Practices ................ 2
2.2 Industry Codes and Standards .......... 2
2.3 Government Regulations ................... 3
3. Definitions .................................... 3
4. Requirements ............................... 4
4.1 General .............................................. 4
4.2 Materials ............................................ 5
4.3 Construction....................................... 8
4.4 Exfiltration Test ................................ 14
4.5 Considerations for
Existing Facilities ............................. 14
1. Introduction
1.1 Purpose
This Practice provides requirements for the installation contractor for fabricating and
installing underground gravity sewers.
1.2 Scope
This Practice describes the requirements for materials, installation, and testing of
underground gravity sewers. Requirements for pipe, inlet structures, manholes, and
appurtenances for sanitary, storm, and industrial process sewers are included.
Requirements for pressurized pipe, double-contained, and emission-controlled
industrial process sewers in environmental applications are not included.
2. References
Applicable parts of the following Practices, industry codes and standards, and references
shall be considered an integral part of this Practice. The edition in effect on the date of
contract award shall be used, except as otherwise noted. Short titles will be used herein
where appropriate.
– ASTM C700 - Standard Specification for Vitrified Clay Pipe, Extra Strength,
Standard Strength, and Perforated
– ASTM C969 - Standard Practice for Infiltration and Exfiltration Acceptance
Testing of Installed Precast Concrete Pipe Sewer Lines
– ASTM C1433 - Standard Specification for Precast Reinforced Concrete Box
Sections for Culverts, Storm Drains, and Sewers
– ASTM D422 - Standard Test Method for Particle - Size Analysis of Soils
– ASTM D1248 - Standard Specification for Polyethylene Plastics Molding and
Extrusion Materials
– ASTM D2321 - Standard Practice for Underground Installation of
Thermoplastic Pipe for Sewers and Other Gravity Flow Applications
– ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic
Pipe, Schedules 40, 80, and 120
– ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl
Chloride) (PVC) Plastic Piping Systems
– ASTM D2855 - Standard Practice for Making Solvent-Cemented Joints with
Poly(Vinyl Chloride) (PVC) Pipe and Fittings
– ASTM D3212 - Standard Specification for Joints for Drain and Sewer Plastic
Pipes Using Flexible Elastomeric Seals
– ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and
Fittings Materials
– ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for
Joining Plastic Pipe
• American Association of State Highway and Transportation Officials (AASHTO)
– AASHTO M 36 - Interim Specification for Corrugated Steel Pipe, Metallic
Coated for Sewers and Drains
– AASHTO M 294 - Standard Specification for Corrugated Polyethylene Pipe,
300- to 1200-mm Diameter (for Storm Sewers and Culverts)
3. Definitions
contract documents: Any and all documents, including design drawings, that purchaser has
transmitted or otherwise communicated, either by incorporation or by reference, and made
part of the legal contract or purchase order agreement between purchaser and supplier
supplier: The party responsible for performing excavation, backfill, and pipe installation,
including work executed through the use of sub-contractors
owner: The party who owns the facility wherein the underground gravity sewer will be
installed
purchaser: The party who awards the contract to the supplier. The purchaser may be the
owner or the owner’s authorized agent.
standard dimension ratio (SDR): The ratio of the pipe outside diameter (inches) to the
minimum wall thickness (inches)
4. Requirements
4.1 General
4.1.1 Quality Control
4.1.1.1 Sewers shall be fabricated, installed, and tested in accordance with
this Practice; with codes, standards, and procedures specified in this
Practice; and with all applicable codes and regulations of the
controlling federal, state, and local jurisdictions.
4.1.1.2 Purchaser shall have the right to inspect, at purchaser’s expense, all
materials and workmanship and shall have unrestricted entry to the
fabrication shop at all times work is being performed.
4.1.1.3 Purchaser can reject improper, inferior, or defective materials and
workmanship at any stage of production.
4.1.1.4 All defective materials and workmanship shall be repaired or
replaced at no additional cost to purchaser.
4.1.15 Purchaser inspection shall not replace the supplier’s quality control
procedures and responsibility for compliance with all applicable
requirements for the material, fabrication, and installation.
4.1.1.6 Unless directed otherwise by purchaser, if at any time during
installation and testing, weather or any other factor causes the
degradation of the pipe foundation, pipe and/or fitting installation,
bedding, or backfill, all affected materials shall be removed and the
work shall be reinstalled in accordance with this Practice.
4.1.2 Submittals
4.1.2.1 The following documentation shall be submitted to the purchaser
2 weeks before installation:
a. Fabrication drawings and instructions for the installation of
pipe and appurtenances
b. Certification that an OSHA-defined excavation-competent
person (ECP) shall oversee all excavation
4.2 Materials
4.2.1 Pipe and Joints
4.2.1.1 Specifications for materials other than those listed in the following
section (such as welded, coated, and wrapped carbon steel) that are
4.3 Construction
4.3.1 Receiving and Handling
4.3.1.1 Care shall be taken during handling and storage so as not to damage
or to cause stresses or deformation in pipe materials.
4.3.1.2 Pipe materials shall be inspected before installation. Any damaged
materials that are not acceptable to purchaser shall be rejected and
replaced at no cost to purchaser.
4.3.2 Trench Excavation
4.3.2.1 All excavation and trenching shall be made in accordance with
PIP CVS02100, OSHA standards, and owner’s local requirements
and guidelines (as applicable) for the following:
a. Shoring, bracing, and/or sloping wall construction
b. Marking and flagging open excavations
c. Permitting and confined space entry requirements
d. Employing excavation-competent person (ECP)
e. Handling and storing excavated materials
4.3.2.2 Proper care and protection shall be provided to prevent damage to all
existing facilities (e.g., foundations, services, pipelines, etc.) on,
4.3.4.2 Bedding material shall be placed under and equally along both sides
of the pipe in uniform layers not exceeding 6 inches (150 mm) loose
depth to a height of the centerline of the pipe and compacted by
hand, pneumatic tamper, or other owner-approved means.
4.3.4.3 Bedding material shall be compacted to a density approximately that
of the undisturbed site soil materials or as specified in the contract
documents.
4.3.4.4 If compacted, the pipe bed shall provide uniform bearing for the
bottom of the pipe (see trenching requirements specified in this
Practice).
4.3.4.5 Localized loading and differential settlement shall be minimized
where the pipe crosses other utilities or subsurface structures or in
areas having special foundations such as pile caps or sheeting. A
cushion of bedding shall be provided between the pipe and any such
point of localized loading.
4.3.4.6 Bedding shall conform to one of the following classes. Class C
bedding shall be used if no class is specified in the contract
documents. See Figure A for details.
a. Class A - concrete cradle bedding - requires embedment of the
lower part of the pipe in plain or reinforced concrete of suitable
thickness and extending up to the sides of the pipe a distance
not less than 25% of the pipe outside diameter.
b. Class B - first class bedding - requires the pipe to be placed on
the fine granular materials foundation extending up to the
center line of the pipe. The trench shall then be filled to 1 ft
(300 mm) over the top of the pipe with granular material in
6-inch (150-mm) layers and compacted to fill all the space
around the pipe.
c. Class C - ordinary bedding - requires placing the pipe on fine
granular material cradle extending up to the sides of the pipe a
distance not less than 1/6 of the pipe outside diameter. The
trench shall then be filled to 6 inches (150 mm) over the top of
the pipe with granular material placed and compacted to fill all
space around the pipe.
d. Class D - impermissible bedding - allows the pipe to be placed
on the bottom of the trench with no effort to shape the trench to
fit the pipe. Fill shall be placed around the pipe.
4.3.4.7 Bedding for box culverts shall conform to one of the following
classes. Class C bedding shall be used if no class is specified in the
contract documents.
a. Class B bedding shall be obtained by installing the box section
on a minimum thickness of fine granular material of at least
2 inches (50 mm). Compacted granular material shall be placed
12 inch 12 inch
(300 mm) min. (300 mm) min.
Compacted
Bc Bc
granular
1/4 Bc material
1/4 D max. d
Concrete
CONCRETE CRADLE GRANULAR FOUNDATION
H 6 inch H 6 inch
(150 mm) min. (150 mm) min.
Compacted
Bc granular material
Bc
1/6 B c
d Loose backfill
Legend
Depth of bedding
material below pipe
Bc = outside diameter
H = backfill cover above top of pipe D d (min.)
D = inside diameter
d = depth of bedding material below pipe 27 inches (690 mm) 3 inches (75 mm)
As = area of transverse steel in the & smaller
cradle or arch expressed as a 30 inches (760 mm 4 inches (100 mm)
percent of area of concrete at invert to 60 inch (1.53 m)
or crown. 66 inches (1.68 m) 6 inches (150 mm)
L f = bedding factor & larger
ATTACHMENTS:
REQUESTED INFORMATION:
Per 60-CVES-0004 section 4.2.3 in the overlay, General fill should meet the requirements of section 4.3.7.8(b). 4.3.7.8(b) requires the compaction to be 95% of the
standard proctor, it also states in section C "Moisture content of material being compacted shall be between minus 2% and plus 3%" Then, section D states that
"Chemical stabilization may be used provided the engineer of record approves modifications". The moisture in the soil is too high to achieve the minus 2% and plus
3%, without extensively disking the area and letting the material dry in the sun for long periods of the time.
Due to the extensive work involved and the weather conditions in the area, as well as the test that have been ran on the general fill material that WT-BYLER used to
raise the cooling tower pads, Zachry is requesting engineering approval to use chemical stabilization for areas that require general fill as backfill.
PROPOSED RESOLUTION:
Zachry would like to use chemical stabilization on the general fill backfill material, to lower the moisture in the soil and help achieve compact/moisture
requirements in a more timely manner.
RESPONSE:
Use of lime is approved. Several lime series tests were performed by WTB as part of the HC contract and can be made available if desired. Recommend
mixing in the lime in percentage increments until the placed material meets the moisture and compaction requirements.
REDLINE REQUIRED YES NO MATERIAL IMPACT: ARE THE QUESTION & RESPONSE ADEQUATE FOR CLOSURE OF
THIS RFI? YES NO
NO COST
✔ SCHEDULE
✔ SAFETY
Liming the material will save time in the schedule, but liming budget will need
5),&$7(*25</(*(1'
CC – CONSTRUCTION CLARIFICATION '&±'(6,*1&/$5,),&$7,21 ''±'(6,*1'(9,$7,21
0&±0$7(5,$/&/$5,),&$7,21 4&±48$/,7<121&21)250$1&( 9&±9(1'25&/$5,),&$7,21
EC±EXISTING CONDITION 2&±2:1(5&+$1*( 27±27+(5&+$1*(
IWP-036B-12-41SW-003
50-CMRI-00007
116005-USGC
Page 1 of 1
II OSBL NOV. 7, 2023 Revision
- YT 0
FIELD CONSTRUCTION CONTRACTOR
Required Fields *
REQUEST FOR INFORMATION (RFI)
GOLDEN TRIANGLE POLYMERS PROJECT-OSBL
AREA:* OSBL CWA 50-Area 47-Ground Flare Area CRAFT CODE:* 18 - STRUCTURAL CONCRETE
SUB-SYSTEM:
CWP/SWP:* CWP-310-12-41SW IWP:* IWP-310-12-41SW-001
ATTACHMENTS: Field Photos, DAM-IT Data sheet, Adeka P-201 Data Sheet
RFI CATEGORY:* CC DC
C DD MC QC VC EC OC OT
(Legend below)
IF OT EXPLAIN:
REDLINE REQUIRED: YES NO REDLINE DOCUMENT NUMBERS: POTENTIAL FOR COST/SCHEDULE/SAFETY/MATERIAL IMPACT DUE TO THIS RFI?*
NO COST SCHEDULE ✔ SAFETY MATERIAL
REQUESTED INFORMATION:*
During the ex-filtration test on an RCP section, a leak was discovered, upon further inspection it was noted that the gasket
on a section of pipe had protruded inward. Should on the attached photos, a section of gasket has rolled inward.
After speaking with the manufacture (Ameritex), the following option was give.
PROPOSED RESOLUTION:*
Zachry would like to place Adeka P-201 as the elastic sealant and DAM-IT as the grout.
BMZ ENGINEER APPROVER SIGNATURE / DATE QC CLOSE OUT QC CLOSE OUT DATE
CRAFT SUPERINTENDENT
RE-WORK REQUIRED: YES NO
CLOSE OUT:
PROPOSED RESOLUTION:
RESPONSE:
AREA:* OSBL CWA 50-Area 47-Ground Flare Area CRAFT CODE:* 18 - STRUCTURAL CONCRETE
SUB-SYSTEM:
CWP/SWP:* CWP-310-12-41SW IWP:* IWP-310-12-41SW-001
ATTACHMENTS: Field Photos, DAM-IT Data sheet, Adeka P-201 Data Sheet
RFI CATEGORY:* CC DC
C DD MC QC VC EC OC OT
(Legend below)
IF OT EXPLAIN:
REDLINE REQUIRED: YES NO REDLINE DOCUMENT NUMBERS: POTENTIAL FOR COST/SCHEDULE/SAFETY/MATERIAL IMPACT DUE TO THIS RFI?*
NO COST SCHEDULE ✔ SAFETY MATERIAL
REQUESTED INFORMATION:*
During the ex-filtration test on an RCP section, a leak was discovered, upon further inspection it was noted that the gasket
on a section of pipe had protruded inward. Should on the attached photos, a section of gasket has rolled inward.
After speaking with the manufacture (Ameritex), the following option was give.
PROPOSED RESOLUTION:*
Zachry would like to place Adeka P-201 as the elastic sealant and DAM-IT as the grout.
RESPONDER: Bryce Oswald TITLE: C iv il/S tru ctu ral E n g in eer DATE: 7 /1 8 /2 0 2 3
BMZ ENGINEER APPROVER SIGNATURE / DATE 7 /1 8 /2 0 2 3 QC CLOSE OUT QC CLOSE OUT DATE
Bryce Oswald
CRAFT SUPERINTENDENT
RE-WORK REQUIRED: YES NO
CLOSE OUT:
PROPOSED RESOLUTION:
RESPONSE:
The proposed solution is acceptable. Care shall be taken to ensure the entire annular space is
filled with grout. Exfiltration testing still needs to be met. If leakage is detected or we are having a
hard time sealing the connection, we would recommend flow filling around the pipe connection on
the exterior face of the manhole.
FINISH GRADE
A
FINISH GRADE
GENERAL BACKFILL
AS SPECIFIED GENERAL BACKFILL
AS SPECIFIED
TRENCH WIDTH
TRENCH WIDTH AS SPECIFIED
TOP EL (SEE SCHEDULE) CL STRUCTURE LOCATION AS SPECIFIED TRENCH GENERAL BACKFILL
12"
AS SPECIFIED B
GROUT FRAME NOTE 2 1
TRENCH GENERAL BACKFILL
12"
TO MANHOLE
PIPE OD
AS SPECIFIED
FRAMES & COVERS: NOTE 2 1
ADJUSTING RINGS STORM MANHOLE COVERS SHALL HAVE SPRING LINE
PIPE OD
OR BRICK AS REQ'D "STORM SEWER" CAST ON THE COVER AND
6"
SHALL BE NEENAH R-1678-A OR SPRING LINE
FINISH GRADE FLOWABLE FILL OR FINE
ENGINEER APPROVED EQUAL GRANULAR MATERIAL
NOTE 2 1
FLOWABLE FILL OR FINE
GRANULAR MATERIAL DOUBLE BARREL CONCRETE PIPE TRENCH
NOTE 2 1
NOT TO SCALE
NOTES: C
6"
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
CONCRETE PIPE TRENCH PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
ECCENTRIC CONE (ALL PRECAST RISERS NOT TO SCALE
DEPTH VARIES - SEE PLANS
AND TOPS SHALL CONFORM TO ASTM C478) NOTES: 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
USE O-RING OR OTHER APPROVED PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
(20' MAX)
PRECAST REINFORCED FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT D
DIMENSIONS 1
CONCRETE MANHOLE EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. FINISH GRADE
SECTIONS (ASTM C478)
6"
MIN NOTE 2
ID/2
6" MIN
AS SPECIFIED
INVERT CONCRETE, SEE NOTE 1 NOTE 2 & 3
12"
TRENCH WIDTH E
AS SPECIFIED
PIPE (SEE PLAN
6" MIN FOR SIZE, LOCATION, 2"
AND INVERT ELEVATION)
BASE SLAB SECTION
12"
MIN
(SEE SCHEDULE FOR DIMENSIONS) TRENCH GENERAL BACKFILL
AS SPECIFIED
1
NOTE 2
PIPE OD
6" MINIMUM DEPTH
TXDOT ITEM 247 (GRADE A), INV EL (SEE PLAN) SPRING LINE
SEAL SLAB OR 3/4" GRAVEL
Inches
6"
OR BY LAYING A PIPE THROUGH MANHOLE, THE TOP BEING BROKEN OUT LATER. EXIST REINF CONC
OR PRECAST STRUCTURE
2. SEE TYPICAL CONNECTION TO MANHOLE STRUCTURE. CHDPE PIPE TRENCH
NOT TO SCALE
3. BASE SLAB SHALL BE CONNECTED WITH PRECAST MANHOLE STRUCTURE.
TYPICAL CONNECTION TO
4. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO NOTES:
MANHOLE STRUCTURE
PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION. NOT TO SCALE 1. EXCAVATION AND BACKFILL PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY TO
PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
PRECAST CIRCULAR CONCRETE MANHOLE DETAIL NOTES: G
NOT TO SCALE 2. FOR PIPES CROSSING ROADWAYS, BEDDING AND TRENCH GENERAL BACKFILL
1. STORM SEWER CONNECTIONS PER PROJECT SPECIFICATION 60-CVES-00006 OVERLAY
SHALL BE FLOWABLE FILL THE ENTIRE LENGTH OF PIPE SECTION.
TO PIP CVS02700 UNDERGROUND GRAVITY SEWERS SPECIFICATION.
FLOWABLE FILL SHALL BE PER 60-CVES-00004 AND SHALL NOT
EXCEED A 100 PSI 28-DAY COMPRESSIVE STRENGTH. 1
2. CHDPE PIPE MANHOLE CONNECTION AS MANUFACTURED BY A-LOK, Z-LOK STM
MECHANICAL BOOT CONNECTION OR ENGINEERING APPROVED EQUAL. INSTALL PER
MANUFACTURER'S SPECIFICATIONS. 1
This information is proprietary and confidential to Golden Triangle Polymers Company, LLC and is
to be used or disclosed without written authorization of the Golden Triangle Polymers Company, L
2 01/30/2023 RPH JBB ATK UPDATED TYPICAL CONNECTION TO MANHOLE STRUCTURE NOTES project contract
9400 WARD PARKWAY 116058 -
KANSAS CITY, MO 64114
1 12/22/2022 RPH JBB ATK UPDATED NOTES Burns & McDonnell Engineering Co, Inc. drawing rev.
Firm Reg. No. F-845
0 08/26/2021 RPH JBB ATK ISSUED FOR CONSTRUCTION 60-CVDSW-08805 2
designed detailed
no. date by ckd app'd Description DWG No. Reference Drawings ORANGE, TEXAS
R.HALLER C.DONNICI
RFI No.:
RFI-BMZ-5037-12-00001 REVISION:* ISSUE DATE:* 09/22/2023
0 PROPOSED RESPONSE DATE:* 09/25/2023
SUB-SYSTEM:
CWP/SWP:* CWP-310-12-41SW IWP:* IWP-310-12-41SW-001
ATTACHMENTS: Field Photos, DAM-IT Data sheet, Adeka P-201 Data Sheet
RFI CATEGORY:* CC DC
C DD MC QC VC EC OC OT
(Legend below)
IF OT EXPLAIN:
REDLINE REQUIRED: YES NO REDLINE DOCUMENT NUMBERS: POTENTIAL FOR COST/SCHEDULE/SAFETY/MATERIAL IMPACT DUE TO THIS RFI?*
NO COST SCHEDULE ✔ SAFETY MATERIAL
REQUESTED INFORMATION:*
During the ex-filtration test on an RCP section, a leak was discovered, upon further inspection it was noted
that the gasket on a section of pipe had protruded inward. Should on the attached photos, a section of gasket
has rolled inward.
After speaking with the manufacture (Ameritex), the following option was give.
Zachry would like to place Adeka P-201 as the elastic sealant and DAM-IT as the grout.
RESPONDER: Bryce Oswald TITLE: C iv il/S tru ctu ral E n g in eer DATE: 9 /2 5 /2 0 2 3
BMZ ENGINEER APPROVER SIGNATURE / DATE 9 /2 5 /2 0 2 3 QC CLOSE OUT QC CLOSE OUT DATE
Bryce Oswald
RE-WORK FIELD WORK CRAFT SUPERINTENDENT
REQUIRED: YES NO REQUIRED: YES NO
CLOSE OUT:
PROPOSED RESOLUTION:
RESPONSE:
E n g in eerin g ag rees with so lu tio n p ro p o sed b y m an u factu rer. C lean th e jo in t th o ro u g h ly p rio r to p lacin g to
adh esiv e. E n su re th e g ask et is p laced b etween g ro u t an d h ydro p h ilic/swellin g sealan t to allo w fo r ex p an sio n
with o u t o v erstressin g th e g ro u t.
Form Dam-It-6.97
WARRANTY: The Euclid Chemical Company ("Euclid") solely and expressly warrants that its products shall be free from defects in materials and workmanship for six (6) months from the date of purchase. Unless
authorized in writing by an officer of Euclid, no other representations or statements made by Euclid or its representatives, in writing or orally, shall alter this warranty. EUCLID MAKES NO WARRANTIES, IMPLIED
OR OTHERWISE, AS TO THE MERCHANTABILITY OR FITNESS FOR ORDINARY OR PARTICULAR PURPOSES OF ITS PRODUCTS AND EXCLUDES THE SAME. If any Euclid product fails to conform with
this warranty, Euclid will replace the product at no cost to Buyer. Replacement of any product shall be the sole and exclusive remedy available and buyer shall have no claim for incidental or consequential damages.
Any warranty claim must be made within one (1) year from the date of the claimed breach. Euclid does not authorize anyone on its behalf to make any written or oral statements which in any way alter Euclid's
installation information or instructions in its product literature or on its packaging labels. Any installation of Euclid products which fails to conform with such installation information or instructions shall void this warranty.
Product demonstrations, if any, are done for illustrative purposes only and do not constitute a warranty or warranty alteration of any kind. Buyer shall be solely responsible for determining the suitability of Euclid's
IWP-036B-12-41SW-003
products for the Buyer's intended purposes.
116005-USGC II OSBL NOV. 7, 2023 - YT
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
P-201
Technical Product Data Sheet
GENERAL DESCRIPTION
PRODUCT DESCRIPTION
ADEKA ULTRASEAL® P-201 is a water-swelling, single
Single component hydrophilic grey paste
component, elastic sealant. P201 is packaged in 320 ml
(10.8 oz) cartridges or in 3.17 gallon bulk pails. 24 Cartridges per Case,
320 ml (10.8 oz) per Cartridge
Packaging
WATERSTOP FOR: OR
3.17 Gallon Bulk Pails—Special Order
• Cold/construction/control joints
• Expanded metal forms PROPERTIES
• Piping penetrations Expansion Information Approximately 100%
• Crack / joint repair by Volume (2 Times by Volume)
• Sheet pile interlock sealant HYDROPHILIC WATERSTOP IN A CARTRIDGE
• Precast segment sealant One of the most versatile Adeka products.
- Utility vaults
- Manholes STAND ALONE WATERSTOP
- Tunnels Use in below grade cast-in-place concrete joints. P201 can
- Riser rings
replace conventional waterstop in nonmoving joints.
P-201 is used as a waterstop in new construction and in CAVEAT: P-201 must cure before placing second concrete.
repair applications. It can be placed on damp or uneven Curing time varies by bead size, temperature and humidity.
surfaces and functions in a wide range of temperatures and Place concrete without displacing or deforming the bead of
ground water conditions water. P-201.
TYPICAL USES
OCM, Inc.
1120 Peterson Road, Grayslake, IL 60030
Toll Free: 866-457-5710 • Phone: 847-462-4258
FAX: 847-462-4259
www.adeka.com • www.ocm-inc.com
sales@ocm-inc.com
PIPE PENETRATION WITH SMALL ANNULAR SPACE
IWP-036B-12-41SW-003 116005-USGC II OSBL NOV. 7, 2023 - YT
ULTRASEAL ® P-201
Waterstop H-Piles
PRECAST SEGMENTS