Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

KAMPUS ALAM BINA

AP229
DEGREE IN BUILDING SURVEY

BSR 512
MEASUREMENT AND ESTIMATING I

TASK 1
GROUP ASSIGNMENT

PREPARED BY :
NO. NAME MATRIC NO
1. NUR ZAFIRAH BT JOHN AQMAL 2022494662
2. CHERLEN MAGDELEN ANAK FRANCIS KHAN 2022659702
3. NASTINA NESHA ANAK ROLAND 2022824592
4. CHE WAN NUR SYAZLYANA BINTI CHE WAN SAPAWI 2019295484
DAYANG NUR HAZIMAH BINTI AWG. EMBUN 2022809918

PREPARED FOR :
MADAM NORSALISMA ISMAIL
ELEMENT :FLOOR FINISHES
ITEM MATERIAL SPECIFICATION JKR COMMENT IMPLICATION
1. CERAMIC FLOOR TILES Clause K/8-4.1.1 The ceramic tiles method and All ceramic tiles for floors shall
Ceramic tiles shall be defined as in materials used for installation be of first grade or grade A
the MS 1294. Shall be as specified throughout the Work shall be with approved surface finish
in TABLE K2. complying with MS 1294-1 as and texture colour and
described in Tiling Work. manufacture. Format to be
The installation shall be installed stored with the store
with skilled operatives working
safely using protective clothing and
appropriate equipment. The
workmanship shall be comply with
BS 8000-11 for ceramic tiles.

2. CEMENT SCREED Clause K/8-4.1.6 Cement screed shall be bedded on Screed additives allow for a
Ceramic tiles shall be 300mm x 20mm thick semi-dry cement and reduction of the amount of
100mm laid lengthwise on cement sand (1:3) screed lay on the mixing water or the water-
and sand (1:3) screed as decribed. concrete base with has been cement ratio respectively. This
thoroughly clean and wetted. can also result in a reduction
of the time required for floors
to reach readiness for
installation
ELEMENT :FLOOR FINISHES
ITEM MATERIAL SPECIFICATION JKR COMMENT IMPLICATION
3. CRUSHER RUN none Crusher Run can be graded to The project use 150mm
various sizes but most commonly is consolidated thickness of
offered in 75mm – dust or 40mm – crusher run because there is no
dust. It is normally used as a sub- PWD specification for crusher
base for domestic applications, as run and therefore it differs in
when compacted it makes an particle size and frost
extremely solid and level base for susceptibility. Where the
flooring. crusher run is produced in a
quarry that also produces a
fully graded Clause 803 which
is likely the frost susceptibility
will be compliant with highway
standards, however, the
particle size will be very
different. Crusher run often
have a much higher percentage
of the smaller particle sizes
ELEMENT : STAIRCASE

ITEM MATERIAL SPECIFICATION JKR COMMENT IMPLICATION


1. CONCRETE . none Staircase is main material that use Standard straight-run stairs
to make staircase. Staircase use in a have dimensions of a stair
building for access to a storey width of 36 inches or 91.4 cm,
capable of being let in separate a stair tread depth of 11 inches
tenancies, or where more than ten or 28 cm, a stair riser size of 7
persons are employed on such inches or 18 cm, and a length
storey; from the bottom to the top of
the stairs of 10 feet or 3 meters.

2. CERAMIC TILES Clause K/8 - 4.1.5 The tiles must be laid with a gap of The ceramic tiles to be used
2 mm to 3 mm, and all joints must should be hard, wear resistant,
Ceramic tiles to internal floor
be filled with approved tile no allergy concerns and must
shall be vitrified with water
proprietary grout. Exposed tiling have a rough-textured surface
absorption less than 3%
edges must be finished with that are made of ceramic or
[Classification Group BIa or, BIb]
rounded on edge tiles. porcelain. All type of ceramic
shall be vitreous hard wearing non-
To achieve a high-quality standard, tile shall should be comply
slip glazed complying with MS
ceramic tiles can only be installed with JKR specification and
ISO 13006 and the tile size shall be
by well-trained and experienced tile requirement.
300 mm x 300 mm.
installers
ELEMENT : STAIRCASE

ITEM MATERIAL SPECIFICATION JKR COMMENT IMPLICATION


3. FORMWORK D/22 – 7.1.1.6 The Contractor is deemed to have The formwork shall be
made a study of the Drawings at sufficiently rigid and tight to
The Concrete Society Manual
Formwork - Guide to good tender stage and is aware of all prevent loss of grout or mortar
practice, and in CIRIA Report 108,
areas of construction, requiring from the concrete at all stages
Concrete Pressure in Formwork,
and in BS 5975. Vertical propping heavy and specially designed of construction and shall be
to formwork shall be carried down
propping to provide the support and appropriate for the methods of
sufficiently far to provide the
necessary support without the necessary bracing for the placing and compacting.
overstressing the completed
stability of such propping.
concrete structure.

H/14 – 16.2

The preferred sizes for modular


staircase and stair openings shall
comply with MS
1064: Part 3